Hi Experts,
Can any body tell me how can we confirm the process order through PI sheet without batch no.? I know though COEBR we can confirm the order through PI sheet but it requires batch no. & We don't have batch managenent implemented.
Youe suggestions are valuable for me.
Regards,
Shivkumar Dachawar
To make GR for the order for materials without PI sheet.
1. Process instruction category PROD_2 - which does not require batch number. Tcode O12C
2. Assign this Process instruction category to your Control recipe destination for your plant - SPRO- > PPPI -> Process management -> Control recipe / PI sheets -> Contrl. rec. destination -> Define and setup
If you need more information let me know.
Similar Messages
-
Process order confirmation through PI sheet -reg
Hi,
Please tell how to confirm the operation/order through PI sheet.
I have created the process order with PH_CON as process instruction catagory. after I sent the message thr. CO53 and in CO58 entered the actvity timining and then saved.
But i am not getting any status in the order,
Please tell me is there any mistake inthe process.
Regards
KarthikHi,
Process Massage will generate only after Completing the PI sheet.So after maintaining the PI sheet you have to press Complete button then only system will generate Process Massage regarding completion of PI sheet.
But if you leave the PI sheet only with Save then it means still there are some entries are left or may be change.So in this case system will not generate process massage.
Now first complete the PI sheet then check in CO54 with correct date , time and plant selection.Send it from here and then check in process order.
Regards,
Dhaval -
Automatic Creation of Batch in Process Order Confirmation
Hi Guru,
What are settings required to set the batch creation automatic during the confirmation of the process order? The header material is semifinished and batch management is ticked in the material master. BOM has been created. In the present scenario, few
Regards,
RajaHi,
You can do that in T Code CORW.
For the required production scheduler select the batch creation for process order.
Also in the Assignment tab of the process order, there is a field for batch, next to it there is a Create button. Click that, you will get the batch number in that field.
Hope that helps.
Regards,
Rohit.
Added: I apologise, its not the Assignment tab in process order. It is Goods Receipt tab.
Edited by: Rohit Chauhan on Aug 3, 2009 9:42 AM -
Sample Preshippment information in PI Sheet or Process order confirmation
Dear Gurus,
We are using the strategy 40. We need some information on sample sending procedure like preshipment or coshipment and quantity of delivery to the process order PI sheet to identify the production team to keep the sample ready before confirmation or receipt of the process orders.
It is sepcific to some customer or material.
Could you please help me how to configure / flow information from sales order or Material to PI sheet or process order confirmation.
THanks in Advance
SriniHi,
Process Massage will generate only after Completing the PI sheet.So after maintaining the PI sheet you have to press Complete button then only system will generate Process Massage regarding completion of PI sheet.
But if you leave the PI sheet only with Save then it means still there are some entries are left or may be change.So in this case system will not generate process massage.
Now first complete the PI sheet then check in CO54 with correct date , time and plant selection.Send it from here and then check in process order.
Regards,
Dhaval -
Process order confirmation without 101mvt type
our client is a process industry.client need during process order confirmation Background 101 not happen.
Step : 1 Process order create
Step : 2 Goods issue The material -261
Step: 3 Process order confirmation (No 101)
Step: 4 Goods Receive (MIGO) 101 happen
Following Steps Process only,
cork-only activity confirmation only,after Activity confirm GR will Happen , how to configure in the system,any user exit or sap note there in the sense tell me?
Thanks For AdvanceHi Thiyaharaajan,
For Goods issue i believe you are using MB1A/MIGO. You also use backflush to automatically issue the material during confirmation.. For this maintain Backflush - 1 in material master MRP 2 view.
Also during confirmation for doing Auto GR (101 movement type) you need to assign the control key ticked with Auto Goods Receipt for Last operation/phase of Master Recipe.
Thanks & Regards,
Ramagiri -
Problem with creating Process order confirmation using BAPI
Hello,
While creating Process Order confirmation using BAPI_PROCORDCONF_CREATE_TT, material document is getting created. But a line item is inserted in the table AFRU without material document number. When it is created manually using the transaction COR6, the table is getting updated with material doc in the line item. Can anyone let me know what other attributes to be passed in order the update the same?
Thanks in Advance.
Regards, Senthil G.Hello , I am working with the same Bapi, can you please send me the code to fill the parameters, if I find the same error like you, I will send you the solution if I correct that.
Thanks for your help.
[email protected]
Guatemala, Cempro ADATSA -
Problem during Process Order Confirmation - COR6N
Dear All,
We are into process industries
Till now we are creating different BOM for each section and different process orders for each BOM.
For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
Now we have created new BOM for FG - showing all input/output of RM, SFGs. In Recipe, define operation for each section. and assign operation to material. I have attached screenshot of Recipe Operation.
During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
I have checked in Recipe, control key is ok i.e. Automatic GR, in OPK4 setup is also correct.
We have created new BOM and Recipe. There is no change in other configuration parameter.
Thanks and Regards,
NiravHi Nirav
The automatic goods receipt is defined by the operation/phase control key.
Control key PI03 has the automatic goods receipt setting by defaul.
Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
BR
Caetano -
Dear Experts,
In process order confirmation can we make a kind of restriction through configuration in which system should not allowed a confirm quantity of phase 20 is not greater than previous confirmed quantity of phase 10 there is no relationship between this two phases.
Regards,
Murari ShahHi.
Just my 2 cent , Not sure about standard SAP configuration perhaps there's but i don't know.
But i very sure , you can implement this with the user exist below:
===============================================================
CONFPI01 |Process order conf.: Calculate cust.specific default values
CONFPI02 |Process order confirmation: Customer spec. input checks 1
CONFPI03 |Process order conf.: Cust. spec. check after op. selection
CONFPI04 |Process order conf.: Customer specific input checks 2
CONFPI05 |Process order conf.: Cust. spec. enhancements when saving
CONFPI06 |Process order confirmation: Actual data transfer
Customise with ABAP , please check with your abaper.
Thank you. -
Process order confirmation error in COR6
Hi Gurus,
I am working as sap manual tester and facing below issue in Process order confirmation in t-code COR6.
Batch 456 for component 350515 does not satisfy BOM requirements
Message no. Z_MFG017
Need ur help.
Regards,
Imran
Edited by: imran.shek38 on Jan 25, 2011 7:16 AMHi,
Please check whether the Batch-Management checkbox is maintained for the component in the Material Master (MM02).
Also, check the Transaction MSC2N for this component and activate the checkbox for batch-managed item in the BOM.
Hope it helps.
Regards,
Kaushik -
Set loss quantity to a fixed percentage in Process Order Confirmation - C0R6N
Hi Experts,
How it is fixed the loss qty percentage at the time of process order confirmation.
I want to set the loss quantity to a certain percentage when compared to the Total Process order quantity.
For Example:
If the Total processed quantity = 100
Yield Quantity = 20.
Loss = 80.
This kind of scenario should not happen, since Loss quantity is very much higher that the yield quantity. I want to set the loss quantity to a particular percentage ( say 20-30 %) of the total processed quantity so that the yield quantity will be higher than the loss quantity by a substantial amount. Are there any possibilities of doing this through configuration. If not what are the other options?
NB: Scrap quantity is not maintained at the time of process order confirmation.
Regards,
Umapathy.Hi Umapathy,
Yield and Scrap are user entry fields where you can have restriction on entered qty by changing under delivery and over delivery to error through OPK4 config as shown below. Agree that any qty can be entered in any field (Yield or Scrap)
OR
You can define the operation scrap. Read the below doc for more details.
http://scn.sap.com/docs/DOC-52834
OR
Another option is to use exit and write your logic based on input yield and loss.
Thanks & Regards,
Ramagiri -
Restriction during process order confirmation
Hi,
I want one validation during process order confirmation (mile stone) through t code COR6N if resource capacity & shift intervals not maintained ( t code CRC2) then process order should not confirmed & there should be error message. Plz advice how it is possible through customization.
regards,
sps.Dear shukla,
Check with this User Exit,
CONFPI02 Process order confirmation: Customer spec. input checks 1
CONFPI03 Process order conf.: Cust. spec. check after op. selection
CONFPI04 Process order conf.: Customer specific input checks 2
CONFPI05 Process order conf.: Cust. spec. enhancements when saving
If the above is not working then check with this BADI
WORKORDER_CONFIRM at the time of saving,
Regards
S Mangalraj -
How to creat Process messages automatically through PI sheet saved?
How to creat Process messages automatically through PI sheet to the Process message destinations.
Hi Jessie,
When you process instruction category PROD_3 in master recipe, the process message PI_PROD is created.
After releasing process order, you have to create control recipe. Upon successful creation of control recipe, process instructions will get generated. Check the error log for control recipe creation for error if any.
Note that control recipe will be generated only with order status "Released".
You have to sent this control recipe to process control (CO53).
Hope it is helpful.
Regards,
Sachin -
BAPI For Process Order Confirmation
Hi,
For Process Order Confirmation we are using the following tcode. COR6N. in the t-code we are include a new field (Shift Field) with help of CONFPP07. and we made the field as mandatory also. in cor6n it is working fine.
now we are using the bapi for same Process Order Confirmation. here the new field is not available. we want to include the new ( Shift ) Field also. we are using the following
BAPI Fm: BAPI_PROCORDCONF_CREATE_TT .
Regards
SathisBAPI_PRODORDCONF_CREATE_TT to confirm a production Order
Erwan -
Product Costing - Process Order Confirmation
Dear Experts,
We are facing a situation with our Product Costing Scenario :
Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
Entry : RM (Cr), Consumption (Dr).
Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
Reason:
According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
My Answer was:
- They can find all material costs in Process Order as Debit Item.
- They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of WIP entry immediately after Goods Issue of Raw Materials to Order.
Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
Regards,
Zain BashirHi Zain
This is a very unusual question
Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
Assume there is a fire (God forbid).. After the accident, you wont even know how much was lying there unconsumed which got gutted in the fire..
And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
My opinion - Dont build system for such requirements
Br. Ajay M -
Update Process Order Confirmations Back to SAP ECC
Hi,
Is there a document or step by step guide which explains how i can update SAP EARP with process order confirmations from my shopfloor? Below is the scenario i am looking for help in
1. There is a SQL server table where the SHOP floor update the quantity manufactured against a Process order.
2. I need to pick up that data from the SQL server table and update the ERP against that Process order.
Can any one explain how this can be achieved.
I checked the sample's and the templates in SDN but none of them actually show how to update any ERP?
Please advice!!.
Regards
SurajCheck this one
https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/60ac6bb8-a684-2b10-208d-b90883004a5e
https://www.sdn.sap.com/irj/scn/downloads?rid=/library/uuid/204a13d0-399d-2b10-ec84-9c254cd7efd4
You use this component to enable the shop floor operators to record their production order and process order confirmations using a touch screen user interface. In SAP ERP Central Component (SAP ECC) operators must complete many steps to confirm orders. Instead, you can use this interface, on a touch screen to enter the production performance easily and effectively. You can also use this component to obtain operators' work lists and information on their current activities.
Regards
Ram Upadhyay
Maybe you are looking for
-
Hi Everyone! Regular visitors to this board will have noticed that there is a little area at the foot of each post that asks you if the post was helpful or not. If you are new to the boards here you will be able to see it now, just in the bottom righ
-
My ISP changed their email system. I have the same email address, but they have changed the account name to the full email address instead of just the first part of the email address. Example [email protected] My old User Name used to be Johndoe,
-
5GHz wireless unavailable since upgrading E2500 to Firmware 2.0
My 5GHz wireless is unavailable since upgrading E2500 to Firmware 2.0. I did a complete reconfiguration of the router after upgrading. Anyone one have any ideas on how to fix this? Ed
-
Hi all, can anyone tell me as to how I can pass value between two views in IC Web Client. Regards, Vijay
-
Turkish caharacter set problem in Windows XP
My operating system is Windows XP and I installed J2SE 1.4.0 correctly. My problem is Turkish characters. In summary, output of a System.out.println(" .... "); statement with Turkish charcters as parameter is not correctly displayed in the console. I