Producrt Cost by Sales Order with Valuated Stock

Hi Gurus,
My client is having  Producrt Cost by Sales Order with Valuated Sales Order Stock. Can anybody reply me for my following issues.
1. while calculating Sales order cost estimate thru VA02 , the same Cost estimate is appearing against with EK02 condition type in Sales order Condotions. what is the use of Sales order Cost estimate? is there any impact on production?
2. What is Difference between Sales Order Cost Estimate and Order BOM Cost estimate?
3.when can we calculate Sales Order Cost estimate ? whether before Production or before billing ? can anybody tell me please..
4.while settling the production order also system picking the cost in VPRS not in EK02, i am not sure about this step.can any body correct if i am wrong
5.I know we can caluculate WIP in Sales order also. when can we calculate ? before settling the Production order or after production ?
thanks
Prasad

Hi,
there are 3 types of scenarios in MTO.
In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
Please let me know if you need further details in this regard
Surya

Similar Messages

  • Product cost by sales order with Valuated Sales order stock

    Hi Gurus,
    I am working on Poduct cost by Sales Order with Valuated stock. but i have doubt ragarding to Cost estimation.
    1.In sales order scenario also Standard Cost estiamtion (CK11n and CK24) and Marking, Releasing is Mandatory? if not how can we estimate the cost?
    2. If we are estimating the cost by using Standard Cost estimate, when can we estimate the cost?
                can anybody please give me the steps which we are following in Poduct cost by Sales Order with Valuated stock from starting to end Settlement
    Thanks&Regards
    Prasad

    Hi,
    there are 3 types of scenarios in MTO.
    In Two scenarios Sale Order would be cost object - (Non-Valuated Sale orders stock and Valuated Sale Order stock with Sale order being Cost Object)
    In third scenario (Valuated Sale Order Stock without Sale Order controlling), Only Production Order is the Cost Object.
    In all the cases wherever the Sale Order is the cost object, Sale Order is the final Receiver.  Only the difference is that in valuated sale order stock, stock entries would be passed to FI and in non-valuated sale order, no goods movement for FG will be there.
    Please let me know if you need further details in this regard
    Surya

  • VL10E report should show only sales order with complete stock

    Hello Friends,
    I have to make-to-order scenario. While creating a sales order the system proposes a delivery date based on the inhouse production day maintained in the material master.
    In VL10E the system gives list of Sales Order for which delivery is due on that particular date. It does not check whether actually the material is really available on that date for the concerned sales order.
    Is there any scope ( any config change or user_exit) which will show only the sales order with complete stock confirmed through production order in the VL10E report.
    Regards
    Debesh

    Hi,
    Check userexit LV50R_VIEWG02. If CF_SUBRC = 1 you will not see it in the list. For this purpose in the interfase you have the information in IS_VBEP. Set a break-point and check the conditions.
    For more info check the Note 198137 - VL10: Customer-specific enhancements / user exits
    I hope this helps you
    Regards
    Eduardo

  • Issue in V_V2: Can system rescheduling the sales order with out stock

    Hello All,
    I created sales orders with one material. For that material the stock is zero now. The system has not confirmed the qty in sales orders while creating.
    After that as per the client we ran the V_V2 for rescheduling, but system has not rescheduled any schedu lines in any sales orders.
    Is it due to lack of stock?
    One more point is we do not have Delivery proposal option in sales order. Only One time delivery option.
    Is it due to this setting?
    Please help me to solve this issue.
    Regards
    Lakshmikanth

    Hi
    Because there is checking rule set at order level , thats why once stocks is not there due to unavailabilty of stocks system not allow to go for V_V2.
    for this u hav to deactivate under oVZ8/9
    thanks
    mk

  • How settlement rule will be created for Sales order with cost object

    Dear Experts,
    We are using product cost by sales order with valuated stock. In addition we are not using COPA
    We also consume some materials at sales order level and at the end of month we want to do the result analysis and settlement for the same amount. In this case can any on explain how system will behave regarding settlement of sales order cost and what entries will get pass in the system.
    In our case we have done below activities...
    we have created sales order,
    All production order activities completed till final GRN including month end activities
    Material consumption against sales order
    Result analysis executed
    At the time of sales order settlement, system throwing error (Sender doesn't have valid receiver, please create settlement rule for sender object)
    Then i checked in sales order there sales order settlement rule not defined.
    I guess this settlement rule need be generated by system automatically. If not, please let me know the process of it.

    HI kishore
          the reason is that sale order always carry the revenue  and production order and production period carry the cost .
       cost you can settle to the Material and even management want  to be settle the cost to material only in production order OR period
    but in sales order  when u sell the product it carry the revenue not the cost and management want see and analysis based on profitability segment are profit center level .
    Prerequisites
    If CO-PA is active, the system generates a settlement rule when you create the sales order. The settlement rule determines whether data is settled to other objects or other areas in Controlling. In accordance with this settlement rule, the relevant data is settled to CO-PA.
    If CO-PA is not active, create a settlement rule. This settlement rule that you create manually normally contains a G/L account as a receiver (such as 399999). You can also settle costs and revenues or results analysis data to objects with revenue.
    You can also settle the cost of sales calculated in results analysis to a fixed asset or a cost center. To do this, you must add to the allocation structure the results analysis cost elements under which the cost of sales is updated to the order.
    The settlement rule includes a distribution rule for the sales order item. The distribution rule is made up of a settlement receiver, a settlement share, and a settlement type:
    The settlement receiver (such as profitability segment or G/L account) specifies the object to which the actual costs and revenue of the sales order item are settled. The settlement receiver can be proposed through the settlement profile.
    The settlement share defines the percentage or the equivalence numbers used to distribute the costs to the individual settlement receivers. The settlement share for sales order items is usually 100%. A settlement share of 100% is preset in the system.
    The settlement type specifies full settlement of the sales order item. This ensures that all the data on the sales order is available for results analysis.
    Settlement still takes place in each period. The revenues and the cost of sales are transferred to CO-PA by period, and the work in process and the reserves are transferred to FI.

  • MTO Sales order controlling with valuated stock

    Hi,
    In SAP MTO with sales order controlling (sales order is cost object) with valuated stock, how to make settlement rule set to sales order so that costs will flow from production order to sales order .
    Can anybody advise me in this.
    Regards
    Rajesh A

    Hi Rajesh,
    I'm new to Engineer To Order (ETO) and Make To Order (MTO) Product Costing and my client like to implement ETO and MTO product costing with Project Systems(PS) integration.
    If you worked on these proccess? please can you guide me how to design the process or could you please forward me design and configuration documents....my client is discrete manufacturing industry.
    Thanks,
    Rau

  • Sales orders with credit issues taking availability stock

    Hi,
    I am doing confirmation using Global ATP in APO. The confirmation is well done, but the confirmed quantity for sales orders with clients that have credit issues is taken the available sotck for other sales orders with ok clients that I want to confirm the quantity they ordered.
    For example:
    Stock: 10 PC
    Client A order 15 PC and 10 are confirmed, but the ordered is retained becuse of credit issues with client A.
    Then client B order 3 PC, but nothing is confirmed because the ordered for client A is reserving the stock (note: this would be ok if client A had not credit issues).
    So, I want that the 3 PC for client B are confirmed and the 10 PC not reserved for the cient A while client A has credit issues.
    How could I configured, so that the orders with credit issues do not reserve stock for the incoming orders?
    Thanks a lot.

    Hi DB49,
    thanks for the quick answer.
    I checked the configuration in the R3 and seems to be fine. To prove it, I disconnect APO and did the availability check in the R3 system and it is working fine; the orders quantities that are blocked because of credit issues, do not reserve stock for incoming orders.........son new incoming orders are well confirmed.
    But after connecting APO the problem continues. I checked the next points.
    In R3 transaction CO09: takes to the APO screen and you see the ATP available quantity OK (do not consider the quantities of the credit issues orders). But at the moment that you make the order (VA01) it does not confirm any stock and if you select the line and go to the ATP screen (the same you get from the CO09) the quantities of credit issues orders are taken into account..the ATP availability quantity changes from the first going directly from the CO09.
    What could it be?
    Note: it was working fine with APO, I started to have the issue after implementing note 1262475 in APO. This note was becuase the BAPI_APOATP_CHECK was not brigning any value for the ATPQTY_***.
    Thanks a lot!!!

  • Valuated or Non Valuated Sales order or Project stock?

    Hi,
    a) What factors should i consider before deciding on whether my Sales order or Project stock should be Valuated or non valuated?
    b) If i have decided to have the Project and Sales order stock as valuated how can i go about doing the settings for the same in SAP? How can i assess its value in financial accounting?
    Thanks

    Hi
    As per my knowledge, the Material type controls whether that material is valuated or not.
    Thanks,
    Ravi

  • Sales order with material & plan cost

    Hi,
    A sales order with material and assign WBS can display the plan revenue which equal sales revenue. How can I make the material cost also be display as plan cost? This material cost should equal standard price of material master.

    It is not possible to copy material cost from sales order to project. Please activate network cost planning, and assign the same material in the project structure, so system will take the material cost in plan cost.

  • Sales order costing - tracking of actual costs at sales order item level

    Hi
    We are going with sales order costing for services
    Service material is non-valuated hence the scenario is non-valuated sales order stock
    PP module is not implemented.
    I am having following questions
    1. How to track the actual costs at sales order item level? Is Internal order/CO production order is required to be created for the same?
    2. Can I do activity confirmations directly from cost center to sales order item.
    3. Can Raw material is issued directly against sales order item.
    4. Is Sales order is a real or statistical account assignment object?

    dear friend,
    please look here:
    http://help.sap.com/saphelp_47x200/helpdata/EN/42/d7248ab27111d19e9a080009b0db33/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/EN/90/ba6cfb446711d189420000e829fbbd/frameset.htm
    reagrds,

  • Product Costs by Sales Order - Settlement Options?

    Hello All -
    I am trying to understand if I need to settle to a sales order (SDI) or directly to material (MAT) or to COPA (PSG).
    If i look at my sales order, it has item category ZPSF, which product costs by sales order configuration shows a requirement class ZKE.  ZkE has a valuation of M, which means separate valuation of reference to sales document/project.
    Does this mean I need to settle to sales order first?
    Then i run vA88 to settle sales order to copa?
    if ZKE valuation is blank, does that mean its not valuated?  I have read on other sap help pages that means it is valuated.  Please clarify.
    also, when does one directly settle to MAT? what scenarios?  this confuses me.
    Thanks!
    Emmas

    I'll give this a try. When working in a make-to-order environment there are 2 settings in the requirments class that you must consider in determining how to settle the costs (and maybe the revenue as well).  The first setting is the account assignment category.  In the standard system "E" is used to designate the sales order as a cost collector.  "M" is used to if you don't want the sales order to be a cost collector.  Whether the sales order is a cost collector or not will determine your settlement options. 
    The second critical field is the valuation setting.  If you set it to "M" then the stock assigned to the sales order will be valuated (by valuated I mean that once the goods are produced they will be held in inventory as sales order stock with a value).  If you leave the valuation field blank then the stock assigned to the sales order will be held in inventory without a valuation. 
    If the sales order is not a cost collector then the cost to manufacture the order will be collected in your production order and the settlement rule for the production order will be to the material you are producing.  Since the material has a valuation, the costs collected in the production will be reduced by the material's valuation once it is received into finished goods inventory.  Any remaining costs are settled to wip or variance based on the production order's status and the RA key and variance key settings.
    If you have set the sales order as a cost collector then the production order costs can either settle to the finished material or to the sales order.  If you are using valuated sales order stock you would normal have the costs settle to the material and the production order would behave very much like the previous example.  If you are not using valuated stock then you would need to settle the costs to the sales order and all the production costs would accumalte in the sales order.
    If you are using the sales order as a cost collector than you will probably want to settle the sales order as well.  During the sales order settlement you have the option of settling the cost and revenue assigned to the sales order to COPA.  The settlement profile along with the RA key assigned to the sales order controls how these are settled.

  • Product cost by sales order - conceptual clarity required

    Hi,
    We are a manufacturing company with both Make to Stock and Make to Order Scenarios. In cost object controlling, we have made the settings for product cost by order. Now, the question is whether product cost by sales order is a mandatory setting in MTO scenario. I understand this is a conceptual question but i never got the clarity after reading help files, threads and blogs.
    I'll put down my understanding - pls correct me.
    If i do the product cost by sales order, there will be a statistical cost object ie sales order. Now every cost incurred (with a component split) will be recorded stastically in the sales order in case of production orders created from S.O.s
    If I don't do the setting i cannot get a component wise split for the cost of sales order to do any analyses. but still I'll have the COGS which i'll capture to COPA and take the profitability.
    Can you please give me some more clarity on this scenario? Are there any other factors/ advantages/mandates in product cost by sales order?
    Best Regards
    Vimal

    Hi  Vimal
    Prod Cost by SO is done in the case of MTO.. Here, you have 3 possible scenarios
    A. Only Qty i.e. GR from Prod order is tagged to Sales Order.. Sales order is not a CO Object....
    This scenario is as good as MTS... Only that GR is tagged to SO....
    Your costs are collected on Prod order....
    PGI uses GBB-VAX i.e. does not post to sales order... Billing updates revenue and COGS to costing based COPA
    B. SO is cost obj with non valuated stock (SAP recommends this)
    C. SO is cost obj with valuated stock...
    B -
    Prod Order is settled upon sales order.. GR from prod order does not update any acc doc
    Sales order is settled to COPA.. Here you can use a PA Trf Str where in you have replicated your Cost Comp Str... i.e. You can create as many assignment lines in KEI1 as your CCS in OKTZ and assign each one of them to a separtae value field
    No question of variances in this case
    C
    Prod order is not settled upon sales order.... GR from Prod order updates acc doc.... However, variance from prod order can be settled to the sales order if you create variance account as a cost element... Else, it is settled to COPA
    Upon PGI, the COGS is posted to Sales Order as a single line item
    Here, in your PA Trf Str, you would create an Assignment line and tick "Qty Billed/Delivered".... This would update the Billing Qty to COPA upon settlement of Sales order
    This Qty update will trigger KE4R.... i.e. You need to assign CCS to VF in KE4R for PV=01 and Rec Type = C.... This would update the CCS in COPA as per the Sales Order cost estimate
    The Costing Key in KE40 should refer to "Sales order cost estimate" and not "Std Cost estimate"
    br, Ajay M

  • Product costing by sale order

    Dear all,
    Please tell me the process in product costing by sales order.
    In my client place, i have done the configuration but i dont know the process.
    Please guide me.
    Thanks & Regards,
    AR

    Hi,
    Product cost by sales order is useful when  a finished product is manufactured  for a specific customer rather than for the normal make-to-stock inventory. You can use the Product Cost by Sales Order component in the following situations:
    When you are manufacturing in-house with reference to a sales order in complex make-to-order production
    When you are purchasing customer-specific trading goods with reference to a sales order and reselling them to your customers
    When you are providing services whose costs are assigned to a sales order
    When you want to collect the sum of the actual costs incurred for the sales order item on the sales order item (standard cost of goods manufactured of sales plus variances) For detailed information, refer to the sections Valuated Sales Order Stock and Settlement in Product Cost by Order or Period.

  • Product costing by sale order(urgent)

    Dear all,
    1. Please tell me all the configuration steps to do product costing by sale order.
    2. Also please tell me how to test it after configuring.
    3. Please explain me the end user part also.
    I will award full points.
    Thanks & Regards,
    A.Anandarajan.

    Hi,
    Product cost by sales order is useful when  a finished product is manufactured  for a specific customer rather than for the normal make-to-stock inventory. You can use the Product Cost by Sales Order component in the following situations:
    When you are manufacturing in-house with reference to a sales order in complex make-to-order production
    When you are purchasing customer-specific trading goods with reference to a sales order and reselling them to your customers
    When you are providing services whose costs are assigned to a sales order
    When you want to collect the sum of the actual costs incurred for the sales order item on the sales order item (standard cost of goods manufactured of sales plus variances) For detailed information, refer to the sections Valuated Sales Order Stock and Settlement in Product Cost by Order or Period.

  • MTO-Product cost by Sales Order

    Hi Guys,
    My client is manufacturing Energy Meters, they want Sales order based Production Planning and costing etc.,
    in MTO scenario, Product cost by Sales Order
    1. Sales Order will be created
    2. BOM is created
    3. some of raw material in the BOM list are available in the stores
    My question is that
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order.
    Correct me if am wrong,
    if the system is not checking the available qty, then there is no Planned Order, everything will be new PR for the whole sales order Qty.
    Expecting your valuable reply
    Thanks for your help in advance.
    Regards
    Elan

    Dear ,
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order
    Answer is Yes .In Sales Order Based Production Order -MTO  , you will be having pre-determined BOM and Routing , before creation of FG Sales Order .
    Based on Planning Strategy 20 : If you are using 20 planning startegy , then you will frist roll the cost in Sales Order Level  by going to VA02-High Lisght Line item -Extras-Cost -based on BOM and Routing  , Sales order will be costed and flagged with green .Then Sales Order will be credit relased in VKM3 for MRP run in MD02.
    Now , in MD02 , you need to select NETCH , 2,1,1,3,2  while executing MRP on FG item .Here , MRP system will explode the BOM till the lowest level and does net requirement calcuation for BOM Component (as depedent to FG) .If the stock alwardy available , then it will  show up as Stcok in Order Report (MD4C/MD04-Planned Order -Order Report ) under Reseravtion number or else it will generate PR for componenet where as planned Order for FG.
    Creation of PR or Plnned Order depends on Procurment Type -E/F as well as selection of indicator Create PR in MD02.Basically , for MTO Sales Order item , it will FG  with procurement type E and compoenet will be F if there there is no farther sub-assblmy .So it should generate Planned Order for FG and PR for shortage qty of component .
    Hope this is clear
    Regards
    JH

Maybe you are looking for

  • Connecting two monitors

    ok so the mac pro has two different monitor ports after about an HOUR of searching i finally figured out the second port is an ADC port. now i want to hook up a vga monitor to it. is there and ADC to vga adapters out there. I have only found ADC to D

  • JRockit doesn't install

    The "Java Virtual Machine Launcher" produces the following message: Error loading: D:\TEMP\sfx8.tmp\jre142_04\bin\jrockit\jvm.dll Any ideas what goes wrong?

  • ICloud photo library download inturrupted

    Tried to download a 470Mb video from my iCloud photo library using the website on to a windows PC, anyone else have this issue?

  • POSReady7x32 F8 Safe mode boot

    I have just done a clean install of PoSReady7 32 bit. No additional drivers or Windows updates installed. OS boots to desktop ok. However, when I press F8 and select a safe mode boot option, the OS boots as far as the Welcome screen with the animated

  • Images not displaying (any browser)

    I am using Ubuntu Trusty (Latest Ver.) All my browsers are up to date, including firefox. The browsers display images from all of the websites I visit, except for my personal server. I think this may be a problem with the mime-type or a problem with