Process of ordering stacks at commerce/shipping.asp

Hello,
I have set up the e-commerce package and I tried to make an ordering of some products.
The process of ordering stacks at the shipping phase (this means that there is no button continue for steping to billing) with the following output:
"Freight rates are not available for this user.
Rates have not been defined for this order: the subtotal or weight of the order does not meet the cost structure of any defined rate."
I suspect that something must be configured in the database. Could you please describe me what?
Thanks in advance.
Best Regards
Vassilis Giatilis

Hello,
if you want to set up e-commerce on top of SAP Busness One
i would like suggest you go for Magento Commerce with SAP Business one
for more details about this you can visit sboeconnect.com
Magento is todays word fastest growing e-commerce platform, with SAP Business One you can really create enterprise e-commerce
hope this will help you
rakesh
sboeconnect.com

Similar Messages

  • Prevent changes to ship-to and vendor address in Process Purchase Orders

    Hi SRM experts,
    I have recently used BBP_UI_CONTROL_BADI to affect the displays of fields and buttons in the shopping cart. I now need to change the displayed fields in the Process Purchase Order screens (Vendor Address and Ship-To address) to prevent edit. I've debugged in method BBP_PO_UI_CTRL and see screens 1000, 2200... 3000 etc. but can't see the screens and fields I need to affect. I suspect that I might be at the limitation of using the BADI or am I looking in the wrong place?
    Can anyone help?

    Hey,
    i believe you have filter for shopping cart (BUS2121) in BBP_UI_CONTROL_BADI. you need to do a seperate implementation for PO (BUS2201), Which should/must work for your requirement.
    Cheers, Renga
    **Award points for helpfull answers**

  • Error while processing sales order as factory calendar missing.

    "factory calendar missing or error in factory calendar".iam getting this error while processing sales order even though i have assigned it to shipping point and plant and sales org.

    Hi Malik, How are you? I'm sorry to trouble you,
                   Let me introduce, I'm Daniel, and I saw your fantastic asnwer in
    the topic "How to update Factory Calendar in SRM", and might I have the same
    problem. It's with the "factory calendar".
    In transaction va02 when I choose a Delivery Date, and I sent it to process, as
    a result in the "shipping tab" it calculated to the first item one date, and to
    the rest one date different.  I don't know What it happen?
    I debugged the program and I saw that to the first item use to calculate the
    date is the function  'APO_SCHEDULING', and to the rest item use
    'SD_SCHEDULING', and until here I come.
    How can I do to what the dates calculated are the same? or What would be the
    problem?
    I need the dates calculated are equal.
    I looked at it's using two "factory calendar" which are "J4" and "C2". Is this
    correct?
    Thanks In Advance,
    My best regards,

  • Sale process flow of SBO E-Commerce - What documents are created in SAP B1?

    Dear All,
    Can any one please confirm the sale process flow of SBO E-Commerce, when a customer submits an Sales Order and pays the amount online?
    I am mainly interested to know about the documents, which are created in SAP B1 after the said Payment against the Order through the Web tools?

    As I understand it, out of the box WebTools simply creates a B1 Sales Order from a WebTools order during the scheduled synchronization.
    If you are accepting credit card payments and have configured a credit card gateway (Paypal, Skipjack, etc), then you can choose to authorise the payment only for capture later or capture the payment immediately at the time of order. Neither of these events creates any document in SAP B1. You process the order as normal and post a payment manually as part of your workflow.
    If you have a credit card add-on (CitiXSys or similar) installed and specified in the WebTools Synch Manager, the normal SAP B1 processing of the Sales Order (creating a delivery document)  will trigger the capture of a previously authorised credit card payment, creating and posting an A/R invoice and an associated payment document in B1.
    Hope this helps you in your question.
    Cheers,
    Dave Bragg

  • I have tried to purchase Adobe Acrobat Professional XI this morning and payment (AED 1983.53) has been taken, I received a message stating there was/is a problem processing my order and that I should contact your customer service team in UAE.  Having trie

    I have tried to purchase Adobe Acrobat Professional XI this morning and payment (AED 1983.53) has been taken, I received a message stating there was/is a problem processing my order and that I should contact your customer service team in UAE.  Having tried this, I was met with a recorded message, in Arabic, and no options to speak to anyone.  I have found this process extremely frustrating and poor on your behalf.  Not providing any options to speak to an Adobe representative is equally annoying.  Please get back to me ASAP, as I need to use the product immediately.

    CS2 is very old and reached its "end of life" a while back.  So probably won't run on modern operating systems.  If you can still run it, you'll need to uninstall what you have and re-install with the download link below to activate it.
    Error: Activation Server Unavailable | CS2, Acrobat 7, Audition 3
    Nancy O.

  • How do i purchase license for lightroom 5? When i tried to process payment, it says There was a problem processing your order, please contact our Customer Service team on 800 448 1642 for assistance.

    How do i purchase license for lightroom 5? When i tried to process payment, it says There was a problem processing your order, please contact our Customer Service team on 800 448 1642 for assistance.

    In this forum, we can't help with purchasing issues.
    My suggestion is to call that phone number.

  • Process purchase orders

    Hi all,
    our's is extended classic scenario,  one user is trying the open the PO through process purchase orders option, he entered the po number and then clicked on find. He is getting the message " no documents avail for search criteria".
    Here the PO is exist and carte is created by that user only. Then why he is not getting the po details.
    Please explain what might the cause for this?
    regards,
    Krish

    Hi
    One user raised this issue, when he tried to process the po she is not getting the po details,
    After analysis, that particular user is moved to new organisation id from his previous one.
    Normally whenever user moved to new org id then all his attributes will changes, in this case system will not allow him to do any changes in PO's which are created when he is in previous org id.
    I don't know about your case, process PO is possible only for the po's created by you not possible for po's created by other users.
    Regards
    Krish

  • Status Change for Purchase order in Process Purchase order

    Hi All,
    We have implemented SRM 4.0 with Extended Classic scenario.
    SRM does provide standard status for Process Purchase order worklist (such as Ordered, Held, Error in Process etc.). Is there any BADI i can use to overright my own status message for the PO.
    To give brief background of the requirement. Client wanted status to be changed to "Cancel" For POs whose all the line items we have deleted or "Close" when Last delivery or Final Invoice check is ticked.
    I am aware that i can use BBP_DOC_SAVE_BADI as structure BBP_PDS_ITEM i can get items deletion indicator. But will i able to change the standard Status message?
    Presently even though all line items marked delete still shows PO as "Ordered" status.
    Kindly let me know if i can acheive with anyway.
    Thank you
    Ritesh

    Hi Masa,
    Thank you for your response. I have few doubts about the configuration which you have suggested.
    - Define Status schema for User status will create a status Profile in which i have to include my own status. In the document of Define Status Schema it specifies that After creating User profile you have to assign same profile to transaction types. (I.e. BUS2201 or BUS2121 etc).
    My concern is will my own status profile over-write the standard status which is coming? such as Ordered, Created, Transmission fail etc.
    If so then do i have to create status profile to include all the Standard Status message in it as well?
    - Other thing i found that Ordering PO goes through many standard status message (COMP, CRTD, CTRA, DCOM, ORDR) and always the last status in the Hearder will display on  ITS level. Is my understanding right?
    - I found that there is a standard system status message I1045 (BECN Cancel) Can i use this through BADI?
    Kindly let me know.
    Thank you once again.
    Regards
    Ritesh

  • Delete button in process purchase order

    Hi All,
    I need some informaiton on the "Delete" button in process purchase order screen.
    Has it been enabled only for held POs? It is disabled in case of ordered POs. Can we enable it for ordered POs?
    Also, I put an ordered PO on hold and after that I could see the delete button enabled in PO. When I delete it, it is giving me the message "Your order was deleted". But still I could able to see the Po in the system.
    Is there a note or SAP help describing this? Plz help.
    Thanks,
    ss
    Edited by: SRM Stranger on Aug 25, 2009 11:27 AM

    Once the PO is published, you cannot delete it. If you have created a change version for the published PO, you can delete the change version but not already published PO.

  • Why is it taking so long to process my order?

    Hey, I ordered CS6 Production Premium from the Education store on the 13th of September and my order staus is still pending.
    I also uploaded my college ID on the Customer Support Portal on the 16th and it says "Pending Adobe Response".
    Could anyone help me out here as to what's going on. Why is my order not being processed? Its becoming quite frustrating waiting for the order to be processed when it said Adobe would respond to my case within a couple of days of me uploading my college ID and dispatch the software soon after.
    Can anyone help me out as to why its taking Adobe so long to process my order and how much longer do I need to wait before I can finally use the software...
    Thanks.

    Well, anybody who buys the software should be able to start using it right away by downloading and running the 30-day free trial for the product...
    As for student academic validation, Adobe says it should normally take about two business days:
    https://www.identit-e.com/default/static/adobecontactus

  • I am trying to order a book, I keep getting the same error message," A network error occurred while processing your order, please check your network connection and try again"

    I am trying to order a book with iphoto, I keep getting the same error message.
    " A network error occurred while processing your order, please check your network connection and try again"
    I get the billing part up, it has even uploaded my jpegs but at the final process, I get the same message.
    I have ordered two books a few months ago without any problems.
    Now I keep getting the same message either half way into
    the order or at the final hurdle after the images have been uploaded.
    Any ideas?
    My shared Network has been fine and that does'nt seem an issue.
    Help.

    Try again in a couple of hours - sometimes it is a temp condition
    LN

  • List of issues and fixes for procure to pay process and order to cash process for a trading company

    Dear All Gurus
    Kindly tell me where I can find the list of all issues arising in procure to pay process
    and order to cash process and there fixes for a trading company in support project
    Thanking You
    Abdul Baseer

    Hi Abdul,
    There are no standard list to provide, you should identify the issue through regression testing and raise an SR or create a thread accordingly we can help you.
    Note:- Issues are vary to instance to instance, version to version, installation to upgrade etc..

  • Process Sales Order based on minimum order

    Hi Sap gurus,
    Can any one Help me Out regarding How the System should have capability to process Sales Order based on minimum order quantity and minimum order value and How we will map In sap
    Thanks
    Points will rewards
    Regards
    Rajesh

    Hi,
    We can set the control for Min order quantity in the Sales org1 view. Like wise we can control min order value also.
    For that we have to use two condition types AMIW & AMIZ.
    AMIW is min order value, where as AMIZ is min ord surcharge
    Let's say AMIW value is 50,000.If the order value is less than 50,000 then AMIZ comes into picture.Amiz compares the automatically determined order value and AMIW value.The difference of those two values Amiz takes as surcharge and it overwrites the automatically determined order value with this value.
    Like wise we can maintain min order value also by using this two cond types.
    In the pricing procedure
                            subtotal      req   Altcal   Altcond+bv
    AMIW                D
    AMIZ                                  2         13
    Award me points if u satisfy
    Thanks,
    Sudheer

  • WMS :  How to Process Sales Order Released before Turning on WMS

    Hello Gurus,
    How to process sales orders released before WMS enable flag is turned on in the  new WMS enviournment in Oracle 11.5.10 ?

    Helios,
    Thanks for the document.
    I m looking for how to perform Pick confirm transactions for already printed Pick slips before WMS enabled flag is turn on for the org.
    One option is to close all the deliveries  but if there is no on hand at that point the they will remain option.
    Other option is to Back order those deliveries and re release them post wms enable flag is turned on... The only issue i see here is that if there are more new orders for one of the items  and the orders are released then which orders will get allocated/reserved if there is limited on hand quantity to statisfy the SO need.
    Let me know if you can think off some alternative solution.
    Apprecite help !!
    Thanks,
    Sam

  • Change in Sales order deleted all process production order

    Dear All,
    We have Make to order scenario for our export sales. When we have receive order we make production with reference of sales order with help of t-code MD50 then convert plan order into production order.
    IF sales department do changes in sales order it'll delete all processing production orders So, we have to do revoke all production orders manually.
    2 query is that, Is there any way to run MRP (Make-to-order) on all line items of sales order ?
    Please provide solution.
    Thanks,
    Farrukh khan

    Dear Farrukh,
    There is not tcode to run sales order for all line items, but if you run MD02 it will plan all sales order & line items also. You can run MD02.
    Regards
    Abhijit Gautam

Maybe you are looking for

  • Printing problem from my Dell Laptop to my printer

    Hi everyone.  I'm new at this, but really need some help.  I have a Wireless Dell Laptop, and it uses Vista.  When I was with Comcast, I was able to print to the Wireless HP Officejet J6480 All in One printer.  However, we changed to Qwest recently,

  • Can't add any books to ibook on mac.

    I try to add a book but to ibooks on my mac however every time an error message comes up saying that "either the former doesn't exist or the folder containing the latter doesn't exist." I lost all of my books and can't add any new ones. I've tried to

  • Creating Style Sheets for Existing Text

    Can I get some advice on what would be the easiest way to create and apply style sheets to a document that was layed out w/o any? My Art Director layed out a dozen pages of actual type w/o any style sheets. It's a pretty basic layout with Headers, Su

  • OCI catalog in EHP4 Webdynpro screens

    Hi Folks, As of ECC6.0 it is possible to use an OCI compliant catalog from the PO and PR creation screen. Do any of you know how to anebla that in the "new" webdynpro screens for creating PO's and PR's either via business client or portal? Thanks in

  • TS1362 songs i have purchased on itunes will not play all the way from start to finish....

    a group of songs from different artist will not play from start to finish and will skip to the next song 3/4 the way through the song...