Procuring for 2 different Plants(Diff CoCd) in 1 PO

Gurus
I have extended a Material to 2 different plants belonging to 2 different Company Codes with a Centralized Purchasing Organization.
E.g I used CoCd 0001 and 1000 in standard SAP system and two plants, each from these CoCds. The mat I used is extended to both these plants. In the PO I used a Purch Organization (Not assigned to CoCd, but to both those plants) and 0001. It worked!
Plz lemme know...

For information on maintaining purchasing organizations, see the IMG activity Maintain purchasing organizations.
You have the following options:
You can assign a purchasing organization to one company code. This is company-specific purchasing.
You can assign a purchasing organization to no company code. This purchasing organization can then procure for all plants assigned to it, irrespective of the company code to which the plant belongs.
Since each plant must be assigned to a company code, the company code can be determined via the plant in each procurement transaction, even if the procuring purchasing organization is not assigned to a company code.
A purchasing organization must be assigned to one or more plants. This is plant-specific purchasing.
For more information, see the IMG activity Assign purchasing organization to plant.
regds
ravi

Similar Messages

  • Internal HU number range for 2 different plants

    Hi,
    I have one plant with WM-HUM and internal number range for HU is 1.
    Now implementation for a second plant (same controling area but different company codes), with his own WH number, is going to use WM-HUM.
    I'm wondering what internal number range should be used for plant 2:
    - same number range than P1 then no need to create new packaging material types. Just check if both plants accept to share numbers
    - different number range to fastly identify which plant belongs to the HU number (without using HUMO)? But need to create new packaging material types.
    Are there other SAP impacts of these solutions?
    I have to precise there will be stock transport orders with deliveries between both plants.
    Thank you.

    Hello Cathy,
    I  would suggest to use the same number range considering the scenario you have mentioned .
    Cheers
    Kaushik

  • Bulk Procurement for various different company codes in a single PO

    Hi friends,
    I have a scenario.
    My client has 3 company codes in 3 different countries ( India, Ukraine and Japan)
    They procure a number of laptops for their project run at all over.
    They have central purchasing organization in India and assigned to all the plants of the all the company codes.
    Since they have bulk requirement, they will go for bulk procurement from India and ask vendor to deliver at Ukraine and Japan. This will help them to have good discount on bulk quantity.
    How to map in SAP. How account posting done.
    How Japan and Ukraine company codes gets liability. These purchases should reflect individual company code expenses.
    Gurus please suggest me.
    Thanks.
    Atchyuth

    As your all three companies are having different Currency,standard SAP will not allow to create PO for multiple company code.
    The company code in PO is maintained at header level and One PO will have only one company code.
    Regards,
    Manish
    Edited by: Manish Kumar Agarwal on Jun 15, 2009 5:59 AM

  • Sales organization for two different plant

    Hi,
    We have one company code , one plant as mfg.   and one sales organization  it is in live  we do all activity in those plant,  now in development along with this plant  we have created one new depot plant  and assign to exsting compnay code, we in this company we want to do both mfg  as welll as trading activity  now we have two Plant  so it is necessary  to create  two differenmt sales organization  for this,
    or with single sales organization we can do both the activity  , in case of sales order  how we can give the ref.  of Plant   thorugh which we want to dispatch the materils,  we have material  , vendor , custom commom in both plant.
    regards,
    zafar

    Hi Zafar,
    You dont have to create two sales organization for mfg plant and trading plant. With one Sales organization you can do all the activaity.
    Ie sales from mfg plant, sales from trading plant, Stock transfer from one plant to another plant. all the sales related transaction you can cover with one sales organization.,
    Like different vendor, material and custom can be handle with one sales organization.
    In terms of report SD will have all kings of report from which you can easily identify from this plant how much sales has been done. All the details you can get it.  
    Try with one sales org only, if any problem ur facing then let me know.
    Regards,
    Nagesh
    Edited by: Nagesh MS on Dec 7, 2011 11:37 AM

  • Change the issue quantity for different plants

    We are facing a problem in the following issue.
    A material is being used in two plants. The material is procured from vendors in packets. The pack quantity varies for each plant for the same material since it is procured from different vendor. The base unit of measure for the material in the material master is maintained as NOS and the unit of issue is PAC. The alternative unit of measure in the material master can be maintained for only one PAC. If the pack quantity varies for different plant, how to maintain in the material master.
    For example : -
    Plant I u2013 Vendor A u2013 Pack quantity u2013 200nos.
    Plant II u2013 Vendor B u2013 Pack quantity u2013 300 nos.
    While creating reservation in plant II for one pack, the stock keeping quantity is 200 nos. On issue the issue quantity is 200 nos, but our requirement is the system should issue 300 nos. Kindly give solution to the problem.

    Hy afzal,
    I don't think it is possible to maintain different Conversion factor for 2 different plant for a single material.
    Acording to me there is 3 way to comeout of this problem.
    1) Create different Material codes for both plants.
    2) Insted of using alternate unit of measure use Batch specific unit of measure.But for this Materials are Batch Managed.
    [Batch Specific Unit of measure|http://help.sap.com/bestpractices/BBLibrary/Documentation/Q24_BB_ConfigGuide_EN_US.doc]
    3) Try to convince one of the vendor to change its packing qty/Packet.
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Jul 31, 2008 11:25 AM
    Edited by: Dhaval Choksi on Jul 31, 2008 1:26 PM

  • Material group in material master for different plants

    Warm greetings Masters of Material Management
    We have one material master for three different plants example  1000, 2000 &3000 with same material group  with different valuation class
    If we change material group in plant 2000 it is reflected in 1000 & in 3000
    My question is  this the standard practice that material group changed in one plant will be reflected in other plants
    Regards
    shamul heq

    Thank u Amola  
    The current situation, if user change  material group for plant 2000, it is effected in plant 1000 & in 3000
    the impact of this is in purchase requisition
    As the release statergy  is triggered from material group    to different department
    How can we solve this issue
    regards
    shamul heq

  • Different order unit for different plant

    Hi,
    I ahve a material whose base unot of measure is kgs. Its purchase order unit for plant 1000 is Tonnes, and I want to have a different purchase order unit say LBS for plant 1100. Is it possible?
    Please advice.
    Regards,
    Vengal Rao.

    Hi,
    You can maintain different order units for the different plants, since purchase view is at plant level.
    Order unit field is available in the purchase view.
    If required, you can maintain different order unit in the PO/Contracts other then the order unit in the material master record for that material and plant by activating variable order unit in the material master record - purchase view. In this way, you can maintain different order units in the PO for the same material and plant.
    Regrads
    KRK

  • Import PO for different plants having  diff. excise group

    Dear All ,
    How to capture & post the Excise Duty for an Import PO ,
    Where the PO is created for different plants .The plants have
    different excise groups.
    Regards
    R B Panda

    The only way to do it is to assign a small notional value (like 0.01 USD) to the item, so that the conditions tab does not disappear.
    The only problem will be that the GR/IR clearing account will have an open entry, which can be cleared via MR11 with minimum accounting impact.
    Regards,
    Aroop

  • Number range of  accounting document for different plants

    whenever a billing document is created in SD (using the T-code VF01); an accounting document will be simultaneously created in the FI module. one document type(TS,number range---60:1 to 9999 ) have four  plants .different plants have own number range and sequential document number .
    eg: doc. type   num.range    fr       to           plant cty       co code
             TS           61            1        1000       PLANT_1      3100
                            62           1001    2000       PLANT_2      3100
                            63           2001    3000       PLANT_3      3100
                            64           3001    4000       PLANT_4      3100
    How can that carry out this function ?
    thank you for your help !

    Hi leung,
      As Mr.Rohit has mentioned it has to be done with the z table and the available user exit.
    Wht we have done is.we have created no ranges in obj rv_beleg.Eg
    AA   0000000001 to 0000099999
    AB   0000100000 to 0000199999
    AC   0000200000 to 0000 299999.
    Using the user exit we have created a Z table.And assignd for this ombination in the Ztable.
    Plant X   Billing type A   AA
    Plant Y   Billing Type A  AB
    Plant Z    Billing type A  AC
    Once this combination matches the appropriate invoice no range gets picked up.
    Regards,
    K.Vivek

  • InfoPackage to load multiple flat file for different plant

    Hi
    There is a requirements to load the data from multiple flat files by different plant into BI which source data is coming from other system. Each flat file has it own naming convention.
    As data has to load via infopackage into the targeted cube. Then I have to create multiple infopackage in order to load the data according to the number of flat files that provided. However, new plant will be created due to expansion of bussiness. If that is the case, additional infopackage is required to create as and when there is a new plant. 
    Is there a way to create a infopackage to load the data from flat file by plant? Your advice is much appreciated.
    Thanks and regards
    Kang Ring

    Hi,
    The best way I can suggest is....
    1. Create a folder in AL11 for your requirements.
    2. In InfoPackage under Extraxction Tab you can have File Name , just side of this you can fine ABAP Routines ICon there you click on that and asks Name give some and then it will takes to your into ABAP Code there you can access the AL11 and then write code in such way that to take file irrespective of the File name, whatever the file is there in that Folder it ahoud take from that AL11 Folder path.
    3. Load the Data using PC.
    4.At the end of the PC Delete the File in AL11 folder , becasue we don't need it for next load.
    Else
    See the thread
    Re: Automation of load from application server
    Thanks
    Reddy
    Edited by: Surendra Reddy on Jun 4, 2010 11:03 AM

  • Purchasing Info Record- Different Regular Vendor for different Plant

    Dear Guru,
    I'm encounter a problem with PIR.
    I have this PIR 9001 (Vendor A) and 9002 (Vendor B) for material A, which i have extended to 2 different Pur.Org 0001 under company code 0001 and Pur.Org 0002 uner Company code 0002.
    For Pur.Org 0001, i set the Regular Vendor as Vendor A, but when i trying to set the regular vendor for Pur.Org 0002 to be as Vendor B, i receved the message as "Up to now, vendor A has been regular vendor for this material".
    And After i changed this Regular vendor to vendor B, this changed have also affected the PIR for Pur. Org 0001.
    Can i know if there is a way to change the PIR Regular vendor at Pur.Org or Plant level?
    Thank you very much,
    Regards,
    Chee Wee

    Hi,
    Regular vendor is at client level.
    That's why, you cann't maintain more then one vendor (Source of supply) for the same material.
    If you want to maintin separate vendor for the each plant and same material combination, then don't activate / select regular vendor option in the info record. You have to maintain source list.
    Sour list is nothing but a list of source of supplies for the specific plant and material combination with in the validity period of time. If there are more then one vendor for the specific plant and material combination for the same validity period of time, then you can activate fixed vendor option in the source list. Then at the time of creating PO, SAP will pick fixed vendor for the Plant and Material combination.
    So first, system will check whether regular vendor is there for this material in the info record. If is there,system will pick regular vendor in the PO. If not, then system will check fixed vendor in the source list for the material and plant combination. If yes, then system will pick fixed vendor from the source list. If not system will propose all the vendors in the source list. If the source list it self not created, then user has to give vendor number manually.
    Regards
    KRK

  • Stock Posting for Different Plants

    Hi MM Gurus,
    Is it possible to post directly to a Work Order reservation from a different plant?
    Example: A WO is raised and a reservation created for plant A and we want to move stock
    from plant B and post it directly against the reservation. Is there a one step process?
    Thank you,
    Jograd

    Hi,
    If you wish to do that, then open the production order, go to components tab, change the plant & sloc details in the component tab & save. Now you can post from the other plant directly via MB1A or MIGO or co27 with 261 mvt. If
    Hope it answers your query.
    Regards,
    Vivek

  • Number range userexit same type of PR but  for different Plant

    I would like to have the same type of PR but  for different Plant, I would like to have different Number range.
    The exit  MM06E003 M06B0003 Mo=06B0004  not work for ME51N.
    Any other  exits help for this

    HI
    Put this code in  EXIT_SAPLMEREQ_009
    DATA pr_header TYPE mereq_header.
    DATA pr_items  TYPE mmpur_requisition_items.
    DATA pr_item   TYPE mmpur_requisition_item.
    DATA: l_item   TYPE mereq_item.
    DATA: l_zmm_numrange    TYPE zmm_numrange.
    MOVE-CORRESPONDING eban TO l_item.
    CALL METHOD im_req_header->get_items
      RECEIVING
        re_items = pr_items.
    READ TABLE pr_items INTO pr_item INDEX 1.
    CALL METHOD pr_item-item->get_data
      RECEIVING
        re_data = l_item.
    CHECK l_item-werks = '6301'.
    CALL METHOD im_req_header->get_data
      RECEIVING
        re_data = pr_header.
    SELECT SINGLE * INTO l_zmm_numrange
       FROM zmm_numrange
       WHERE  werks EQ l_item-werks
         AND doc_type EQ 'PR'
         AND bsart EQ pr_header-bsart.
    IF sy-subrc EQ 0.
      ex_range   =  l_zmm_numrange-numki.
    ENDIF.

  • Can Equipment No same for 2 Equip in different Plants of same company code?

    Hi Gurus,
                Please tell me if there is any possibility of having same Equipment No for 2 Equipments in Different Plants.
                The 2 plants are in the Same Company code.
                e.g.  Equip           Plant                Company Code
                   1)  Equip_DIE    Plant1              A
                   2)  Equip_DIE    Plant2              A
               If it is possible how the Equipment histroy and Breakdown history is updated in the PMIS.         
               Also tell me the advantages and Disadvantages of keeping same Equipment no for 2 diiferernt Equipments or otherwise keeping different equipment no.
    With best regards,
    Narendra Dere

    Hi Pete ,
              Thanks for your valuable reply.
              Actually I am doing implementation for 5 plants within same Company Code.
              They are geographically distant (say 50km from each Other.)
              The Finish Product is same but the method is different.
              They have already assigned some Equipment Numbers in the Plant for Regular Maintenance Activities.
              Since Planning and Maintenance can be done at the different Plant and team of the MAintenance is different, they dont hv anyproblem if equipment number is same. Otherway they wll have the added advantage that they can continue with there own Equipment no which can be same in differnt Plant.
           e.g 800TONPRESS - Plant1
                800TONPRESS - Plant 2.
       With best regards,
       Narendra Dere

  • Single Purchase Order for different Plants of Different Company Codes

    Hi Experts,
    I have a scenario, My Client has 3 Company Codes (1000, 2000, 3000 )
    Company Code 1000 has 2-Plants    ( A001 and A002 )
    Company Code 2000 has 1-Plant      ( B001 )
    Comapny Code 3000 has  3-Plants   ( C001, C002, C003 )
    All these 3-Company codes has centralised purchase organisation.
    My Client requirement is to raise a single purchase order for external vendor, for all the plants A001, A002 which is in one company code and similarly in same Purchase Order for B001 plant which belongs to 2000 Company Code and Similarly for same purchase order for C001, C002, C003 plant which belongs to 3000 Company Code.
    1)Is it possible to raise a Single Purchase to External Vendor for plants of Different Company Codes ?
    2)Does it affect the accounting document ?
    3)How to inward and where to inward these goods ? with respect to plant wise ?
    Please Guide with Valuable inputs.
    Thanks in Advance
    Best Regards
    Javeed
    Best regards
    Javeed Ahamed

    1) How about Profit Centre ? We have Framed each Profit Centre with respect to Plant
    Why should there be a problem?
    2)In Case of Migo does we have to be careful and do stepwise MIGO with respect to different Plants ?
    of course people have to be careful when performing transactions.
    if you have multiple items in a PO then you can easily receive all items in one go. So people have to careful and need to check if they really received each of the PO items. Especially if people have authorization for many plants, then the user who is usually performing the receipts for plant A can easily post the receipts of plant B too.
    3) How to Process MIRO ? Can we process Partial MIRO"S with respect to Line-items of those particular Plants ?
    MIRO allows to post the invoice like it is send to you from your vendor. If it is just for a part of your PO then this is just a fact and MIRO allows to post this kind of invoices too.

Maybe you are looking for

  • MAX giving error - Unable to locate Labview run-time engine

    I have LV 7.1 and 8.5.1 installed on a WinXP pc. No problems until now. I installed some support software for a LabJack  interface, which required LV version 6.1 run-time, so I let it install that. I now get the error whenever I run MAX: "Unable to l

  • Firefox 6 seems to produce a corrupt prefs.js file as soon as it opens, which cannot then be updated.

    I have tried deleting the prefs.js file and restarting firefox, but the file seems to be corrupt at the outset and will not allow saving changes in preferences.

  • Internal Speaker Laptop NOT WORKING

    Hi Guys, I have problem with my laptop that is HP Compaq 510, OS: window 7 Ultimate 64-bit.  My speaker internal laptop is not working. However, for speaker output to headphone jack is working. So, it will be grateful if anyone can give solution and

  • Group Footer Alternating Background Color

    I have an alternating background color on my GF2, which works correctly using the code below in the section expert.  However when I add a new suppressed group (GH3/GF3) to the report, the alternating is not correct as it may skip a few instances of G

  • Re: Photoshop CC - adjustment layer curves issue

    First post here in the discussion, Just upgraded CS6 to CC and really enjoy alot of the changes but there seems to be a bug with the adjustment layer curves (not regular curves). If I make a change to the curve using modification point and then toggl