Prod Version Slection during conversion of planned order to production orde

Dear Experts,
I have two BOM for a semi finished product. I have created two production version for the same. After MRP run, it created planned order for BOM1.  This is fine.
My requirement is, when I convert the planned order to production order, it should ask for selection of production order as it ask while creating the production order using CO01. I know that I can select the alternate prodution version by reading the PP master data. Can system ask for selection of production order while converting the planned order to production order.
Thanking You,
Chetan

Dear Chetan,
If you have manual selection of production version set in OPL8 and if you have set the BOM selection method as 2 in
MRP 4 view of the material master then,
1.If you create a production order manually then the system displays the pop up to select a production version.
2.If you are converting the planned order into a production order then it picks up the one which is
present in the planned order.So obviously if 2 production versions are there with same lot size and
validity dates,then the system picksup the first one only during MRP run.
Even if it picks up the first prod.version in planned order,but while converting click on master data and
change the production version if required.
3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
considered during MRP run.
Check out and revert back.
Regards
Mangalraj.S

Similar Messages

  • BUG in  Conversion of Planned order to Production Order.

    Dear all,
    I got an error while conversion of planned order to production order are as follows,
    No Default values maintained for op.generation for order type ZFT1(matlPILSF002).
    Can anyone please guide me to proceed further.
    Kumar.

    Hi,
    Root cause behind this problem is, no Routing found.
    First complete below settings.
    - Go to OPJG And create defult Operation creation in case of no Routing found.This setting will generate the default Operation incase of no routing found during Order creation.
    - In T.code OPJF Create automatic selection parameters (Selection ID) for Routing.
    - In T.Code OPL8 Maintain Selection ID for Routing and also maintain type of Routing selection (3 - Automatic Routing selection)
    Regards,
    Dhaval

  • Program PPBICO40 for conversion of planned orders to production order

    Hi,
    The program PPBICO40 is for conversion of planned orders to production orders in the background job.But while set up of variant it is asking me for peson who created error folder and recipient.I want to know the significance of these two fields and how these are useful.
    Please throw some light on this.
    Thanks in advance,
    Ravi

    Dear,
    PPBICO40 the non-convertible planned orders are put together in one batch input session and can be postprocessed with batch input tools. It is possible to create a separate error session for each MRP controller.
    Error folder for each MRP controller: creates a separate error folder for each MRP controller.
    Receive folder according to view: If the indicator is set, the error folder is not deleted after processing in batch input.
    Creator of the error folder: User who is entered as creator in the error folder .
    Send mail: Sends a mail to the respective MRP controllers during the creation of a batch input session. If the indicator 'Error folder per MRP controller' is not set, the mail is sent to 'Recipient (alternative)'.
    Express document: sends mail as an express document.
    Recipient (alternative): Recipient of the mail, if no recipient is specified in the material requirements planning master record of the MRP controller responsible .
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Conversion of planned order to production oder.

    hello friends,
    we are making a project,in that we are facing a small problem.
    we made demand management,and mrp run.after we have go
    gone to md04,there we tried to convert planned order to process order, routing is not selected by production order.but if we go to co01,there production order is created.what are the configurations to be made for conversion of planned order to production order.pl help.
    reward points will be given for the best answer.
    regards
    seshagiri

    Dear Seshagiri,
    Tell me after MRP run,for your Finished product,are you able to see planned orders?
    IF so,copy the planned order number and display it in MD13 or directly in MD04 by double clicking on the planned order number and
    click on display button(Press F7).check whether you are able to see BOM components and Detailed.scheduling tab key assuming in
    MRP control parameter you have given value 2 for scheduling.
    IF present and during conversion are you facing the problem?
    Please clear these doubts.
    Regards
    Mangalraj.S

  • Conversion of planned orders to production orders

    Hi,
    we are doing mass conversion of planned orders to production orders and performing capacity availability check, how system will give log information based on these two things,
    when i perform availability check at time of order creation and will not allow to create if anything is missing (i selected user decides option in configuration), does it show any error log report and where can i see.
    When i perform availability check at time of release, if anything missing it will not allow to release and give a choice for a user to release in normal production order creation process, how it will work in mass conversion. is there any standard report to look at missing planned orders so that users will come to know and then decides whether to convert to production order or not.
    thanks in advance.

    Dear ,
    In SM38-Enter PPBICO40 -Execute -Here you need to Mark the Output log option with Erros only or Error Folder for each MRP controller  .Frist you do it in test mode and then remove test mode , mark the Output log option as per requured field and check the result .
    refer this useful thread : Program PPBICO40 for conversion of planned orders to production order
    Regards
    JH

  • Partial conversion of planned order into production order of AFS material

    Dear Experts,
    I am working with SAP 6.0 EHP4 with AFS add-on. My material is AFS specific material. I am not able to convert planned order into production order partially from MD04 screen as all the fields in the CO48 screen is grayed out. 
    Please help...
    Regards,
    Alok Tiwari

    Hi,
    I am not able to get what is passing the start date.
    Second thing is how you are generating the serial number - manually or automatic?
    If you are generating serial number automatic, then it is not possible to generate it considering the basic start date.
    But if you are entering the serial number manually, then there should not be any problem as system will accept that serial number which you enter at the time of conversion of planned order to production order.
    Regards
    Amit parkhi

  • Bug in Conversion 4m Planned Order to Production Order.

    Hi guys,
    While conversion of Planned order to Production Order i got the below error,
    "YOU CANNOT MAKE AN ASSIGNMENT TO MAKE-TO-ORDER STOCK"
    Message # CO684
    Settings i ve done,
    MRP3 View for this particular Material i have selected Stratergy as 20.
    Please help me to resolve this issue,and what are the settings i need to do.
    Awaiting a positive reply.
    Regards,
    Kumar.S

    Resolved Sucessfully
    Kumar.S

  • Auto conversion of planned order to production orders

    Hi Gurus,
    Few days back I posted a question on; Auto conversion of planned order to production orders.
    http://forums.sdn.sap.com/thread.jspa?threadID=2135568&tstart=0
    There is standard SAP Transaction to run a batch job. no need to use - user exit or a BAPI
    Follow this procedure:
    TCode: COHV
    on the initial screen; select "CHECK BOX" for planned orders and deselect production orders.
    select mass processing tab.
    Function: 210 Convert planned orders.
    On Menu-Programs-Execute in background
    Thanks

    HI Alok,
    I was looking at CO41 and there is only one small problem with that. You have to give an 'Order Type' as a input. And I don't see 'Execute in the background' anywhere. I think I have to create a job using wizard in SM36.
    Please correct me if I'm wrong.
    Thanks

  • Conversion of planned order to production order resulting into Runtime error

    Hello Gurus
         I am trying to convert Planned order into production order in MD04,  but I am getting ABAP Runtime error; for details please see image here posted.
    Please help me to resolve the issue.
    Thanks in advance!
    # If anybody wants remote access of my system through Team viewer I am ready to share my desktop for same.
    Regards!
    AKSHAY

    Hi Akshay,
    Overflow during arithmetical operation type P COMPUTE_BCD_OVERFLOW comes when the maximum of the internal ABAP field that is 99,999,999,999.99 many be quantity, cost value UoM conversion etc.
    Please check how this UOM (unit of measure) is defined in transaction CUNI. In this transaction, you may have set the Value-based commitment indicator. This indicator controls whether commitments for the chosen unit of measure are recorded on a quantity basis or a value basis.
    Please search OSS note for this dump and also raise this to OSS.
    Regards,
    R.Brahmankar

  • Re-exploding BOM at conversion of planned order to production order

    Hi, all.
    I'd like to be able to specify that the planned orders I'm converting to production order re-explode the BOM on the scheduled date rather than the basic date of the production order.
    I want to be able to do this in customizing rather than specifying a BOM Explosion Date (fixed key date) in the planned order or independent requirements.  Is there anything in customizing that could do this?
    Thanks!
    Sarah

    Hi Sarah,
    I think you have checked the note:
    391846 Modif: Reading master data when converting planned order
    Because only with the modification of this note, you will be able to re-explode the BOM when converting the planned order to production order,  however, there is no way to set the BOM explosion date to the scheduled date during the conversion, there is no such customizing as the note only add three action for this function:
         ' '  Do not read
         '1'  Read with explosion date from planned order
         '2'  Read with newly determined explosion date
    So if you need such function, you may try to develop the modification by yourself.
    Regards,
    Rachel

  • Conversion of planned order to Production Order

    Hi,
    I am converting Planned Order to Production Order in CO40.
    During this I am getting an information "Error or warning occured during master data transfer". What is this due to?
    Please give your inputs.
    Regards
    Ramakanth

    Hi,
    Check whether the BOM and Routing Maintained for this Material and they are valid or any PV maintained is OK.
    If there is any problem with the BOM then the relevant information like BOM Not fond etc.. can be seen in MD04 itself.
    It seems, the problem is with the Routing, as at the time of Production Order conversion only the Routing will be copied..
    So, check the details and revert for further discussion..
    Regards,
    Siva

  • Error in Conversion of Planned order to Production Order

    Hi,
    I am getting error while converting the planned order to Production order.
    Error is " Scheduling parameters not defined for the production orders"
    I have maintained the parameters in Prod-> Shop Floor Control -> Operations -> Scheduling....but after that also the same error is coming.
    And also I have maintained in the Capacity Req Planning
    Kindly assist me where I can define the scheduling parameters for the production orders in MTO cycle.
    Regards
    Toshi

    Hi ,
    My production order has been created ....but now m getting error while releasing it.
    Its saying that "No checking rule maintained for operation"
    I have maintained the checking rule in OPJK. But still m getting the same error.
    Kindly assist me for the above error.
    Regards
    Toshi

  • Partial conversion of Planned orders to Production orders

    Hi all
    I wan tot partially convert planned order to production order. I am able to do this with MD04. Is there a tcode for mass partial conversion. CO41 does not allow a partial conversion. Is there a way I can collectively do a partial conversion.
    thanks

    Hi John,
    To the best of my knowledge there is no t-code to do a mass partial conversion of planned orders.
    You can try with a lsmw recording of t-code co48 & then input your planned order numbers with the qty to be partially converted or alternatively use co41, change the qty & convert the planned orders, but with this you will need to re-run MRP to create another planned order for the balance qty.
    Hope the above helps.
    Regards,
    Vivek

  • Error while mass conversion of Planned order to production order

    Hi All,
    Thanks in Advance for help. We are facing one issue since Oct-2011.
    We have set up batch jobs for early morning to convert planned orders in to production orders. This is set up for transaction COHV.
    We have both MTO and MTS scenario.
    But problem occurs in Make to Order (MTO) scenario.
    Error comes in ST22 as   " SAPSQL_ARRAY_INSERT_DUPREC"
    *..Reservierungsköpfe inserten
      IF NOT rkpf_i[] IS INITIAL.
        INSERT rkpf FROM TABLE rkpf_i.
      ENDIF.
    Note : This error is not coming on consistent basis, it comes randomly. Secondly we are not aware of the reason/root cause of this error, hence not able to replicate error at all on Quality server.(Quality is backup of production till nov-2011)
    Writing to SAP, they debugged and provided note 504255. A part of that note says "Remember that this note describes a MODIFICATION which differs from
    the standard behavior of the system. Therefore, the customer assumes
    the responsibility for the implementation of this source code
    change. Due to this reason, SAP AG does not provide any support or
    maintenance for the changed source code."
    Hence client is reluctant to implement that note.
    Can any one help us out on
    1) What can be the cause of error as mentioned above?
    2) Resolution apart from SAP note?
    Best regards,
    Ravi Davda

    Hi Ravi,
    I am also facing same kind of issues from past couple of months.
    Sometimes this issue come up as sales order credit ststus is not approved and some times it happens due the following error INSERT rkpf FROM TABLE rkpf_i..
    I am also looking for some permanent solution.And today I have also faced same error and will be converting it manually.
    And can you tell for which client you are working?And if you find any solution for this please update me
    Regards
    Punjabi

  • Conversion of Planned Order to Production order or Purchase requisition

    Hi Experts,
    When  a planned order is converted to a production order or a purchase requisition, is it permanently deleted from the database?
    Thanks for your help.
    Regards,
    Rose

    Hi,
    Yes in SAP planned is getting deleted once converted into production order or purchase requisition. But you can check its no in assignment with both in future for any reference.
    Hope this will help you.
    Regards,
    Ashish

Maybe you are looking for

  • No video in monitor,but, audio plays when playing timeline CS5.5.1

    In one sequence only, no video plays in monitor, but, audio is heard. What have I done ? The same H.264 mov clips when set in new sequence plays ok ?

  • How to embed Cap3 in MS PowerPoint 2003

    Can anyone provide me with "step by step for dummy" instructions on how to embed a movie created in Captivate 3 in to PowerPoint 2003. I can create it OK in Captivate, just need to know what to save it as, and how to embed it in to PowerPoint. Intent

  • InDesign CS3 vs. Framemaker/Ventura

    Has anyone used InDesign CS3 for producing long, text-intensive, books? How does it compare to Framemaker or Ventura? Will InDesign handle multi-page tables, for example? Is it possible to rotate multi-page tables 90 degrees (landscape table on a por

  • "Popping" noise w/ Audigy 2

    Hi, I have had this constant, periodic popping noise through my 7. Creative speakers with my Audigy 2 ZS whenever I load windows and mostly when I have two sounds playing at once ie. Games and Winamp... please does anyone know how to fix this? It is

  • Dev and Production BW systems not in sync.