Process order with variant configuration material

Hi,
I create a process order for a material XX.
This material has a BOM with a material that has variant configuration "class type 300" for price configuration.
When I save the process order I get a message saying "There are still characteristics for components to evaluate". I dont want to evaluate this material in my process order.
What can I do to not have this message?
Regards.

Hi all,
Yes, I work with variant configuration. But sales orders are not involved.
What I do is:
1) I create a purchase order for material X (this material belongs to a BOM), this material has variant configuration. I give a value to the characteristics in the PO.
2) I create a process for a material XXX that has a BOM (material X is in the BOM and cannot be removed).
3) When I save the process order the system asks me to evaluate again the characteristics. This is what I dont want it to do.
Any ideas?
Regards.
Eduardo

Similar Messages

  • BAPI/FM in ECC to create a sales order with variant configurable material

    Hi all,
    I need to create a function module that creates a sales order in ECC with a variant configurable material.
    can some one tell me if there is a in built function module or BAPI that i can make use of to create a sales order with variant configurable material in ECC.
    Regards,
    Jessica Sam

    Thanks MxG,
    I dont know how to use this BAPI. .Can you suggest me a sample code.
    My reqmnt is, i have
    Sold to party, ship to party, bill to party , VC config material and all char values that should be populated while creating a sales order.
    please help me with what values should i populate in i/p paramters and and how to use this BAPI with some sample code if posible.
    Regards,
    Jessica.

  • BAPI/ FM in CRM to create a sales order with variant configurble material

    Hi All,
    I need to create a sales order using variant configurable material in CRM not manually through GUI. I need to develop a function module that will create sales order using variant configurable material in CRM .
    Can some one tell me if there is an in-built BAPI/Function Module availabe in CRM to create sales order using variant configurable material in CRM .
    When i researched i found that there is a BAPI 
    BAPI_BUSPROCESSND_CREATEMULTI which can create a sales order in CRM.
    I dont know if this can create a sales order with varinat configurable material in CRM
    can some one guide be how i can build a function module in CRM which generates a sales order with variant configurable material.
    Regards,
    Jessica Sam

    Jessica
    I am not a CRM expert and am still learning. But you can try the BAPI CRMXIF_ORDER_SAVE and see if that helps.
    Good Luck
    Ram

  • Create a production order with variant configurator data

    Hello,
    Can anyone tell me the way to create a production order with variant configurator data. Is there a BAPI ? an IDOC ?
    Is there several steps ?
    I have to create an interface which creates automatically PP orders. The data input is a file.
    Thanks for your help

    Hi,
    There are fews BAPI's available for creation of Production Order. They are:
    BAPI_PRODORD_CREATE
    This bapi will suit to your requirement, as input will be provided from file.
    Others are
    BAPI_PRODORD_CREATE_FROM_PLORD " this converts planned order to production order
    BAPI_PRODORD_CREATE_FROM_REF      " this creats production order considering other production order as reference.
    Hope your query is answered.
    Regards,
    Brajvir

  • Sales Order with Variant Configuration

    I´m trying to create a Sales Order with Variant Configuration.
    First, I tried to create the order with the BAPI SD_SALESDOCUMENT_CREATE but It would not let me update characteristics.
    Then I separated into two BAPI's:
    SD_SALESDOCUMENT_CREATE to create Sales Order and  BAPI_SALESORDER_CHANGE to modify the characteristics.
    I run the two SAP BAPI's from SAP and create the Sales Order and make the characteristics correctly, but when I try to invoke from The Middleware the message  V1 555 The sales document is not yeat complete  is displayed and does not update the characteristics.
    Both functions are such as Remote-enabled Module.
    The remote user profile is SAP ALL
    Reviewing where the message is used, I see that the message is in the include MV45AF0B_BELEG_BEARBEITEN_ENDE
    IF DA_LINES> 0 AND
    SY-NE SPACE AND BINPT
    CTU_AMODUS BI_INFO-NA 'A' AND
    CATTAKTIV IS INITIAL.
    MESSAGE I555.
    ENDIF.
    Do you have any idea why since Middleware is not working?.
    Best Regards.
    Blanca Segovia.

    Hi Diwakar
    I changed the creation of Sales Order using only SD_SALESDOCUMENT_CREATE and using Commit Work and it is the same, running the function from se37 create the Sales Order and make the characteristics correctly, but when I try to invoke from The Middleware the message V1 555 The sales document is not yeat complete is displayed and does not update the characteristics.
    I Open that Sales order in VA02 and check 'Incompletion Log'  the screen show 1 Configuration, I Open the tab of the characteristics without changing the characteristics and only save, then the status changes to Complete document.
    You give me another idea that could be happening?
    Thank you very much.
    Blanca Segovia.

  • Creation of sales order with Variant configuration info

    Hi friends,
       I am creating sales order along with Variant configuration data. We have 3 level BOM structure.
    I am using BAPI_SALESORDER_CREATEFROMDAT2 and filling in ORDER_CFGS_REF, ORDER_CFGS_INST, ORDER_CFGS_PART_OF ORDER_CFGS_VALUE, ORDER_CFGS_REFINST
    tables exactly the same way BAPISDORDER_GETDETAILEDLIST FM returns.
    Sales order is being created with no variant configuration information.(Not in the header level atleast)
      Can any one help me on this.
    Thanks
    Seshagiri

    Updating Variant Configuration data for SO item became little tricky for us in an ongoing implementation. After spending some hours investigating the correct combination of data to pass, we were able to post the document correctly. As no detailed documentation is available online for this scenario, I hope this post will help community for similar requirements. J
    For updating Variant configuration (VC) data for Sales order item, we need to populate below tables of standard FM or BAPI (e.g. SD_SALESDOCUMENT_CREATE).
    Normally the standard FM or BAPI does not return any error messages in case configuration data is not updated successfully.
    ·         SALES_SCHEDULES_IN: The required date field should be populated with appropriate value (REQ_DATE).
    ·         SALES_ITEMS_IN: Field PO_ITM_NO should be populated with appropriate value.
    ·         SALES_CFGS_REF Table:
    1.       This table should have 1 record per item.
    2.       Combination of CONFIG_ID and ROOT_ID should be unique across line items.
    POSEX
    000010
    CONFIG_ID
    000001
    ROOT_ID
    00000001
    SCE
    1
    COMPLETE
    T
    CONSISTENT
    T
    CBASE_ID_TYPE
    G
    ·         SALES_CFGS_INST:
    1.       This table should have 1 record per item.
    2.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    CONFIG_ID
    000001
    INST_ID
    00000001
    OBJ_TYPE
    MARA
    CLASS_TYPE
    300
    OBJ_KEY
    MATNR value
    QUANTITY
    Quantity value
    QUANTITY_UNIT
    Quantity Unit
    COMPLETE
    T
    CONSISTENT
    T
    OBJECT_GUID
    MATNR value
    PERSIST_ID_TYPE
    G
    ·         SALES_CFGS_VALUE:
    1.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    2.       We can have multiple characteristics for a material. In that case appropriate records should be inserted in this table. Note that CONFIG_ID and INST_ID should be same for all the rows you insert in this table for multiple characteristics for a material.
    3.       The characteristic value should be in SAP internal format.
    CONFIG_ID
    000001
    INST_ID
    00000001
    CHARC
    Material characteristics
    VALUE
    Material characteristics value
    ·         SALES_CFGS_VK:
    1.       Combination of CONFIG_ID and INST_ID should be unique across line items.
    2.       We can have multiple characteristics for a material. In that case appropriate records should be inserted in this table. Note that CONFIG_ID and INST_ID should be same for all the rows you insert in this table for multiple characteristics for a material.
    CONFIG_ID
    000001
    INST_ID
    00000001
    VKEY
    Material characteristics

  • Production Order BOM with Variant Configurable Material

    Hi,
    I have a requirement to process the document items in the Production Order BOM for a variant configurable martial. I am not sure which Function Module will do this purpose. I checked the FM: CS_BOM_EXPL_MAT_V2 and does not seem to be working.
    Can you please help me with a suitable Function Module or program that will process the Production Order BOM? Appreciate Your Help.
    Thanks,
    Kanan
    Edited by: Kannan SA on Jul 6, 2011 8:59 PM

    What are you doing with the characteristics right now ?
    If you want operations selected based on characteristic values, you need to have dependencies written just like you do (or in your case, will do) in your BOM components.
    I understand the business-push to not do things 100% at the start and just "oh we'll add that part later" but I would really push back to get that part included initially.

  • Order with two configurable material codes

    Hi all,
    I have this necessity:
    create a sales order with one material code ( A ) to which are connected two configurable materials code, is it possible ?
    If yes,
    which should be the material type of the material code ( A ) and how to set the MRP views?
    is necessary create a BOM with BOM usage 5 ( sales distribution ) ?
    Thanks in advance for any kind of help.

    Thanks MxG,
    I dont know how to use this BAPI. .Can you suggest me a sample code.
    My reqmnt is, i have
    Sold to party, ship to party, bill to party , VC config material and all char values that should be populated while creating a sales order.
    please help me with what values should i populate in i/p paramters and and how to use this BAPI with some sample code if posible.
    Regards,
    Jessica.

  • Regd : Error during saving the  sales order for Variant configuration

    Hi -
    When the item( config material) is saved in the sales order , system scheduled the production order and getting an error as " Posting Rule for Assembly order for item 000010 could not be generated".
    Any solutions regarding the error.

    Hi,
    This is the process of Assembly to order with variant configuration. In material master, you can maintain gen item category 0002 (configurable material) in basic data view, sales 2 view item category grp 0002 and strategy group 82 in MRP 3 view. After creating of material master, BOM & Routing, You can create sales order in VA01 transaction.
    In this VA01, When you create sales order, system will check material availability, capacity checking and system will show variants for each items. And also when you will save the sales order, system will create production order no immdiately.
    So you can maintain the above settings compulsory.
    please let me know any clarification.
    Regards,
    Mohan

  • BAPI for Creating Sales Order For Variant Configuration Materials

    Dear Gurus,
    Before posting this thread, we have referred many SDN threads, OSS notes and other sites for any sort of help..but no success..All threads and other referrals are not much of help as they are kind of incomplete( Perhaps, we are unable to understand them..no offense).
    Few checked threads on this subjects are:
    http://scn.sap.com/thread/34590
    http://scn.sap.com/thread/851070
    http://scn.sap.com/community/abap/blog/2014/04/23/update-vc-variant-configuration-data-using-standard-bapi-in-sales-order
    http://scn.sap.com/community/abap/blog/2014/07/15/creating-orders-with-variant-configured-items-using-bapisalesordercreatefromdat2
    http://scn.sap.com/community/abap/blog/2014/04/23/update-vc-variant-configuration-data-using-standard-bapi-in-sales-order
    http://scn.sap.com/thread/120144
    OSS: 549563
    Well, we're using the BAPI (BAPI_SALESORDER_CREATEFROMDAT2) which creates the sales order successfully but without the characteristic values in line items.
    We're passing data to the following parameters - ORDER_CFGS_REF, ORDER_CFGS_INST, ORDER_CFGS_VALUE to create the variant config but not able to see it getting created.
    Pls find attached BAPI coding document for your reference.
    If you could throw any light on this issue will be of great help for us.
    Thank You in Advance!!!
    Reg,
    Jagan-SD.

    Jagan nath
    Try below.
    you would need miimum of 3 segments to pass variant config data using this bapi
    ORDER_CFGS_REF for each configurable item
    POSEX = ITEM #
    CONFIG_id , root_id - Start with 1 and increment it for each configurable line item
    ORDER_CFGS_INST
    CONFIG_ID - from above
    INST_ID - Start with 1 and increment it for each configurable line item
    OBJ_TYPE = "MARA'
    CLASS_TYPE = '300'
    OBJ_KEY = material #
    ORDER_CFGS_VALUE
    CONFIG_ID for the item, INST_ID for the item
    charc for characteristic value
    VALUE for characteristic value
    Reference thread
    How to Fill Configuration Data in BAPI BAPI_SALESORDER_CREATEFROMDAT2
    Hope it will solve your issue.
    Thanks
    Ritesh

  • Configure-to-Order (CTO) Production with Variant Configuration and Assembly

    We are trying to create a Configure-to-Order (CTO) Production with Variant Configuration and Assembly Processing.
    I have set up the required master data for variant configuration which is working fine in a sales order. I have used startegy group 82 in the MRP view of the material master for Finished goods/header material. A production order with BOM explosion is getting generated automatically during the creation of the sales order.I have stock of components available. Uploaded using 561 movement type (unrestricted stock).The requirement class that is being determined is 201.
    ISSUE:
    Availability check of the components in the production order that is getting automatically generated during sales order creation is failing. The components are not getting confirmed inspite of initialising the stock of the components in the plant we are using.
    I am looking for pointers on the important settings related to the availability check in Configure to Order scenario that have to checked to resolve this issue.
    TIA

    Hi,
    Availability check controls for Production order will be done in OPJK for plant , order type combination. Based on the settings either for creation or release system will carry Availability check of components. you can set the controls such that release can be possible even if parts are missing.
    If you have settings to restrict the release if components are missing and there is stock in unrestricted, then you need to transfer the stock to the sales order using MB1B and 413 movement type so that system can recognize the availability and allow the release of order.
    Based on your requiremnts you can map the settings in OPJK
    Hope this will help
    Regards,
    Brahmaji D

  • Sales order costing for Configured Material (Material Variant Not KMAT Mat)

    Hi All
    For a Configured Material (Variant) (Not KMAT Material), which is having Std price costed.
    But if we create a Sales Order for the Configured Material, what options are availale to Execute Sales order costing and take the sales order value to COGS during Delivery.
    The reason being Client wants to Cost BOM items are price which is different from the Price used in Std cost estimate due to Price Volatility.
    I can understand we can do this in KMAT, but not sure how to do in Conifgured material. We can execute sales order costing and get Statistical cost value in EK02/EK01, but how to get this value posted during PGI..?
    Thanks
    Aravind

    Hi Ajay
    Even if i maintain M in Valuation filed, my Material Variant HALB material is already having standard cost in its material master and it is picking the std cost during PGI Delivery and hitting COGS A/c.
    Now how to get my sales order costing to real and post my sales order costing value to GI..this is the client requirement.
    Due some complication KMAT is not used and logistics go with Material Variant

  • Is it possible to release Process Order  with Material Shortage

    Hi All,
    We are using PP-PI & still wants to have behavior of the PP prod order
    i.e. Release Process Order with Material shortage.
    Is it Possible.
    Regards,
    Jatin

    Hi Jatin,
    Go to Transaction OPJK. Select your Plant, order type and Business function as 2-Check availability during order release.
    Under Material Availability tab, maintain '1- User decides on release if parts are missing' if user wants to decide for release of Process order or '2-Release permitted despite missing parts' if you want directly the Process order should be released despite of shortage in Release material field.
    These settings are similar to PP.
    Please check and revert.
    Regards,
    Hiren Ramani

  • Stop user creating process order with material for specific order type

    Hey Team,
    Is there a way where I can stop creating process order with material for specific order type says Z*. We are using ZNMA  order type to create trial batch and we do not want to create process order with material for this order type.
    Any ideas?
    Thanks
    Bhavesh Patel.

    You can restrict the order creation in CO01 based on authorization, Remove the authorization for Z order type for the particular user,  Check with your basis Guy

  • Problem creating process order with ref of sale order

    Dear all,
    Kindly give solution for this scenerio..............................
    I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is assigned to that order only.
    My problem was suppose if sale order is created for 10 tonns, but my batch size and resource capacity is 2 tonns only. so first time i change my batch quantity 2 tonns instead of 10 tonns and created my order and confirmed.
    if i go to second time the same process i am doing creating process order with ref of same sale order but it comes again 10 tonns instead of 8 tonns. why it comes like this already i confirmed 2 tonns in this sale order?
    my requirement is if any process order is created with ref of any sale order and again if i am creating any process order with ref of same sale order left quantity only system should show.
    for this what i have to do kindly help to this
    regards,
    s.sakthivel

    Dear KK,
    Pls check whether ZKIN, ZKQT, ZKOR have all the properties similar to IN, QT, OR respectively. If they are different, please ensure that you know the reason why they are different. This check has to be done at tcode VOV8
    Some fields like sales document category, Transaction group, screen seq group, Doc pricing procedure need to be similar to the parent document unless you know why you have changed them.
    Once this check is done, check the copy controls in VTAA. Before that try creating these documents separately without reference. This shoudl work fine only after which you need to check copy control. If this is not working fine, then there is some problem with the document type settings in VOV8. Testing this is possible only if Reference mandatory field is left empty. Make sure that is properly configured.
    Once this is done, check copy controls in VTAA. You can just copy the copycontrol between IN and QT and QT and OR and create for ZKIN to ZKQT and ZKQT to ZKOR.
    Once this is done, check whether your item category settings are properly done , also the schedule line settings. The tcodes are VOV7, VOV6, VOV4, VOV5 etc.
    Now check whether your material master and customer master are consistent with the item category settings(Item category group).
    Now create the transaction. It shoudl work fine.
    Reward if this helps.

Maybe you are looking for