hi experts,
our client has a R&D trial batches scenario .
for that they will create a process order and the cost should go to cost center of r&d and not to matrial.
at present i get MAT in settlement rule , so the cost is settled against material.
i need CTR to come in default when i create the process order instaed of MAT .
please advice.
regards,
satish

If PS is implemented
for project related production for R & D
1) create a project profile with non valuated( for raw material procurement for project the price is taken from info record.
2) assign the production material in activity
3) maintain a settlement rule as cost center R &D
4) Run a MRP for a material
5) convert plan order into production order, system will set the WBS as settlement rule
6) Do the GI  in MB1A or co11n  ,confirmation in Co11n & GR in MB31 or MIGO or in CO11n
(If the material is valuated, system will take MAT as default ( as per the setting in OPL8 default settlement rule as PP1 or PP2)
the reason is if material is valuated, variance  = (GI value + activity value) - GR value
only the variance in settled in settlement, so the variance value( (GI value + activity value) - GR value ) is going to MAT
if the material is non  valuated then variance =(GI value + activity value) )
7) do the settlement for production order ( the variance (GI value + activity value) ) is settled to WBS element
8) after that confirm the project in CN27.
9) settled the project in CJ88, the cost will settled to relevant cost center
if PS in not implemented
or go head with
you can create a order in CORO itself by maintaining settlement rule as CTR with R& d cost center( manually)
we can't make particular cost center as default in settlement rule.

Similar Messages

  • Process Order Settlement Rule by Order Type

    Hi Experts
    Our Client  a requirement to have Process Order Settlement by Order Type please let me know how it can be achieved
    In SAP  a Process Order Variance is settled via the following Combination in OBYC  :-
    1 Chart of Accounts
    2 Transaction PRD
    3 Valuation Modifier
    4 General Modifier
    5 Valuation Class
    6 GL Account
    Can   this account assignment based on the Order Type ?
    Thanks
    Suman

    Dear Suman,
    Normally, Order Types serves a different purpose. We can maintain default settlement rule, Costing Variants, Settlement Profiles, Number ranges etc at Order Type Level.
    It is not possible to directly manage the Order Types in the Account Assignment in OBYC.
    Thanks & Kind Regards
    Umapathi G

  • Process order settlement

    Hi,
    when i do process order settlement , system gives error message that "maintain the settlement rule of the sender".
    Process order contains two co-product and i have given details in "joint production" in MRP II tab.
    When i checked order settlement rule in COR2 i couldn't find anything and when i try to insert new settlement rule system gives error message .
    Sunoj

    error message when executing KKS2
    KV     206     1     OIT 20000095/1     No suitable settlement rule found for object OP0000200000950001          Checking and processing orders

  • How to open field WERKS in Internal order settlement rule

    Hello experts,
    Could you explain please  how to add field PLANT (WERKS) in internal order settlement rules. I would like to fill out this field during the settlement process.
    Any advices will be very appreciated.
    Regards,
    Ivan

    HI Ivan,
    Please post more details on your business scenario. Why you want to add plant field in the rule?
    To which receiver you want settle your internal order? If you want to settle to a material for instance, plant will be one of the field available. Try double click on settlement rule to get to detailed screen.

  • For internal order settlement rule amount column is requied instead %

    Hi Gurus,
    For internal order settlement rule percentage is there but business wants  to settle from AUC to final asset by amount wise how can we do this.
    I tried to change the investment profile but it is coming amount field while saving it is not displaying.
    Please help in this regard
    Thank you.
    Ranganadh

    Hi
    Check the path
    IMG>Controlling>Internal Orders>Actual Posting>Settlement>Maintain Settlement Profile>Maintain Settlement Profile.
    Here there is a tick for amount settlement under Indicators. You need to maintain this check box for your requirements.
    Regards
    Sanil Bhandari

  • Error during Process order settlement

    Hi Gurus,
    i am facing problem during the process order settlement. an error is occured is as follows: Tax code V0 country IN does not exist in procedure ZTAXIN.
    actually this V0 tax code is assing to the ZTAXIN procedure & which is also assign to country. i couldn't get why it ask tax code during the settlement.
    In Process order Itemization i find the 2 GL ( Element) in which there is one consumption GL & second is COFG sold GL. from GL Master i remove both GL Tax category & also remove the click from posting without tax allowed. till i am facing this problem?
    Please help me to overcome this issue.
    Point will be rewarded if question solved.
    Than'x
    Dhananjay R

    hi gopan,
    Than'x for attention on my question. till my problem is not solved. during the process order why it hit the tax code? would u please guide me how to find the tax code assignment which hit during the process order settlement?
    i have check all the Tax related setting till this issue not solved. ( Check calculation procedure (OBYG), Tax code assignment (FTXP), also check the Tax Account Integration (OB40).
    also i remove tax related assignment from the GL master related to specific gl which are display in component structure.
    pls help me to solve this issue..
    Than'x
    Dhananjay

  • Process order settlement to cost center

    Hi,
    We have a requirement to settle only the quantity to material and the costs to
    cost center from the process orders. This is to ensure the materials are
    handled as non-valuated and the COGM is computed from the goods consumption
    postings.
    The process orders will have both co products and by products as well.
    There is also one more requirement to allow Purchase orders against the non-
    valuated materials.
    I am planning to propose the following :-
    1) To make the materials valuated but set the standard price to zero to give
    the effect of non-valuated materials and at the same time can also raise
    purchase orders because otherwise non-valuated materials cannot be used to
    raise Purchase orders.
    2) When goods receipt happens from the process order the actual costs of the
    process order will remain as it is in the process order since the standard
    price of the FG is zero and only the quantity will be received into inventory.
    3) When process order settlement happens the full actual costs will be settled
    to a price difference account and cost center tied to the price difference
    account.
    Do you guys see any flaws in the above design?
    Edited by: FICO Consultant on Feb 21, 2012 4:28 AM

    Answered

  • PROCESS ORDER SETTLEMENT - KO88

    Hi!
    As per my knowledge KO88 will be done for OHDS and for Material.  OHDS settlement will be done in month ending which results the difference between KSII and KP26.
    Can anybody explain how the accounting entry will be generated at the time of Process order settlement of material i.e. KO88. 
    Sreenivas

    Hi
    Settlement entries are same as in production order.  No diff
    However, u must be aware settlement entries are dependent on status of process order.  If status is DLV or TECO wip is calcelled and variances are calculated.  If status if PREL or REL or PDLV wip entries are posted. 
    Hope you have made settings in WIP for offsetting entries
    Pls assign points if this clarifies else send query with more explanation

  • Maintain internal order settlement rule using LSMW

    HI ALL
    I want to do mass maintenance of internal order settlement rule. Settlement category is PSG.
    But when I use LSMW to do KO02, I only can input one settlement receriver, the first line will be overwritten by the second line.
    I also see BAPI INTERNAL_ORDER_CREATE,but cannot find PSG as a settlement category.
    Does anyone know how to do this?
    THX
    Deelia

    Hi Lian
    When you do recording, enter two settlement rules..
    Then, before pressing the "DEFAULT ALL" button, change the Field names for the 2nd settlement rule
    The problem you described happens because the field names for both settlement rules are same.. Hence, it gets overwritten
    Assume that field name for Order is AUFNR... You can change the field name in recording to ZAUFNR for one of the fields
    See the screen shot, wherein I changed the name of the recorded field to _01, _15 and _70
    Br. Ajay M

  • Where can I define Account assignment category for order settlement rules

    Dear Gurus,
        When I used Tcode: CO07 to create a rework order for parent order. But I cann't find the Account assignment category = Ord (Order) in the maintain Settlement rule overview.
      Where can I define Account assignment category for order settlement rules?
      Please help me. Thanks!
    Regards
    Paul.

    I've resolved this question.
        Firstly, run OPJH - Define Order Types, we should assign settlement profile for the order type.
        Secondly, Run OKO7-Maintain Settlement Profile, find and mailtain the settlement profile. In 'Valid Receivers' we should set the field 'Order' = 1-(Settlement Optional).
        Thirdly, run CO07 - Create Order without material. We can find account assignment catetory 'ORD' in maintaining Settlement rule.
    Edited by: Paul Chan on Feb 16, 2009 5:15 AM

  • Work order SETTLEMENT RULE Error

    Workflow Work order SETTLEMENT RULE Error, but settlement is done no problem in updation. But notification error there.
    Notification of completion cannot be generated
    Problems occurred when generating a mail
    Error '9' when calling service 'SO_OBJECT_SEND'
    Error handling for work item 000112476185
    Work item 000112476185: Object 000020154849 method UPDATESETTLEMENTRULE cannot be executed
    Call transaction was canceled.
    No errors occurred -> Details in long text
    No errors occurred -> Details in long text
    Please advice what could be the reason this error.
    Best Regards,
    Prabhakar

    Message no. WL821
    Message no. FD009
    Message no. WL863
    Problems occurred when generating a mail
    Message no. SWF_RUN534
    Error handling for work item 000133673828
    Message no. SWF_RUN630
    Error '9' when calling service 'SO_OBJECT_SEND'
    Message no. SWF_RUN535
    Thanks,
    Prabhakar

  • Problem with process order settlement

    Hi,
    I'm having a problem while doing settlment for process orders. I have two types of process orders AJWV and AJW0; AJWV works for center 2000 and AJW0 works for center 1000. When I calculate variances both work good. The problem comes when I try to settle them. For AJWV orders there are three finance documents generated, FI document, Controlling document and Profit Center document. But for AJW0 it's just generated Controlling document and Profit Center document.
    Both order types have the same settlement profile assinged
    The settlement rule for both orders is to Cost Center, full settlement 100%
    Both orders are produced for Sales order with valuated stock
    I already checked the account assigment for the materials corresponding to each order, and both account determination are ok.
    What can be the problem so the AJW0 is not posting to FI variances?
    Thanks

    Hi,
    Yes for AJWV the FI entry was generated.

  • Stop Process order settlement (CO88/KO88) for DLV status orders

    Hello gurus,
    My business requirement is to prevent process orders with status DLV (Delivery completed). In standard SAP orders with DLV/TECO are being settled to settlement receiver. ANy help would be richly rewarded.
    Thanks
    RG

    Dear Ajay,
    Thanks.
    I am able to change the profile. But after that when I try to exit from the screen system throws the following error/message :
    1  Receiver categ. MAT is not allowed by settlement prof. 000090 for this sender
    2. Maximum number of 0 rules reached
    3. Rules exist, but set. prof. 000090 states no settmt of act.costs/cost of sales
    First two are Errors and last one is message with yellow mark.
    Thanks and Regards,
    Nirav

  • User exit for profitability segment in service order settlement rule

    Does anybody know if exit EXIT_SAPLKEAK_001 works for the profitability segment creation during the creation of a settlement rule of a service order?
    The context is the following: the company uses service orders which are settled periodically (it receives revenue from sales order which is posted to the service orders at time of billing, and also costs at time of goods issue). The profitability segment in the settlement rule of the service order needs to be the same as the one from the billing document that posted to the order.
    Can I use EXIT_SAPLKEAK_001 to find the characteristics from the billing document and populate it in the PSG of the settlement rule? If yes, could this be applied to only one specific service order type?
    Thank you.

    Hi
    If your settlement is triggered by a batch or is triggered by a workflow exit EXIT_SAPLKEAK_001 is not run. From release 5.00 on characteristic groups are indeed not considered any more during batch input processes because there were problems before with initial chars of a CO-PA line item resulting from a batch input process that actually shouldn't be initial.
    Refer SAP Note 581739, which put an end to usage of char groups during batch input processes. Also refer SAP Note 142628.
    Regards
    Sanil Bhandari
    Edited by: Sanil K Bhandari on Jun 23, 2011 10:12 AM

  • Defaulting G/L account in work order settlement rule

    Hello,
    I have set my work order settlement profile, the default object to be G/L.  However, in the equipment master record, at the Organization tab (account assignment group), i don't see any field for G/L account.
    When i create settlement rule with default, i get error that rule cannot be created with default.
    Where can i enter the G/L account in the equipment master to enable the auto settlement rule creation?

    you can always explain the concept of FI account through Cost Center and CO account through Cost Element from Plant Maintenance and FI/CO organisation point of view and in relation to business process.
    As you cant define in master data you cant get it automatically copied into settlement rule and hence have to maintain it manually as system dont know which GL to use as settlement receiver as not maintained in master data.

Maybe you are looking for

  • Upgraded from 6.04 to 6.05. Now Itunes will not open at all

    I had 6.04 on an XP Pro PC working fine. I did the suggested upgrade to 6.05 and the install appeared to go fine, but when I click on the program I get an hour glass for a few seconds and then nothing. I have repaired and reinstalled and same thing.

  • Sap crm 2007 installbase

    hi, I installed sap crm 2007 in my PC, (capacity is 2 GB RAM.) whenever i open any transaction code its  take long time and also showing the some of the ABAP Run time errors how, im fedup with these type of Runtime errors, how it is be solved could p

  • Error in VA01: Message 00002 'Enter a valid value'

    Hello Experts! When I try creating a sales order in VA01 after entering the order type and other mandatory information, I get the error message (no. 002 of class 00) saying 'Enter a valid value'. When I searched other threads in SCN with the same mes

  • Vertical alignment

    <div class="content">   <div> (css attribute float : left)     <img>   </div>   <div> (css attribute float : left)     <table>  (I need this table to align vertically with the image.)                  (vertical-align : middle   doesn't seen to do any

  • My blackberry z30 does not turn on with red light flashing

    hi i have a blackberry z30 , after charging my blackberry z30 it does not turn on and show me a red light blinking 5 times...what i should do? please help.