Prod.Order Creation- Using Reference Operation set.

Hi
While creating a production order of particular order type,after entering the quantity and order finish date as today's date(05.06.2007),backward scehduling,it's showing no routing found for the material (as we are using REM-Repetitive manufacturing,we are having rate routing) ,and in the same mesaage box itself I choosed the Reference operation set(that I have created today) and entered the  group no,and after entering its showing me an error as <b>Ref. operation set 50000008 is not valid according to the selection conditions</b>,
So I created a routing for the same material nd in MRP4 view of the same material under for selection method i kept blank(Selection by order qunatity) and tried to create Prod.order,and there was no problem,but if the same i'm trying to create using Reference operation set I'm not able to create the Production order.
Kindly give me a solution for this,Is there anything to do with order type dependent parameters of the particular order type?
Thanks & Regards
Raj

Hi,
Is your problem solved ?
One more solution to create a order with reference operation set,is to use a trigger point.
Once you create a reference operation set.
Use T.code co31 to create a trigger point, chosoe create order with reference & choose a system status eg: PCNF. & click the user parameter tab.
The system will aks for the reference operation set no & group counter.
Then assign this reference operation set to the routing operation.
When you do partial confirmation of this operation, this will trigger the generation of a order.
Regards,
Senthilkumar SD

Similar Messages

  • Rework using reference operation set

    Dear Gurus,
    Am working in an ECC 6.0 environment.
    Want to create rework order using reference operation set.
    Master data created:
    BoM
    Reference Operation set to which the header material is assigned to which a BoM is assigned.
    The settings in OPL8 for order type ZXXX are:
    Production version :  manual selection
    Routing:
    Application: Routing
    Selection Id: RW (priority 01, task list type 'S', and usage 1)
    Task list type: S
    Routing Selection: 4
    BoM:
    Application: PP01
    Create a production order (CO01), with order type ZXXX. The system asks to select the task list group once the order quantity and dates are entered. On selection of the Group for the reference operation set system generates an error 'No valid BoM exsists for Material xxxxx Plant xxxx'.
    SAP helps says - A reference operation set cannot be used directly in production.
    Am I doing something wrong?
    Your expert advice please.
    Tarang

    Dear first create a reference operation set go to CA11 just press enter without entering anything then enter plant,usage,status and lot size in component allocation you can select the required BOM and assign with the operation.
    and create the order in CO07 enter the plant and order type in next screen don't give any material code give description rework and give the quantity to be reworked and in components give the required components for consumption during rework before this you need to give the reference operation set group and task list in the popup and in settlement rule maintain the category and settlement receiver and save the order.
    You can confirm the order in CO15 by providing the order number and enter the yield quantity to confirm and save.
    Please note that during this rework order confirmation, only Goods issue will happen based on the input given in the components tab rework order and NO GOODS RECIEPT will happen.
    Cheers
    KK

  • Prod order creation using a BOM

    Hi Experts,
    I am trying to create a production order for a BOM which has one line item. I could create a prod. order for the line item, but when i am trying to create the prod. order for the BOM, I am getting  a message "No Default value mentioned for Op. generation for order type PP01 (material name BOM). What do I do?
    Pls advise.
    Vijay

    Hi,
    Maintain the default operation for plant & order in OPJG
    Manu

  • Reference Operation Sets

    Hello Everybody,
    Can someone tell what is meant by a Reference Operation Set?
    Where can we create it and how can we assign it to the Routing?
    What are the important feilds to be passed to it?
    Please help. Its urgent.
    Thanks,
    Shashi Devi.

    Hi,
    A Reference operation set can be created using transaction CA11.
    Here we can enter a set of operations needed.
    Then in CA01 (create routing) from the operations screen we can add the reference operation set & all the operations from the reference operation set will be copied to this routing.
    Hence whenever we need to create a routing with similar set of operations we can use reference operation set.
    Also to create a rework order we can use reference operation set with the help of trigger point.
    Regards,
    Senthilkumar

  • Creating reference operation set using RCPTRA01

    Hi Experts,
                      I have to create a LSMW for reference operation set (CA11) by using the program RCPTRA01.I dont have to create the routing. Can this standalone task be acieved using the above mentioned program.If yes then please provide me the steps for the same.If no,then why?
    Thanks
    Abhishek

    Hello Abhishek,
    I am trying to do Reference Operation Set upload with component allocation using RCPTRA01 program in lsmw.
    Even though  i assign values to BIMPZ structure fields the component allocation is not happening.
    Could u please give some inputs ?
    Thanks!
    Regards,
    Deepali

  • Problem in Component Allocation using RCPTRA01 for Reference Operation Set

    Hello,
    I am trying to do Reference Operation Set upload with component allocation using RCPTRA01 program in lsmw.
    Even though i assign values to BIMPZ structure fields the component allocation is not happening.
    Could u please give some inputs ?
    Thanks!
    Regards,
    Deepali

    Hi,
    Check this link, if it can help you.
    http://help.sap.com/saphelp_45b/helpdata/en/35/a47e3b763e0392e10000009b38f9b7/content.htm
    Reddy

  • CO07 - got error Reference operation set DOOR not found

    Hi PP Experts,
    I'm unable to create prod order without material (transaction CO07).
    The error says 'Reference operation set DOOR not found',
    but I can't click the error to find the message number.
    I checked that reference operation set DOOR has been created correctly.
    Please give me some light.
    Thanks and regards,
    Thomas Wahid

    Many thanks for all your suggestions.
    The problem is now solved.
    We use the unit SHE, this is actually the commercial of unit ZSH, you can see it if you check in CUNI.
    The referenced operation set DOOR uses unit M3, but we do not have the same dimensiond in CUNI.
    The unit M3 has dimensions VOLUME, but the ZSH has not been assigned any dimension so it get the default one AAAADL which is different, so the system can not convert the unit and the error happens.
    Best regards,
    Thomas

  • Assignment of Reference Operation set to routing.

    Dear Experts,
    This is regarding the assignment of a reference operation set to a routing. We have one ref. op. set which is applicable for some 30 variants of our products. Now, we need to assign this ref. op. set to the existing routing. The follwoing points are to be taken care of:
    1. Set up, m/c time, etc are allocated based on the operation number.
    2. Change in the operation number leads to the change in these values. This is not acceptable.
    Now when assigning the ref.  op. set to the routing using the t. code. CA02, the systems asks for operation increment  say 0010 (mandatory field). If we accept this value, the operation number  follows a different sequence. Consequently, the setup, m/c times gets upset. This is due to upsetting of the operation number sequence.
    How can we assign the ref. op. set to the routing without upsetting the operation number sequence i.e., copying the operations as it is in the ref. op. set.
    Pl. suggest.
    Regards,
    Pradeep Santara

    Dear Sharavan,
    Probably, i have not been able to explain the issue. I will give it another try..
    Say for the ref. Op. Set the operation sequence is 12, 14, 19...so on
    But when we assign the Ref. Op. set to the routing CA02, the at the intial screen we come across one mandatory field "operation srl. no. increment", if we use 0010 in that field . The system copies the ref. Op. set with operation serial nos. starting 00,0010,0020 onwards and not in the order of 12, 14, 19....so on...
    If still not clear pl. revert

  • Routing & Reference Operation Set

    Hi All,
           Could you guys please help me to understand the following will be grateful
    What is the difference between Routing & Reference Operation Set?
    When the Routing will be used?
    When Reference Operation Set will be used?
    What are all the advantages and disadvantages behind using Routing & Reference Operation Set in prodution?
    At which Scenario Reference Operation Set is must?
    Thanks in Advance

    Hi,
    Routing defines the sequence of operations that should be carried at a work center to make up a product.
    In the operation you define the values for setting the machine and the machine time to prodduce a finished product for a particular base qty.
    Routing is one of task list in PP module to carry out the production of finished and semi finished parts. it consists operation sequence which requires for manufacture finsihed and semi finished parts like operation 10. 20, 30...
    Ref operation sets is use as template to create routing , rework order.
    These are four types...
    1) Routing and Ref operation sets (used is discreate manufacturing).
    2) Rate routing and Ref rate routings (used in repetative manufacturing).
    3) Recipe (used in process manufacturing)
    Ref operation sets are repeated operations can be use for several products. you have use these always in rotuings.
    For documents and PDF files you can download from the below link
    http://mysapbi.blogspot.com/2007/01/sap-help-in-pdf-files.html
    CA01 = Standard Routings
    CA11 = Reference Operation Sets
    CA21 = Rate Routings (used in Repetitive manufacturing only)
    CA31 = Reference Rate Routing (used in Repetitive manufacturing)
    Regards,
    R.Brahmankar

  • Phantom, Assembly, Reference Operation Set

    Hi All,
            I am always having a little confusion with follwoings, so could you please help me to understand clearly will be grateful.
    What is Phantom ?
    What is Assembly ?
    What is the difference between Phantom & Assembly ?
    What is Reference Operation Set ?
    What is the difference between Routing and Reference Operation Set ?
    At which situation Reference Operation Set is used instead of Routing in SAP?
    Thanks in Advance

    Hi Madhan,
    Phantom
    Phantom assembly is a logical grouping of material.
    Design point of view it is assembled.
    Physically not assembled, but logically it is assembled.
    Ex: CAR
    BOM Header: CAR
    Item: ENGINE
    For ENGINE: Items are cylinder, piston, crankshaft....Here engine is phantom... while manufacturing car, engine is mandatory so if u assign engine as phantom it won't create planned order for engine. We can direct issue the materials (such as cylinder, Piston, CS) to car; by that time it reduces the work of issue and receiving goods to engine assembly.
    But if u want engine as spare parts that time u can create planned independent requirement for engine and u can stock as ordinary processes...
    In material master of MRP 2 view spl. procurement key - 50.
    or Assign in BOM item - make tick mark in phantom assmbly.
    If you create in material master wherever the material, system consider as a phantom.
    If you mark in BOM, only that particular BOM, system consider as a phantom.
    There is no stocking of phantom material
    Routing and Reference Operation Set
    Refer below link
    Routing & Reference Operation Set
    Regards,
    Sankaran

  • Reference Operation Set association to a Routing by CP_BD_DIRECT_INPUT_PLAN

    Hi .
    I want to know how we can associate reference Operation Set to a  Routing  with  using the FM: CP_BD_DIRECT_INPUT_PLAN (The Direct Input API for Routing update) . I am successful with creation of Operations(Table: PLPO_DI_TAB). I found few fields in that structure like : VPLNTY, VPLNr etc for Reference Operation Set.
    Can somebody help me with test data for associating reference operation set to a Routing with CP_BD_DIRECT_INPUT_PLAN ?
    Thanks & Rgs,
    ~ Guru

    Resolved. the field VPLNTY should have the vale 'S' for reference operation set....

  • Restrict Item Category Item Creation using Reference Only

    Hi All
    Here is the scenario, I want  "Restrict Item Category Item Creation using Reference Only"
    a.Retrieve document number VBELN from sales order header table VBAK for the current order. Check if the sales order is of type ‘ZAB’ referencing field AUART in table VBAK.
    note : Any changes to existing sales order "ZAB" will be performed in thesame sales order type(ZAB) in VA02 transaction.
    b.If step a is passed, check internal table structure for sales order item level as XVBAP-PSTYV for possible item category values of 'ZDEF' for the entered line item and document number (XVBAP-VBELN).
    c.If the cancel/change item category values are found on the line item, check internal table structure for document flow (XVBFA) if the cancel/change item category was created as reference:
    i.Check if entry exists in XVBFA for the preceding document number field VBELV with value equal to value in the subsequent document number field VBELN. This value must equal the current sales document number VBELN in table VBAK.
    ii.The above check must be done in conjunction with the following check:
                1.Check if entry exists in XVBFA for the preceding document type field VBTYP_V with value ‘C’ equals subsequent document type field VBTYP_N with value of ‘C’.
    d.Once the above checks are passed, collect the item number from internal table XVBAP (Field: POSNR) for the change/cancel item category line item added to the sales order.
    e.Check if the item number retrieved in the previous step exists in table VBAP (Field: POSNR) with an item category that is not part of the list of cancel/change item category defined in step b.
    f. Check if the item number collected in the previous step exists in the subsequent item number (Field : POSNN) in internal table XVBFA for the row that passed checks in steps b and c.
    g.If item number exists, check if this subsequent item number field equals the preceding item number field value (Field: POSNV) in table XVBFA.
    h.If step g fails, generate an error message stating that the user needs to the create the cancel/change item category line item with reference to the original line item and do not allow the user to proceed with the transaction.
    i.If step g succeeds, allow the user to proceed with the transaction.
    can any one send me the logic for this scenario.
    Rgds
    Chinna

    Hi Chinna,
      Please use BADI "BADI_SD_SALES_ITEM" to achieve your requirement..
      Let me know if you have further questions..
    BR
    Rakesh

  • Link for reference operation set

    Dear SAP Guru's
      Can anyone provide me the link for Reference Operation Set in SAP Library?
    Thanks in advance
    Regards
    Kalyan

    Dear kalyan,
    i think ur looking for Rework order, Reference operation set
    Plz refer my reply from this Thread
    [http://forumsa.sdn.sap.com/click.jspa?searchID=32188014&messageID=8172970]
    Regards
    kumar

  • CA11: How copy a reference operation set without its materials attribution

    Hello gurus
    I have a reference operation set that has many materials attributed.
    Using transaction CA11, when I create a new reference operation using the functionality copy from the existing operation set, also the material attribution are copied in new one. How It is possible to avoid that. I would like to copy only operations not the materials attribued.
    Thank you in advance

    Was it really necessary to post the whole API description?!?
    Locale[] locales = Locale.ENGLISH();ENGLISH is not a method in class Locale, so do not add the braces "( );".
    Also, the constant ENGLISH is not an array, but just a single Locale object.
    You didn't say what your problem was. What do you want to achieve with your program and what is it that you don't understand?

  • Reference operation set:tr CO48

    Hi guys,
    while I 'm running the tr.CO48 to convert partially a planned order the system have given me the message 'Reference operation set ..&..not found(check entry) ' but I have cretaed the operation set and it exist..which is the meaning?
    Thanks in advance
    Best regards
    Massimiliano

    dear Massimiliano,
    check following things
    1) Check the plan order start date, On that date the Reference operation set is valid?, IF not change the start date in plan order and then try to convert to production order
    2) Is the reference operation set is Released? if not change it to release in Header
    3)  check are you assigned the finish material to that reference operation set by clickimg material assignment If not maintain it
    and then try to convert to production order