Dear Experts,
My client uses PP-PI and he has a requirement for a line that he has 4 resources to do the same operation. We are using a class 019 to plan the resources as alternative resources, but he also wants in some cases to produce the same process order in more than one resource at the same time.
How can I produce the same process order in more resources and do not split the order?
Thanks in antecipate
Thiago Cyrillo

In the case of some special case, you could add some operation to the process order , assign it to the different resource and link the phases of these operations as parallel. You should also enter the operation quantity, this is the way that splitting takes place.
Regards

Similar Messages

  • Re: More than one planned order on same day

    Dear All,
    I am getting more than one planned order for the same day in MD04 after I run MRP run. My requirement is that the planned order should get clubbed.
    My lot size is WB & 2: collective requirement setting.
    Please advice.
    Regards,
    Vivek Sharma

    Karthick,
    I am getting more than one planned order on same date.If I check any of the planned order for pegging requirements I find that the planned order has been created after clubbing all the requirements( the Raw material is being used in morethan one FG )
    Now the issue Is :
    09.06.2010     PldOrd     0019211763/STPO     13.02.2010     30     159.500
    09.06.2010     PldOrd     0019211764/STPO     18.02.2010     30     1,536
    09.06.2010     PldOrd     0019211765/STPO     25.02.2010     30     787.500
    09.06.2010     PldOrd     0019211766/STPO     11.03.2010     30     2,536.755
    09.06.2010     PldOrd     0019211767/STPO     29.03.2010     30     862.500
    09.06.2010     PldOrd     0019211768/STPO     13.04.2010     30     108.750
    09.06.2010     PldOrd     0019211769/STPO     27.04.2010     30     1,678.500
    09.06.2010     PldOrd     0019211770/STPO     30.05.2010     30     980.745
    So I dont understand how is this happening.
    Regards

  • How to cummulate sales orders for creating one planned order.

    Hello friends,
    My scenario is make to stock. I use sales orders for creating plan only. I want to cummulate all sales orders of one finish material and create one planned order  for that material when i run mrp. How can i do this?
    Thanks

    Kiran,
    What is the planning strategy you are using?
    Does all the sales order requirment same? If it is same then it is possible. Please explain more in details. If not you need to look at using some perodic lotsize procedure to combine requirments. Like "Daily", Weekly" "Month" etc..
    Regards,
    Prasobh

  • Can I have more than one version of adobe reader at the same time?

    can I have more than one version of adobe reader at the same time?

    If I may add a qualification: on a device running full Windows 8, you may have both Adobe Reader Touch and Adobe Reader (normal desktop edition). This does not apply to the primitive devices which cannot run desktop apps (running "Windows RT"), and while I may be wrong, I believe that the Surface 2 is such a device.

  • Can I pair and use more than one set of bluetooth speakers at the same time on my ipod touch 4.0

    can I pair and use more than one set of bluetooth speakers at the same time on my ipod touch 4.0 or Iphone 4s or Ipad 2?

    You can only connect to one device at a time using Bluetooth, See article below for more information.
    http://support.apple.com/kb/ht1664
    While your iOS device can maintain multiple pairing records, it can only connect to one headset or hands-free device at a time. This prevents your iOS device from sending your data to the wrong Bluetooth accessory.

  • Will mac pro and monitors ordered together ship at the same time?

    Will Mac Pro and Thunderbolt monitors, if ordered together, ship at the same time? Or will they ship the in-stock monitors now initiating the Applecare start date for the whole order even though the Mac Pro is not expected to ship until sometime in March?

    I ordered the new Mac Pro (model 6.1) on December 18, 2013 along with a 27 in. Apple thunderbolt display.  The fully maxxed out new Mac pro shipped on January 8, 2014 and arrived January 13, 2014.  My Thunderbolt display shipped within 1-2 days of placing the order, i.e. the week of December 18th and arrived before Christmas.  A few days after receivng my new Mac Pro, I received the Apple Care paperwork and both the new Mac Pro and the Apple Thunderbolt display were listed with a start date of January 7, 2014, i.e. the day that my new Mac {ro was prepared for shipment -- not the day my thunderbolt display was shipped.
    Tom

  • SNP Planned order not following resource bucket capacity/factory calendar

    Hi gurus,
    SCM 5.0
    I am running SNP heuristics for a product and expecting planned orders for it.  It has corresponding production data structure and multimixed resource.  The resource has an assignd factory calendar and SNP bucket capacity.  The bucket capactiy availablity dates of the resouce is consistent with the factory calendar workdays/holidays.  Using simple lot for lot strategy, I am expecting heuristics to schedule the planned orders on the dates of the demand in compliance with teh SNP bucket capacity availability of the resource.  APO does not schedule on holidays consistent with bucket capactiy.  This is true until...
    We have a public holiday in factory calendar that needs to become a workday. To remedy this, we put a special rule for the factory calendar and explicitly made that holiday into a workday.  The changes were synchronized with APO, and this is also reflected in the bucket capacity of the resourc: former holiday now has bucket capacity after the calendar change.  However, when running heuristics, it still does not create SNP planned order on that former holiday that has been changed into workday.  Even if it is a public holiday, there is already a special rule for the factory calendar and the resource bucket capacity reflects this correctly. But SNP heuristics seems not to follow this change.
    Any ideas on this? looks like a bug.

    Hi Edgar,
    Yes, when your resource reflects the addional capacity of the holiday turned working day, then it is expected to be considered for the SNP planned order.
    Instead of SNP heuristics, you may try to check interactively in SNP planning book, if manual order creation in the bucket works out.
    Since this is a mutlimix  resource , it can also be checked if in PPDS planned order can be created on the day.
    The above checking may not solve your problem , but will get to know if at least manully the bucket is being considered or not.
    regards
    Datta

  • Planning multiple machines for one planned order

    Hi,
    presently, we have 30 machines in single operation, business wants to plan and confirm the production order with individual machines ( Workcenter ), we have tried individual workcenter creation and make the routing with 30 machines and planner has be determine the machines while converting the production order fron planned order , but it is having problem , if we select the same workcenter in operation like for exmple we want carried out the production on workcenter 10,15,16, 20 respectively. but in actual if business want to confirm the operation 30 before operation 20, again it is problem in confirmation even we permit to user to allow the operation,
    please suggestion me to define this scenario in discrete MFG.  

    Hi Patel,
    If you want to have confirmations in sequence then in OPK4 for the combination of plant and order type under General Valid Settings - Under Operation sequence maintain" Error when operation sequence is not adhered to". With this settings if user tries to confirm operation 0030 before operation 0020 is confirmed system will throw error message.
    In case you have planned on X work center, but actual producion happened on Y work center, then there is also option available during confirmation in CO11N to change the workcenter as Y through changing the Confirmation profile.Go To T.code OPK0 and in Area Selection select 0410 Personnel :Incl Work center , Wage Group as a one of the selected area
    Please let me know if anything is required.
    Thanks & Regards,
    Ramagiri

  • How to control more than one instrument via different interfaces at the same time

    Hi, I am new to Labview.  I am working in a project where I have to make a Automated testing tool . So, here is the set up -  I have a Chip on a board to which there are several instruments connected namely Agilent power supply, Agilent pattern generator, oscilloscope,Dmm and Thermotron. All these instruments will be connected to the host computer via ethernet, GPIB or RS232. I have to write a program on Labview where the program  should be able to communicate with these  instruments  at  the same time  and show the ouput  on display unit . I have to run the program once, should be able to view the ouputs. So, Is it possible to write such program in Labview??.  I have  downloaded  few instuments  drivers. Is it possible to combine those intrument drivers and construct a new VI which would be able to control all this ??   Will it be easier to program this on Labview or  I should  go for Labwindows/CVI  ??.
    Please mention some useful sites or tips (if u know) for writing program.
    Thanks in advance
    shasanka

    Hi Shasanka,
    ofcourse it's possible to control more than one instrument at a time.
    You should use the VISA routines to access all your devices. Every device get it's 'address' as 'VISA resource name'. This resource name contains information on the used bussystem and the (internal) device address (i.e. GPIB devices have an address number).
    So I suggest to read the manual and to look at the examples that come with LabView!
    And (from your question) it seems you should take the 3 or 6 hour seminar as well! (Look at www.ni.com -> academics.)
    Best regards,
    GerdW
    CLAD, using 2009SP1 + LV2011SP1 + LV2014SP1 on WinXP+Win7+cRIO
    Kudos are welcome

  • Transferring data from one planning area to other within the same system

    Hi,
          We have two planning areas setup and the corresponding planning books in the same system. Now I have to save the results of first book and transfer the results in the other. They have common key figures. Is the data saved to the key figure after saving show up immediately in the second one or do I need to load?
    Thanks.

    Visu,
    If I understand your requirement correctly, you should be able to use transaction /SAPAPO/TSCOPY (Copy/Version Mgmt) to send the data from the one planning area to the other.  Please let me know if I misunderstood the requirement.
    Sean

  • Can more than one child be visible/open at the same time in Accordion navigator container?

    I have a situation where I need a layout like Accordion
    container but with more than one child panel visible at the same
    time. Is it possible with Accordion container? If not, any
    suggestions to implement this layout?

    Ryan,
    Could you elaborate on what you mean when you say that the program which ran first cannot find its report?  Are you trying to modify the same report simultaneously with these different apps?
    Regards,
    Jared Boothe
    Staff Hardware Engineer
    National Instruments

  • Can I configure my Bluetooth connections to use more than one wireless audio output device at the same time?

    I am trying to get my Macbook Pro (OS X 10.8.5) Bluetooth system to recognize 2 different wireless speakers at the same time. both are currently paired with mu computer and can be chosen independently and work nicely.

    Version 10.0.3 is the latest version of iMovie. iMove '11 (as in 2011) is version 9.
    iMovie saves your Projects automatically. So you can just choose to create a new Project. Your existing Projects will remain available for you to go back to whenever you like.
    You can have as many Projects as you like. You don't need ot finish one before you begin another.
    Post back if you have specific questions.
    Matt

  • How can I install one app on multiple iPads at the same time?

    We have a volume purchasing account, but when purchasing an app we get multiple serial numbers that all seem to need to be entered individually. The iPhone config Utility will not sync multiple iPads at the same time. Am I missing something? This cannot be the method for mass deployment, it seem too complicated.

    You can do a  backup of you iPad then restore the backup to many devices.
    How to use multiple iPods, iPads, or iPhones with one computer
    http://support.apple.com/kb/HT1495
    Mobile Device Management Solutions for iOS
    http://www.apple.com/iphone/business/integration/mdm/
    http://www.apple.com/ipad/business/resources/
    "iOS mobile device management (MDM)
    With an unmatched breadth of features, a Self Service console forover-the-air (OTA) distribution of in-house and app store apps, and integration with Apple's Volume Purchase Plan (VPP), the Casper Suiteallows administrators to easily achieve the four major tenets of iOSmobile device management: Inventory, Configuration, Security Management, and App Distribution."
    http://jamfsoftware.com/products/casper-suite/

  • OS10.6x - Connect to Server as 2 or more users at same time

    Our office uses a mac-mini as a server running Mac OS10.6.x Server to support 10-15 users (all OS10.6.x).
    Most of the staff only need to connect to our main shared volume / file store (shared point) using a standard login name + pass
    (eg all staff login as <general_user>)
    We also have another file store on the same shared volume for more restricted files which can be accessed by a restricted login name (eg managers can login as <restricted_user>)
    Sometimes I need to access those restricted files from from a computer already connected as <general_user> so it would be useful to have 2 different connections (with different user names) to the server/ shared volume at once.
    ie. connect to the server as <general_user> and <restricted_user> at the same time from single computer
    eg.
    A Staff_Member has general access to the server (or shared volume).
    They are working on a report which they have asked me to review - we do this together on their machine (which is currently connected as <general_user>)
    While reviewing the report, I need to access other information which is of a restricted nature - say select figures from an account etc - that I want to copy and past into the document.
    I want to be able to connect to the server as <restricted_user> temporarily, open the report and then copy and past info into the current document.
    Is this possible.
    It seams that you need to disconnect user one before connecting as another user, however this is not always possible to eject a volume as a task may not allow this (where it is utilised by a application task?).
    Any help would be appreciated
    Thanks
    Pete

    The start transaction model didn't Fit well with all the process we are doing, but the idea of locking or holding the other users seems to work pretty fine, we are now using a flag to determine if someone is doing the process and put in hold the new ones.

  • Ordering 2 books at the same time? How do you do it?

    I Want to order 2 different books at once so I can save on postage and packaging, some one please help?!

    You can only save shipping costs by ordering multiple copies of the same book, but it is impossible to combine two different books in on order, sorry.
    http://store.apple.com/us/help/print_products

Maybe you are looking for

  • Double click on Clip in Timeline

    If you double-click on a clip in a Timeline it will open in the Source Monitor. That feature is sometimes confusing, because if you do it by accident and think that you are viewing your source clip and set a new Mark In after the original Out point,

  • HP LaserJet Printer 1320

    HI! I am the tech at an elementary school and just received a shipment of Dell Latitude E6410 laptops and and Optiplex 730 with Windows 7. I have several HP 1320 Laserjet printers that I need to connect to these computers. I downloaded the universal

  • I have Pages in my IPad, can I use this software in Mac Mini?

    I have Pages in my IPad, can I use this software in Mac Mini?

  • Wireless Network, 2 Mac Laptops, (Air and Pro) 2 different download speeds

    I have a (Frontier) 24 mbs DSL broadband plan, wired to my desktop, wireless for everything else in the house.  I get 24 mbs DL, 2 UL) over ethernet and (wirelessly) in every location in the house except for one room (or so I thought).  At first, I t

  • Car Kit for Zen Vision

    Okay, so my previous post didnt seem to have a message.. Is there a car kit to play music from the creative zen vision m in your car? I have a CD player in my dash, not a tape thanks!