Product Costs Split is required, that is fixed and Variable costs

Hi All,
In a Sales Order screen (VA03), if we check the Costing, by clicking on EXTRAS -> COSTING, we get Total Costs, Fixed Costs  and Variable Costs.
Can someone please help me in getting these costs, I have used Table KEKO,
In KEKO (filtered based on Material, Plant, Sales Document, Item) and executed it, taken the resultant ProdCstgNo (KALNR)
In KEPH used that KALNR, as a result I am getting 4 records, However 2 records are not correct, and 2 are correct. 
In correct ones I have to add few costs to get FIXED COSTS and few costs to get VARIABLE COSTS.
My question is, which filter should I use to get the correct record (probably just one record) ?
Can I in some table get the summed up VARIABLE COSTS and FIXED COSTS, rather that I have to add them seperately ?
Please help, will award points promptly. Thanks

Hi,
In KEKO (filtered based on Material, Plant, Sales Document, Item) and executed it, taken the resultantProdCstgNo (KALNR)
In KEPH used that KALNR, as a result I am getting 4 records, However 2 records are not correct, and 2 are correct.
The table you mentioned CKMLKEPH is used for Material Ledger actual cost components.
Regd,
Khan.

Similar Messages

  • Fixed and variable cost component break up in PCA

    Hi,
    Is it possible to get fixed and variable cost component break up and contribution report in PCA at each product group level and lower level of node. I think this requires development. As my client requires the report to have cost break up into fixed and variable in PCA at each line item level. Can anyone solve this

    Hello
    You can get the report by using the  report painter, no development will be required.
    Regards
    Madhav

  • Fixed and variable cost element's cost

    hi,
    i would like to clarify. need your kind advice.
    1) can direct cost has both fixed and variable cost? can have example?
    2) can indirect cost has both fixed and variable cost? can have example?
    3) direct cost only happens in direct cost center and indirect cost only happens in indirect cost center?
    4) can direct cost center assign to fixed cost element and variable cost element? Likewise, indirect cost center assign to fixed cost element and variable cost element?
    thanks

    Hi,
    As per my understanding
    Direct cost  to a department could be variable or fixed.
    Example:  A supervisor in the X department would be a direct cost to the Dept A department. Since the X salary is likely to be the same amount each month regardless of the quantity of products manufactured, it is a fixed cost to the department. The supplies furnished to the X department will be a direct cost to the department, but will be a variable cost to the department if the total amount of supplies used in the department increases as the volume or activity in the department increases.
    Indirect cost is the Power used to operate a production machine.
    Example: The cost of the Power is variable because the total Power used is greater when more products are manufactured on the machine. Depreciation on the production machine is also an indirect product cost, except it is usually a fixed cost. That is, the machineu2019s total depreciation expense is the same each year regardless of volume produced on the machine.
    As you can see, costs can be direct and indirect depending on the cost object: product, department. The cost is fixed if the total amount of the cost does not change as volume changes. If the total cost does change in proportion to the change in the activity or volume, it is a variable cost.

  • Product costing - Fixed and variable cost.

    HI,
    I like to know how the cost is divided into fixed and variable at the cost compent level.
    as there is only one setting available at Define Cost Component Structure.
    Kindly let me know how this is done and possible forward the Product costing document and setting.
    my e-mail :[email protected]
    With Regards
    Krishna Singareddy
    Edited by: krishna singareddy on Feb 26, 2008 8:26 PM
    Edited by: krishna singareddy on Feb 26, 2008 8:27 PM

    Hi,  FICO MOH ,
    Do u have any logic if a coast element has 100 how do u divide it among the fixed and variable.
    what is the persentage or based on what it is defined .
    can u put some example pls
    with regards
    krishna

  • Definition of fixed and variable costs

    Hi,
    where do I define if a an expense account is a fixed or variable cost element? Do I have to set up separte expense accounts in the Chart of Accounts for fixed and variable?
    Can you give me some info of how this is done.
    Thanks
    Paul

    Hi Paul,
    You can use the features of Cost Element Attributes and Cost Element Attributes Mix for this.
    Pls check OKA4 and OKEC transaction codes for this. IMG -- CO -- CE Accounting -- Master Data -- Cost Elements
    Once you create the Attribute Mix, you can populate it in the Cost Element Master Data.
    You can describe a cost element with a maximum of eight attributes, independent of the chart of accounts. You can use these attributes for evaluations in reporting.
    You can store a valid combination of permitted attributes:
    --In the cost element's master data
    --In cost center planning for the combination cost center/cost element
    Pls revert back for further explanation...
    Srikanth Munnaluri

  • Fixed and Variable Breakup of Actual Cost

    We have implemented Material ledger and also activated actual cost component split. We are getting the actual product cost at month end. In the costing cockpit we get the Peiodic unit price(Actual cost) as well as std price of the material. But In costing cockpit we are not able to get the breakup of Fixed and variable. Whereas we are getting Fixed and varible breakup when we check cost component report in ckm3. But there, we can see individual material wise fixed and varibale breakup.
    Can anybody help me so that I can see the Actual Fixed and variable cost for all the products at a time?
    With regards
    Mukesh Poddar

    Fixed price, is the fixed costs - I usually see it in relation to Overhead..
    Fixed costs remain, whether you manufacutre or not.
    Say you are deciding whether to out-source an assembly,  If you outsource, VARIABLE cost will be saved, Material, labor for that assembly, Overhead representing fringes for that labor, the electricity to run that specific machine.  However, you will still have fixed costs of: Management Salary (although some of that can be variable); insurance on the building; heating and cooling for the building; realestate taxes.
    If the cost to make "in house" is 150 each and the vendor is going to charge you 100, thi is only a true saving if your fixed costs are less than 50.
    SAP allows you to separate fixed and variable costs so that you do make/buy analysis, budgeting, etc
    Hope this helps
    Edited by: Althea Madigan on May 12, 2010 2:11 PM

  • Overview report cost estimate (fix and variable)

    Hello
    anybody knows a overview report  where i can see for the current valid cost estimates
    per material
    costs splitt between fix and variable costs
    Alternatively it would be sufficient if this is just shown for a costing run
    In CK40N and all other reports i know i have the complete costs but to see details an extra click to the between fix and variable costs is needed and i can not extract to excel.
    Or is the only option an query on KEKO,KEPH, CKIS?
    Cheers
    Tim

    Hello
    @Sachin: Thanks for the report but the output is not that good - but helpful
    @Eric: Thanks this report solved my problem )
    Cheers
    Tim

  • Base cost and Variable Cost

    Hi All
       Can anyone help me to understand what is base cost and what is variable cost. And also from where can I find these both.
    Thanks
    Vani

    Mayby you mean fixed and variable costs?
    Variable costs are expenses that change in proportion to the activity of a business.
    For example, a manufacturing firm pays for raw materials. When activity is decreased, less raw material is used, and so the spending for raw materials falls. When activity is increased, more raw material is used and spending therefore rises.
    Fixed costs are business expenses that are not dependent on the level of production or sales.
    For example, a retailer must pay rent and utility bills irrespective of sales.

  • Fixed and variable prices of an activity type understanding

    Hi,
    To my understanding the fixed portion of the price will not be multiplied by the quantity and the variable price will be. However, i tested the cost estimates and it looks like both the fixed price and variable price is summed up together to get the total price and this total price is multiplied with the quantity.
    In this case what is the purpose of having fixed price and variable price in the activity type?

    Fixed price, is the fixed costs - I usually see it in relation to Overhead..
    Fixed costs remain, whether you manufacutre or not.
    Say you are deciding whether to out-source an assembly,  If you outsource, VARIABLE cost will be saved, Material, labor for that assembly, Overhead representing fringes for that labor, the electricity to run that specific machine.  However, you will still have fixed costs of: Management Salary (although some of that can be variable); insurance on the building; heating and cooling for the building; realestate taxes.
    If the cost to make "in house" is 150 each and the vendor is going to charge you 100, thi is only a true saving if your fixed costs are less than 50.
    SAP allows you to separate fixed and variable costs so that you do make/buy analysis, budgeting, etc
    Hope this helps
    Edited by: Althea Madigan on May 12, 2010 2:11 PM

  • Budget Report to show the fixed and variable split for Materials

    Hello Gurus,
    Could you tell me if there is a budget standards report that will show the fixed and variable split for Materials? Example: Labor, Equip., QC and Overheads? 
    I need it for the correctly rolled-up 'final material number' step.  The report that does this now (without fixed and var split) is the Indented BOM Comparison (sret - cost mgmt-product costing - cost mgmt-customized reports - cost estimate comparison - costed multilevel compare rpt - Indented BOM Comparison).
    Thanks,
    Jefferson

    one simple way is in your final itab declare a slno type i field
    data : begin of itab occurs 0,
    slno type i,
    <other fields>
    end of itab.
    after filling the data in itab.
    loop at itab.
    itab-slno = sy-tabix.
    modify itab.
    endloop.
    in fieldcatalog also you have to define that slno field as the first column.
    but it will change its order if you are sorting the output or filtering the output.
    regards
    shiba dutta

  • KSII - Trying to split the activity price in fix and var

    Hi gurus,
    does anibody know if is possible calculating the actual activity price split in fix and var?
    I know the percentage in which i'd like to split the price, for example 75% and 25% for Cost Center Group XXX; 60% and 40% for Cost Center Group YYY and so on...
    Is it possible to do something in the system in order to obtain the price split?
    As it is now, the price is all fix.
    Thanks,
    Enrico

    Hi Enrico
    It is possilbe... For that you need to plan costs in KP06 like that.... i.e. You need to do activity dependant planning in KP06 so that you will be able to enter Plan values - Both Fixed and variable
    You would agree that Act Price is Plan Cost / Plan Qty... So, the Numerator i.e. Plan Cost has to be planned as such in order to get the output as fixed and variable price
    Thats the only possible way and no other option exists
    Regards
    Ajay M

  • Differance betwen Variable & Fixed and Variable in Cost Component Structure

    Dear All,
    What is the difference between the Variable and Fixed and Variable for the cost component for the Cost Component Structure.
    why we have to take Raw Material Cost Componennt always Variable.  Is any help?
    Regards

    fixed cost is irrespective the level of production the cost remains same. or upto certain level of production the cost the cost will ramain same and after the cost may increase.
    example: rent of the factory building or office buildings remains same irrespective of the operations level.
    variable is with every change in the level of production the cost change.
    example: raw material used in manufacturing finished product. The more finished products the more is the consumption of raw material.

  • HT1338 i have about 88,000 songs in my music library, some are duplicates. Does anyone know of any Apple Product or 3rd party software that will identify and remove duplicates.

    I have about 88,000 songs in my music library, some are duplicates. Does anyone know of any Apple Product or 3rd party software that will identify and remove duplicates.

    Backup your music to an external source before doing this, just in case you delete the originals by accident.
    iTunes will show you the duplicates.  But I recommend tagging their comments or another field once selecting them to ensure you don't accidentally delete both the original and duplicate.  You can always select all of them and change all their comment tags at once.  Once you've done that, stop showing duplications, and then sort by the comment field.  This will allow you to determine whether only the duplicates were shown in the show duplicates, or the originals.  If you see any without comments, then you can go ahead and delete the duplicates.

  • Examples for Fixed and variable prices for activity type

    Hi,
    Can someone please provide a real life example for the fixed and variable prices of an activity type?
    Moderator: Search SDN and SAP help material

    Hi,
    Fixed Price are those expenditures which remains constant in total amount irrespective of change in Volume of production.Eg Rent will be constant even if your production volume changes.The activity price calculated for such expenditures will also be constant per activity rate even if there is a change in the volume of production.
    Varriable price on the other hand changes with the volume of production .e.g power cost will change if you produce more.the the activity rate say KWH/ton will also change and its price will also change if you produce more.
    Generally activities for service center fixed costs will yield fixed price.
    Once you are done with planning in KP26.these plan amounts are used for standard cost estimate.when you are doing standard cost estimate, cost will calculated from BOM(Materials cost) and Routing(here you have activitype plan cost/hr.no.of hrs to finish goods).
    once you are with standard cost estimate it will update material master.
    To calculate variances(target costs Vs Actual cost),we use target cost.target cost is nothing but your standard cost estimate cost for that particular materials(Finished or Semi -Finished).
    you can check this in OKV6 T.code.
    Thanks,
    Rau

  • Fixed and Variable Overhead

    We are using standard costing and with only one Overhead Resource - we would like create a Fixed and Variable Overhead Resource - we have tested adding 2 new resources - but when we run the Assembly Cost Update - for WIP it revalues the jobs as if they had no Overhead at all before - does any one have any help to offer on the correct way to make this change and revalue WIP correctly?
    The change is correct for a part when you view the item cost and the Inventory onhand is revalued correctly.
    Thanks
    Pam

    Pam,
    Did you review the output of the WIP Standard Cost Adjustment report after the standard cost update to see how the wip inventory was updated? I would suggest that you get the following to verify if the cost update is not updating wip correctly:
    -The WIP Standard Cost Adjustment report this is created when a standard cost update is performed
    -The log file of the Standard cost update with the debug profile options MRP:Debug option set to yes and CST:Cost update Debug level set to Full
    -The output of the Job.sql (see note 378348.1) for a job that the standard cost update is being performed against both before and after the standard cost update
    -Screen shots of the resource set up and cost that is being changed
    -Screen shots of the Item Cost of the frozen cost type and the cost type that the cost is being updated from.

Maybe you are looking for

  • Payment mathood is deciline and i have debit card

    payment mathood is deciline and i have debit card

  • Blank browser page when viewing html/swf exported from Indesign

    We've created a 'flip book' in Indesign and exported it as a swf and html docs. These docs both view correctly locally, but when uploaded into the same directory on our server and viewed via safari or chrome, they both appear as blank browser pages.

  • Merging blackchannels of different PDFs

    Would anyone know if there any means of merging the blackchannels of two different PDFs? The problem is we are working on a catalogue wich must be produced in 15 languages. Working in layers in Indesign makes the file very heavy, working with differe

  • Passing internal tables dynamically to a subroutine

    Hi All, How to pass internal tables dynamically to a subroutine? In subroutine logic i'm fetching data from MARA table for all entries in the internal table passed to the subroutine. Based on some condition the internal table varies. I'm placing the

  • POError-What to do?

    Dear Legends, While running the PO the user gets this error Error Messages: Unexpected error occurred during tax calculation. Exception: 023 - An Unexpected error has occurred Please contact your system administrator. Please correct the problem or Co