Process order components BI content

Hi,
We want to install BI infocubes which will have data from process order component from tables
AUFK + AFPO or CAUFV.
If anyboy is aware of this standard flow ,plz let me know. I am also searching on Help for same.
regards,
Shital

Hi ,
Check the standard multiprovider 0PP_MP03 - Plan/Actual Comparison Operation/Work Center View , The
multiprovider is based on cube 0PP_C03 and it receives data from the below datasource
2LIS_04_P_ARBPL: Work center view from PP/PP-PI ( gets information from AFKO , AFPO and AFVC
http://help.sap.com/saphelp_nw70/helpdata/en/bd/386a377a377832e10000009b38f8cf/frameset.htm
Hope this helps,
Sathya

Similar Messages

  • Planned qty. and value for process order (components wise)

    Hi Experts,
    I need to capture the planned qty. (requirement qty.) and planned value of the components of a process order for some profit report. Please suggest me from which table i can get these values. (In RESB only req. qty. is there.)
    Thanks
    Nitin kapoor

    COSP or MBEW would help get that info. But take help from your FI/Co colleague to understand the table better

  • Missing Process order components in product View

    Dear all,
    We have a problem with Process order in APO.
    We have created a planned order in APO and converted to process order . All the components of the order are APO relevant and PPM is having  all the  components . When We create the planned order , RRP3 is showing all the components but when we convert the planned order to process order , then the components are missing in product view . But all the components are available in Process order in ECC . We deleted the process order in APO and again CIF the order from ECC to APO , but still the components are not appearing .  We need to have all the components of the order to plan the dependent demands.
    We checked the Queues and found no blocked queues .
    Can any one suggest me what could be the problem.
    Thanks & Regards
    Prabhakar

    Hi Prabhakar,
    How are you integrating your production order - like are you sending the planned order to ECC and convert there or you are not transferring the planned order to ECC, but setting the conversion indicator in APO?
    If you don't integrate the planned order to ECC, then all the components will be displayed in APOby exploding APO PDS - no active integration model required for components.
    If you integrate the planned order to ECC, then in ECC, the BOM explosion happens. - So, active integration model required.
    Regards,
    Manimaran M.

  • Automatic Batch determination for process order components

    Hi ,
    If we maintain the batch entry at MRP2 for the process order component  as 3 - automatic batch determination upon order release ,if  automatic batch determination is not happening for the order components and system is stopping to enter the batch for the component at order release , what else settings do we need to check ?
    Please advice
    Thanks ,
    MK

    Hi MK,
    You need to go thru these configurations/setup:
    1- CORC: Search Procedure is enter for Order type and Plant combination (PP-PI)
    2- Assign the Search Procedure in transaction COR4 or OPL8 (COR4 for PPPI ot OPL8 for PP)
    3- Batch Determination condition is maintained in COB1: this will generate the automatic determination of the batches.
    4- Take a look of the field Batch Entry in MM02 (MRP2). This was already done by you.
    Of course all your batches need to have the corresponding classification and you should assign correctly the search procedure in COB1.
    Try with the previous steps and come back if you still don't get the automatic batch determination.
    Best Regards,
    Mariano

  • Error while saving the process order

    Hi All,
    I changed the quantities of the components and trying to save the process order. But I'm getting a message " "PLEASE REEXPLODE BOM, SINCE THE PROCESS ORDER COMPONENTS HAVE CHANGE". What would be the reason? It is not happening to all the users. Some users can able to save after changing the qty. Some users can't?
    Regards,
    Sureshbabu G.

    Hi,
    "PLEASE REEXPLODE BOM, SINCE THE PROCESS ORDER COMPONENTS HAVE CHANGE"
    I think it is your Develpment and not from SAP Standard One.So it is difficult to trace out the cause, better will be contact your devlopment team to trace out the reason.
    Regards,
    Dhaval

  • Batch reservation & Allocation in process order

    I am allocating batch to process order components(for active ingridient)While I am allocating the batch I am able to select the batch which has all of its quantity reserved,which is not desireble.Any solutions please??/
    Eg.In MMBE my batch stock(say for batch AA11) is as follows:Unres stck 100 & reserves 100
    If I am determing batch for a different process order where this component is used,I am able to select the same batch,even though it has no open quantities.
    Please suggest

    Hi Rele,
    Please check in CO09 transaction for the availability of this batch stock whether it is free or confirmed to any other component like.
    Regards
    R. Senthil Mareeswaran.

  • Problem in automatic batch determination for components in process order

    hi
    Ours is a process order industry. Here we prepare food items.
    We are entering manual batch for finished product. We want to perform automatic batch determination for one of the components raw material. For other packing material we do not want to maintain batches.
    The batch procedure picked is me0001 for 261 movement type instead of C00001.
    Because of that we need to enter batch manually.
    Send us the procedure to automatic batch determination for components.
    regards
    ravi

    Ravi,
    Before posting please do search in this forum because this topic has been discussed many times in past.
    Please check below links which could be helpful to you Automatic batch determination in process order
    http://www.sapsword.com/home/sap-batch-management/sap-batch-determination
    If you still have issues then please come back.
    Br
    KK

  • Storage location not getting copied in process order for components

    Dear PP Gurus,
    While making a production /process order the storage location of component materials is not getting copied from material master into the process order, it is showing any default storage location.
    What couls be the reason for it..
    For all components it is defaulting the same storage location.
    Please throw some light on the issue what could be the reasoon for it..

    Dear,
    System determine issue storage location from the material master, the value of the storage location of the BOM item, or the storage location from the supply area.
    Check in BOM component details storage location you have defined.
    Check production storage location from the plant segment of the component is taken into account for the use of MRP areas also. When planned order is being created for the superior assembly in a MRP area?
    Also check the Material requirements planning (PP-MRP)
    --> planning process
      --> BOM explosion and dependent requirements determination
        --> storage location determination for BOM explosion
    Regards,
    R.Brahmankar

  • Tolerance limit for Components in Process Order

    Dear Friends,
    As we can provide underdelivery / overdelivery tolerance for GR of process order, likewise is it possible to provide tolerance for BOM components in process order?
    The requirement is like that confirmation should be allowed with GI done within + / - 5 % of BOM qty in process order. Is it possible to cater this requirement with any exit / BAdi?
    Kindly help with your valuable inputs.
    Thanks in advance.
    Regards,
    Tejas

    Dear,
    Thanks for your prompt reply. Actually I have been already working on this exit only.But me & my technical fellow are stuck up for build logic for tolerance limit. It is working to restrict confirmation till GI has been done. But we are unable to give provision of tolerance limit for GI with this exit.
    Can you pls share more details about writing logic for it?
    Regards,
    Tejas

  • Auto batch detmn for components in Process Order selects batch in Q status.

    Hi Gurus,
    We have the following issue with automatic batch determination for component batches for a Process Order:
    Say for a Process Order it requires components A,B, and C.
    The issue is with component C. if the PO requires 100 Qty of C. the system is picking batch X having 80 qty  and picking 20 from another batch Y which is still in u201CQu201D status (due to some defects it is not cleared .  for which inspection should have completed 3 days before Process Order is released).
    Also there are only these two batches for this component in MMBE.
    What I understand is system adds GR date + GR processing days ( for inspection) and release component for production after that (ie., moves to Un restricted stock). Therefore system selects this batch as per the availability check (by calculating the GR+ GR processing date) even thoe it is not cleared yet.
    Also, I want to know If this is correct procedure, how can we make system to not to include batch with Q stock (batch which is having some defects).
    Thanks,
    N.

    Hi
    Use separate Checking Group(Availability Check) in MRP-3 view for comp C with the settings in OPJJ(Availability Check+Checking rule combination) with untick incl.quality insp stock. Idea is to select the un-restricted batch stock qty during Auto Batch determination for Components
    Regards
    Brahmaji

  • Content repository configuration to store process orders record in COPA

    Dear Experts ,
    i have status ORRQ for my process orders. to save the order records i execute T-code COPA but message comes
    " zero  process order stored ".
    after investigation it was found that we have to maintain content repository  id in OAC3 for process order object type BUS0001.
    OAC0 , OACT  are the t-codes to maintain it in SPRO.
    but the problem i dont know how to do it , neither know which module consultant will be able to do that.DMS or netweaver or
    someone else.
    please guide
    regards
    satish

    not answered

  • Withdrawn qty of components automatically updates in Process order

    Hi,
    We are facing a peculier problem.
    We create a process order. Some of the components have very less requirement qty (0.004 abc where 0.1 abc = 0.01 g).
    Withdrawn qty for these components are automaticcaly updated equivalent to requiremnents qty although there is no goods movement.
    Due to this reason the reservation of these components is also 0 & due to this reason only no Transfer requirements is created.
    Any inputs on this issue is highly appreaciated.
    regards,
    Mohit

    Dear
    Please note the following in your case :
    1.During maintaing the unit of measure in T-code CUNI we can define No. of decimal places to which rounding should be performed which specifies the number of decimal places to which this measurement unit should be rounded.
    System will not allow more than 3 decimal places in satandard SAP.You can use a larger base quantity of 100 or 1000 in the BOM header (instead of 1).That would eliviate your issue with the 3 decimal places in the component quantity. SAP always takes the base quantity into account during requirements calculation.
    refer : How to maintain decimal places in BOM Qty & what is the essence of base qty
    2.Pl go to SU3 transaction and select 'Defaults' tab, check option selected against 'Decimal Notation'. pl select dot decimal notation and SAVE.After you changed it, please re-start your sap session(s).Or go to System -
    > User profile-----> Own Data. In user profile page go to Default setting for Decimal notation. Change it to 1,234,567.89
    Check both the point and try
    Regards
    JH

  • Process Orders Missing Components

    All,
    We create planned orders in APO and CIF them over to ECC. We also convert the planned orders in APO as well and then release them in ECC.
    The issue that we are having is that when we convert the planned orders in APO to process orders the materials are missing in the process orders in R/3. We re-explode the process orders in R/3 and then the materials appear in the process orders.
    Any help will be gratefull.
    Thanks
    Rob

    Hi Rob,
    The components in the planned orders are just the replica of PPM/PDS data which are
    coming from bom and routing through ECC.
    Check the PPM data of the products whether they are updated properly through CIF.
    If CIF transfer is corrected, all components will get transferred correctly and you
    can see orders without any missing components.
    Regards
    R. Senthil Mareeswaran.

  • How to determine the oldest batch to the components of a process order??

    Hi gurus,
    While releasing I have configures to determine automatically the batches at order release, I want that system assign for each component of the process order the oldedst batch ( I can control wich batch is older because is a consecutive number so assigning the smallest batch should work)
    Right now system doesn't allow to to release because is asking for the batch for each material, so it seems to me that the batch determination is not happening, I created a batch and a characteristic but I dont know if this must be done of if I have to do something else, please guide me trough the steps needed to achieve this with Tcodes.
    Thanks
    Julio

    Hi Julio
    I hope you want to use the FIFO method for the batch Determination,,
    it can be done through STD config settings,,
    1. Characteristics for the LAST GR date-CT04
    2. Batch sort rule-CU70
    3. Define the batch determination for the Process orders-COB1
    In the Batch master there is a Field - Last GR date,, you have to maintain this as a Characteristics and make as automatic populate field based on the LAST GR field from Basic Data1 from the Batch Master,,
    This field you ref on Batch Sort rule.. and Define the batch determination how it has to pick (like- Split batch, One after other)
    After this at the time of issue the goods click the Batch determination- it will provide the list of batches,, if not picj the rules first time, there itself you can select the rules and assign to get the batch list by last GR date
    Ref the below links for further details
    http://www.sap-img.com/materials/lifo-and-fifo-in-batch-management.htm
    http://www.sap-img.com/materials/config-setting-in-batch-management.htm
    Thanks
    Senthil

  • Process Order is not picking the follow-up material

    Hi Gurus,
    We have changed a BOM by discontinuing a component and giving a follow-up material with the valid from dates as 18/5/09.  and then MRP is run on that nignt  ( mrp job set to run daily in the back ground). and on 19/05/09 a Process Order is created from the planned orders genereated by the MRP run.
    now, we found that the new componenet (follow-up) is not copied into the process order, but the old compomemt (discontinued) is removed. 
    MRP parameters are correctly defined (Planning mode is set to 2) .  Please let me know if we are missing anything.
    Thanks,
    N

    Hi
    Pl ensure that the Following requirements have been met before you can use the discontinuation functionality:
    1) Both materials must be planned using MRP.
    2) The base unit of measure of the follow-up material must be the same as the base unit of measure of the discontinued material.
    3) You must enter discontinuation data for the discontinued item and follow-up data for the follow-up item.
    and Also refer the SAP link for Complete Details
    http://help.sap.com/saphelp_45b/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm
    Regards
    Brahmaji

Maybe you are looking for

  • Bridge is SLOW!!!!!!!!!!

    I posted this previously, never got an answer- I can't believe how SLOW this new version of Bridge is. If I batch rename, say 70 .dng files from the 1DSMKIII (around 21-26mb each), I can go eat lunch & come back 45 minutes later, & it's still working

  • New iMac plan...look OK?

    I currently have an early 2008 24" iMac. I am upgrading to a BTO 27" iMac that should be shipping shortly - except for memory (stock 4GB only), it has the top available specs including 3.4Ghz quad core i7 with 2TG HD and 256GB SSD and 2GB graphics ca

  • Thunderbird erased many important, random emails from gmail and now they are not even on thunderbird. what do I do? It's been over 30 days.

    I wanted to print all the emails from a gmail label. My googling suggested that Thunderbird would do this. I didn't see any warnings about Gmail's stealth setting that it would ERASE me emails from the server, but it did. And now Thunderbird has no e

  • Query in schedule task adapter using FilestreamProvider

    Hi, Requirement: I need to use a dynamic file send port which appends the file every 2 hours after which is picked up by an ftp adapter on a daily basis on a fixed time.For the above, I am using a scheduled task adapter to pick the from folder path( 

  • IPhoto slideshow on DVD is a mess!

    I am trying to create a slideshow on DVD for a client. His business is a small newspaper. For an upcoming tradeshow, he wants to have a large display with a slideshow of each page of the paper scrolling across the screen, flipping to the next page, e