Prod order, work instruction and operation

Hello
Can somebody tell me the rationale between work instruction and operation , how they are interrelated and linked to prod order.
Thanks

Hi,
Pl. refer the below link.
https://wiki.sdn.sap.com/wiki/display/ESpackages/Manufacturing%20Work%20Instructions
Madhava

Similar Messages

  • Prod.Order Creation- Using Reference Operation set.

    Hi
    While creating a production order of particular order type,after entering the quantity and order finish date as today's date(05.06.2007),backward scehduling,it's showing no routing found for the material (as we are using REM-Repetitive manufacturing,we are having rate routing) ,and in the same mesaage box itself I choosed the Reference operation set(that I have created today) and entered the  group no,and after entering its showing me an error as <b>Ref. operation set 50000008 is not valid according to the selection conditions</b>,
    So I created a routing for the same material nd in MRP4 view of the same material under for selection method i kept blank(Selection by order qunatity) and tried to create Prod.order,and there was no problem,but if the same i'm trying to create using Reference operation set I'm not able to create the Production order.
    Kindly give me a solution for this,Is there anything to do with order type dependent parameters of the particular order type?
    Thanks & Regards
    Raj

    Hi,
    Is your problem solved ?
    One more solution to create a order with reference operation set,is to use a trigger point.
    Once you create a reference operation set.
    Use T.code co31 to create a trigger point, chosoe create order with reference & choose a system status eg: PCNF. & click the user parameter tab.
    The system will aks for the reference operation set no & group counter.
    Then assign this reference operation set to the routing operation.
    When you do partial confirmation of this operation, this will trigger the generation of a order.
    Regards,
    Senthilkumar SD

  • Difference in Main work centre and Operation workcentre

    Hello PM Gurus,
    In CS order, we have two work centres. One at header level called as Main work centre and another at operation level.
    Why do we have two work centres. The one at operation level itself should have been enough.
    There is a main work centre at functional location too ( Organisation tab). So what is the connection if we use this functional location as the reference while creating a CS order.
    Please reply soon.
    Cheers
    Sunny

    Hi Sunny,
    The work center at haeder i.e., Main Work Center is the reponsible work center(say a department). It means it takes the reponsibility of the whole job mentioned in that work order(or job given by production dept.). Now, assume , it further distributes the whole work to its own sub-dept or different work centers as per nature of job. Say, electrical related work to elec work centers etc., by ,means of assigning to different operations.
    The Main work center's cost center will be copied as responsible cost center in Additional data TAB of the order.Now thus you see commercially the responsibility of doing the job lies with the responsible cost center (or say Main work center).
    Hope it is clear.
    Regards,
    Rajesh

  • Prod Order Work Centre Details

    Hi,
          Please let me know in which table we will get  production
    order wise routing and work centre details
    Regards
    Prakash B.

    Hi Prakash,
    Before cretaing Zreport, please check with std report COOIS. i think it will fulfill your requirement.
    Selection criteria is
    list= oprations
    Profile =standatd profile
    Prod order box = select.
    Give ur production order list & plant then excute. inside trhe report u can change the layout as u need
    i doknow what is ur requirement exactly.
    please try and come back
    regards
    pradeep

  • Difference between Order Header BSD and operation schedule SSD

    Hi,
    One of your Client is operating on SAP 4.7
    There are some cases where Order Header Basic Start Date and operation Schedule Date are no same.
    example:
    Present Order Basic Start Date 24.06.2011
    Present Order Basic Finish Date 01.07.2011
    Forward Schedled order.
    Operation 1
    Operation 2
    Work Center has sufficient capacity and is available to perform work 24hrs.
    Using planning board CM10 user dispatches operation 1 to 30.06.2011 and operation 2 to 01.07.2011.
    The problem is order basic start date is remaining same i.e. 24.06.2011 and not chaning to 30.06.2011.
    Can any one please help in this issue.

    yes for all order types and also i have observed that most of work order has basic start date as 24.06.2011 when all the operations of orders are scheduled in future dates (date other than 24.06.2011).
    The first time scheduling of work order operation is done on 24.06.2011 (CM10) and then after re-scheduling (through IW38) of operation changed the schedule start date but work ordre basic start date remained same i.e 24.06.2011.
    Dispite of first time scheduling and then re-scheduling basic start date remained 24.06.2011.
    Note: Same profile was selected in both CM10 and IW38 while accessing planning board.

  • Table Link :  Prod Order & Operations attached to the Order

    Hello,
    I need to extract Following Data:
    Input: Prod Order Numbers
    Output. Operations & Control key  attached to the production Order.
    Request to give the Table link to get the infornation.
    Thanks & Regards
    Nitin

    Hi,
      Production Order No-AUFNR from AFKO table
      Operations from AFVC table
      Link between AFKO and AFVC is AUFPL(Routing no. of operations)
    -Thaila Shree

  • Where is Prod Order status stored

    I need to create a query of all Prod Orders Not delivered and Partially delivered.
    Where are these status stored in the AUFK . The AUFK-ASTNR does not have DLV or PDLV status.Thanks

    Ramesh,
    You use table AUFK to get OBJNR.
    With that OBJNR go to table JEST and get field STAT.
    with JEST.STAT go to table TJ30T, which has all statuses.
    I hope this helps.

  • Single work order to release 2 operation from Task list 1 month and 6 month

    Hello,
    We have a maintenance plan for an equipment. It has a task list with 2 operation: Operation 0010 is 1 month interval and Operation 0020 is 6 month intervals.
    Currently when the preventive maintenance plan is release, 2 work order are created for every 6 months.
    Is it possible to combine the One month interval and 6 month interval task to a single Work Order?
    Thanks.

    For 1 month freq, orders will be created every month. In 6th month, order will be created with one month & 6th month operation together.
    If you want to suppress one month operation while order is getting created with 6th month operation, mention higher hierarchy for 6 month freq in strategy. This means, mention hierarchy 1 for 1 month freq & 2 for 6 months freq. While both the operations are due, operation with higher hierarchy only will be taken over to the order.
    I guess, this what you expect. Please confirm.

  • Work Order field define and display in Operation TAB

    I have a question about the user field define in work order's operation:
    I define the user field in the standard IMG for operation's Enhancemen use. but the field can only display in the operation's details' Enhancemen Screen. 
    What I want is the User field can display in the Operation list screen.
    BTW:what does the Equipment numnber in Operation TAB 's   meaning
    thanks  a lot

    Duplicated [here|Work Order field define and display in Operation TAB;

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Flash app works in FF and Opera but not in IE

    Good day all,
    I am not a flash fundie, but i am part of a project which has
    run into a snag and i have been left to do research what is causing
    the snag.
    The testing browsers we used:
    FireFox 3.0.5 (used in linux and windows) with Shockwave
    Player 10.0 r15
    Internet Explorer v6.x as well as v7.0.5730.13 (windows only)
    Opera v9.63 (linux version)
    We are building an online fixed odds poker game for a client.
    Front end is flash and actionscript (v3) with the backend being a
    combination of php and c++.
    The issue:
    When playing the game in Firefox (both in linux and windows)
    one can play a game from preflop to flop to turn and to river. And
    when you shuffle the deck each player gets new cards and each of
    the mentioned stages has new cards, thus a new game. Note that the
    game does work correctly in opera as well.
    But when playing it in IE in windows we find that the first
    game you play repeats; over and over again. As long as you place
    your bets in the same order each time the same game will repeat
    never ending. Change the order of your bets and the game throws a
    developed communications error. Then you restart the game, you now
    get whole new set of cards but when you reshuffle the deck at the
    end of the game you get exactly the same cards again, and then if
    you keep the order of the betting the same you will find that the
    game repeats non-stop.
    We have cleared the cache of IE, we have "cleared the cache"
    of EVERYTHING! :P But still the issue persists in IE in windows.
    The issue occurs on both the versions described earlier and occurs
    on three separate PC's of which two are in our offices and one is a
    home pc.
    My experience in flash and action script is zero (i am a
    php/JS/mysql programmer) but we have little resources and i am
    standing in for the flash person who cannot get an opportunity to
    to research this matter.
    Any questions you have, feel free to ask. Any remarks or
    feedback or opinion you may have feel free to give it with as much
    technical details as you prefer. I will pass all details i receive
    on to the Flash developer.
    Any and all assistance would be greatly appreciated.
    Thank you.

    How are you getting the data for the dealt cards?
    If it is thru some external data source, using a url to call
    it in, you can try adding ?nocache= XX
    where XX is a randomly generated number (so it isn't the same
    all the time) The significance of using nocache as a variable name
    is probably none... meaning it could probably be called
    anything.

  • JSP works in IE 7 and Opera 9.1 but not Firefox 2.0

    Hi everyone,
    I have a JSP with a form and a list box. When the user selects a value in the list box the form is submitted:
    <form id="ampForm" method="POST" action="AMPSearch">
        <fieldset>
            <p>
                <label for="amp">
                    Actual Medicinal Product Search Result:
                </label>
                //Here is where I think the problem lies the "onchange" method does not appear to be recognised by Firefox.
                <select size="10" name="amp" onchange="ampForm.submit()" class="listbox">
                    <c:out escapeXml="false" value="${requestScope.ampList}" />
                </select>
                <input type="hidden" name="ampList" value="<c:out escapeXml="true" value="${requestScope.ampList}" />" />
                   </p>
            <p>
                <label for="ampp">
                    Actual Medicianl Product Pack Sizes:
                </label>
                <select size="10" name="ampp" class="listbox">
                    <c:out escapeXml="false" value="${requestScope.amppList}" />
                </select>
            </p>
            <c:if test="${!empty requestScope.amppList}">
                <p>
                    <label for="quantity">
                        Quantity:
                    </label>
                    <input type="text" name="quantity" value="" />
                    <input type="submit" value="Add Order" name="addOrder" />
                </p>
            </c:if>
        </fieldset>
    </form>This all works fine in IE7 and Opera 9.1 and Netscape 8.1 when it is set to display like IE, but not in Firefox 2.0 or when Netscape is set to display like Firefox.
    Does Firefox not recognise the "onchange" method? What should I use instead? Any help would be much appreciated.
    Tom

    Not to worry people, I have done it again.
    For some reason when I post on here a few minutes later I figure the problem out even though I have been struggling with it for ages.
    The form should have had name="ampForm" not id="ampForm". Stupid thing.

  • PM Order - Change "Work Center" on operations to "Main Work Center"

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi Tilak,
    Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.
    I am not functional, so just talking in terms of technical terms.
    Is there a way the work center at operation level can be changed to main work center in background?
    Thanks,
    Ankur Sharma

  • Audio not working in pavilion dm3 after harddrive change and operating system reload

    I had hard drive failure on my Hp Pavilion dm3 and so I got a new hard drive and had the operating system reloaded and upgraded from Windows 7 Home Premium to Windows 7 Professional.  My audio isn't working unless I have external speakers plugged in.  I have no missing drivers in the Device Manager.  The speaker icon has movement and it seems like there should be volume coming out but there's nothing. 
    Is it possible that while I had my machine repaired that the guy unhooked the speakers from inside the computer accidentally?
    Its not easy to get into the inside of  this machine the repair guys said.  I did take this computer to a repair shop to get fixed because I don't know how to do all that changing.  I really don't want to take it back in just yet cause Im hoping its just a driver issue. 
    Also before I had all this work done and computer working great, I used to have little image pop up when I would press the mute button or when I would increase or decrease the volume and I can see how high or low my volume without having to hover over the speaker icon on my taskbar.  Now after the reload all that doesnt appear.  The buttons work but no little image popping up and I can figure out what that driver is called. 

    Hi,
    You can alwasy roll back the updates using Windows Restore then apply one by one or Please use the following instructions to check and fix:
       http://h10025.www1.hp.com/ewfrf/wc/document?docname=c01912228&cc=ad&dlc=en&lc=en&jumpid=reg_r1002_us...
    Regards.
    BH
    **Click the KUDOS thumb up on the left to say 'Thanks'**
    Make it easier for other people to find solutions by marking a Reply 'Accept as Solution' if it solves your problem.

  • Tables for Basic end date and work center for operation

    Hi!
    I need table name to fetch the basic end date of a maintenance order and maintenance work centers with respect to each operation in maintenance order.
    Regards,
    VM
    Edited by: V M on Jul 20, 2010 7:22 AM
    Edited by: V M on Jul 20, 2010 7:35 AM

    Hi VM,
    Input is Order Number (AUFNR).
    You can find the Basic End date of Order in Table AFKO, filed is GLTRP.
    For work center in Operations, you can use the Table AUFPL from AFKO.
    Pass this AUFPL in AFVC and get the ARBID.
    Then pass this ARBID to CRHD Table as OBJID, and get the work Center (ARBPL)
    Regards,
    MLN Prasad

Maybe you are looking for

  • Very large file 1.6 GB..sports program for school. lots of photos, template where media spots saved and dropped photos in..trying to get it to printer swho says its too large but when reduces size loses all quality...HELP??

    Please help...large file my sons Athletic program. Had noto problem with Quality last year..this new printer said file is too large..too many layers, can I FLATTEN..He reduced size and photos look awful. It is 81 pages. Have to have complete before n

  • Magic Mouse Scrolling

    After 6 years my wireless mouse died, and I purchased a new "magic mouse." The instructions and the salesperson both said I could use it to scroll by rubbing my finger on its back. I do not get this result. I just am able to click the left side to cl

  • PS4 won't play games

    Hope someone can help me! My PS4 boots up as normal and is allowed a couple minutes start up time. Everything seems fine and a disc is inserted to play. When play is selected, the games initial backdrop image appears full screen, but it goes no furth

  • Putting Items In Trash

    I listen to podcasts and also have times when I want to delete songs that I am tired of listening to. I move them to the trash can but they don't appear in the one on the launch bar. Do they get sent to another trashcan? I know it asks me of I really

  • Listing folders on a server

    Hello, I have been scrounging the forums for any ideas on how I can list the folders on my server from my clients location. I am making a user manual that's just a set of videos embedded into HTML files and I thought if I put each HTML file into sub