Process order confirmation without 101mvt type

our client is  a process industry.client need during process order confirmation Background 101 not happen.
Step : 1 Process order create
Step : 2 Goods issue The material -261
Step:  3 Process order confirmation   (No 101)
Step:  4 Goods Receive (MIGO) 101 happen 
Following Steps Process only,
cork-only activity confirmation only,after Activity  confirm GR will Happen , how to configure in the system,any user exit or sap note there in the sense tell me?
Thanks For Advance

Hi Thiyaharaajan,
For Goods issue i believe you are using MB1A/MIGO. You also use backflush to automatically issue the material during confirmation.. For this maintain Backflush - 1 in material master MRP 2 view.
Also during confirmation for doing Auto GR (101 movement type) you need to assign the control key ticked with Auto Goods Receipt for Last operation/phase of Master Recipe.
Thanks & Regards,
Ramagiri

Similar Messages

  • Problem during Process Order Confirmation - COR6N

    Dear All,
    We are into process industries
    Till now we are creating different BOM for each section and different process orders for each BOM.
    For example Pulverize, Acid MIXING, Continuous Rotery, Blending and Packng.
    Now we have created new BOM for FG - showing all input/output of  RM, SFGs.  In Recipe, define operation for each section. and assign operation to material.  I have attached screenshot of Recipe Operation.
    During process order confirmation, system shows movement type of all material perfectly during each phase. But during confirmation of last phase system does not show 101 movemet of FGs.
    I have checked in Recipe, control key is ok i.e. Automatic GR,  in OPK4 setup is also correct.
    We have created new BOM and Recipe. There is no change in other configuration parameter.
    Thanks and Regards,
    Nirav

    Hi Nirav
    The automatic goods receipt is defined by the operation/phase control key.
    Control key PI03 has the automatic goods receipt setting by defaul.
    Analyzing the screenshot I could observe that this control key is assigned to all the opration/phases, however, it should only be assigned to the last operation/phase, where the goods receipt will actually take place.
    For all the previous operations/phases you should use a different control key, without automatic goods receipt, such as PI01.
    BR
    Caetano

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Problem with creating Process order confirmation using BAPI

    Hello,
    While creating Process Order confirmation using BAPI_PROCORDCONF_CREATE_TT, material document is getting created. But a line item is inserted in the table AFRU without material document number. When it is created manually using the transaction COR6, the table is getting updated with material doc in the line item. Can anyone let me know what other attributes to be passed in order the update the same?
    Thanks in Advance.
    Regards, Senthil G.

    Hello , I am working with the same Bapi, can you please send me the code to fill the parameters, if I find the same error like you, I will send you the solution if I correct that.
    Thanks for your help.
    [email protected]
    Guatemala, Cempro ADATSA

  • Process order confirmation reversal

    HI friends,
    I am cancelling a process order confirmation using T-code CORS. The confirmation cancellation is happening, but the goods movements are not reversed. Help in resolving will be much appreciated.
    Thanks in advance.
    Warm regards
    Vivek

    Hi All,
    Sorry for the delay in response and thanks for your suggestions.
    The backflushing is activated. I checked in COGI transaction for the concerned order. I got several entries with different error text. The error text is as follows
    "You have no authorization for this transaction with movement type 102"
    "You have no authorization for this transaction in plant XXXX"
    "Deficit of SL Unrestricted-use 6,957 TO : 1030604 XXXX PL01"
    Please let me know how to resolve these errors.
    Warm Regards
    Vivek

  • ABAP Programming Error when saving the Process Order confirmation in COR6N

    Hello,
    We have an issue related to Process Order confirmation using Tcode COR6N. When we enter all the inputs to confirm( Activity, yield and phase) and click on save it gives ABAP Programming Error (Exception condition "SEQ_NOT_FOUND" raised).
    Any inputs in this regard, would be appreciated.

    Hello
    I can observe that you have implemented the report ZOPSECRE and that an inconsistency was found.
    This repor corrects inconsistent orders which do not have an operation or a sequence, or the two of them.
    The report checks whether there is at least one operation or one sequence and creates both including status objects.
    Therefore, you need to have the default valus for the operation generation defined on OPJG for this order type/plant.
    BR
    Caetano

  • OPK4 Process Order Confirmation parameter

    Dear All,
    In process order confirmation i want do a configuration like
    Operation 10     
    Phase      20     0010(supr.ope)
    Phase      30     0010(supr.ope)
    Operation 40
    Phase      50     0040(supr.ope)
    now I maintained a relationship between 50 & 30 like "30 is predecessor of 50"
    I required during confirmation if confirmed quantity of phase 30 is 50 and now if I go for phase 50 confirmation system should not allowed confirmed quantity >50 of previous confirmed operation 30
    for that i have done setting in OPK4 like
    Checks
    Operation sequence " E Error when operation sequence is not adhere to"
    but system is allowed to do a confirmation more than 50 qty of operation 30
    so what is the meaning of operation sequence check in PPPI
    Regards,
    Murari Shah
    Edited by: murarisap1986 on Apr 6, 2011 7:50 AM

    Dear Murari shah,
    "E Error when operation sequence is not adhere to" This is to avoid the operation confirmation if it's not in sequence.
    For example,assume there are 5 operations in an order,directly i can't confirm the operation 0050 unless it's prior operation is
    confirmed.So the system checks whether the prior operation is first confirmed,if not the system proposes an error.
    So for this reason, we can make the necessary seetings in OPK4 for plant and order type combination.
    check and revert.
    Regards
    Mangalraj.S

  • In-process inspection...how to stop the process order confirmation?

    Hi...i'm making an in-process inspection and i want to stop the movement to the next phase or the process order confirmation, until the usage decision is made...how can i make this ?

    Dear,
    You can do this with OPK4 setting here slect your plant and process order type go in details here change the setting to
    Results Rec. (QM) = Error message  if no inspection result exist.
    Regards,
    R.Brahmankar

  • Order Confirmation without component fully issued

    Hi
    We found system allowing Process order confirmation even component Materials are not fully issued to respective reservation by MIGO_GI. We found system is allowing confirmation and even TECO. Even Production material get produce without component qunaity reduse from system.
    We want to stop confirmation and Techo if all component materials are not issued.
    How to achive this.
    Note, in OPK4 we have activated Error handling for goods movement but there is no tick on "Termination for incorrect goods movement"
    Thanks
    Sunil

    Dear Sunil,
    For this requirement,check with this BADI - WORKORDER_CONFIRM using the method AT_SAVE by cross checking the
    requirement quantity and quantity withdrawan for each component and then allow the confirmation based on the complete or
    partial GI of the components.
    Regards
    Mangalraj.S

  • No 101 for Co-products in Process order confirmation

    Hi All
    I have a problem in Process Order Confirmation.
    I have a order with Co-products.  When I do confirmation, 101 Mvt type is not happeneing for all the co-products along with the main product.
    The configs looks fine
    1.  Control key has "Automatic GR"
    2.  Confirmation parameters have "GR Co-products"
    What else could be the problem?

    Hi Jack,
    I'm not sure how it works with process orders but in case of production orders is it not possible to do auto GR for co-products - according to my best knowledge.
    Please check:
    http://help.sap.com/saphelp_erp2004/helpdata/en/b1/c04d01439a11d189410000e829fbbd/content.htm
    You can use MB31 + PrdOrd reference to book the co-products by mvt 101.
    (You can also search in this forum to find threads in connection with this.)
    BR
    Csaba

  • BAPI For Process Order Confirmation

    Hi,
    For Process Order Confirmation we are using the following tcode. COR6N. in the t-code we are include a new field (Shift Field) with help of CONFPP07. and we made the field as mandatory also. in cor6n it is working fine.
    now we are using the bapi for same Process Order Confirmation. here the new field is not available. we want to include the new  ( Shift ) Field also. we are using the following
    BAPI Fm: BAPI_PROCORDCONF_CREATE_TT .
    Regards
    Sathis

    BAPI_PRODORDCONF_CREATE_TT to confirm a production Order
    Erwan

  • Update Process Order Confirmations Back to SAP ECC

    Hi,
    Is there a document or step by step guide which explains how i can update  SAP EARP with process order confirmations from my shopfloor?  Below is the scenario i am looking for help in
    1. There is a SQL server table where the SHOP floor update the quantity manufactured against a Process order.
    2. I need to pick up that data from the SQL server table and update the ERP against that Process order.
    Can any one explain how this can be achieved.
    I checked the sample's and the templates in SDN but none of them actually show how to update any ERP?
    Please advice!!.
    Regards
    Suraj

    Check this one
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/60ac6bb8-a684-2b10-208d-b90883004a5e
    https://www.sdn.sap.com/irj/scn/downloads?rid=/library/uuid/204a13d0-399d-2b10-ec84-9c254cd7efd4
    You use this component to enable the shop floor operators to record their production order and process order confirmations using a touch screen user interface. In SAP ERP Central Component (SAP ECC) operators must complete many steps to confirm orders. Instead, you can use this interface, on a touch screen to enter the production performance easily and effectively. You can also use this component to obtain operators' work lists and information on their current activities.
    Regards
    Ram Upadhyay

  • In process order confirmation screen there should be 2 rows for down time.

    hi,
    We are using cor6n for process order confirmation, where we can put down time  with confirmation text at once,
    if there is two different down time, then user has to again  run cor6n with 0 yield  for put another down time, which gets more time.
    for this reason i have customised single screen entry profile by mentioning two down time & confirmation rows in screen.
    when i going for confirmation i put two different down time  after goods movemnt order get confirmed & settled.
    but when i see report in COOISPI  there is only one down time against order.
    system only considers last down time.
    hows the system consider down time?
    thanks in advance.
    regards
    sanjay.

    Hi,
    The report COOISPI considers only one line of the down time, it is not considering the 2nd row of the down time. You need to change the COOISPI program to read the 2 lines of the down time. You need to change the standard program to read the 2 down time lines.
    Thanks & Regards,
    V. Suresh

  • Process order confirmation

    Dear Experts,
    In process order confirmation can we make a kind of restriction through configuration  in which system should not allowed a confirm quantity of phase 20 is not greater than previous confirmed quantity of  phase 10 there is no relationship between this two phases.
    Regards,
    Murari Shah

    Hi.
    Just my 2 cent , Not sure about standard SAP configuration perhaps there's but i don't know.
    But i very sure , you can implement this with the user exist below:
    ===============================================================
    CONFPI01 |Process order conf.: Calculate cust.specific default values
    CONFPI02 |Process order confirmation: Customer spec. input checks 1
    CONFPI03 |Process order conf.: Cust. spec. check after op. selection
    CONFPI04 |Process order conf.: Customer specific input checks 2      
    CONFPI05 |Process order conf.: Cust. spec. enhancements when saving  
    CONFPI06 |Process order confirmation: Actual data transfer       
    Customise with ABAP , please check with your abaper.
    Thank you.

  • Process order confirmation error in COR6

    Hi Gurus,
    I am working as sap manual tester and facing below issue in Process order confirmation in t-code COR6.
    Batch 456 for component 350515 does not satisfy BOM requirements
    Message no. Z_MFG017
    Need ur help.
    Regards,
    Imran
    Edited by: imran.shek38 on Jan 25, 2011 7:16 AM

    Hi,
    Please check whether the Batch-Management checkbox is maintained for the component in the Material Master (MM02).
    Also, check the Transaction MSC2N for this component and activate the checkbox for batch-managed item in the BOM.
    Hope it helps.
    Regards,
    Kaushik

Maybe you are looking for