Hi,
We have a requirement to settle only the quantity to material and the costs to
cost center from the process orders. This is to ensure the materials are
handled as non-valuated and the COGM is computed from the goods consumption
postings.
The process orders will have both co products and by products as well.
There is also one more requirement to allow Purchase orders against the non-
valuated materials.
I am planning to propose the following :-
1) To make the materials valuated but set the standard price to zero to give
the effect of non-valuated materials and at the same time can also raise
purchase orders because otherwise non-valuated materials cannot be used to
raise Purchase orders.
2) When goods receipt happens from the process order the actual costs of the
process order will remain as it is in the process order since the standard
price of the FG is zero and only the quantity will be received into inventory.
3) When process order settlement happens the full actual costs will be settled
to a price difference account and cost center tied to the price difference
account.
Do you guys see any flaws in the above design?
Edited by: FICO Consultant on Feb 21, 2012 4:28 AM

Answered

Similar Messages

  • Plant maintenance order settlement to cost center

    Hi,
    I have a requirement from the client that PM order costs should be settled to Cost center (real) and credit the order line with statistical cost center.
    1. Consumables GL is debited at the time of goods issue with refrence to PM order , cost center is not updating in this line item
    2. Settlement rule maintained as cost center receiver which is mentioned in the PM order and after settlement consumables GL is getting credited with Order and debit to cost center mentioned in settlement rule , statistical cost center is not updating in credit line
    My client requirement is
    Statistical cost center should update along with Maintenance order at the time of goods issue for consumables GL (Debit)
    Statistical cost center should update along with maintenance order at the time of settlement for PM order (Consumables GL credit with statistical cost center and maintenance order and the same GL debit with settlement receiver cost center (real)).
    If i provide cost center in account assignment at the time of Goods issue , system is updating the cost center along with order , however at the time of settlement both cost center and order are not updating in credt line item and the cost is lying in the order without settling.
    Please advise any configuration setting or user exit to meet the above requirement.
    Thanks,
    Sreedhar

    Hi Ravi,
    Thanks for the update.
    If i give the cost center in acct assignment in MB1A it is taking , is there is any option to default the cost center either from PM order or thru some other setting.
    I have tried both substitution and OKB9 , however system is not defaulting the cost center from this settings.
    Please let me know if there is any other option to default the cost center in MB1A.
    Thanks,
    Sreedhar P

  • PP Order settlement at Cost Center

    Hi! Gurus,
    We have peculiar requirement of settleling PP order at Cost center, client is asking for correct cost center to be pop up as settlement receiver.
    moreover we can not remove default receiver(material) otherwise it won't allow GR.
    Now the thing, is there any means by which we can populate settlement receiver as "particular" cost center during the order creation, as second line item?
    OR
    Is there anymeans to put validation, as if correct Cost center would not be selected it will terminate Order creation?
    Looking forword expert advice.
    Regards,
    Asheesh

    Hi Ambi ash,
    To achieve this you have to activate a user exit/form exit & substitutions in CO module. Your CO Consultant should be able to help you out.
    Thanks & regards
    Mahesh babu

  • PM Order Settlement to Cost Center(real) & Internal Order simultaneously

    Dear Experts.
    I have a request from client to settle 100% of PM order to Cost Center (real) and internal order (statistical) simultaneously. The purpose of statistical orders is to capture all the expenses (electricity, water, security charges, maintenance, etc...) location-wise. 
    PM Order settlement through statistical IO will contribute to  the maintenance aspect, and other expenses will be captured to statistical IO through financial GL posting. Hence each location will have a unique statistical order maintained.
    In the settlement Profile, I have maintained Order and Cost Center elements as "Settlement Optional" Under "Valid receivers". But the system doesn't allow this settlement. As per my understanding SAP allows settlement (100%) to go only to a single object.
    Appreciate your inputs on this matter.
    Thanks,
    thushantha.

    hi,
    Please check how you maintained the real object in the settlement rule.
    You must maintain both the cost center and internal order on the same assignment line such as:
    CAT:     Settlement receivers
    ORD      ORD_Number   Cst_Center_number         100%   PER
    The system will correctly generate KI178 if you have the following:
    CAT:     Settlement receivers
    ORD      ORD_Number                              100%   PER
    CTR      Cst_Center_number                       100%   FUL
    regards
    Waman

  • Settlement receiver (cost center) for an PM order

    Hi Gurus,
    In which table I can find the settlement receiver (cost center) for an PM order??
    Thanks.

    Settlement distribution rules are stored in table COBRB.
    Regards
    Sreenivas

  • Problem with process order settlement

    Hi,
    I'm having a problem while doing settlment for process orders. I have two types of process orders AJWV and AJW0; AJWV works for center 2000 and AJW0 works for center 1000. When I calculate variances both work good. The problem comes when I try to settle them. For AJWV orders there are three finance documents generated, FI document, Controlling document and Profit Center document. But for AJW0 it's just generated Controlling document and Profit Center document.
    Both order types have the same settlement profile assinged
    The settlement rule for both orders is to Cost Center, full settlement 100%
    Both orders are produced for Sales order with valuated stock
    I already checked the account assigment for the materials corresponding to each order, and both account determination are ok.
    What can be the problem so the AJW0 is not posting to FI variances?
    Thanks

    Hi,
    Yes for AJWV the FI entry was generated.

  • Process order - settlement rule

    hi experts,
    our client has a R&D trial batches scenario .
    for that they will create a process order and the cost should go to cost center of r&d and not to matrial.
    at present i get MAT in settlement rule , so the cost is settled against material.
    i need CTR to come in default when i create the process order instaed of MAT .
    please advice.
    regards,
    satish

    If PS is implemented
    for project related production for R & D
    1) create a project profile with non valuated( for raw material procurement for project the price is taken from info record.
    2) assign the production material in activity
    3) maintain a settlement rule as cost center R &D
    4) Run a MRP for a material
    5) convert plan order into production order, system will set the WBS as settlement rule
    6) Do the GI  in MB1A or co11n  ,confirmation in Co11n & GR in MB31 or MIGO or in CO11n
    (If the material is valuated, system will take MAT as default ( as per the setting in OPL8 default settlement rule as PP1 or PP2)
    the reason is if material is valuated, variance  = (GI value + activity value) - GR value
    only the variance in settled in settlement, so the variance value( (GI value + activity value) - GR value ) is going to MAT
    if the material is non  valuated then variance =(GI value + activity value) )
    7) do the settlement for production order ( the variance (GI value + activity value) ) is settled to WBS element
    8) after that confirm the project in CN27.
    9) settled the project in CJ88, the cost will settled to relevant cost center
    if PS in not implemented
    or go head with
    you can create a order in CORO itself by maintaining settlement rule as CTR with R& d cost center( manually)
    we can't make particular cost center as default in settlement rule.

  • Internal orders/networks and Cost center

    is it correct to say, all internal orders and process orders will roll into a cost center at the end.
    Sri

    Hello Ganga,
    You can settle the costs collected on an internal order to one cost center, one G/L account, or one business process using one settlement cost element.
    Hene, it is not necessary that all internal orders will roll in to a cost centre at the end.
    Rgds
    manish

  • Report Painter - How to identity statistical orders in a Cost Center Report

    Hello,
    currently I am in the process of building a cost center report based on reporting tabel CCSS.
    This report should list all primary and secondary costs which are charged to a specific cost center/cost center group .
    The cost center or cost center group is given in the general data selection.
    All direct primary cost postings are identified in rows like this:
    - Cost Element (SET): cost element group A1, A2,...Axx
    - Business Transaction Type: COIN
    All primary cost postings deriving from (real) internal orders are identified like this:
    - Cost Element: 1 to 9999999999
    - Business Transaction: KOAO
    - Partner object number: 0 to 99999999
    Now here is the problem:
    The controlling department requests to identify all primary cost postings  to the given cost center which have been postet to a statistical internal order at the same time.  The most part of the primary costs have been directly postet to the cost center in the Additioanal Account Assignments. But some have been posted to the cost center and at the same time to a statistical internal order.
    Looking into BSEG I can quickly identify these line items as they have a value in BSEG-KOSTL and BSEG-AUFNR.
    How can I select these items in a report painter report?
    I would like to separate all items whith connection to statistical int. orders from those with no connection to internal ordes.
    Thanks for your help!

    Dear Elli,
    Dear SAP-Gurus,
    once again, thank you for your quick reply.
    You hints and remarks are very much appeciated.
    My problem seems to be slightly more complicated than what I had expected.
    All postings to the cost center/cost center group are actual postings. The cost center is the "real" cost element, there are no postings of value type 11 here.
    Most postings have the cost center as the only cost element, but others additionally mention a statistical order.
    My goal is to seperate those postings to the cost center [as (real) cost element] plus the statistical order from those with only the cost center.
    I would also like to sort these postings by the order number.
    I could easily write two reports:
    One  for the cost center and another one only for the statistical orders. The latter would use value type parameter 11 (as you proposed!). Unfortunately, I do not know all order numbers tied to the cost center. As table BSEG is not suitable for SAP Query,  I  run into deep problems here.
    I know I have problem in the design of my report here and  I would like to sort out, which options I have.
    Is Report Painter a suitable tool for me here anyway?
    Thanks again!
    Karsten

  • Costs to be recorded to Internal Order instead of Cost Center

    Hi,
    My client has created a new Personnel Area and has started hiring people for it. They did not create a cost center for this. Meanwhile, if any costs are to be recorded for the employees in this Personnel Area, the client wants them record to an Internal Order (instead of Cost Center). Later, when they create a cost center, they may transfer the costs from Internal Order to the Cost Center.
    What needs to be done to satisfy this scenario.
    Best Regards,
    Veera

    hi
    create internal order through kO01, which is of type real order, and post all the expenses by keeping this internal order as cost object. later as you want to settle this internal order to cost centre, you should have settlement profile attached to the internal order to settle that. please update settlement profile while creating the internal order
    krishna

  • Process Order Settlement Rule by Order Type

    Hi Experts
    Our Client  a requirement to have Process Order Settlement by Order Type please let me know how it can be achieved
    In SAP  a Process Order Variance is settled via the following Combination in OBYC  :-
    1 Chart of Accounts
    2 Transaction PRD
    3 Valuation Modifier
    4 General Modifier
    5 Valuation Class
    6 GL Account
    Can   this account assignment based on the Order Type ?
    Thanks
    Suman

    Dear Suman,
    Normally, Order Types serves a different purpose. We can maintain default settlement rule, Costing Variants, Settlement Profiles, Number ranges etc at Order Type Level.
    It is not possible to directly manage the Order Types in the Account Assignment in OBYC.
    Thanks & Kind Regards
    Umapathi G

  • Wbs settlement to cost center

    Hi Gurus,
    We have project sysyem, FI and cost and profit center accounting.
    We are booking cost and revenue on wbs and then we are settling it to cost center.
    Do we really need to settle to cost center what is the need and what is the correct process???
    Thank you

    Hi Mohit
    It is against SCN's rules to post the same discussion thread twice. You have already posted a similar question in the below thread. Please refrain from doing this and close one of the threads.
    Initial balance upload of revenue GL accounts with wbs
    Regards
    Sowmya

  • PM order settlement to the center.

    hi,
    I want to know is there any report available which shows the settlement amount from the PM order to the cost center.
    The report must be cost center-wise.
    Thanks in advance.

    hi
    check the information system under  cost center accounting

  • Process order settlement

    Hi,
    when i do process order settlement , system gives error message that "maintain the settlement rule of the sender".
    Process order contains two co-product and i have given details in "joint production" in MRP II tab.
    When i checked order settlement rule in COR2 i couldn't find anything and when i try to insert new settlement rule system gives error message .
    Sunoj

    error message when executing KKS2
    KV     206     1     OIT 20000095/1     No suitable settlement rule found for object OP0000200000950001          Checking and processing orders

  • Internal order posting vs cost center

    HI,
    I have a requirement like this; in our company we have allowed the posting to be made only through internal orders no
    direct cost center postings are allowed. Is there any report to carry out a comparison between internal order posting and cost center postings? I just want to check the transaction which directly posted to cost center instead of internal order.
    please help.
    thanks
    best regards
    gayani

    Hi,
    Do you want to trace postings which were done only on cost centres without I/O? You can go to KSB1 and select the line where Auxiliary account assignment is blank - this will mean that these lines were posted only to cost centre.
    Also, if your I/O are real one, you can select in KSB1 postigns with '4' value type, which will mean that the posting on cost centre is real and not statistical; therefore, no postings on I/O happened.