Product allocation check found changes to the confirmation

Hi friends,
while creating the sales order after entering the material, i am getting the Error -'product allocation check found changes to the confirmation'.i have checked in MMBE stock is there for the material and because of this the schedule line is not confirmed.
what could be the possible Answer ? please help me out.
regards
santosh

Hi
Double Click on the sub-item and goto schedule lines tab and them from menu select Environment and click on Availability.
See whats the available stcok.
Regards
Madhu

Similar Messages

  • BAPI for product allocation Check gATP

    Hi all,
    I read in the SAP documentation that we can use gATP on APO to check order item coming from non R/3 OLTP on product allocations.
    Is someone test it, which BAPI or BAdi do we use?
    Many thanks in advance.

    Hello,
    Following enhancement is available for Product allocation.
    Maintain Enhancement Projects for Product Allocation
    In this IMG activity, you can edit customer exits for the global availability check.
    Product allocations
    The enhancement for the initialization is APOQT001 .
    The user exits for product allocations are divided into two different call sequences:
    Product allocations is the requirements check against the product allocation time series from planning. A complete check is executed for this call sequence.
    The enhancements for product allocations are:
    APOQT010 copy parameters
    APOQT012 product allocations control
    APOQT021 product allocations
    APOQT022 consumption at beginning situation
    APOQT023 order consumption
    APOQT032 results control
    APOQT033 sequence of product allocation procedures
    APOQT007 product allocation assignment of partial deliveries
    APOQT018 adjusting field catalog
    The comparison adjusts the results of product allocations to the results of the other basic methods. This adjustment is necessary when product allocations is not the last basic method executed.
    The enhancements for the comparison are:
    APOQT011 copy parameters
    APOQT014 product allocations control
    APOQT024 consumption
    APOQT034 results control
    APOQT035 sequence of product allocation procedures
    The sequence of the basic methods is configured in the check instructions.
    When comparing, the entries in the table for the product allocation assignment and the temporary quantity assignments (delta records) are adjusted to the final results of the ATP check.
    If the behavior of product allocations is changed by the user exits, the behavior of the comparison must be adapted accordingly in the corresponding user exits!
    Thanks and Regards

  • Availability check during changing to reconsider confirmed quantity

    Hi there,
    Is it somehow possible during changing the order quantity of an already confirmed item to reconsider the confirmed quantity?
    When decreasing the quantity he sometimes reschedules the item and the the whole confirmed quantity is one month back.
    Regards and thanks,
    Alex

    But I don't want to have a new ATP check.
    Example:
    Yesterday I got 3 pieces of material X confirmed.
    Today my customer only wants 2 and I have to reduce the quantity now. But then a new ATP check runs even if there are enough stocks.

  • Product Allocation Massage VQ211 Deactivate

    Hi All
    Please suggest how to deactivate "VQ211" information massage "__Product allocation check found changes to the confirmation_"_ of product allocation appearing at sales order creation level.
    Please urgent help required
    Thanks
    AB

    Hi
    We need product on allocation for certain sales offices but others should not see message SQ211, that is the requirement.
    Help needed to deactivate this information message.
    Any other suggestion.
    Regards
    AB

  • Trouble with Sequence of Product Allocation Procedures in GATP

    Hi,
    I have created two allocation procedures. ZATP1,  ZATP2.  The expected result is the total quantity confirmed by ZATP1 + ZATP2.  In the ATP simulation, I am getting only the output  confirmed by procedure ZATP1.  The following are my settings.
           1. Created a procedure ZATP1 : I checked this individually in simulation and it is working
           2.  Created another procedure ZATP2 : I checked this individually in simulation and it is working
           3.  Created a "Sequence of Product Allocation Procedure ZSEQ" containing allocation procedure ZATP2.
           4. In the product master "ATP" tab I have updated , "Allocation Procedure" =ZATP1  and  Procedure Seq = ZSEQ. 
    Can any one you tell me what I am missing to achieve this business requirement?  Any one faced a similar problem ?   We are in SCM 5.0
    /Shibu

    Thanks for the reply. I maintained only location <b>independant</b> product allocation with allocation sequence.
    To replicate the scenario :
         We have two organizations who can make the allocation. Both are independent and shouldn't distrub each other. (Only production allocation check is configured in the check instructions).
    The planning area I maintained are
        <b>ZDP01 :</b>  CVC : Allocation object :ZATP1 , Commerical model : A100 , Customer : 1000
    For Oct : total allocation : 2000   Consumed :800
    For Nov : total allocation : 1000  
    <b>ZDP02 :</b>  CVC :      Allocation object :ZATP2, Commerical model : A100 , Customer : 1000
    For Oct : total allocation : 500   Consumed :300
    For Nov : total allocation : 500  
    THe customer "1000" is now placing an order of  1250:  He should get confirmation in oct because 1200 can be given up by ZATP1 and 50 can be given by ZATP2.
    The result I am getting via ATP simulation is 1200: Oct  and 50 Nov. (Both consumed against ZATP1):
    Thanks again for sparing time on this issue.
    /Shibu

  • Check the Product Allocation Settings - /SAPAPO/ATPCQ_CHECK

    Hello,
    I have an issue when I use the Check the Product Allocation Settings (TCODE: /SAPAPO/ATPCQ_CHECK), the system returns ''SYST: Period 000 is not valid in financial year variant J1''. J1 is my calendar and I using this calendar for all another Product Allocation Groups whitout erros. I just have this information by system report.
    I sincerely don't no why some groups have this issue because all groups are using the same setup.
    Anybody have any ideia?
    Thanks,
    -Ralph

    Hi Santosh,
    First thank you for help me, following your instructions I have made a investigation and now I know thatu2019s
    another team doing a test with this calendar in R/3, for FI, and really have differences between systems. Your direction are correctly.
    Thank you very much!
    Ralph Veiga

  • Complications in the Product Allocation

    Dear SAP Gurus,
    I am facing lot of problems in configuring the Product Allocation.
    Problem-01
    I started creating new Info Structure S561 copying the existing Info Structure S140 as the Info Structure is to be assigned in OV3Z (Specify hierarchy).
    The problem is that the Table MCVOBJECT is not appearing in the u201CCharacteristics for 0001 Incoming Orders Quantityu201D in the transaction code MC25. I tried to insert the Table name as MCVOBJECT and Field name as KONOB against the characteristics u201CProd Allocation obj.u201D but I got the error message as u201COnly source fields from MC Communication structures allowedu201D
    Only few Table names are available after pressing F4.
    Please help me how I can put the Table name MCVOBJECT and field name KONOB in the Characteristics for MC25.
    Problem-02
    In OVZ0  (Define Flow according to requirement category) I am not able to create new Requirement even in the change Mode. But I found some of them started with Z i.e. it has been created by somebody. I am in IDES system.
    Problem-03
    The same issue in OVZ8  (Process flow for each Schedule line Category) I am not able to create new Requirement even in the change Mode. But I found some of them started with Z i.e. it has been created by somebody.
    Please guide me how to create a new requirement and assign it.
    Problem-04
    When I am checking in OV8Z (Check setting in Product Allocationu201D, the following comments appear. If anybody guide me on this basis I will be grateful to him.
    u201CProd.alloc.detmtn prod: PRODUCT Description: Various Items
      Use for following materials:
        1478
      Method:
        Cumulative check
          Step: 01 Description: First step Info struct.: S561
            Info struct.
              Planning version 000 is defined for info structure S561 .
              Periodicity M ( ) is set for info structure S561 .
            Update
              Updating is not defined for S561 at schedule line level!
              The update date is not permitted for S561 (permitted; MBDAT , WADAT , EDATU )!
              The period settings for info structure S561 agree
              The info structure is updated synchronously.
              Formula 146 is used for the order incoming quantity
              Not every characteristic has a formula
            Plng
              No allocation quantities have been defined for product allocation object MCA1 !
              End of allocation validity is always end of a period (PRODUCT ,01 ).
              The product allocation objects are entered in the planning hierarchy.u201D
    Problem-05
    Where should I put the quantity because when I am creating Sales Order no Product Allocation function is working.
    Problem-06
    I have used Transaction code MC8A for creating Planning type but every time I put some value and save but after that in change mode I am not finding those values.
    Regards,
    Jans

    Hi Lakshmpathi,
    Please help me in solving these problems,
    Thanks,
    Jans

  • Leading zeros in the Product allocation characteristic combinations.

    Hi All,
    I am copying Characteristic combination from planning area to product allocation group, after i complete the transaction system is automatically preceding the zeroes to the product number.
    I have one the following activities before copying CVC of planning area to product allocation group.
    against all the Product allocation settings.
    2.Created the MPOS with product (characteristic length of Product is 18), Customer and Allocation object.
    3.Created planning area and planning book.
    4.Copied cvc combination from planning are to product allocation group and also copied planning area values in to Product allocation group.
    5.Tried to check in the ATP simulation mode, while I was doing system has given no characteristic combination found, when I checked Product is preceding zeros as per the filed MATNR length 40 and this MATNR is selected from the Product allocation field catalog, But when I add zeros to product system is performing Product allocations in simulation mode.
    6.Tried triggering gATP Product allocations by creating Order in ECC, here also it has given same error No characteristic combination exists.
    When I did initial R&D on this. I found that material number in the product allocation characteristic combination is leading by zeros for ex:- 000000000000000002200325.
    Could any one please suggest me what to do on this.
    Thanks and Regards,
    T.Muthyalappa

    Hi Muthyalappa ,
    If i have understood your question properly , then my guess is you should be facing this problem only for numeric material codes. Try out the following things
    1. Execute the same test condition for a non numeric material. I believe it will work perfectly .
    2. For numeric material codes it is not working because of the difference in MATNR length between ECC and APO. In ECC the maximum possible MATNR length is 18 char whereas it is 40 chars in APO. So as per std SAP functionality the numeric materials get concatenated with leading zeros when you try to transfer it (or carry out any kind of processing ) from ECC to APO.
    ex consider material 12345. In ECC it will be stored internally as 13 leading zero's followed by12345 . But in APO it will be stored as 35 leading zero's followed by 12345.  Your issue is the system does not recognize the CVC that has this material as characteristic. At the time of cvc creation / change make sure your material characteristic ( especially for numeric material codes) totally has 40 chars . Pack it with leading zeros and make the material length 40.
    Try this out and update me .
    Thanks
    Saradha

  • V_V2 CHanged the COnfirmed Quantity to 0

    Hi SD Gurus,
    We have a background job that runs V_V2 nightly. This morning, I checked one sales order that was changed. The Confirmed quantity was changed from 5000 to 0. I am not sure why this happened because there is stock for that material in MMBE. Am i missing anything here?
    Thanks,
    Jograd

    Hi,
    Rescheduling run will only snatch away confirmed quantity from a Sales Order if there is another  Sales Order/ STO with higher "priority" seeking stock for delivery.
    Rescheduling "priority" can be set by sequencing parameters like Document Category, Delivery Priority, Creation date, Document Number, Item Number as per the business logic you want.
    I would suggest to first have a look at MD04 for the material in question and check the stock allocation.
    You can find out which documents have snatched the confirmation from the order in question.
    You should be able tp pin point the issue, using this.
    Else please let me know your observation, in case you require further help.
    Thanks
    Sachin

  • How is the product allocation  work?

    How is the product allocation  works? (material master: Basic Data 1,) where is the place to maintain the parameters?
    point will given

    Product Allocation
    Configuration Overview; Allocation Specific Usage
    1.Allocation Procedure (OV1Z) The product allocation procedure is the parent of the entire allocation process. All materials that are to be included in the allocation scheme are required to have an allocation procedure assigned to it in the material master. In addition, as of release 4.0, it is in the procedure that the method of allocation is defined. The user has the opportunity to set an indicator to identify their choice of two different methods (discrete and cumulative allocation) to evaluate the quantities to be considered for product allocation.
    2.Allocation Object (OV2Z) The allocation object is the root level of the allocation process where actual data is entered and planned in LIS. The object allows the user to further break down a procedure into smaller parts for future validation of components comprising a specific material
    3.Allocation Hierarchy Mapping (OV3Z) Primarily, this transaction permits the assignment of an allocation procedure to an LIS information structure. Secondly, a character is assigned to the information structure to permit collective planning. Finally, the user can assign a step level to the procedure and information structure to sequence the order in which allocation quantities are checked. This functionality allows the user the opportunity to check product allocation against several product allocation scenarios, before the required quantity is confirmed
    4.Define Consumption Periods (OV5Z) The allocation consumption periods functionality is only valid if the allocation method flag has been set (OV1Z). If you have de-selected the method field, this functionality is not available. The consumption window indicates the number of past and future periods to be used in the allocation check.
    5.Control Product Allocation (OV4Z) In order for the allocation process to function properly, allocation control records are created primarily to map allocation procedure steps to their corresponding objects so that the allocation data records can be located for validation. Secondly, validity periods must be established to indicate when the allocation control records are active. Finally, the user has the option of establishing a conversion factor per allocation control record to accommodate BOM listings of constrained materials
    6.Activate Allocation for Requirement Class (OVZ0) In order to turn on allocation in the standard order processing functionality, the requirements class must have a flag indicating that allocation is relevant.
    7.Activate Allocation for Schedule Line Category (OVZ8) In order to turn on allocation in the standard order processing functionality, the schedule line must have a flag indicating that allocation is relevant
    8.Create Planning Hierarchy (MC61) In order to adequately establish allocation quantities, the user must initially determine the level at which the allocation is to take place and the aggregation factor of the allocation quantities. In this step, the levels for the collective allocation search procedure are also identified.
    9.Generate Masking Character (OV7Z) Upon completion of the level determination for the planning hierarchy, the collective allocation masking character must be generated to allow aggregation indicators to be established. This transaction simply reads the hierarchy established in the planning table and then generates a collective mask character for each level of the hierarchy
    10.Modify Planning Hierarchy (MC62) This step is a repeat of MC61 where the initial hierarchy was established. In order to complete the hierarchical set up, the collective allocation (mask character) hierarchy must now be maintained with the appropriate aggregation factors
    11.Allocation Procedure Assignment to Material Master (MM02) At the root level of the allocation process are the materials. Each material that is to be considered in allocation scenario must be mapped to an allocation procedure. In order entry, then, when a material is entered with a valid allocation procedure in the material master, the allocation data is verified prior to confirming the line item ordered
    12.List of Suitable Structures (OV9Z) This report is used to identify potential LIS information structures that can be used in the product allocation process. This report simply reads through the data dictionary and selects all the active information structures that contain the field product allocation object (KONOB) as the first field. This data can then be utilized in the mapping transaction (OV3Z) to link the allocation procedure step to an information structure (previous step).
    Regards
    Jitesh

  • Displaying data on a different level then the allocation check

    Hi
    we are creating sales orders in R/3 and executing a sales order check based on a planning area in APO.
    this check is done on Product / sold to, because that is the level where teh forecast is entered.
    However, one sold to can contain different ship to's. so because of disagregation, it is randomly done over the ship to's.
    What we want to obtain is that the when the allocation check is done and the orders is in APO via the CIF, the data is displayed on product sold to, ship to like in the sales order while the check to see if there is enough quantity can remain on product sold to.
    Do you have any ideas?
    Tommy

    Tommy,
    Please elaborate on your problem.
    I assume you are talking about the Planning book used for Allocations; please confirm.  If the only CVCs in your Allocation planning book and your Product Allocation Group are 'Product' and 'Sold To', then 'ShipTo' (and ShipTo disaggregation) is irrelevant.  Product Allocation only considers the CVCs that have been created.  In this case, multiple ShipTos against a single SoldTo are 'first come first served' until the SoldTo Incoming Orders qty reaches the SoldTo Allocation Qty.
    It is possible to include ShipTo in your Allocation Group and Allocation Planning Area in addition to SoldTo; this is a fairly common solution.  If you do so, you will THEN have to consider ShipTo Disaggregation issues.  Since this seems to be a negative issue for you, I would recommend against it.
    Best Regards,
    DB49

  • Issue with Product Allocation Scenario

    I am Trying out Product Allocation in APO (SCM 5.0).
    Relevant setup in SPRO - Product Allocation Object, Group, Procedure, Sequence etc., Planning Object Structure, Planning Area, CVC generation, Connection between Planning Area and Product Allocation object in GATP, assignment in Location Product Master (at Customer Location) Product Allocation Procedure, Check mode, ATP Group has been done in APO.
    After entering data in appropriate keyfigures (Allocated Qty) it shows up under GATP>> Reporting >> Product Allocations >> Time Series per CVC
    Have carried out ATP Simulation to check that for a given product at Customer the Product Allocation against a Required Quantity takes place correctly.
    Now trying to carry out the Product Allocation check by creating a Sales Order in ECC. In that case during the material availability check screen in APO, the product allocation does not show up.
    I believe it is related to master data settings for the product in ECC. My questions are as follows:
    1. In ECC the product exists at the manufacturing plant only (and not at customer as in APO). There in MRP3 tab Strategy Group is maintained. Is this along with Availability Check field responsible for determining the check instruction (combination of check mode + business event) in APO for the Product Allocation check.
    2. If so (which I guess it is) I can see the check instruction picked up in APO while creation of sales order in ECC is different from the check instruction I ran simulation with. How can I ensure the same check instruction is chosen (in which case I believe the availability check result will be same as the ATP Simulation carried out in APO).
    3. In APO I ran simulation for the product at customer location (and maintained the required ATP settings in the product master). In case of Sales Order creation in ECC how does system pick up the Check Mode and Business Event for the product (having Sold-to as customer and Supply Plant as the plant code) and use it in APO.
    4. Any other setting/configuration that is missed causing this behaviour.
    I guess some of the questions is a bit hazy but I would appreciate if someone can outline the Product Allocation Scenario. I am trying out based on Building Block S59 Demand Planning for Product Allocation but of course it does not detail out enough.
    Disclaimer: My knowledge of GATP is almost nil but am exploring.
    Thanks,
    Somnath

    Hi Somnath,
    It will be a pleasure to help you out.
    Firstly I will list out all the steps which I can think of:
    (1) R3-You have moved all the ATP customizing from R3 to APO via ATP integration model.
    (2) APO- goto SPRO>APO>GATP>General Settings>Maintain Check Instructions
    Here go to Check Mode- 041 and Business Event- A and maintain the following settings manually in development and migrate it all the way to Production
    I am assuming here that you want to first do an allocation check and then availability check**
    Product Allocation: Change from NO CHECK to First Check
    Product Check: Change from First Check to Second Check
    This check mode and business event is the most common one which is triggered while placing a sales order
    See the following blog for DETERMINATION OF CHECK MODE
    http://solution-timezone-issue.blogspot.com/
    There might be other check modes( 030, 050) which might also require this change. However you can judge that while placing a sales order and when you go to the availability screen, You have the tab - SCOPE OF CHECK CONTROL where you can see the Check Mode + Business Event
    Following guidelines can be used to modify Check Instrctions after Customizing Import from R/3 –
    1.     Business Event A*  is Sales Order Entry (The main scope of GATP) so define check instructions for all check modes since it is not possible to identify the requirement class that may come over on an order. For Business Event A* if availability check was being done in R3, then define check instructions with Allocation as first step, then Availability check as second step. Else if no availablity check in R3 then define check instructions with no availability and no allocation checks.
    2.     Business Event B* is  normally for deliveries but is also required for Rush Sales Orders. An R/3 configuration showed that 041 is the only requirement class that will come across for this business event. Hence defined only for 041 check mode. For Business Event B* if availability check was being done in R3, then define check instructions with Allocation as first step, then Availability check as second step. Else if no availablity check in R3 then define check instructions with no availability and no allocation checks.
    3.     Business Event 03 required for Inventory Transaction availability check such as MB1C. For such transactions, the APO Product Master Check Mode is used. Hence check instructions for all Check Modes are maintained. For Business Event 03 if availability check was being done in R3, then define check instructions with Availability check as first step. Else if no availablity check in R3 then define check instructions with no availability checks.
    (3) Maintain the Product Alllocation Procedure:
    <b>a-</b> Create a Product Alloc Object -- Example: PAO-001
    In this step, we define the product allocations objects - product allocations are saved per object for a characteristics combination in the product allocation group.
      Product Allocation Procedures can be used to maintain different Product Allocation Objects for different time validity periods.
      Generally Product Allocation Objects are used to model the different ‘reasons’ for the need for allocation – material shortage, capacity constraint, etc.
    <b>b-</b> Product Alloc Group--PAO-1234
    A product allocation group defines a group of characteristics against which allocation checking is done.
       Creating a Product Allocation Group creates a characteristics directory in the APO database and an area in Live Cache where the key figures are maintained.
       If ‘Check Planning Area’ is set to No then allocation and incoming order quantitiy data can be seen in table /SAPAPO/QTTAB. If the ‘Check Planning Area’ is set to Yes then no data is stored in this table and the allocation check is done directly against the data in the Planning area.
       Detials of allocationconsumption by sales orders are maintained in table /SAPAPO/QTVB in APO and in QTVB in R/3.
      If ‘Check Planning Area’ is set to ‘Yes’ and if there are users are in the change mode in the Planning Book, Sales Order Entry can get locked out.
      If ‘Check Planning Area’ is initially set to yes and then deactivated later you will no longer see data in /SAPAPO/AC42.
    Settings:
    Check Planning Area – Yes. The reason being that users are not expected to lock planning books as they would be defaulted into the display mode (through a development object). Also most allocation uploads will be through batch jobs. Setting it to ‘Yes’ reduces one step of moving data between the planning area and the allocation group.
    Check Date - Material Availability Date. Consumption of allocation quantity and checking of available allocation quantities is determined by the check date.
    Time Bucket Profile – Week
    Characteristics – Product Allocation Object (1), Product (2), Plant(3), Customer(4)
    Consumption Period – Bwd Consumption 1  
    Meaning that first the order will consume from current week allocation and then go 1 week backward to consume.
    <b>c-</b> Product Allocation Procedure --- PAO-4567
    Step Sequence:
    <i>Step</i> -
    <i>Step Name-</i> -
    Prod Alloc Group -
    Wild card
    1                      First Step             PAO-1234                     9
    <i>Alloc Procudure</i> - PAO-4567
    <i>Prod Alloc Step</i> -1
    <i>Control</i>
    <i>Valid from -
    Valid to---- -
    Object -
    Active -
    Factor</i>
                            12/31/2037      PAO-001    Check the Box                  1
    <b>d-</b> Maintain Connection to Planning Area (APO) 
    In this step, we maintain the assignment of the planning area to the product allocation group. We must make this assignment because characteristics of the product allocation group have different names from the info objects of the planning area.
      All characteristics of a product allocation group must be assigned to an info object. But multiple info objects can be assigned to one info object. It is not always necessary to assign every info object to a characteristic. It is possible for aggregation and disaggregation (depending on the direction of transfer) to take place with info objects that are not assigned.
    <i>Product Alloc Group -
    Planning Area -
    Version -
    Time Buckets</i>
    PAO-1234                         xxxxx                     000             W
    <i>Characteristic</i>
    KONOB - Prod Alloc Obj
    MATNR --- Material
    WERK -
    Plant
    XXXXX---- Customer
    <i>Key Figures</i>
    Order Qty - AMENGE
    Alloc Qty - KCQTY
    <b>e-</b>  Check the Product Alloc Settings
    This is only a check- Everything should be green and OK .
    (4) You have planned the Characteristic Combination on which you want to do ALLOCATION.
    <b>Create a new POS-</b> Which has your chracateristics as PRODUCT, PLANT,CUSTOMER, Product Alloc Object ( 9AKONOB)
    <b>Planning Area,-</b> Key figures required are Alloc Qty, Order Qty( Sales Order Qty)
    <b>PLannig Book, Data View</b> which has the following characteristics- Product, PLant
    Assuming you are allocating at the following CVC level- Product, PLant,Customer
    Step 1:
    /n/sapapo/MC62-Create Time Series- Basicallly your CVCs -
    Example: Product 1234, Plant INDIA, CUstomer WALKART
    Step 2:
    Move Characteristic Values Combination to Allocation Group (APO) 
    /SAPAPO/ATPQ_PAREA_K
    INput :
    Planning Area: xxxx
    Prod Alloc Group: PAO-1234
    (5) In the INtegration MOdel - Activate the ATP CHECK Integration model for the Plant and material
    THis is the KEY which decides whether availability should be done in R3 or APO
    Material Active in the integration model -- Means Availability( GLOBAL AVAILABILITY: Prod Alloc+Prod Availability) is done in APO
    Material not active in the integration model --- Means Availability Check is done in R3
    (6) APO MASTER DATA SETTINGS:
    Material Master:  On the ATP Tab, Assign Loc Dep Procedure ( Prod Alloc Procedure)
    Location Master: Calendar Tab> Create a shipping time stream calendar
    Additional Info: Please contact your R3-SD people as this involves a lot of understanding and I have not listed all the details here.
    This config shown here is a very basic one which not even 25% of the companies might be using.
    If you have any questions on this part- please see my business card and email me**
    (7) SCHEDULING: This is a major task which determines the route and transit times for calculating the
    Material Availability date
    Goods Issue Date
    Delivery Date
    on the sales order line item- schedule line
    I dont know whether you need info on this**There are many ways of doing this
    a- Configurable Scheduling
    b- COndition records
    c- User Exit
    You can find documentation in SPRO or else let me know*
    For simplicity- Let me take the easiest to create and difficult to maintain master data- Condition Records
    Step1 --Define Field Catalog for Condition Table (APO) 
    /SAPCND/AU01
    Require Plant and Route defined here in the field catalog
    Step 2- Define Condition Table for Scheduling (APO) 
    /SAPCND/AU03
    Create a new table- 901
    901 -  Pick Time based on Route with key as Route
    902- Route Time based on route
    Step 3- Maintain Access for Scheduling (APO) 
    /SAPCND/AU07
    Take the important ones- PICK and TRAN
    I am assuming again as I dont know what kind of Scheduling is maintained on R3 Side. Mostly 80% companies have only two lead times- Pick and Route Transit time.**
    PICK- Select pick and click on accesses > <i>Acno</i>-10-- <i>Table</i>-901
             >> Then save it > and go in again
    Select PICK and click on Fields> A popup will appear > Enter the access sequence as PICK--- Enter the access as 10  and click on the GREEn ARROW and save it
    TRAN- Select TRAN and click on accesses > <i>Acno</i>-10-- <i>Table</i>-902
             >> Then save it > and go in again
    Select TRAN and click on Fields> A popup will appear > Enter the access sequence as TRAN--- Enter the access as 10  and click on the GREEn ARROW and save it
    Now coming to maintaining the Condition records in APO EASY ACCESS
    /SAPCND/AU11
    Create  SCheduling Step for PICK : Enter condition type- PICK
    <i>Enter Route</i>- USCAN --- <i>Duration</i> -24:00 (Hrs)
    Create  SCheduling Step for TRAN: Enter condition type- TRAN
    <i>Enter Route</i>- USCAN --- <i>Duration</i> -48:00 (Hrs)
    Now Let me answer your questions:
    (1) Question 1- <i>In ECC the product exists at the manufacturing plant only (and not at customer as in APO).</i>     
    I did not undertsand what you mean here. As we can create a Material at the following locations in APO( Dist Center(DC), Manu Plant(PL), Cusomter, Vendor, etc)
    For GATP all we need is the material at a PLant location
    STrategy Group on MRP3 tab: This is purely used for determining the CHECK MODE value on APO Product Master.
    When this is blank on R3, the check mode will be blank on APO.
    However SAP recommends Putting in a strategy group value on R3 Material Master
    or
    a default Check MOde value for all those Products who have blank check mode-   041 is the best value * This piece SAP hasnt recommended but I found that there is No harm in anyway and it is MANDATORYfor inventory transactions like GOODS ISSUE otherwise you will get a QUEUE in SYSFAIL **
    Even if this is blank this has no effect on the GLOBAL ATP as the Check mode for a SD transaction is determined as follows
    98% of the SD transactions will generate a CHeck mode of 041 and Business Event- A ***
    Through the item category and the MRP type in the MRP view
    The item category is derived from the item category group in the Sales view of the material master record and from the order type of the sales document. Together with the MRP type in the MRP view of the material master record, the item category determines what requirements type is selected. The advantage of this method is that the selection of the requirements type depends on the business process (such as quotation, sales order, or repair).
    (2) Question 2 - I guess now you must have understood why when you do a simulation in APO, it is taking the Check mode from APO product Master
    and when you do a ATP Check from R3, the check mode(041) is different
    You dont need to ensure that they are the same- It doesnt matter in anyway.
    (3) Question 3- <i>In APO I ran simulation for the product at customer location (and maintained the required ATP settings in the product master).</i>I
    When you run ATP simulation- AC04, you generally run it for the plant as that is the supplying location and not the customer.
    <i>In case of Sales Order creation in ECC how does system pick up the Check Mode and Business Event for the product (having Sold-to as customer and Supply Plant as the plant code) and use it in APO.</i>
    PLease look above for this answer.
    (4) Question 4 - <i>Any other setting/configuration that is missed causing this behaviour.</i>
    To my best knowledge, whatever I could remember I have listed out. However there are some more steps which might be needed.
    Follow all the steps as I have mentioned and whenever you get struck somewhere, shoot me a message and I will help you.
    ONe more pointer here to what you have mentioned
    Relevant setup in SPRO - Product Allocation Object, Group, Procedure, Sequence etc., Planning Object Structure, Planning Area, CVC generation, Connection between Planning Area and Product Allocation object in GATP, assignment in Location Product Master (at Customer Location) Product Allocation Procedure, Check mode, ATP Group has been done in APO.
    After entering data in appropriate keyfigures (Allocated Qty) it shows up under GATP>> Reporting >> Product Allocations >> Time Series per CVC
    <u><i>Have carried out ATP Simulation to check that for a given product at Customer the Product Allocation against a Required Quantity takes place correctly.</i></u>
    Somnath, I believe you might have a wrong picture here. The concept of allocation is  Controlling Supply against huge Demand which is in this case coming from SALES ORDER
    When you place a sales order, the supplying location is your plant and that is where you would like to put in allocation quantities
    Say for example for a material 12345 - You have stock of 100 Qty in Plant KING fo this week and it shows as follows in the planning book
    Customers say are WALKART, GE-FUG, MACROGUN
    The CVCs which we have to create are as follows
    Similar to Demand PLanning**
    Material 12345 -PLant KING-Cust WALKART-Prod Alloc Obj
    Material 12345 -PLant KING-Cust GE-FUG-Prod Alloc Obj
    Material 12345 -PLant KING-Cust MACROGUN-Prod Alloc Obj
    And this is how it appears in the planing book when you go into DETAILS ALL
    You basically enter the Allocation Quantities just as how you enter forecast quantities in DP Book*
                            Wk1   |  WK2     WK3   WK4  WK5
    Alloc Qty                     |
    Material 12345                |
    Plant KING                    |
    Cust WALKART            50    |
    Cust GE-FUG             30    |
    Cust MACROGUN           20    |
    Incoming Order Qty               |
    Material 12345                   |
    Plant KING                       |
    Cust WALKART           <u>50</u>|
    Cust GE-FUG            <u>25</u> |
    Cust MACROGUN          <u>20</u> |
    <u>50</u> : Say the Cust WALKART has ordered 250 for this week, however only the allocated quantity -50 will be confirmed for him and the remaining 200 qty will be confirme at a later week when he is given the allocated amount.
    <u>25</u> :Similarily say this customer GE-FUG has ordered 20 qty. So his remaining allocation is basically 5 which cannot be used by any other customer.
    <u>20</u> : Say this customer MACROGUN has ordered exactly the allocated amount of 20. So his remaining allocation will be 0.
    This is the basic idea of how Allocation Concept is used in GATP.
    Ofcourse you can add the other functionalities like
    Rules Based ATP(LOcation Substitution, Product Substitution)
    Multi ATP( BOM-COmponents)
    Check Aginst Forecast
    Etc Etc
    Like any other module of SAP- this module has much to offer which unfortunately I cannot list here**
    GOOD LUCK and let me know If you need additional help.
    Regards
    KUMAR AYYAGARI
    Message was edited by:
            Kumar P Ayyagari

  • Product allocation determination procedure error

    We use product allocation determination procedure in material master
    I made SIS(S603)
    when an order item is created and changed and deleted, Quantity of the incoming order is updated in Sales Information System(S603). key figure of S603 is sales organization/material code/sales group
    But sometimes error is occured
    when i check up quantity of the incoming order in s603, quantity is not correct
    (i usually use t-code MC94 or mcsi)
    in my opinionm when an order item or order is deleted, quantity of the incoming order is not updated is SIS, Quantity of the incoming order in s603 is more than confirmed quantity of order in the delivery date of the schedule line.
    What is problem?
    Edited by: SD User SD User on Aug 23, 2010 10:44 AM

    Hi,
    Please check consumption period configurations whether s603 info structure are defined or not from the path of ( SD > basic functions > Availability Check and Transfer of Requirements > Availability Check > Availability Check Against Product Allocation
    > Define Consumption Periods). and
    in product allocation control configuration screen, flow according to requirement category flow for schedule line, check whether product allocation is active or not.
    and other needed configuration should be checked again to solve this problem.
    Finally, you can check your product allocation determination procedure from SD > basic functions > Availability Check and Transfer of Requirements > Availability Check > Availability Check Against Product Allocation > Check Settings In Product Allocation. by this way, you can figure basic problem out.
    I hope these will be very useful for you. Please share with us effects
    Regards,

  • Adding new field to product allocation catalog?

    We are configuring product allocations in SCM 7.0 and have a requirement to add a new field to the standard field catalog for the allocations check.  We have followed the procedure outlined by SAP to add our new field to the structure /SAPAPO/KOMGOZ, add the field to the field catalog, and copied the source code to ERP.
    The issue that we are having is that new custom field that we added to the field catalog is not being populated when we execute /SAPAPO/ATPQ_PAREA_K - Characteristics Combinations from Planning Area.  The product allocations group that is being used in /SAPAPO/ATPQ_PAREA_K has three characteristics. The first two which are SAP provided fields are being populated correctly, but the last custom field we added to the field catalog is not. It is just blank.
    Is there a step that we missed during the configuation.  We are only using this field for the product allocations check (we do not use Rules Based ATP).

    Hi Arnel,
    I was expecting with examples but anyway.
    consider the examples of your CVC
    Country Region brand SO DV DC mat plant  etc...
    now you want to first get confirmation on SO and DV  , Prd allo group with these 2 characteristics
    same goes for all other combinations.
    now if you want to go with Either Or   /And.. decides if you need to go with one product allocation procedure with many prod allocation group  /or/ a sequence product allocation procedure.
    Its very straight forward as such... if you come up with examples, i can give better details.
    Looking at point 3 it looks like you want to go with 'OR' so you will have to go with sequence.
    (tcode: /SAPAPO/ATPCQ_GENER)-  is to check the customizing,  sometime you might move the Prod allocation from dev system and just to make sure there is no issue in transport /missing config.. it will check with transaction code.  I don't think you have to run this every time. After every transport..may be you have too as a caution check.
    Imp:  just to check @ different levels i dont think you will have to create different planning area.  If all the characteristics on which you want to (combinations) is available in one planning area , you should be good with one planning area only.
    Hope this is helpful.  I would suggest to follow what we have discussed so far and then you can create another message after the configuration/approach you finalized  with new issues/concerns you will be facing.
    If issue are really bothering you much, you can reach out to me directly. Let me know
    Pravin M

  • Add a custom field for Product Allocation

    Hi experts,
    I have copied S140 to S501 to add a custom field for product allocation.
    I have added the custom field in MCVBAKUSR, so it is visible in MCVBAK.
    However, I don't know whether I can populate data into custom field. I searched in forum, someone said it can be done in SAP enhancement MCS10001. But it can't work. I have tried to place a break-point in the code, and seems that throughout the order creation and product allocation check, it hasn't get into the codings in enhancement MCS10001.
    Can anyone give me some idea on it? Thanks.

    You should have simply extended VBAK table. It would've taken care of extending MCVBAK, etc. Then VBAK field would have to be populated in a user exit USEREXIT_CHECK_VBAK in MV45AFZB, when a document is being created/changed.

Maybe you are looking for

  • Error in installation of Sap Solution Manager - AIX / Oracle

    <b>Hello, We are installing SAP Solution Manager in Operating System is AIX 5.3 and Database System is Oracle 10.2 After the Oracle Installation, in the phase of Abap Import (16 of 44), we are receiving the follow error message:</b> Required system r

  • GR Print Out Put Types

    Hi Wats the diff between invidual slip and collective slip in MIGO screen Wats the std out put type for GR print out in mb90 Vijay

  • Pdf file not creating

    i have  a report which should create a pdf file (it may run in back ground r fore ground) i m geting msg in backgrong that pdf file is created but the pdf file is not getting created  wat could be the problem....................

  • I need an EIN : Employer Identification Number to publish.

    Hi, I'm currently living in Japan and I'm a french citizen. I would like to sell ibooks under the name of my company established in Japan. I have an App developer Account and from what I understand, I cannot use it to publish books on the iBookStore.

  • Defect: Ctrl-Shift-N Blanks worksheet contents.