Product costing in rem
Hai gurus,
I am currently facing a problem during MFBF.
1) i have fert(a) to halb(b) and to Roh (c).
2) i had done MF60 for Roh and moved the same to required storage location.
3) while doing MFBF the system throws the error as- No active std cost estimate exists,
4) Initially i had created pcc for halb and fert and also run the std cost estimate(ck11n) and marked and
released the cost manually using T.C MR21 as i could not do using T.C Ck24, and the marked price
was updated in costing view - 2, under future cost.
5) But MFBF could not be done.
kindly tell me where i had went wrong.
regards,
sekar chand
Hi,
You need to mark and release the standard price through CK24 transaction. Then the price will come and sit in the current price in Costing view-2. Then only u can able to do the backflushing.
MR21 is not the correct way of doing.
Regards,
V. Suresh
Similar Messages
-
Reports for product costing in REM
Hi All,
Kindly give a list of various std. reports & table names for costing in REM.
regards,
MohitHi,
MASTER DATA <b>C223</b> PRODUCTION VERTION
PRODUCT COST PLANNING
COSTING RUN <b>CKMATSEL</b> CREATE
SELECTION LIST <b>CKMATCON </b> Edit
<b>CK40N</b> EDIT COSTING RUN
its easy to find the Tcodes & Tables in R/3
for any Tcodes: Goto Tcode SE16 and select TSTC press enter and execute or just enter any first letter in the Transaction code Field and execute it will list all the tcodes starting with that letter.
Tables
Goto any transaction and press F1 on the field and click Technical info you get the table name, program name, everything.
Regards
Rehman
Reward Points if Useful -
Hi,
Would you help me out in product costing of REM scenario where HALB is given for subcontracting.Here I want to know in standard cost estimation how the cost of each activity type is incurred.
Regds,
sats.Dear Dilip,
Whether its Discrete or REM scenario,for Semi-finished products(Sub-contracted) generally BOM is maintained along with the BOM
components and along with the Source List & Info record for sub-contracting process.
So while doing the Cost rollup for the Finished product , the standard cost for the HALB is automatically calculated.
So the price of that sub-contracted product = Raw materials cost (as per the planned price given in costing 2 view) + sub-contracting
charges (activity cost for doing the activity).
The cost calculation is done using CK40N or using CK11N+CK24.
Revert back in case of any more queries.
Regards
Mangalraj.S -
Error while creating product cost collector in REM ?
HI, all SAP expert,
I have to run repetitive manufacturing .
I create work center of category production line and use in rate routing of semifinished material.
In mm02 -- mrp 4 view of semifinished material , i select rem profile , production version.
Now I create product cost collector ( t-code kkf6n) for semi. material by giving order type (yrem), production version after enter it shows error
Error in number management (notify your system administrator)
in help it shows
Error in number management (notify your system administrator)
Message no. KO162
Diagnosis
A system error occurred in the number management.
Procedure
Please contact your systems analyst or the SAP hotline.
Edited by: Nitin Nerkar on Sep 30, 2009 12:16 PMDear Nitin,
Check whether is the number range maintained properly for the order type RM01,check the config setting in T Code
KOT2_PKOSA.
This is related to CO Module.
Check and revert back.
Regards
Mangalraj.S -
Use of Product cost collector in REM
Hi All,
I am new to PP module, I got some doubts when working on costing of the product.
1. In REM scenario why do we need an extra step of creating product cost collector ??
2. when a product is produced will the prod cost collector is used for both debiting(raw and semi) and crediting(finished prod) ?Dear Reddy,
1.Product cost collector is the cost collecting object for a period based production or in a REM - repetitive manufacturing
scenario.
2.Without having any product cost collector you cannot carryout production confirmation(assembly backflush) for a product.
3.So for all the products for which production confirmation will be declared requires a individual product cost collector.
4.Prior to this you require a production version for the material.
5.Production version and a product cost collector is also the master data for a REM scenario.
Now check and revert back.
Regards
Mangalraj.S -
REM Product cost collectors and Production version
Hi All,
Can some one pls let me know
What are the product cost collectors in REM and how to create the product cost collectors ?
What is the production version and the difference between production version and controlling version?
Thanks & Regards,
BujjiDear Bujji,
A product cost collector is a cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. It can be created in txn KKF6N.
[Product Cosr Collector|http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
[Product Cost Collectors: Collective Entry for Repetitive Manufacturing |http://help.sap.com/saphelp_47x200/helpdata/EN/08/77ba810a1611d3a6b900104b55d538/frameset.htm]
A production version determines the various production techniques that can be used to produce a material. It defines the following information:
Alternative BOM for a BOM explosion
Task list type, task list group, and group counter for assignment to task lists
Lot-size restrictions and period of validity
A material can have one or more production versions.
It can be defined in the Material Master (txn MM02) in one of the following views:
MRP 4
Work Scheduling
Costing 1
The costing version is a different issue. It is a costing parameter and is used to save several cost estimates for the same material, with the same costing variant and the same costing date (e.g. in oder to cost the material several times with minor changes without creating new costing variants).
BR,
Antje -
Hai gurus,
I have one doubt in REM product cost calculation.
1) when I am running PCC for REM I met with following error as - Routing does not match with selection
ID 01.
How to correct the error.
Regards,
sekar chand.Dear Sekar,
1.While creating product cost collector,use Production version as the controlling level.
2.Check RM01 is the order type and ensure your production version is without any errors.
3.Ensure you have selected rate routing in the task list type in the production version.
4.Check what routing selection id is assigned in MRP parameters in OPPQ and also in the scheduling
parameters in OPU5 for the order type PE.
5,Your routing selection id should be a one which gives the first priority to the rate routing R.
Now check and come back with your further queries.
Regards
Mangalraj.S -
Automatic product cost collector in REM
Hi,
Could someone please let me know if there exists any functional module / BAPI to create product cost collector auomatically in background ?
Many thanks
Regards
SeshuHi Satish,
Thanks for the response,
I have come across a functional module KK_F_PKOSA_CREATE which creates product cost collector.
Have you / someone in the forum come across this functional module ?
Also please let me know if we can schedule KKF6M in background for all REM materials and plants to create product cost collector ?
Look forward for the response
Thanks
Regards
Seshu -
How to see materials which donot comes under product cost collector
hello every body,
can any one help me in finding materials which donot comes under product cost collector.
thanks for all the people who are supporting me
regards,
Bh.krishna mohanDear Krishna,
1.Usally the product cost collectors will be maintained for the materials which are executed using a REM scenario.
2.Check in table MARC for the materials for which REM profile does not exists(means this field should be empty) for a given plant.
3.After executing download this and if needed pass it to MARA table to get the FERT and HALB materials.
4.So only those materials for which REM profile is empty ,the product cost collector does not exists.
Check and revert with your queries.
Regards
S Mangalraj -
Hi,
GURUS,
I donot have PP knowledge(I m into QM),and I am trying to run production cycle in rem.I have creatd the master data by opying from other..I have reached backflush stage,but system is saying no cost estimate available for period. Can somebody suggest what steps to do next.Or am i missing some master data.
Pls asssist
THANK you in advance
GRHi,
Hi assume u have created required master data,however pls reconfirm whether
a)u r MM mrp profile has rem profile and rem allowed indicator.
b)do u have a valid poduction version
c)in the P>V tab have u CHECKED teh Run shedule header tab.
Next, step will be to create Run schedule header.(3.1i) ,t code: MF01.or product cost collector as our PP guru suggested.The Run Scedule header is basically an object that collects all the Costing data related to u r product(inclusive of P.V,therefore BOM,Pr line,Routing,Validilty dates for RSh,etc).So when u run a cost estimate for this product the system will pick data with reference to RSh.This RSH is like a cost collector for updating or collecting the costs for this product.
Cost estimate(3.1 i),since our guru has suggested for laetr verison)
--CK11 run cost estimate(pls check status or error logs,and clear error logs with ur CO consultants help)
--CK20 for marking cost estinmate
--ck21 for releasing cost estimate.
Once it is succesfully done,check u r material master for FERT if the Std Cost estimate has updated.
Then u shud not have problem running backflush,since the system will now know where to credit or debit the costs .
GURUS,Pls update on this.
THNX
HKR -
Service Product Cost & Profitability
Dear Experts,
I am having the following situation.
1) My Service product is relevant for cost but not for CATS entry.
2) Can I maintain a standard cost related to a service product?
I evaluated the option of replicating the service product to R/3 and then maintain an activity corresponding to a service product. This activity will have a cost attached.
But when the service order is saved , it creates an internal order in R/3 but this internal order does not have any information about the service product.
How do I post the revenue and cost for my service order?
Regards,
AmbarishDear Kandan,
1.Product Cost Collector is one of the master data in REM.
2.After material master,BOM,Rate routing,Production versions are created for the HALB & FERT item's,then the next step will be
product cost collector creation using KKF6N.
3.The controlling level for product cost collector will be Production version.
4.For each Production version an individual Product Cost Collector can be created.
5.Without a product cost collector you cannot carryout backflushing for an Inhouse manufactured items.
6.After backflushing,all the cost for producing the product will be saved(getting accumulated) in this product cost collector.
I hope this will clear all your doubts.
Regards
Mangalraj.S -
hello gurus,
Can anyone please tell me the what are the configuration is required to Product cost by period
thanks
rihanaDear Rihana,
In my understanding product cost by period will be used in a REM scenario(Repetitive manufacturing).
The product cost collector serves as the cost collecting object and for each Semifinished or finished product for which
confirmation(backflush through T Code MFBF) are made a product cost collector should exist.
Product cost collector will be generally created for Order type RM01 and number ranges has to be defined.
Each product cost collector has a number and using the no,the variance and the cost will be settled periodically.
Product cost collectors will be created using T Code KKF6N or KKF6M and the preliminary cost estimate can be done through
MF30.
Regards
Mangalraj.S -
Product cost by period process
Hello
Gurus,
Can anybody please explain the process of product cost by period, eventhough i searched but i did'nt get clear picture.
Please help in this because i have interview
ThanksDear Kavya,
1.Product cost by period is used in a REM scenario - Repetitive Manufacturing.
2.Here a product cost collector is created for the material + each production version combination.
3.All the costs(activity posting,Goods issue,goods receipt) are captured in the product cost collector of the respetive material.
4.Each product cost collector has an order number and based on this variance calcualtion and settlement can be done according
to the business scenario.
5.This type of costing can be used for a continous production like cement industry,steel manufacturing(dealing with furnace).
6.Here along with the costing part there are certain other shop floor control parameters to choose or select this scenario or a
Discrete scenario(where Production order's are used).
7.In a REM scenario confirmation will be made against a planned order or even with out any planned order.
Regards
S Mangalraj -
Essence of product cost collectors
In REM
what is essence of product cost collector (KKF6n), {As I understand production cost collectors
are cost carrying elements}, but needs to have more insights like how it captures
production costs ( i.e through activities, price maintained in accounting view....)
Does it make any difference if product cost collector is executed before MRP run, or it has
to be executed only after MRP runDear Eshwer,
1.Product Cost collector is one of the master data in REM scenario.
2.This product cost collector is no where related to MRP.
3.Product Cost collector is used as a cost object in REM scenario,which means all the cost will be
booked under this product cost collector for that material.
4.Whatever the confirmations that are done in MFBF or MF41 or MF42N,the cost will get debited or
credited accordingly for that material and the impact will be seen in the product cost collector.
5.This product cost collector will be having an order number which will be used for order settlement and
variance calculation.
6.For creating a product cost collector you will require a production version.
7.so whenever you do an assembly or activity or component backflush,the cost will be booked under
this product cost collector.
8.So as such there's no relation between MRP and a product cost collector.
I hope this pints will help you to some extent.
Revert back with your further queries.
Regards
Mangalraj.S -
T codes for production reports in REM
Dear All,
What are the std. t code for production reports in REM like daily production report,monthly production reports,shift wise production,bom reports etc.
Thanx in advance
rg
TusharHi Tushar,
Following are the standard reporting T-Codes REM
MCP9 - SFIS: Select Run Schedule
MCRM - Reporting Point Statistics: Selection
MCRP - Material Consumption Analysis: Repetitive Manufacturing
MCRK - Product Cost Analysis: Repetitive Manufacturing
MCP6 - Goods Receipt Analysis: Repetitive Manufacturing
MF26 - Display Reporting Point Quantity
MF51 - Print Production Schedule
MF52 - Display Master Production Schedule
MF57 - Coll. Display of Planning Screens
MF60 - Pull List 4.5
LAS3 - Display Sequence Schedule
If you won't find your requirement in these,you need to develop new one accordingly taking the technical consultants help.
Regards.
Maybe you are looking for
-
PDF documents are blank but epub documents are not
Hello All; I have an install of ACS 4. Installed on the following. Linux version 2.6.28.1-xxxx-std-ipv4-32 ([email protected]) (gcc version 4.3.2 (Debian 4.3.2-1) ) #2 SMP Fri Jan 30 09:55:02 UTC 2009 I have a production license and I am able to fulf
-
Not possible to edit Comm. Structure or Activate transfer rule
Hello Experts, Do you know what is causing the problem in development box we facing? We are neither able to edit Comm. Structure nor activate transfer rule for myself data mast data sources in BW. Basically, it doesn't let us go in edit mode when we
-
One of our VM's is stuck starting. It randomly shutdown and now has been stuck starting for over an hour. I have already stopped it via powershell once and then restarted it in the panel. This is a critical server, I need assistance ASAP.
-
How to programatically insert values into a object
I have dynamically created a object. cre_fml_str varchar2(32767) := 'CREATE TYPE FML_DAT_ITEMS_OBJ AS OBJECT EXECUTE IMMEDIATE cre_fml_str;After that I made a table based on this object. And know I make a pipelined table function that should fill and
-
Can any one tell whether the concept which i understood is correct or not
hai everyone iam studying jdbc and this is what i understood about the basic concept .can any one tell whether the concept which i understood is correct or not whenever the statement class.forName("driver class") is executed driver class is loaded an