What are the settings and configurations that are required to be done for production order costing by PP and FICO modules so that the order gets costing. I am told there are settings for activity type in workcenter. Also terms like cost carriers that bind the workcenter and the cost center and finally this data flowing after the confirmation is done.
Kindly explain the process and how to do the same in SAP system also.

Dear Varun Kapoor,
Check this,
Product Cost = Materials Cost(ROH + HALB Materials Cost)Activity Cost (Operation Cost)Overhead Cost.
1.Raw materials cost are generally entered as Planned price along with the valid from date in Costing 2 view,and price
control indicator is "V".Origin group has to be given to all the Raw materials in costing 1 view.
2.For HALB Materials Price control indcator will be S for Inhouse manufactured & V for externally processed materials (Sub-
Contracted Items) respectively.Also assign Overhead group for all Inhouse manufactured items if a costing sheet is maintained for
overheads..
3.No need to enter any value(price) for the materials having S as the price indicator and for Sub-contracted itesm that's F30 also no
need to enter any cost in the material master.
4.Activity cost is the cost incurred in performing individual operation.This cost is captured via the work center which we mention in
each operation in the routing of that product.A Cost centre and an appropriate activity type is assigned in the work centre.
5.Proper Rates should be assigned for the combination of Activity type and Cost centre.
6.Overhead cost is the indirect cost that we capture according to the customer's requirement.
7.If certain items for certain products alone should not be considered for costing means,then we can achieve this using
costing relevancy indicator in the BOM and for the activity(operation's mentioned in routing) which should not be considered for costing
also can be mapped by removing the costing relevancy indicator in routing.
Overhead group is aasigned in Costing1 view.
8.Creating Cost center - KS01
9.Create Activity Type - KL01.
10.Assiging Rates for a cost center/activity type combination in T code KP26.
11.Cost estimate Related T codes are CK40N,CK11N,CK24.
12.UseCK40N always,so that you can do the costing ,mark the price and release the same.Generally Cost Rollup will be taken for
Finished product so that the sytem automatically calculates for the Semi-Finsihed products standard cost.
13.IF you use CK11N,then only costing will be done,but for marking and release you have to use CK24.
14.For each Production order type in T code OPL8 Order Type Dependent Parameters - Under controlling tab - Costing variant Planned
and actual has to be assigned.
15.In REM scenario - Product Cost Collector has to be created using T code KKF6N for all Inhouse Manufactured assemblies.
Regards
Mangalraj.S

Similar Messages

  • I want product costing  related full documents

    Hi
    i want product costing related full docments.
    Thank you
    Anil

    hello
    Best way is to prepare your own documentation from the IMG.
    Next, go to google and search for all the PDF / PPTs/ config documents.
    Download all, take a printout and start practising.
    Suresh

  • I want product costing related documents

    Hi
    I want product costing related documents, material..when i can download full producting, internal orders, profit centers, cost centers related...
    Thank you

    http://www.sap-img.com/financial/simple-overview-of-product-costing.htm
    http://www.sap-img.com/financial/simple-overview-of-product-costing.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/1e/e9293504e1fd77e10000009b38f889/frameset.htm
    Regards
    Anantha

  • Product Costing Related Reporting

    Hi Gurus,
    Kindly provide the Transaction codes for Product Costing reports and any other related but useful to Product costing reports.
    Also, what is the TCode for consumption reports to compare actuals with planned..?
    Many thanks.
    Points available.
    Cheers..!!

    HI,
    There are lot of Product costing report available under Information system menu. Product Cost Controlling-> Product Cost Planning ->Information system.
    Hope this helps.

  • Product Costing related: where-used on a part and then recost every part

    Hi,
    I want to find out in SAP product costing function, is there a "where-used" function for a part number, and then able to see every product that ties to this part number; then the ability to recost those products that are tie to this part number?!
    Thanks,
    Ali

    Hi Alice
    You question is not clear. please re frame
    The product costing is done for all material by T code CK 11 N or CK 40 for material for period ex  ( every month are every 3 months like that ).
    The quantity structure that is BOM and Routing is used to do product costing to capture materials used and the activity hrs and cost for activity.
    I am clear about recosting of product??. costing is done in all company periodically.
    CS 15 Tcode will give you material where used list in BOM only.

  • MRP/PP/Product Costing - Datasources

    Hi,
    Could you please let me know what are the datasources for MRP , PP and Product costing related information from ECC to BW.

    You can get the list of data sources under PP from RSA5 in ECC system
    Below is the list of data source used in PP.
    2LIS_04_PEARBPL                   Reporting Points for Repetitive Manufacturing
    2LIS_04_PECOMP                    Repetitive Manufacturing Component View
    2LIS_04_PEMATNR                   Repetitive Manufacturing Material View
    2LIS_04_PKKANBAN                  Kanban DataSource
    2LIS_04_P_ARBPL                   Work Center View from PP/PP-PI
    2LIS_04_P_ARBPL_20                Work Center View from PP/PP-PI (EhP5)
    2LIS_04_P_COMP                    Component View from PP/PP-PI
    2LIS_04_P_MATNR                   Material View from PP/PP-PI
    Check the below link :
    http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/6c/6111846c3911d3b6df0000e8359890/frameset.htm

  • ETO and MTO Product Costing

    Hi All,
    I’m joining new project, which is basically Product costing related to ETO and MTO processes. As a design consultant, what would be my tasks in ETO and MTO process?
    Any one have Design documents and Configuration documents related to ETO and MTO product costing, please forward to me.
    I will assign points.
    Thanks,
    Rau

    Hi,
    Refer this:
    http://help.sap.com/saphelp_46c/helpdata/en/51/5828e4a44c11d189bf0000e829fbbd/frameset.htm
    Regards

  • Product Costing SAP TABLES

    Dear Gurus ,
        can someone provide me the list of CO Product Costing related SAP TABLES please . Full points will be assigned .
    Regards
    Deepesh

    Deepesh,
    There are many tables / structures used in product costing by SAP. The primary being:
    KEKO - Product Costing - Header Data
    KEPH - Product Costing: Cost Components for Cost of Goods Mfd
    Between these, you should be able to find cost component values for all your materials.
    However, if you are looking at customizing tables, look at TCK*.
    There are still more tables out there - e.g., for costing run (KAL*), for material ledger, for unit costing (CKIS, CKIP, CKKS). Have fun exploring.
    Remember to assign points if found useful.
    Regards
    Gulshan

  • Encryption of standard SAP field (product cost)

    Hi,
    My client would like to encrypt product cost-related fields, and I was wondering how to encrypt the field much like you would a credit card number of password.
    Thanks
    Brian

    Not sure if the encryption is in the GUI so users don't see it or in the database so DBAs can't access it.
    One way to encrypt it is through DB encryption methods such as TDE for Oracle.  If you are Oracle shop, TDE is in your license and you can use is as of Oracle 10.2.0.4.
    Mike

  • What is BOM? Steps Needed. How is it Related to Product Costing

    Gurus,
    What is BOM?
    How is it related to Product Costing and Profitability Analysis and CO?
    Technical help and steps would be appreciated.
    Thanks.
    Points available.

    Hi,
    BOM (Bill of Material) is a structured list of components (with the object number, quantity and unit of measure) that go into making of a product or an assembly.
    Bill of Material can be simple or complex depending upon the structure of the product. And, a collection of BOMs that lets you describe a product or a number of similar products is known as BOM Group.
    T code is CK51.
    In product costing BOM is used to estimate the cost incurred for the creation of a finished product.
    Technically, when u do a product cost run for particular material and if you don't have BOM for the material, the system will give an error.
    If useful, assign points.
    Regards,
    Manju

  • Tables related to Product costing variance

    Hi Friends,
    Can any one send me the tables related to product costing variances.
    Specifically i am looking at tables in which variances related to product costing group valuation variance values are stored.
    Valuble inputs will be rewarded points and highly appreciated.
    Thanks in advance.
    Regards
    Ravi

    KEKO Product-costing header
    KEPH Cost components for cost of goods manuf.

  • Product cost collector for sales order related production

    Hi Friends,
    This is Azam and here i am new to this discussion forum.
    we are in situation that use diffrent variant for configurable material in sales order related production,
    I would like to have some information about use product cost collector for this kind of sales order related production,
    also I want to know difference between prelimanary cost estimate or cost estimate for sales order?
    Please co-operate me.
    I would be highly appriciated if you can respond at the earliest.
    Thanks
    Azam

    Hi,
    Here, for each sales order item, you will have sales order cost estimate. This enables the system to compute the variances once the actual costs are booked against the production.
    In the case of preliminery cost, we get the preliminery cost for production order as a plan cost and is not being used for the computation of variance but only for comparision purpose which is very marginally used.
    Trust this helps much and do encourage our efforts!
    Cheers!

  • All settings related to Product Costing.

    Hi,
    Please let me know all the settings that are to be done to perform  "*product costing*" in Controlling.
    Thank U.

    Kattula,
    A good starting point is
    http://help.sap.com/bp_bl603/BBLibrary/Documentation/169_BB_ConfigGuide_EN_IN.doc
    Rgds,
    DB49

  • Issue Relating to Power Cost in Daily Product Costing

    Hi,
    We are doing daily product costing. Here we want to allocate the power units of service to production cost centers proportionately on daily basis. Can anyone tell me is there any option in SAP and we need to go for development.

    hi,
    Power usage or cost can be apportioned only monthly wise not possible on daily basis. U can run the distribution or assessment cycle only for month wise, but not on daily basis.
    Regards,
    Sreekanth

  • Product Costing:External Processing

    Hi Gurus,
    My doubt is I am comparing standard cost estimates of production client with another client which is its copy. The product cost estimate of a material, the cost component 'External Processing' is showing value 700 in PN client and 1000 in the New client. The cost element for 'External Processing is 700000000H as primary cost element and another as secondary cost element. I tried checking the GL account report in FBL3N regarding the postings happened in the GL accounts.
    1. My question is why there is a variation of 700(of PN client) and 1000(in NEW client).
    2. The second question is, from where these values are flowing.How we can trace back the flow of values for this particular cost component of External Processing' of a material cost estimate?
    Is it anyway related with Exchange Rate differences? If so, how and where it is linked?
    I'll be really grateful for your answers.
    Looking forward for you reply soon.
    Thanks,
    Prithwi.

    Hi,
    I have checked the valuation variant 001. The startegy sequence is same only. There's no change in configuration settings as the new client is copy of production client only.
    I wanted to know, the 'External processing' data or values from which.postings. How it gets picked up and how we can check its origin?