Process Order Confirmation Quantity from Preceeding Operation

Hi All,
Please can you let me know if the below requirement can be met:
I have 2 phases to confirm (both are milestone confirmations). The Process order header quantity is 100 kg. While doing the confirmation for Phase 1, I do a final confirmation  for 90 kg. Now while doing the confirmation for Phase 2, the system still populates the default yield as 100 kg and not 90 kg.
Is there a way to display 90 kg as default yield for Phase 2? Is there a standard Config that can help? If not what is the solution?
Thanks,

Hi,
Please refer the following link.
http://help.sap.com/saphelp_47x200/helpdata/en/b1/c04d83439a11d189410000e829fbbd/frameset.htm
Regards
Kannan

Similar Messages

  • Process order confirmation quantity

    Dear friends,
    I am working with process industry. My order type is PI01. Control key PI01.
    In material master in "work scheduling" view, i have maintained production scheduling profile as"000001". ( in t.code OPKP--i have activated "Auto GR indicator).
    In material master MRP2 View ihave maintained Prod store location also.
    I have created my BOM in CS01 for process industry.
    Now i am confirming my order in CORZ,  in my last phase, i am expecting my finished goods also automatically to move.
    <b>But the system is not bringing the finished goods</b>.  Why?
    It is bringing only my BOM components (means semi finished goods). Even for my semi finished goods, it is not bringing the BOM Quantity. I am manually inputting the quantity for my semi finished goods. 
    <b>
    Why the system is not bringing the quantity for my semifinshed goods?</b>
    (I<b> have maintained maste rrecipe for my finished  goods only,not for semi finished goods)</b>
    Thanks
    Senthil

    Hi ,
    In the  customization for confirmation parameters for process orders , in the genral valid settings screen , tick the goods movements for all components feild that will solve your problem ,
    regards ,
    mallikharjun

  • Get Process Order Confirmation&Counter from material document/goods receipt

    Hi @ all,
    i´m looking for a way (the tables) to get the order confirmation and the counter from a goods receipt. I have the material document number und the position of the goods receipt.
    Kind regards,
    Axxter

    Hi,
    we don´t have the goods receipt material documents in AFRU. I don´t know the reason why.
    Message was edited by:
            Sebastian Becker

  • Set loss quantity to a fixed percentage in Process Order Confirmation - C0R6N

    Hi Experts,
    How it is fixed the loss qty percentage at the time of process order confirmation.
    I want to set the loss quantity to a certain percentage when compared to the Total Process order quantity.
    For Example:
    If the Total processed quantity = 100
                            Yield Quantity = 20.
                             Loss              = 80.
    This kind of scenario should not happen, since Loss quantity is very much higher that the yield quantity.  I want to set the loss quantity  to a particular percentage ( say 20-30 %) of the total processed quantity so that the yield quantity will be higher than the loss quantity by a substantial amount. Are there any possibilities of doing this through configuration. If not what are the other options?
    NB: Scrap quantity is not maintained at the time of  process order confirmation.
    Regards,
    Umapathy.

    Hi Umapathy,
    Yield and Scrap are user entry fields where you can have restriction on entered qty by changing  under delivery and over delivery to error through OPK4 config as shown below. Agree that any qty can be entered in any field (Yield or Scrap)
    OR
    You can define the operation scrap. Read the below doc for more details.
    http://scn.sap.com/docs/DOC-52834
    OR
    Another option is to use exit and write your logic based on input yield and loss.
    Thanks & Regards,
    Ramagiri

  • Costing data from Tables of Process Order Confirmation.

    Dear Friends,
    In which table is the Costing relevent data for process order confirmation stored.
    We are developing a report for which we require  material specific-
    Target quantity / Actual quantity
    Target costs / Actual costs
    Thanks in advance.
    Regards,
    Vikrant Sood

    Hi,
    Using the Table : AUFM you can get the data.
    VVR

  • Update Process Order Confirmations Back to SAP ECC

    Hi,
    Is there a document or step by step guide which explains how i can update  SAP EARP with process order confirmations from my shopfloor?  Below is the scenario i am looking for help in
    1. There is a SQL server table where the SHOP floor update the quantity manufactured against a Process order.
    2. I need to pick up that data from the SQL server table and update the ERP against that Process order.
    Can any one explain how this can be achieved.
    I checked the sample's and the templates in SDN but none of them actually show how to update any ERP?
    Please advice!!.
    Regards
    Suraj

    Check this one
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/60ac6bb8-a684-2b10-208d-b90883004a5e
    https://www.sdn.sap.com/irj/scn/downloads?rid=/library/uuid/204a13d0-399d-2b10-ec84-9c254cd7efd4
    You use this component to enable the shop floor operators to record their production order and process order confirmations using a touch screen user interface. In SAP ERP Central Component (SAP ECC) operators must complete many steps to confirm orders. Instead, you can use this interface, on a touch screen to enter the production performance easily and effectively. You can also use this component to obtain operators' work lists and information on their current activities.
    Regards
    Ram Upadhyay

  • Sample Preshippment information in PI Sheet or Process order confirmation

    Dear Gurus,
    We are using the strategy 40. We need some information on sample sending procedure like preshipment or coshipment and quantity of delivery to the process order PI sheet to identify the production team to keep the sample ready before confirmation or receipt of the process orders.
    It is sepcific to some customer or material.
    Could you please help me how to configure / flow information from sales order or Material to PI sheet or process order confirmation.
    THanks in Advance
    Srini

    Hi,
    Process Massage will generate only after Completing the PI sheet.So after maintaining the PI sheet you have to press Complete button then only system will generate Process Massage regarding completion of PI sheet.
    But if you leave the PI sheet only with Save then it means still there are some entries are left or may be change.So in this case system will not generate process massage.
    Now first complete the PI sheet then check in CO54 with correct date , time and plant selection.Send it from here and then check in process order.
    Regards,
    Dhaval

  • OPK4 Process Order Confirmation parameter

    Dear All,
    In process order confirmation i want do a configuration like
    Operation 10     
    Phase      20     0010(supr.ope)
    Phase      30     0010(supr.ope)
    Operation 40
    Phase      50     0040(supr.ope)
    now I maintained a relationship between 50 & 30 like "30 is predecessor of 50"
    I required during confirmation if confirmed quantity of phase 30 is 50 and now if I go for phase 50 confirmation system should not allowed confirmed quantity >50 of previous confirmed operation 30
    for that i have done setting in OPK4 like
    Checks
    Operation sequence " E Error when operation sequence is not adhere to"
    but system is allowed to do a confirmation more than 50 qty of operation 30
    so what is the meaning of operation sequence check in PPPI
    Regards,
    Murari Shah
    Edited by: murarisap1986 on Apr 6, 2011 7:50 AM

    Dear Murari shah,
    "E Error when operation sequence is not adhere to" This is to avoid the operation confirmation if it's not in sequence.
    For example,assume there are 5 operations in an order,directly i can't confirm the operation 0050 unless it's prior operation is
    confirmed.So the system checks whether the prior operation is first confirmed,if not the system proposes an error.
    So for this reason, we can make the necessary seetings in OPK4 for plant and order type combination.
    check and revert.
    Regards
    Mangalraj.S

  • Standard Value doesn't carried to Process Order Confirmation

    Dear Experts,
    I was trying to run Process Order Confirmation via COR6N but I found out that the Activities shown are NOT consistent with the Activities set in Master Recipe.  The following are the figures shown in master recipe, process order and order confirmation.
    Master Recipe (via C202)
    Base Qty =1
    Operation/phase = 0020
    1st Standard Value (activity 3 setup) = 1Hr
    2nd Standard Value (acitivity 1 machine) = 2Hr
    3rd Standard Value (activity 11 labour) = 3Hr
    Process Order (via COR2)
    Order Qty = 1,000
    Operation/phase = 0020
    Setup (to be confirmed) = 1Hr
    Machine (to be confirmed) = 2,000Hr
    Labour (to be confirmed) = 3,000Hr
    Order Confirmation
    Operation/phase = 0020
    Machine time (to be confirmed) = 1Hr
    Labour time (to be confirmed) = 2,000Hr
    My question are as follows :-
    1) Why the Machine time NOT same as in Process Order
    2) Why Setup time NOT shown in Order Confirmation
    Does anyone have any idea?
    regards,
    Abraham

    Hi,
    all the master recipe, process order and order confirmation, including the material master are maintained by myself alone.
    Is it due to some parameters are not defined properly such as in the formula key?
    The formula key are defined as below.
    Formula key defined in OP21
    Setup  = SAP005 = SAP_01 x SAP_11
    Machine = SAP006 = SAP_02 x SAP_09 / SAP_08
    Labour = SAP007 = SAP_03 x SAP_09 / SAP_08
    Paramater defined in OP17
    SAP_01 = Setup
    SAP_02 = Machine
    SAP_03 = Labour
    SAP_08 = Base Quantity
    SAP_09 = Operation Quantity
    SAP_11 = Operation Splits
    I'm a bit confused with these formula keys.  Could you explain to me how they work?
    regards,
    Abraham

  • Process Order/Confirmations/

    Hi,
    I am from BI team and did have little(no) knowledge on PP. However I have to Pull Goods produced from R/3 on a daily level for each plant.
    Can any one give some hints??
    I was observing few tables like AUFK and AFRU-LMNGA fields and got confused which table can help me.
    also i would lile to understand the relation between,
    Planned Order, Process Order, Confirmations and PLANT...
    Can any one help me??
    regards,
    Hari

    Dear Srinivas,
    Thank you for looking into this.
    Objective:
    To bring all the ACTUAL quantities produced on daily basis for each Plant from R3
    to BW.
    In my AFKO table I found entries as below
    Order  - Qty-                   PLANT
    123  -   15,000 Tons  -     US01
    In AFKU
    Confirm-item- Order-Yield- Quantity-  POsting date
    345       -          10     -123-     15,000 -           09/09/2006 -       US01
    346        -         20    - 123 -    15,000      -      09/09/2006   -     US01
    354  -               10   -  123  -   15,000     -       09/09/2006    -    US01
    354   -              20  -   123   -  15,000    -        09/09/2006     -   US01
    Can I assume that on 09/09/2006 total qty produces as 60,000 Tons?
    thanks for u r time..
    regards,
    Hari

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Problem during Process Order Confirmation - COR6N

    Dear All,
    We are into process industries
    Till now we are creating different BOM for each section and different process orders for each BOM.
    For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
    Now we have created new BOM for FG - showing all input/output of  RM, SFGs.  In Recipe, define operation for each section. and assign operation to material.  I have attached screenshot of Recipe Operation.
    During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
    I have checked in Recipe, control key is ok i.e. Automatic GR,  in OPK4 setup is also correct.
    We have created new BOM and Recipe. There is no change in other configuration parameter.
    Thanks and Regards,
    Nirav

    Hi Nirav
    The automatic goods receipt is defined by the operation/phase control key.
    Control key PI03 has the automatic goods receipt setting by defaul.
    Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
    For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
    BR
    Caetano

  • Process order confirmation

    Dear Experts,
    In process order confirmation can we make a kind of restriction through configuration  in which system should not allowed a confirm quantity of phase 20 is not greater than previous confirmed quantity of  phase 10 there is no relationship between this two phases.
    Regards,
    Murari Shah

    Hi.
    Just my 2 cent , Not sure about standard SAP configuration perhaps there's but i don't know.
    But i very sure , you can implement this with the user exist below:
    ===============================================================
    CONFPI01 |Process order conf.: Calculate cust.specific default values
    CONFPI02 |Process order confirmation: Customer spec. input checks 1
    CONFPI03 |Process order conf.: Cust. spec. check after op. selection
    CONFPI04 |Process order conf.: Customer specific input checks 2      
    CONFPI05 |Process order conf.: Cust. spec. enhancements when saving  
    CONFPI06 |Process order confirmation: Actual data transfer       
    Customise with ABAP , please check with your abaper.
    Thank you.

  • Process Order Confirmation and Pallet

    Hi,
    Would appreciate if you can pitch in to get information on below requirement.
    Say for eg., for the 1000 CA of header quantity in a BOM, one (1) Pallet (PAL) is required and assume the pallet's are back flushed.
    - if you confirm 1000 CA, then SAP post 1 Pallet
    - if you confirm partial pallet, like 800 CA - then SAP posts 1 Pallet
    - but, if you confirm partial pallet, like 400 CA - then SAP posts 0 Pallet,
    I believe that's the nature of SAP design in rounding up / down. However in this unique circumstance of a Pallet, everyone would always like to Round up rather than round down.. so, in the example above confirm 400 CA should also post 1 Pallet.
    I couldn't find a solution in SAP with it, and I guess a user-exit might help to round up, but not sure which user-exit at process order confirmation will help.
    Any pointers would be a great helpu2026
    Thanks in advance,
    Nitin

    Is HU enabled for your location? if that case, you could post by pallet.

  • ABAP Programming Error when saving the Process Order confirmation in COR6N

    Hello,
    We have an issue related to Process Order confirmation using Tcode COR6N. When we enter all the inputs to confirm( Activity, yield and phase) and click on save it gives ABAP Programming Error (Exception condition "SEQ_NOT_FOUND" raised).
    Any inputs in this regard, would be appreciated.

    Hello
    I can observe that you have implemented the report ZOPSECRE and that an inconsistency was found.
    This repor corrects inconsistent orders which do not have an operation or a sequence, or the two of them.
    The report checks whether there is at least one operation or one sequence and creates both including status objects.
    Therefore, you need to have the default valus for the operation generation defined on OPJG for this order type/plant.
    BR
    Caetano

Maybe you are looking for

  • Message no. V1631-You cannot enter new delivery costs

    Hi All, before posting this issue i have searched and could not found the correct thread. system: ECC: 6.0 Scenario1: Inter company STO with import process PO created and delivery created and TO created and confirmed and PGI done.and SD invoice done

  • Why are my weblinks not live in Mac Mail?

    I have just switched from using Safari as my default browser in Mac OSX 10.7.3. to FireFox 4.0.1 because both version 10.0 and the beta 11.0 would not allow the plug-in for multiple tool-bars which you can have in 4.0.1. Now I am finding that when I

  • Post-Installation task client

    Hi I´ve a doubt with the post-installation tasks of the installation of the sap system. The default clients are 000,001 and 666. In with client I´ve to realize this tasks?In the client 001 and after that I realize the client copy of the client 000. T

  • Error When Running Weather Modelling on Pertmaster 8.6

    Hi Guys, I am facing issue when i tried to open Weather Modelling on Permaster 8.6. The error description is below : Error Code = 8002801d Code meaning = Library not registered. Source = WeatherModule Description = Automation error Library not regist

  • Cannot get attributes from different child elements...

    Hi, I have an Xpath expression which happily gives me all the 'element' elements when I put in the the step variable(1, 2 or 3), see below.... "/remove[@step < "+step+"]/element" <remove step="1">      <element path="epg.schedule.programme.longName"