Prodction order without BOM

Hi,
Please tell me  we have creating Production order without BOM(Bill of Material) & post the BOM Component of Production Order Manually. when developing the report Material Number wise then BOM not found in the report. So, i want to know that how to relate BOM Component with Material Number & which will be table to use in this report.
AmAn

Hi Aman,
which report?
If you don't select the BOM, then certainly there is no BOM component.
Furthermore, BOM are not referenced in the production order, but the components copied into the order, i.e. these are saved in table AFPO.
But if the components are not maintained manually in the production order (same table), and only the consumption posted directly as unplanned consumption, then you will have trouble getting a link. Possibly only in MSEG by identifying the production order number as the cost collector.
Regards,
Kay

Similar Messages

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

  • Process Order without BOM

    I want to create a Process Order without a BOM & Recipe . Is that Possible ?
    I tried the following :
    Material Master setting  MRP 4 view -Explosion/Dependent Requirements section define " "(Blank) for Selection Method field
    Order Type Dependent parameters (COR4)
    Production Version Blank :
    Recipe: Do not use Master Recipe
    But the problem is that I cannot keep BOM application Blank
    BOM application has the link for selection ID which is linked to BOM usage .
    I am not able to bypass this check in any way & as a result it gives an error (No valid BOM) on Process order creation
    Shall appreciate a response

    Hi,
    Yes, it is possible to create process order without BOM & master recipe.
    By having some config settings in place for BOM & recipe selection, you can create process order without BOM & recipe in SAP.
    Normally, this scenario comes into picture where you're not sure about the operations to be carried out and materials to be consumed for an order.
    For creating and testing such scenario, refer below SCN thread, which was discussed before,
    Create Process order without Production Version | SCN
    Regards,
    Narresh

  • Error while creating Production order without BOM

    Hi Guys,
    While creating production order without a BOM i am getting the following error in the error log.
    Error: BOM for material xxxxxx does not contain any valid items
    Message no. CO636
    Kindly help.
    Regards,
    Sid

    Dear customer,
    could you check in the master data screen of the order if one BOM has been selected?
    please coudl you check your customizing the following transactions:
    OPJM
    OPJI
    what do you have in 'BOM slection field' MRP4 view of the header material?
    Please check if with this info you can find the missing data to explode the BOM
    regards
    Maria

  • Doesn't Create Production Order without BOM & Routing

    Hello,
    I have a requirement that Production Order is not be created without the BOM
    Is there any Customizing Setting??
    I have the option by implementing User Exit but i want to know is there any standard setting???
    Please throw some comments???
    Regards,
    Kumar

    Dear Kumar,
    1.First in OS30 - Application Specific criteria for Altern.Determination,include a
    new entry named ZP00 - NO BOM and dont include any of the check boxes.
    2.In OPL8 - Order Type Dependent parameters,Under Routing --Sequence
    Exchange must be "0" & Routing slection also should be "0".Under Bill of
    material,--BOM Application ,select ZP00 & save.
    Check with this & Revert to forums.
    If useful reward points.
    Regards
    Mangal

  • Conversion planned order to production order without BOM - no message

    Hello
    Problem: during conversion planned order to production order system does not inform (warning or error) that BOM is not exist. Is it possible  to force system to any reaction by standard configuration ?
    Everything is ok if production order is created by CO01, but during conversion there is no any reaction - production order is created, released etc. I only see by system status that something is wrong (NMAT - No material components). Probably we will have to do it by User Exit but I want to know that all standard configs are exhausted.
    Thx in advance. Reg.
    Joanna

    Hello
    The BOM is not read again when a planned order is converted to production order on the standard system.
    You may implement the modification from note 391846 to force master data to be read again, therefore, an error message will be triggered during the conversion when the BOM is invalid.
    BR Caetano

  • Costing for shearing orders without BOM

    The client is into sheet metal stamping. The input materials for pressing are steel sheets in different sizes. Each FG can be produced from only one specific sized sheet.
    These sheets are ideally to be procured directly in the required cut sizes. But in case of unavailability of the sheets in the required size, and due to high requirements, these sheets are obtained by carrying out shearing activity. In this, the required cut sizes are obtained by shearing other larger size sheets. Also, some other off-cuts might be produced while carrying out the shearing.
    This being the regular scene here, we have defined the sheets as HALB.
    But the possibilities of making a particular sheet from the other available sheets are vast. Again from a single sheet many other sheets (as co-products) are possible to be manufactured along with scrap(as bi-product). This makes it impossible to make any BOMs for the particular sheet.
    The problem for this scenario is in costing. We can create a order showing the material to be produced, the co-products and the bi-products (All entered manually in order)  but we are not sure how the costing will happen.
    The material being HALB is given the price control S, and being BOMs are not maintained, the prices are not updated through costing run.
    We have tried with both the price controls S and V. In both cases the costs of the materials are not updated through production orders.
    Can you suggest some answer as to how the costing of the sheets would happen?

    Hi,
    As per your issue, you are not maintainnig  both Co product and By product in Header BOM. instead your are adding the both material during the prodution order creation.
    But Prerequisites is for both, should be defined as line item for Header material Bom.
    1.Co product cost will be  inclued in production order
    For costing of co product  u have to defien  apportionment structure in material master  ,to specifiey  how the total costs should be distributed over the main product and the co-products.
    2.By product cost will be Deducted  from Production order cost.
    For details information see the following SAP link,
    url=http://help.sap.com/saphelp_46c/helpdata/en/b1/c04fc6439a11d189410000e829fbbd/frameset.htm]Co product &  By product[/url]
    One more clarrification , for
    " This makes it impossible to make any BOMs for the particular sheet" - why, if you shearing a sheet from larger one, u will have stock for required size sheet for Material .... why dont u create BOM...
    once u create BOM it will solve your problem. if it usefull reward othrewise ignore
    regards
    pradeep

  • Production order creating without BOM and Routing

    create the production orders without bom and routing
    they confirm the order
    they want to stop confirmation if production without bom and routing
    is it possible to set error or warning message
    my first doubt is how can we confirm the order without bom and routing
    i think it can be solved by production order type
    please reply

    Hi,
    You can make it mandatory by following ways :
    Go to OPPQ -> Select your plant-> Go to BOM / Routing Selection in that you need to maintain BOM Sel ID & Routing Sel ID which is having selection ID with usage 1 Production which will make it mandatory to create BOM & ROuting with usage 1 & need to be selected while creation & saving Production ORder.
    Also, you can maintain another config. for making routing mandatory at Order type level :
    Go to OPL8 -> Select Plant & Order type-> Routing Selection
    Maintain 5     Routing/ref. op. set mandatory (manual selection)
    or          6     Routing mandatory (automatic selection)
    This setting will ensure without routing your order will not be saved.
    Hope this helps.
    Regards,
    Tejas

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

  • Create an RMA without original Order and BOM Item

    Hello everyone,
    I know it is possible to create a RMA-Order without a Reference to the original Sales Order (the qty should be entered negative) ok, so far so good.
    Now I want to add a BOM Item into this RMA, however the sub-Items are not added into the Lines.
    Is there any solution, that the EBS will add these Lines automatically into the RMA Order?
    Greetings,
    Björn

    You can create RMA's without Original SO reference.
    The time you say there is no original SO reference, there is no way system can search for backdated pricing... hence, you would have to take care of price in your program or provide the selling price directly in RMA... like manual pricing... and ignore the price list pricing...
    A step further, in R12 there is enhanced control for serial & lot numbered items... so if un-referenced RMA's would create new let/serial number inventory, and referenced, can be received in same lot or you can create a child lot...
    -bs

  • How to find whether the created Sales Order is with BOM or without BOM ?

    Hello,
    I am technical guy i want to find whether the created sales order is with BOM or without bom.
    Can anyone help me with table details.
    Regards
    VEk@

    Go to TVAP & in FIELD STRUM give 'A' & PSGRP as 'SD01'.It will giveyou all the Item categories maintained in BOM.
    Now you can cross - check with the Item Category maintain in the Sales Order.
    Best Regards,
    Ankur

  • Creating Job Order without Assembly Routing

    How can you prevent Users from Creating Job Order without creating routing to the Assembly used
    Regards

    Hi Laxmikant
    Please note the steps
    Create a BOM Application in OS30
    Create a new BOM ID in OS31 with BOM Usage as Production
    Assign this BOM ID in BOM Application
    Ensure that ID is responsible for Production planning alone.
    Then in that ID maintain a BOM alone without any items.
    Assign this BOM Application in Order type dependent parameters in OPL8
    Now u can create a production order w/o BOM
    Rgds

  • How to detect encoding file in ANSI, UTF8 and UTF8 without BOM

    Hi all,
    I am having a problem with detecting a .txt/.csv file encoding. I need to detect a file in ANSI, UTF8 and UTF8 without BOM but the problem is the encoding of ANSI and UTF8 without BOM are the same. I checked the function below and saw that ANSI and UTF8
    without BOM have the same encoding. so, How can I detect UTF8 without BOM encoding file? because I need to handle for this case in my code.
    Thanks.
    public Encoding GetFileEncoding(string srcFile)
                // *** Use Default of Encoding.Default (Ansi CodePage)
                Encoding enc = Encoding.Default;
                // *** Detect byte order mark if any - otherwise assume default
                byte[] buffer = new byte[10];
                FileStream file = new FileStream(srcFile, FileMode.Open);
                file.Read(buffer, 0, 10);
                file.Close();
                if (buffer[0] == 0xef && buffer[1] == 0xbb && buffer[2] == 0xbf)
                    enc = Encoding.UTF8;
                else if (buffer[0] == 0xfe && buffer[1] == 0xff)
                    enc = Encoding.Unicode;
                else if (buffer[0] == 0 && buffer[1] == 0 && buffer[2] == 0xfe && buffer[3] == 0xff)
                    enc = Encoding.UTF32;
                else if (buffer[0] == 0x2b && buffer[1] == 0x2f && buffer[2] == 0x76)
                    enc = Encoding.UTF7;
                else if (buffer[0] == 0xFE && buffer[1] == 0xFF)
                    // 1201 unicodeFFFE Unicode (Big-Endian)
                    enc = Encoding.GetEncoding(1201);
                else if (buffer[0] == 0xFF && buffer[1] == 0xFE)
                    // 1200 utf-16 Unicode
                    enc = Encoding.GetEncoding(1200);
                return enc;

    what you want is to get the encoding utf-8 without bom which can only be detected if the file has special characters, so do the following:
    public Encoding GetFileEncoding(string srcFile)
                // *** Use Default of Encoding.Default (Ansi CodePage)
                Encoding enc = Encoding.Default;
                // *** Detect byte order mark if any - otherwise assume default
                byte[] buffer = new byte[10];
                FileStream file = new FileStream(srcFile, FileMode.Open);
                file.Read(buffer, 0, 10);
                file.Close();
                if (buffer[0] == 0xef && buffer[1] == 0xbb && buffer[2]
    == 0xbf)
                    enc = Encoding.UTF8;
                else if (buffer[0] == 0xfe && buffer[1] == 0xff)
                    enc = Encoding.Unicode;
                else if (buffer[0] == 0 && buffer[1] == 0 && buffer[2]
    == 0xfe && buffer[3] == 0xff)
                    enc = Encoding.UTF32;
                else if (buffer[0] == 0x2b && buffer[1] == 0x2f &&
    buffer[2] == 0x76)
                    enc = Encoding.UTF7;
                else if (buffer[0] == 0xFE && buffer[1] == 0xFF)
                    // 1201 unicodeFFFE Unicode (Big-Endian)
                    enc = Encoding.GetEncoding(1201);
                else if (buffer[0] == 0xFF && buffer[1] == 0xFE)
                    // 1200 utf-16 Unicode
                    enc = Encoding.GetEncoding(1200);
               else if (validatUtf8whitBOM(srcFile))
                    enc = UTF8Encoding(false);
                return enc;
    private bool validateUtf8whitBOM(string FileSource)
                bool bReturn = false;
                string TextUTF8 = "", TextANSI = "";
                //lread the file as utf8
               StreamReader srFileWhitBOM  = new StreamReader(FileSource);
               TextUTF8 = srFileWhitBOM .ReadToEnd();
               srFileWhitBOM .Close();
                //lread the file as  ANSI
               StreamReader srFileWhitBOM  = new StreamReader(FileSource,Encoding.Defaul,false);
               TextANSI  = srFileWhitBOM .ReadToEnd();
               srFileWhitBOM .Close();
               // if the file contains special characters is UTF8 text read ansi show signs
                if(TextANSI.Contains("Ã") || TextANSI.Contains("±")
                     bReturn = true;
                return bReturn;

  • SG:50, Cannot convert planned orders to prod orders at BOM component level

    Test scenario for Strategy Group 50 (Planning without final Assembly)
    Product Structure
    Material-->  SG50.00 > FERT> (Strategy Group: 50)
    Material---> SG50.02 --> HALB --->(Strategy Group: 40)
    Material---> SG50.04 ---> ROH --->(Strategy Group: Blank)
    Maintained PIRs and Ran MRP at the header level, Planned orders are created
    with order type VP at levels of BOM structure. Thus cannot covert planned orders
    to production orders without having sales order.
    But my understanding of Strategy Group 50, is BOM components can be produced before hand (i.e.
    before sales orders are recieved ). Now planned orders with order type VP not able to convert
    planned orders to prod orders at BOM component level

    Stuti/Prasobh:
    Thanks for your inputs, it answers my question
    Intially maintained Individual/Collective indicator to "2" at header level (FERT), which is why all the planned orders are created with order type VP
    Changed the Individual/Collective indicator to "blank " at header level (FERT), and maintained Individual/Collective indicator  to "2" at component level
    Reran the MRP (MDO2), with the following settings --> Delete and Recreate planning data and Check mark on  Also plan on unchanged components
    Able to see planned orders at component level with order type LA
    Due points have been assigned

  • Production Orders without material - component reservations in APO

    Hi All,
    We are using transaction CO07 to create a production order without material. We have four materials in the BOM for this production order. One is an input product and three are output products. My intention is to have the components on this BOM show up in APO as reservations or something else that will be considered in our planning.
    At this point I am not able to see anything in APO system (e.g order reservations) like I would with a regular production order with material. Does anyone have any experience with this functionality or know if it is supported by SAP?
    Thank you,
    Paul

    Hi Paul,
    It is an interesting case, a don't know if you have solved it. Anyway, here is my suggestion -
    1) If you want to see a reservation in APO for a component, you need to make sure that the header product exists in APO as well, and the production order for this header has also been CIFed over to APO. This is the first check.
    2) If the first check is OK, then you should check that all the 3 header products exist in APO (In your case, you have 3 three header products). And then, the production order appears for all the 3 products in product view.
    With the above checks, I am certain, you should see the reservation for the component, else it is an ieal OSS candidate.
    Thanks,
    Prashant Ghule