Prod source system issue

Dear All,
I have an issue in production system.
We applied a patch in BI prod and r3 prod for data lineage...but after that all process chains failed when i checked in source system connection ...there was no connection..
Now i want to restore my r3 prod source system in BI system Please tell me how to do that.
regards
shweta

Hello,
First check in SM59 whether the connection for the source system exits. If it does not then contact the BASIS team for connection.
If the connection is fine, then you can right click on the source system in BI and choose restore option.
But beware restoring with set the timestamp for all the datasources for that source system.
It will take time as it will replicate and activate all the datasources.
Regards,
Shashank

Similar Messages

  • Source system issues post BW System Copy

    Hi Team,
    Post BW System Copy, we have observed that the RFC connection has changed.
    However the Target Host port is maintained same as the required source system...
    While checking the Connection, we are getting the following error messages:
    @5C@     Port description contains errors: Incorrect destination MR0CLNT200     RSAR     669     
    @5C@     BI unknown in source system     RSAR     8     
    @5C@     BI IDoc type ZSMA002 is not the same as source system IDoc type     RSAR     371     
    @5C@     The following errors occurred in the source system:     RSAR     374     
    @5C@     EDI: Partner profile not available     E0     332     
    @5C@     Entry in inbound table not found     E0     414     
    @5C@     Entry in outbound table not found     E0     400     
    @5C@     Entry in outbound table not found     E0     400     
    @5D@     Destination MP0CLNT200 has incorrect Unicode setting; adjust it to destination     RSAR     673     
    Please advice.
    Thanks & Regards
    Sneha
    Edited by: Sneha Santhanakrishnan on Mar 23, 2011 2:12 PM
    Edited by: Sneha Santhanakrishnan on Mar 23, 2011 3:04 PM

    Hi Arun,
    Thanks..
    Your solution worked for all the datasources except one wherin I am getting a error message while activating the Transformation as "System setting does not allow changes to be made to the object XXXXXXX"
    Please note the Transformation is in the ACTIVE but NOT EXECUTABLE state.
    Find below the details description on the issue.
    Message no. TO128
    Diagnosis
    The system and namespace change option set for this SAP System does not allow any changes to be made to object RSFO 4L8RD1B5MKEQI3WSPE5S8MR2O.
    System Response
    Editing is terminated, the object can only be displayed.
    Procedure
    If you want to edit the object RSFO 4L8RD1B5MKEQI3WSPE5S8MR2O in this SAP System, have your system administator set the SAP System to "modifiable" for this object.
    This can affect the modifiability of the namespace &1 or the namespaces that correspond to the pattern &1, as well as the global setting of the system change option.
    The system change option is set using the Transport Organizer tools (Transaction SE03). Expand the Administration node and execute the program Set system change option. The options are described there.

  • New Source System Issue

    Hi
    We are trying to connect new Source System to BW. It is ECC 5.0.
    When I try to activate the Source System, it generates the following error:
    <b>EDI: Partner profile not available
    Entry in inbound table not found
    Entry in outbound table not found
    Entry in outbound table not found</b>
    I checked WE20, it looks good. This is very similar to the current R/3 System (4.6). I was able to REPLICATE the DATASOURCE with no issues.
    Can you please let me know, how this could be resolved.
    Regards,
    GPK.

    Hi Guru's
    The OSS note mentioned was a good one. I did check that OSS to ensure we were on track. There was no loop hole i got in regards to this issue.
    I cannot say why it worked for me but I could tell what I did.
    1. Deleted the source system, I creted.
    2. Created the Source System back again.
    3. It worked, but the only difference I noted was that, the icon of the source system is like the BW and not like the r/3 icon. I don't know WHY??
    Thank you all for your support and advices.
    Regards,
    GPK.

  • Process chain - Two source system issue

    Hi Experts,
    I face problem when i transport a process chain from BW DEV to Quality.
    I have two source systems in Quality ECI and EXS.EXS is a sandbox server(Source system) which we no longer use.
    When i transport the process chain from DEV to QA, i get two DTP's automatically added to Process chain in quality for two source systems ECI and EXS whereas i do not want the data to be loaded from EXS client.
    I checked the BW dev system, it has only one DTP in the process chain.
    Now I want to elminate the other DTP in the process chain in quality.
    Please suggest.
    Regards,
    Srini

    I Dont think so a DTP for EXS system has got created automatically when you transport the PC to QA (which actually doesn't exist in DEV).
    Please check you DEV system once again, there might a DTP from EXS system also.. other wise go the Release TR and then check the contents-->iif you find two DTP's there then it is there in the dev system..
    Any ways if you want to delete the other DTP from the PC in QA.. you can Delete it directly from the PC itself.. Goto change mode of the PC and then select the DTP which you want to delete-->then right click and hten Click on Remove Process -->then activate the PC..
    Note: You might have authorization to edit the PC in QA then only you will be able to do the changes..

  • Multiple source system issue...

    Hi,
    We have two source system for BW Development and one source sytem for BWQ and BWP.
    My query is: we have added two extra fields 0SOURCESYSTEM, 0FISCVARNT in the key fields to handle data from two different systems.
    Do anyone have any more suggestion to handle such a scenario.
    Suggestions will be highly appreciated.

    Hi,
    Incase if you are loading data from two sourcesytem ,you will have two data sources each representing one sourcesytem,then you can assign these to an infosurce with flexible update.
    now you can craete two info packages for each source sytem and can load the data to the target
    the steps may look something like this
    replicate datasource1
    replicate datasource2
    create infosurce
    assign datasource1 and datsource2 to infosurce
    maintain transfer rules
    under infosource
    later create Ip for source1
    create Ip for source2
    crate target
    create updaterules
    map the infosoure to update rules
    cheers,
    Swapna.G

  • Source System Issue

    Hi Gurus, I am getting "No matching FM area found" and "errors in the source system" when I try to load data thru an InfoPackage into PSA in BI7.0. This is newly installed BW DEV system for demo purposes.
    I have checked that the latest SP13 are installed. SPRO settings are intact. I was wondering where the problem is. Please guide in this matter. Thnx

    Hi SniffBW,
    The error you are getting is from Funds Management (That's what FM means, is not function module).
    Check this link: http://help.sap.com/saphelp_nw70/helpdata/EN/1a/8c425e8afe11d496d80000e835339d/frameset.htm
    You need to enter a FM area as a parameter for the extraction.
    Hope this helps.
    Regards,
    Diego

  • Transports from BW ....source system in transports

    Hi,
    In R/3  i created  Z data source and transported to Test system.
    In BW i created entire stream of z objects (Info Objects, Cube, ODS, Update Rules, Transfer Rule...etc)
    Can you please update me what are the objects i need to transfer...Bcaz i am bit cinsused with the source system.
    If i can’t  transfer  source system...do i need to map the transfer rules again in test system and do i need to assign the source system to info source...
    Please update me on this
    Thanks

    Hi,
    Source system is not transported but if you transport InfoSource, transfer rules and infopackages and you have mapped the source system conversion objects will be linked to your PROD source system.
    Dont remember now.... but think even with source system included in the transport request you will have a warning message in STMS saying source systems are not transported
    Regards,
    Carlos

  • Error in the source systen with app log in source system

    Hi experts
    I am running a full load for 0HR_PT_2(Actual Personnel Times ).this load is loading the data and says no errors occurred and write an app log in source sytem saying
    Extraction date for personnel number 00000000 set to 20081231.
    I have tried to select the data selection of personnel no from
    00000001 to 99999999.
    but it still gives me the same warning.
    please help me in solving.
    thanking you
    satish

    Hi Satish,
      Were you able to fix the application log in source system issue ? I am also facing the same problem for 0HR_PT_2 .
    plz let me know.
    Points will be awarded .

  • Job is not in Active mode, still in Ready mode in the source system

    Hi Folks,
    Process Chain carrying some data loads asusally today also, i noticed there is no action in the details tabs, then i checked in the source sytem, jobs in ready mode. why it is turned like this.
    Can any one provide your valuable inputs on this...
    Thanks,
    V

    Hi ,
    Thanks for your quick responce on this..
    My issue has been resolved: Issue occured due to in the source system issue. All BW job has been scheduled in one particular application server which is facing more than issue.
    Basis team involved and resolved them.

  • BI Source system (critical issue)

    Hi Friends,
    I am working as a basis consultant.
    we have a ECC6 Development server and in the same server we hav installed BI-Cont and using as a BI Dev sever too.
    Client - 400 is R/3 Develop server
    Client - 300 is BI Develop server
    we cofigured 400 client as a source system for bi(300) and lot of develpments are made.
    Now we are planning to make this ECC6 DEV as a Production server for BI. (simultaniously R/3 developments also will happen in the same server).
    Now i have Created a new client-500 for BI(Production) in the same server and i want to add our R/3 Production server client-900(different server) as a Source system.
    1 I maintained RS_MANDT_UNIQUE_SET and set to client 500.
    2 I maintained table RSADMINA and set client 500
    and BW_user
    3 Created RFC between client 500 to PRD server client 900
    now when i tried RSA1 Transaction in BI PRD client 500, it says "Logical system name has been changed for this system"  "Message no. R3206"
    when i see the long text it says
    "The logical system name of this system is PRDCLNT500. However, this system was originally created with the logical system name DEVCLNT300. It is not permitted to change the logical system name, as connections to other systems will be damaged beyond repair.
    System Response
    The transaction is canceled.
    Procedure
    Change the name of the logical system (table T000) for client  back to DEVCLNT300. This enables you to continue working with the system.
    If you really want to change the logical name, than you can, if and when you:
    change the system name back to DEVCLNT300,
    delete all existing connections between this system and other systems,
    delete all transfer structures that still exist, and
    do not use ALE or Workflow."
    1 I tried to remove the source system from 300, but it is prompting to delete lot of packages and it is going for a while. so i stopped it.
    2 I removed all the RFC Connections between 300-400
    3 I deleted the logical system "DEVCLNT300".
    Still the same Issue "Logical system name has been changed for this system".
    Please help me Resolving this issue, since this issue became so critical.
    Thanks in advance
    Prakash

    Thank you for Replying
    I know the landscape we are having will confuse.
    In ECC6 DEV Server a new client 500 is created for BI Producion server (not exactly prod but assume like that).
    There is seperate R/3 Production server (client-900) and that shud be configured as a source system for the new BI PRD Client 500.
    I dont want any data from 300, infact i would delete the 300client (BIdevclt) after i configure everything in client 500.
    I did all the BI post installation steps for client 500.( including RS_MANDT_UNIQUE_SET)
    but since the 300 client was configured as BW dev in the same server, i am getting an error if i access RSA1 in client 500 "Logical system name has been changed for this system"  "Message no. R3206"
    I went through the BDLSS  transaction, but it talks about converting logical system and i dont want to do that.
    Client400 is configured as source system for bi dev 300.  I want to delete all the configuration made in 300.
    I want to know deleting the souce client manually from BI dev 300 client is the only way to fix this or anything else we could do it for this ERROR.

  • Transformation issue while connecting multiple source system of same type..

    Hi,
    I'm working on APO-BW integration project. I want to connect BW QA & BW PROD to APO QA. I've already connected BW QA to APO QA & it is fetching data correctly. RFC part & other BASIS part is already taken care of. I've done export datasource (for mater data, cube etc) in BW PROD & replicated in APO QA. All BW PROD datasources are imported as RSDS (7.X) in APO QA.
    Now my question is how to make sure the transformations will take source system as BW PROD too? I want 2 datasources (one from BW QA & other from BW PROD) to connect to same inforprovider in APO. I've transported 7.x datsource from APO DEV to APO QA environment along with transformations. In conversion of logical system names in APO QA I've given source system -BW DEV & target system - BW QA. So the transformation automatically takes data source as BW QA. It doesn't take source-system - BW DEV & target system - BW PROD as it conflicts previous setting.
    Is only option that I need to manually maintain transformation from BW PROD datasource or there's another better alternative?

    HI,
    You are getting multiple IDOCs into BPM. But output you are getting one message right? IF so, your N:1 Mapping is not done correctly.
    i.e your target message type should have occurence of 1..n and also the interface mapping. Closely obsever the N:1 mapping done in the BpmPatternCollectMerge.
    Also go to SXMB_MONI->PE and check the Technical Details to make sure that, you are getting multiple IDOCs and you are executing the N:1 Transformation step correctly.
    Also in the N:1 Mapping, check out the context you used. Make it root .  Then test the mapping independently in the Integration Repository.
    Hope it helps,
    Regards,
    Moorthy

  • Issue in source system creation under sap node

    hi,
    i am facing a strage issue here while creating a sap source system. 
    i have two development systems - bd1 for bi development, rd1 for r/3 development. rfc is propely maintained between both of the systems. now im creating the source sytsem under transaction rsa1 - source sytem - sap, i put in all the details and it prompts me to log in to the source system as well. it creates the system properly but the problem is that im creating it under the node sap and it goes under the node bi.
    i have deleted it from there and repeated the same process again but still everytime it comes only under the node bi irrespectiv e of the thing that im creating it under sap.
    this is the first time im facing this strange issue i have done the same process many time but never seen nething like this, does anyone have any idea for the same.
    kindly give ur inputs.
    thanks
    dipika

    Hi Dipika,
    It is not an operational issue. Its just a display and should not have any problems.
    Please go through the below SAP Note to fix the issue.
    [Note 1087980 - ECC Source systems appearing in BI folder|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1087980]
    Regards,
    Gaurav
    Edited by: Gaurav Kothari on Aug 31, 2009 4:20 PM

  • Deleting a Source System in BW Prod

    Hi Guys,
    I am trying to delete the assignment of R/3 Production as a Source system in BW Prod but the system is not letting me- informing that:
    Package ZBWD does not exist- choos display object or cancel.
    The reason I am doing this is at present the source system is assigned to Infoobject 0WBS_ELEMT but I want to assign the 0WBS_ELEMT_ATTR & 0WBS_ELEMT_TEXT datasources to the 0WBS_ELEMT_ATTR & 0WBS_ELEMT_TEXT InfoSources.  I would like to un-assign this datasource from 0WBS_ELEMT and assign to the InfoSources stated above. 
    I am trying to bring in WBS Element master data but found in Dev when I bring it in through the infoSources it is available in BW but through the 0WBS_ELEMT infoObject there is no data in the masterdata tables.
    How can I delete this source system assignment in BW Prod?
    Thanks
    Depesh

    hi Depesh,
    i think system won't let you delete source system assignment in prod if it's closed for modification
    (transaction scc4), if you really need to do this directly in prod, please ask basis open awhile,
    have you tried delete the source system assignment in dev and transport to prod ?
    regarding package zbwd not exist, check in prod if package zbwd exist,
    transaction se80, choose 'package', type in zbwd,
    it will display the package or ask to create new if not exist. transport package zbwd from bw dev if it's not exist in prod.
    hope this helps.

  • Source system connection issues

    Hello BI Experts,
    We had issues with the source system connection - from our BI system (NW 04s) to our R/3 system (ECC 6.0) .
    From RSA1, when we right click on the R3 source sytem and do a "Check", it was erroring out: "Error in source system <Logsysname1>". This Logsysname1 was different one from the actual R/3 system's Logsys name (Logsysname2) .
    To Fix this, we restored the connection by selecting the (R/3) Source system and right click and "Restore".
    After providing the passwords for the RFC users, the system again asked "The Connection <XY> is used in the <Logsysname1> Source system as a connection." And we selected the "Delete" option here. Then in the Logon screen to R/3, we provided the administrator user Id and password.
    Once the source system connection is complete, we checked the connection as mentioned above and the "Source Sytem connection is OK" now.
    (1) But now, in the transaction RSA1, the R/3 system is displayed under "BI" instead of "SAP".
    (2) When we asked our BI consultant to check the dataloads, he encountered an error: "No transfer structure is available for InfoSource <X> in the Source system. Errors in Source system".
    How can we bring the R/3 system under "SAP" now?
    If we delete the R/3 system (which is listed under BI) and recreate under "SAP", will the transfer rules will also get deleted?? How to avoid this issue?
    Please advise.
    John
    SAP Basis.

    Hi,
    Please make sure that you have followed the below steps while creating the Source System
    1.     In the initial screen of the source system, choose Tools ® Administration ® User Maintenance ® Users and create a background user with a password and the authorization profile S_BI-WX_RFC.
    2.     Define the RFC destination parameters for the SAP source system in BW. To do this, choose Tools ® Administration ® Administration ® Network ® RFC Destinations in BW.
    Enter the information taken from the source system on the server name.
    u2022     Application server: pswdf090
    u2022     System ID: IDF
    u2022     System number: 90
    The destination name has to correspond to the logical name of the source system that you entered for the process step Define Logical System in the implementation guide for the source system. For user and password, enter the background user that you created in step 1.
    3.     Define the RFC destination parameters for the SAP BW in the source system. To do this, select Tools ® Administration ® Administration ® Network ® RFC Destinations in the source system. Enter the server name information taken from the BW system.
    The destination name has to correspond to the logical name of the BW system that you entered in the process step Define Logical System in the BW Customizing Implementation Guide. ALE communicates using the name of the SAP Business Information Warehouse that you defined. The defined name represents how the SAP Business Information Warehouse is identified. For the user and password, enter the background user that you defined in the BW Customizing Implementation Guide under Business Information Warehouse ® Links to Other Systems ® Link Between SAP Systems and BW.
    4.     Test both RFC destinations with the functions Test ® Connection and Test ® Authorization.
    If an error occurs during the authorization check, the background user is not permitted in this client and with this password. If an error occurs in the connection test, it means there is a network problem.
    5.     In the BW Administrator Workbench choose SOURCESYSTEMTREE ® Root ® Context Menu (right mouse button) ®Create and select the radio button for the manually creating an SAP source system.
    6.     Enter a description for the source system and the logical name of the source system that you entered for the process step Maintain Logical System in the source system implementation guide.
    If you still have any issues, let us know.
    Regards,
    Yogesh.

  • Transport issue - Source system does not exist

    Hi at all!
    I've got a problem after transport from BW QA-system (EBW) to BW PRD-system (PBW). All transports got the same error message, that the Source System DEV500 doesn't exist. But DEV500 is the development R/3 system. How could it be? Because we didn't connect the DEV500 to PBW. We connected PRDCLNT100 (Productive R/3) to PBW. Where is the failure?
    Thanks in advance for your help.
    Christof

    Hi,
    DEV R/3 -
    > QA R/3 -
    > PROD R/3
    DEV BIW -
    > QA BIW -
    > PROD BIW
    Is the above one is your landscape? If so , you must had created the Transport requests in DEV BIW and imported them into QA BIW. And for that you had maintained the source system conversions in QA ABIW .
    Now you want to import into PROD BIW. And remember that the orgin(source) of the trnasport requests is DEV BIW. So you need to maintain the Conversions in PROD BIW for conversion from DEV R/3 to PROD R/3.
    With rgds,
    Anilk Kumar Sharma. P

Maybe you are looking for

  • Address Book syncing is completely broken

    There are other threads on this, but I'm angry enough to start my own. Between my mac, .Mac, and my iPhone, I can't keep good contact data, almost ever. Invariably one of those devices will completely screw it up. Lately it has been syncing my iPhone

  • Hidden Playlist in iTunes 7

    I just switched from manually managing music to syncing it because I had to restore my iPod. So I've created all my playlists in iTunes and they are in my iPod. But now I have an extra playlist under the "Music" tab. It is not in the Playlist sidebar

  • Adding Printer Error on Eprint center

    I have signed up for the eprint services and I have an account. I've use the eprint functionality; however, when I sign in now, it says that it can find my printer settings. However I can print from my phone, I just can't utilize the print center to

  • Error in TYPE conversion in Unicode

    Hi exprts, I have got problem in Unicode conversion. DATA esc_char TYPE x VALUE '1B'. How to convert above to CHAR format, can anybody pls help on this. Regards, Zakir.

  • APD - Rename header at output file

    Hello all, I'm using APDs to run a query and download its results to a CSV file. I need to rename header texts at output CSV file. If you select an option (Insert header row with field names in the first row of the file) headers are generated, but ge