Process order confirmation at individual capacity level
Hi Guys,
I want to select the individual capacity of the resource while confirming the process order , is it possible if possible please enlight me how to do the same?
Thanks and regards
Thamizhchelvan G
Is HU enabled for your location? if that case, you could post by pallet.
Similar Messages
-
Restriction during process order confirmation
Hi,
I want one validation during process order confirmation (mile stone) through t code COR6N if resource capacity & shift intervals not maintained ( t code CRC2) then process order should not confirmed & there should be error message. Plz advice how it is possible through customization.
regards,
sps.Dear shukla,
Check with this User Exit,
CONFPI02 Process order confirmation: Customer spec. input checks 1
CONFPI03 Process order conf.: Cust. spec. check after op. selection
CONFPI04 Process order conf.: Customer specific input checks 2
CONFPI05 Process order conf.: Cust. spec. enhancements when saving
If the above is not working then check with this BADI
WORKORDER_CONFIRM at the time of saving,
Regards
S Mangalraj -
CORK error at process order Confirmation
Hi all
While Process order Confirmation (CORK) iam getting the following error
G/L account 499999 is not defined for chart of account 1000
Message no.F5507
I have run the same in Dev. Client
but unable to do in the quality client
i have checked in OBYB in both the clients
setting are same
plz.. provide the solution
thanx in advance
useful solution points will be awardedHi,
While confirming the Process Order, the following will be the effect in Accounting
FG Stock Account Dr.
To COGM Account
The followings are the possibilities in your quality client
1. whether you have defined the above account in Chart of Account and Company code segment level?
or
2. You should check it in OBYC > GBB > AUF (COGM account) and in BSX key (Stock account for Finished Inventory)
or
3. Whether it is blocked for posting or marked for deletion at Company Code level or Chart of Account level?
Regards,
Jigar -
Process Order/Confirmations/
Hi,
I am from BI team and did have little(no) knowledge on PP. However I have to Pull Goods produced from R/3 on a daily level for each plant.
Can any one give some hints??
I was observing few tables like AUFK and AFRU-LMNGA fields and got confused which table can help me.
also i would lile to understand the relation between,
Planned Order, Process Order, Confirmations and PLANT...
Can any one help me??
regards,
HariDear Srinivas,
Thank you for looking into this.
Objective:
To bring all the ACTUAL quantities produced on daily basis for each Plant from R3
to BW.
In my AFKO table I found entries as below
Order - Qty- PLANT
123 - 15,000 Tons - US01
In AFKU
Confirm-item- Order-Yield- Quantity- POsting date
345 - 10 -123- 15,000 - 09/09/2006 - US01
346 - 20 - 123 - 15,000 - 09/09/2006 - US01
354 - 10 - 123 - 15,000 - 09/09/2006 - US01
354 - 20 - 123 - 15,000 - 09/09/2006 - US01
Can I assume that on 09/09/2006 total qty produces as 60,000 Tons?
thanks for u r time..
regards,
Hari -
BAPI For Process Order Confirmation
Hi,
For Process Order Confirmation we are using the following tcode. COR6N. in the t-code we are include a new field (Shift Field) with help of CONFPP07. and we made the field as mandatory also. in cor6n it is working fine.
now we are using the bapi for same Process Order Confirmation. here the new field is not available. we want to include the new ( Shift ) Field also. we are using the following
BAPI Fm: BAPI_PROCORDCONF_CREATE_TT .
Regards
SathisBAPI_PRODORDCONF_CREATE_TT to confirm a production Order
Erwan -
Product Costing - Process Order Confirmation
Dear Experts,
We are facing a situation with our Product Costing Scenario :
Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
Entry : RM (Cr), Consumption (Dr).
Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
Reason:
According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
My Answer was:
- They can find all material costs in Process Order as Debit Item.
- They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of WIP entry immediately after Goods Issue of Raw Materials to Order.
Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
Regards,
Zain BashirHi Zain
This is a very unusual question
Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
Assume there is a fire (God forbid).. After the accident, you wont even know how much was lying there unconsumed which got gutted in the fire..
And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
My opinion - Dont build system for such requirements
Br. Ajay M -
Problem with creating Process order confirmation using BAPI
Hello,
While creating Process Order confirmation using BAPI_PROCORDCONF_CREATE_TT, material document is getting created. But a line item is inserted in the table AFRU without material document number. When it is created manually using the transaction COR6, the table is getting updated with material doc in the line item. Can anyone let me know what other attributes to be passed in order the update the same?
Thanks in Advance.
Regards, Senthil G.Hello , I am working with the same Bapi, can you please send me the code to fill the parameters, if I find the same error like you, I will send you the solution if I correct that.
Thanks for your help.
[email protected]
Guatemala, Cempro ADATSA -
Problem during Process Order Confirmation - COR6N
Dear All,
We are into process industries
Till now we are creating different BOM for each section and different process orders for each BOM.
For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
Now we have created new BOM for FG - showing all input/output of RM, SFGs. In Recipe, define operation for each section. and assign operation to material. I have attached screenshot of Recipe Operation.
During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
I have checked in Recipe, control key is ok i.e. Automatic GR, in OPK4 setup is also correct.
We have created new BOM and Recipe. There is no change in other configuration parameter.
Thanks and Regards,
NiravHi Nirav
The automatic goods receipt is defined by the operation/phase control key.
Control key PI03 has the automatic goods receipt setting by defaul.
Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
BR
Caetano -
Update Process Order Confirmations Back to SAP ECC
Hi,
Is there a document or step by step guide which explains how i can update SAP EARP with process order confirmations from my shopfloor? Below is the scenario i am looking for help in
1. There is a SQL server table where the SHOP floor update the quantity manufactured against a Process order.
2. I need to pick up that data from the SQL server table and update the ERP against that Process order.
Can any one explain how this can be achieved.
I checked the sample's and the templates in SDN but none of them actually show how to update any ERP?
Please advice!!.
Regards
SurajCheck this one
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/60ac6bb8-a684-2b10-208d-b90883004a5e
https://www.sdn.sap.com/irj/scn/downloads?rid=/library/uuid/204a13d0-399d-2b10-ec84-9c254cd7efd4
You use this component to enable the shop floor operators to record their production order and process order confirmations using a touch screen user interface. In SAP ERP Central Component (SAP ECC) operators must complete many steps to confirm orders. Instead, you can use this interface, on a touch screen to enter the production performance easily and effectively. You can also use this component to obtain operators' work lists and information on their current activities.
Regards
Ram Upadhyay -
In process order confirmation screen there should be 2 rows for down time.
hi,
We are using cor6n for process order confirmation, where we can put down time with confirmation text at once,
if there is two different down time, then user has to again run cor6n with 0 yield for put another down time, which gets more time.
for this reason i have customised single screen entry profile by mentioning two down time & confirmation rows in screen.
when i going for confirmation i put two different down time after goods movemnt order get confirmed & settled.
but when i see report in COOISPI there is only one down time against order.
system only considers last down time.
hows the system consider down time?
thanks in advance.
regards
sanjay.Hi,
The report COOISPI considers only one line of the down time, it is not considering the 2nd row of the down time. You need to change the COOISPI program to read the 2 lines of the down time. You need to change the standard program to read the 2 down time lines.
Thanks & Regards,
V. Suresh -
Dear Experts,
In process order confirmation can we make a kind of restriction through configuration in which system should not allowed a confirm quantity of phase 20 is not greater than previous confirmed quantity of phase 10 there is no relationship between this two phases.
Regards,
Murari ShahHi.
Just my 2 cent , Not sure about standard SAP configuration perhaps there's but i don't know.
But i very sure , you can implement this with the user exist below:
===============================================================
CONFPI01 |Process order conf.: Calculate cust.specific default values
CONFPI02 |Process order confirmation: Customer spec. input checks 1
CONFPI03 |Process order conf.: Cust. spec. check after op. selection
CONFPI04 |Process order conf.: Customer specific input checks 2
CONFPI05 |Process order conf.: Cust. spec. enhancements when saving
CONFPI06 |Process order confirmation: Actual data transfer
Customise with ABAP , please check with your abaper.
Thank you. -
Process order confirmation error in COR6
Hi Gurus,
I am working as sap manual tester and facing below issue in Process order confirmation in t-code COR6.
Batch 456 for component 350515 does not satisfy BOM requirements
Message no. Z_MFG017
Need ur help.
Regards,
Imran
Edited by: imran.shek38 on Jan 25, 2011 7:16 AMHi,
Please check whether the Batch-Management checkbox is maintained for the component in the Material Master (MM02).
Also, check the Transaction MSC2N for this component and activate the checkbox for batch-managed item in the BOM.
Hope it helps.
Regards,
Kaushik -
Bapi 4 process order confirmation??
hi abapers.............
can ne1 tell me wt is the BAPI 4 process order confirmation.
thanx in advance .
anilHi
BAPI_PRODORDCONF_CANCEL
BAPI_PRODORDCONF_CREATE_ACT
BAPI_PRODORDCONF_CREATE_HDR
BAPI_PRODORDCONF_CREATE_TE
BAPI_PRODORDCONF_CREATE_TT
BAPI_PRODORDCONF_EXIST_CHK
BAPI_PRODORDCONF_GETDETAIL
BAPI_PRODORDCONF_GETLIST
BAPI_PRODORDCONF_GET_HDR_PROP
BAPI_PRODORDCONF_GET_TE_PROP
BAPI_PRODORDCONF_GET_TT_PROP
BAPI_PRODORDCONF_PDC_UPLOAD_TE
BAPI_PRODORDCONF_PDC_UPLOAD_TT
Regards
Kathirvel -
Need a BAPI/FM for process Order Confirmation
Hi guys,
I need a bapi or Fm for process Order confirmation.
thnx in advanceChecck
BAPI_PRODORDCONF_CREATE_ACT
BAPI_PRODORDCONF_CREATE_HDR
BAPI_PRODORDCONF_CREATE_TE
BAPI_PRODORDCONF_CREATE_TT
Better read the documentation of each BAPi using the tcode BAPI and proceed.
I feel BAPI_PRODORDCONF_CREATE_HDR would do your purpose.
Documentaion:
<b>
You can use this method to enter order confirmations for production orders.
You can also transfer good movements, that are posted together with a confirmation. If no goods movements have been entered for a confirmation, they are determined using the standard logic for backflushing and automatic goods receipt for confirmations. </b> -
Process order confirmation reversal
HI friends,
I am cancelling a process order confirmation using T-code CORS. The confirmation cancellation is happening, but the goods movements are not reversed. Help in resolving will be much appreciated.
Thanks in advance.
Warm regards
VivekHi All,
Sorry for the delay in response and thanks for your suggestions.
The backflushing is activated. I checked in COGI transaction for the concerned order. I got several entries with different error text. The error text is as follows
"You have no authorization for this transaction with movement type 102"
"You have no authorization for this transaction in plant XXXX"
"Deficit of SL Unrestricted-use 6,957 TO : 1030604 XXXX PL01"
Please let me know how to resolve these errors.
Warm Regards
Vivek
Maybe you are looking for
-
Hello All, When I was trying to migrate a record into Install base using the interface tables with a party as owner for one instance, I am getting an error message saying "Invalid OWNER Party Account for Party ID <XXXX>". I have entered the party_id
-
Using a network-stored catalog with Mac OSX
Greetings all. I am using Photoshop Elements 11 on Mac OSX Mountain Lion and want to store my catalog on a local network drive (FreeNAS). I have encountered many problems while attempting to do this. Then I noticed in the Elements Organizer help, u
-
Can't log in to my Westell 327W router
When I go to http://192.168.1.1, the URL automatically goes to this page-- http://192.168.1.1/edit_user_settings.htm -- and I get a screen that says "User Settings". This page offers me the opportunity to change my USER SETTINGS. There is a box th
-
My line doesn't work with BT HH3 but does with BT ...
Hi folks, To cut a long story short, I've had a selection of BT HomeHubs over the years and my HH2 packed up 3-4 months ago, not sure what went wrong but the orange light just kept flashing and it would not connect, despite resets and reboots. I thin
-
How do i extract photos from a flash drive
I just recently switched from Windows to Mac, and haven't taken a class on how to fully use my computer yet. But I do have a flash drive that I put all of my photos on from my windows computer, and I would like to know after I plug in my flash drive,