Product Costing - Two Costing Variants - Mark and Release In Same Company Code Same Period

Hi All,
We are currently handling a CO-PC project where client has requirement to use two different costing variants in the same period in the same company code. SAP standard does not allow use of two costing variants in the same period for the same company. We can have only One Costing Variant per Co Code for Marking / Releasing Standard Price. 
There are some materials in Plant 1 or Plant 2 for which cost estimates using costing variant ABC1 calculated and than prices are marked and released (CK24), now same materials are received in Plant3 where mixed costing is used and thus need to have cost estimates from second costing variant ABC3 (second costing variant) marked and released. Object is to have ABC3 cost estimates in material master standard price field, but SAP does not allow to mark and release for second costing variant in the same period for same co code as ABC1 variant already ran for plant1 or Plant2 under same company code,therefore, business is not able update ABC3 prices in Standard price of the material master. 
Purpose of this second costing variant mark and release run is that for some materials business would like to implement costing at Plant3 level also, where they get same materials from different production sites (Plants). At Plant3 level, business is using mixed costing where the standard price is a weighted Average standard price, taking the different production sites standard cost into consideration in combination of the volume split between those production sites.
Did any one worked on this kind of requirement? Is there any SAP standard way to handle? Or this will need some ABAP enhancement?
Kindly advise.

Hi Atul
1. You dont need separate Valuation Variant in Plant 3
2. Use Costing Variant ABC1 and ensure that it has the needed Valuation Strategies in Valuation Variant
Allow Complete Transfer in the Transfer Control i.e. Cross Plant Transfer in it
3. Assign the Qty Str Type you have used in ABC3, to ABC1.. i.e. In the Costing Version, assign the Qty Str Type to the Costing Type and Valuation Variant from ABC1
After this, do CK11N and CK24 for Plant 1
Then do CK11N and CK24 for Plant 3, using ABC1.. You dont need to change anythiing before doing CK11N for Plant 3
To make it simple, you can use any one of ABC1 or ABC3 in both the plants.. You only need to ensure that Valuation Variant, TRansfer Control are set up as desired
Br. Ajay M

Similar Messages

  • Delete Costing run - marked and released

    Hi
    I did one costing run which was marked and anolther costing run which was marked and released also.
    I want to delete both the above.
    Which transaction I can use for this and what is the implication of them ?

    Hi NIkhitha,
    CKR1 is the Tcode for Deletion of Cost Estimate as told by Ajay.  However to add few implications and points to be reviwed before deletion.
    1.  Check whether it is really necessary to delete
    2. Any Orders are being valuated by this Cost Estimate price
    SB

  • CK24 - mark and release with different costing version

    Hi,
    We are currently using standard costing variant PPC1 and costing version 1 to mark and release the standard costs. However when we try to recost the material cost due to price changes, system does not allow to mark & release revised standard cost if we try to mark & release on same day. pls note standard cost estimate is already released for the month. And we do not want to delete existing standard cost estimate. Instead we want to explore other options. We are using 4.7.
    My questions are :
      a) Can recost using costing version 2? CK11N allows to save the costing result. However in CK24 Marking allowance, system does not allow to change Costing Version. is there any config option to change this.
    b) If  we cannot use different cost version, can we update material cost with same costing variant (PPC1) and costing version (1) in this case. However when we tried to do recost with same costing variant & verison on same day, system gives an error 'Material AAAA in plant MMM has a released cost estimate.'
    Any inputs on above issue highly appreciated.
    thanks
    Sunil

    Hi,
    While, you can use any of the Costing versions to mark & release Standard cost estimate, you can release Cost estimate only once in a fiscal period. If you want to release correct prices, then you have delete existing released cost estimates using CKR1 transaction and then re-run CK40N to release.
    Hope this helps.

  • Sales order Costing mark and release

    Dear all,
    Kindly help on the following issue:-
    Can we mark and release Sale order costing like product costing(in CK24).
    best regards,
    Gaurav

    Hi,
    Sale order costing is determined by Requirement Class and Item category defined for MTO process in Product Costing.
    Sale Order costing keeps changing when you compare normal costing with CK11n or CK40n.
    Regards
    Balaji

  • Mark and release a new cost estimate in a different system than the one run

    Hello all,
    Here is my functionnal lanscape: in system A, I am managing all the stocks hence material master data.
    In system B, I am managing production, financials and Controlling.
    Hence, once I edit a costing run to have a new standard price in system B, how can I mark and release this new standard price for my material that is maintained in system A. Do you know any standard idoc for this purpose ?
    Also, how will happen the stock revaluation.
    regards,
    Irène

    hi
    kindly check the link below:
    http://help.sap.com/saphelp_40b/helpdata/fr/1a/0e3599539911d1898b0000e8322d00/content.htm
    regards
    eashwar

  • Need Product Costing Interview Questions and Answers

    Hi SAP Gurus,
    I am looking for the product costing interview questions and answers or just questions which covers all the steps like
    1. Product Cost planning, Cost Object controlling, WIP and settling in all the Scenarios (Make to Stock, Make to Order, Repetitive Manufacturing)
    2. period end processing Scenario wise
    3. Entries made by each step in each scenario.
    I have already gone through help.sap.com--> Product Costing and some other forum links but I need with questions and answers which can make me to recall the process and understand the whole process scenario wise completely. Please share with me if you have any documentation.
    Thanks.
    Harter
    Edited by: Harter21 on Jun 25, 2010 6:39 AM

    Could some one help me?
    Thanks,
    -Harter

  • Product costing configuration material   and study material

    Hi all,
    Can any one pass me the Product costing configuration material and study material email id is [email protected]
    thanks in advance
    Regards
    vijay
    Edited by: vijay matlani on May 11, 2008 11:17 AM

    hi
    Product costing documentation
    http://www.sap-topjobs.com/SpecialPP/746.html
    nagesh

  • Regarding marking and releasing in CK24.

    The customer has a direct delivery process as in they purchase finished goods and just sell them. Such a material is newly created under a plant.
    In this case there is no  in house production of that material and the price needs to be maintained manually in MM01. But the user has created a PIR for it and run CK24.
    Now when I try to change the value of the std price using MM02 I am not able to.
    how do I set the std price manually for this material after the CK24 run is carried out?

    Dear Ajitha Koti,
    check this,
    1. A raw material's (Externally procured material)price can be captured either using a moving average
    price or using a planned price or using a price change done in MR21.
    2.Standard cost estimate are generally carried out for the Finished product and while doing the
    calculation the system calculates the cost of the Semi-finished product or sub-assemblies.
    3.Standard cost estimate will be carried out only once in a period for a product.
    4.This can be done either using CK40N alone or else using CK11N for cost estimate and CK24 for
    Marking and release.
    5.Creating a PIR has no impact or no way related to costing.
    so now check and come back with your queries.
    Regards
    Mangalraj.S

  • Posting only possible in periods 2011/11 and 2011/10 in company code 4000

    Hi All Experts,
    I have encountered with this error while doing MIGO.
    Posting only possible in periods 2011/11 and 2011/10 in company code 4000
    Message no. M7053
    Diagnosis
    The posting date entered is not within one of the permitted posting periods (current period/previous period).
    This can be due to one of two reasons:
    The correct current period has not been set in the system.
    For the system, the first of the entered periods is the current period. At the beginning of a new period, your systems administrator must change the current period in the material master record, using the function "Shift periods". This has not yet been done.
    You have entered a wrong date in the field "Posting date".
    Procedure
    Check the posting date and correct it if necessary. If your input is correct, inform your systems administrator that the "period shifting" (period-end closing) process has not yet been completed.
    I have checked OB52, OB29, OB37, MMPV, MMRV. All possible T.codes and threads I tried from SDN itself, still no luck ! In OB52 I have opened 2011 & 2012 year open absolute.
    Would like to share MMRV settings :-
    Current Period : 11 / 2011
    Previous Period : 10 / 2011
    Last period in prev year : 12 / 2010
    We have India based client so fiscal year variant is Apr to March copied from V3.
    Will be very much appreciable experts guidane !
    Regards,
    Sharvari Joshi.

    Hi All Experts,
    I raised the OSS, and here which I got the reply from SAP.
    There is a possibility to run the report RMMMINIT to initialize posting
    periods. Please bear in mind that the valuation data of the previous
    period could get affected.
    If you decide to proceed with the process, please review the
    documentation of program RMMMINIT.
    Please also review attached note 70545 regarding the initialization
    process. Although this note is NOT valid for your release, it provides
    good information on the use of initialization for correction purposes.
    Additionally, please review attached note 369637 in this regard as well.
    PLEASE FIRST PERFORM THIS IN A TEST/DEVELOPMENT SYSTEM PRIOR TO MOVING
    TO PRODUCTION AS YOUR VALUATION DATA FROM PREVIOUS PERIOD WILL BE
    AFFECTED. If you are satisfied with the results, then you can move it
    to production. Please perform this at your own risk as this hotline
    will not support any problems arising out of it.
    Related the error message MM016 please follow the steps from note
    487381:
    To reserve the parameter use transaction SU01 for the user's name who
    executes the RMMMINIT program. The parameter must be set as follows:
    Parameter Value
    MMPI_READ_NOTE YYYYMMDD (for the current date)
    I am not able make out any meaning out of it. Can anyone please understand me this ?
    Help will be appreciated !
    Reagrds,
    Sharvari Joshi.
    P.S : Steps from my side which I performed , I changed the parameters for my ID in SU01 to current date 2011.11.16 (YYYYMMDD) and running MMPI still same error.

  • Posting only posisble error in periods 2009/08 and 2009/07 in company code

    Hi Experts,
    When my user do GI for this month he got error as mentioned below,
    Posting only possible error in periods 2009/08 and 2009/07 in company code
    Already i have done it but still am not confident.
    Also this particular corrections i need to do it in Production system
    Please guide which month i need to enter 1st in MMPV,request you to explain step by step.
    Cheers,
    Kumar.S

    Hi,
    Check in T.code: MMRV and see which period is open for ur Co.Code and back posting is allowed or not.
    In MMPV  open period 09 with your company code.
    Note-1: Check Fiscal Period Variant in OBY6..........is it K4.
    Note-2: From FI side check or Now use t.code: OB52 and open the 09, 2009 period in Account Types A, K, D,M, S and specially Account Type u201C+u201D which stands for valid for all accounts type and save. Better consult FICO consultant for OB52 step.
    Regards,
    Biju K

  • Delivery and shipment belong different company code

    Hi all,
    I do shipment via transportation planning point that has different company code to delivery order. the shipment can be done, but when i was doing for shipment cost, there's an error, that said "delivery and shipment belong different company code". can you help me, what happen with this?
    best regard,
    Hendry

    Hi Hendry,
    Please read SAP online help about this:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/0b/f2ee344ecf11d2bf760000e8a7386f/frameset.htm
    Regards,
    Csaba

  • Possible in periods 2010/05 and 2010/04 in company code in sap

    Hi all,
    when im doing GR/IR im getting this error"possible in periods 2010/05 and 2010/04 in company code in sap". i saw solution for this through the forum only but wanted to know what is this error exactly means and what i have to do for this..
    Explain me on this.
    Regards,

    hi
    fromm mm side
    for month closing activity
    tcode MMPV after that enter your company code
    period -01
    fisal year -2010
    then execute
    from FI side
    tcode OB52
    1111     +                                   1     2010     12
    1111     A                    ZZZZZZZZZZ     1     2010     12
    1111     D                    ZZZZZZZZZZ     1     2010     12
    1111     K                    ZZZZZZZZZZ     1     2010     12
    1111     M                    ZZZZZZZZZZ     1     2010     12
    1111     S                    ZZZZZZZZZZ     1     2010     12
    1111- posting period variant
    (+,A,D,K,M,S)-Account type
    change like above your problem will solve
    regards
    vijay

  • Merits and Demerits of Multiple company codes

    Hi SAP Gurus,
    Could you please let me know the Merits and Demerits of multiple company codes in ECC 6.0. Actually client asking for separate company codes for each production plant. Client having 20 plants (Client registered as one legal entity as per companies Act having 20 plants in different regions with in India) and wants to have separate company codes in SAP to have decentralized control of operations and period closing. Could you please let me know the merits and demerits of Multiple company codes with respect to Load on system, Extra activities/ load on man power on consolidation, complexities ect..
    Thanks in Advance
    Best Regards
    Raj

    Ray,
    From the background explained by you, I feel that you should go for a single company code as they have one singel legal entity. The purpose of comapny code is to generate external reporting(mainly balance sheet & Pand L statement) as per the legal requirements.
    As far as decentarlized control is concerned you can opt for configuring each plant as a separate profit center which will not only allow decentralized  operations and accountability but also a flexibility from internal maangement point of view.
    As far as configuration of multiple comapny codes is concerned, it will make the system too cumbersome and will have undesired complexity.
    Hope this helps.
    Rgds
    Manish

  • Posting is possible in period 2009/09 and 2008/08 in company code

    sir
    In mb1c goodsmovent when i enter that time error is comming posting is not possible in period 2009/09 and 2009/08 in company code. pl guide me what i have to do for this solution

    Hi,
      Please open the period 2009/10 in MM using MMPV T.code give your company code period as 10 and FY as 2009 then execute Now in MM the 2009/10 period will be opened and for FI period opening go to OB52 T.code select the period 09 and change it to 10 in your company code's fiscal variant.
      Other wise you post your transactions using previous months date then you can able to post.
    Regards
    Ramana

  • Posting only possible in periods 2002/03 and 2002/02 in company code 0001

    All
    This is in the ongoing sequence where I am creating everything from the scratch(customers, material, prices  etc).So far, I have been able to create and save the salesorder>deliver it>pick the items and then I was going to carry out the PGI and then this happened.
    when I use the date i.e(Planned GI) 27-09-2006, I receive the following error
    ****************snip********************
    Goods movement: Error log
    Item   Material           Description                                   Delivery qty UoM Batch
    000010 9                  T-AS1_MATERIAL__9                                      10  PC
           E M7 053
           Posting only possible in periods 2002/03 and 2002/02 in company code 0001
    ************End snip*********************
    If I use a date as R/3 wants ,say 27.02.2002(Planned GI),I get:-
    "Picking date is after goods issue date"...which is obvious.
    any day after 27-09-2006, say 28-09-2006(Planned GI), I get :-
    "Goods issue date is later than delivery date"...makes sence too
    one thing was clear here to me, I can only post in Feb/March 2002, while my delivery date is 27 Sept 2006 . So I am in a classic chicken-egg situation.
    where and who is giving this "Posting only possible in periods 2002/03 and 2002/02 in company code 0001" message ? How can I override this thing from the past ?
    I thought of playing it smart and change my system date to the year Feb. 2002 , but in the fear that a lot of other things will fall as a result of that, I did refrain from doing so.
    Could someone make this PGI succesful for me
    Thanks for any lessons.

    Thanks Mr. Srinivas
    MMPV was indeed the magic wand.
    PGI was successful.
    this is my overall document flow as of now :-
    Standard Order 2                                27.09.06 Completed
    . Outbound delivery 80000000                    27.09.06 Completed
    .. WMS transfer order 1                         29.09.06 Completed
    .. GD goods issue:delvy 4900000020              30.09.06 complete
    .. Invoice 90000000                             30.09.06 Missing export data
    As I understand, my invoicing is not yet complete , it's got a number and got saved, but how shall I get rid of that red line message "Missing export data"(foriegn trade data incomplete...was the message while saving the billing document).I would be darn happy if I could just get rid of the foreign data part completely(just want to complete the invoice).Would this be checking off a mandatory rqmt. somewhere in the master data?
    and would this also be the reason, why I see no accounting document which should have been on status 'open' by now ?
    Thanks in advance ,

Maybe you are looking for

  • Form is not displayed in form manager

    hi, i am trying to create a simple workflow, and created a form in acrobat 8 designer. i saved it as .xdp. i created a category and added my form into this category through the admin ui. after log in into form manager i see the category, but my form

  • Shall I buy iPad Air 2?

    Now I have an iPad Mini 1 with 16Gb and you can feel it slow when you are working with heavy documents or editing some that requires power so I want to use my iPad at university but I don't know if I should continue with iPad Mini or upgrade to iPad

  • Can I use a UK registered Creative Cloud in Thailand?

    I'm a UK citizen, with a UK bank account, address etc, but I work remotely and travel a lot. For the first half of this year I'll be in Thailand, will Creative Cloud work for me in this situation? And can I do this without using a VPN to trick the so

  • Traversing SceneGraph

    Hi! I would really appriciate if someone could help me with this. I have to travers all the nodes in one tree, from one BranchGroup, to all the leaf nodes in the tree, to get the Shape3D generated by a 3ds-loader. I would like a method that takes the

  • Got problems with creating RTF-files after OSX update

    Hi I don't know if this is really a MAC OS problem, but it occurred after I updated to 10.5.2 - so it's a likely suspect. Since the update I can't create RTF-files any more with Final Draft, my script writing program. A file is created, but when I tr