Hi Team,
We have means of tranport Truck and Rail
Truck - Transport Duration of a Transportation Lane - 48 hours
rail - Transport Duration of a Transportation Lane - 336 hours
I have maintained product spec means of transport in tlane master i.e.Rail - 336hour
But when i checks product view I could see "start date' and "avia/req date" is only showing two days (48h) transit.
Question - After maintaining product spec means of transpor- "rail" why system is taking truck time instend of rail time ?
Please advice me
Rgds
SDB

Hi SDB,
Please check if the Check box for "All Products" in MOT is selected for Truck MOT. This setting can caue the issue you are facing.
Regards,
Ravi

Similar Messages

  • Optimiser with means of transport

    Hi Experts,
    Pls spend some time to understand the below requirement and the design.
    Requirement- there are two plants, P1 and P2. Material M moves from P1 to P2 using a train R. The train can move 2100 tonnes in one trip.It takes 2 hrs to go from P1 to P2, hence it can make only 6 round trips between P1 and P2(i.e. 12 single trips) in a day. Hence APO should create only 6 orders in a particular day with max of 2100 tonnes as quantity for each order.
    Master data-
    Plants- P1, P2
    Material-M
    Resource(train)- R(bucket resource)
    Tlane- P1-->P2
    There is one SNP planning book and there are two data views- daily and monthly
    System design
    Max lot size for M at P2 is maintained as 2100
    Max bucket capacity for the resource= 6*2100= 12,600
    Means of transport for T Lane P1-->P2 is maintained as 'All products'. Transportation duration is set as 2 hrs
    Product specific means of transport is maintained for M, with consumption as 12 Tonnes
    Results-
    There is a requirement of M at P2 for 12,800 Tonnes. Stock of M at P1 is 12,800 Tonnes
    When I run optimiser on monthly view- it creates 6 orders with 2100 qty and one order with 200 qty, but all on one day-violating the rule of 6 orders only in one day
    when I run optimiser on daily view- it creates 6 orders with 2100 qty in one day and one order of 200 qty on the next day
    Query-
    1.Why do we need prod spec means of transport when the means of transport is defined as 'All products'
    2. What is the use of maintaining consumption as 12 Tonnes
    3. If I just go by transportation duration of 2 hrs, so the train makes 24/2=12 single trips, or 6 round trips. Hence 6 orders should get created with 2100 tonnes each in a day. But this does not happen and no planning happens in this case
    4.Why do I get different planning results when I use daily and monthly bucket views
    Would be very helpful to analyse the design and the concepts if someone can give some pointer
    Regards
    Manotosh

    Hi Kaushik,
    Thank you so much for your prompt reply and help. However I still have some query.
    1.As per my understanding we do not actually need prod spec MOT when all prod incator is there.I think some older versions of optimizer do not consider all prod tlane (I am not too sure abt it).But if all the prods for a specific plant can not be transferred through same MOT then it is required.Also if the res comsumption and the cost is different then also it is required.
                 - Your justification to have a separate MOT is absolutely valid as long as we need different MOT for any reason(cost, duration etc). But here there is only one product M being transferred between P1 and P2.
    2. Resource capacity will define the capacity in terms of total transportation capacity and consumption is required to do the planning.Like if the consumption is not maintained the capacity becomes as infinite.So there will be more than 12600 tons transported.
               - We define the resource max capacity and the utilisation. If the utilisation is more than 100%, I understand that it will try to supply more than 12,600 tonnes. But here the utilisation is maintained as 100%. What will happen if I maintain consumption as 10 Tonnes or 10 BBL or anything other than 12 T as currently maintained?
    3.There is a difference between scheduling and capacity.When you say 2 hrs but parallaly another tran can also go and transportation can happen.But when you define resource and capacity then you restrict the same.This is constrain plng but that duration of 2 hrd will not put any contraints.
           - The transportation resource is assigned to the T Lane. Hence whenever the T Lane is used, only the same resource is used for transportation. Hence we can not have more than one resource(R) acting simultaneously.
    4.If you see the results are same only difference is the period.Check the resource capacity view.I think you can see the capacity planned correctly and also the monthly view check the strt and end date.
           - As per the concept, SNP does bucket planning. Hence it will consolidate all the demands in a bucket and would create orders for the qty equal to the demand qty either at the begining of the bucket or middle of the bucket or end of the bucket. It will split the orders based on lot size or any other parameters defined. Hence I am getting multiple orders with 2100 qty(Max lot size) on 1st of the month. But the resource capacity is overshot in this case.

  • Basis of picking means of transport in APO

    Please help me in understanding basis of picking means of transport in APO and what is the link between R/3 means of transport and APO means of transport.
    Manish

    In R/3 the means of transport is recorded in Shipment document. It contains all the information necessary for carrying out transportation. The means of transport necessary for a shipment is reflected in the system as a handling unit. These handling units contain information about tare weight and -volume of the means of transport as well as the weight of the packed handling unit. Information about the country providing the means of transport, details about the driver and travel time are also included in these handling units. Handling units that have already been created for delivery items are copied into the shipment document where they can be packed further, if necessary. Delivery items that have only been partially packed or not packed at all can be packed in the shipment documents.
    In APO the means of transport is planned in TPVS. If the client do not have TPVS implemented, the means of transport are taken based on the locations, products and cost as well.
    The difference between the R/3 and APO means of transport I see is that in APO there is product specific means of transport wherein we can assign the means of transport for specific products based on its demand or perishability. For example, if we have a Tlane between US and Ind, the possible means of transport could be by AIR or by Water. For a product which is a primary and active product for a company, the means of transport can be assigned as Air rather by water.

  • Sequence of dependencies in product spec

    Hi,
    Does the sequence of dependencies that I enter in the product spec dependencies tab matters ?
    Ex:
    FromComponent ToComponent
    A B
    B C
    FromComponent ToComponent
    B C
    A B
    Does the upper two configurations are same ?
    Thanks,
    Harman

    Hi Harman;
    No, the sequence does not matter.
    While we're on the topic, also keep in mind that OSM can infer dependencies between order components within a product spec (a.k.a. fulfillment pattern).
    For example, if you have a dependency chain like a->b->c, then OSM will still respect the dependency between a and c even if b does not appear in the orchestration plan. This means you don't need to declare a dependency between a->b, b->c and a->c, you just need a->b, b->c. Note that this is supported for dependencies within the same product spec and its ancestors, not across product specs.
    Regards,
    Brian.
    Edited by: brian.dueck on Aug 2, 2011 6:56 AM

  • Safety days supply not followed due to change in Means of Transport in SNP

    Hello All,
    I am facing a strange issue regarding the SNP heuristics and means of transport. We observed that the system was not respecting the safety days supply. For example if we had a receipt in bucket 'N' and there is a violation of safety days supply in bucket 'N-1'. When we un a heuristic ideally system should delete the receipt in bucket 'N' and create a new one in bucket 'N-1'.
    But we observed that the system is retaining the existing receipt in bucket 'N' and also creating a new one in bucket 'N-1'. This is making the available days supply to increase manyfolds and the whole plan looks inconsistent from Safety Days point of view.
    After analyzing the issue i observed that if we have existing receipts using a Means of Transport 'X'. Now if we run the heuristic using a Means of Transport 'Y' then the system doesnt touch the existing receipts. If I run teh heuristics using the existing Mean of Transport then it works absolutely fine.
    Kindly suggest.
    Regards,
    Abhi

    Hi,
    when you check all products flag it means the means of transport is available for all products and not product specific, to select the MOT for SNP you need to check the aggrgtd plng flag.
    Also safety stock has nothing to do with MOT, SNP heuristic plans based on checks the quota arrangement if its for multiple MOT it will distribute the PR based on the ratio in quota if both MOT are able to meet demand on time, otherwise it will violate quota till the time both MOT are not capable of meeting the demand on time.
    If no quota is defined it will check for which lane is able to meet on time n if their are multiple lanes which can fulfill demand on time then it will choose MOT with less cost.
    Have you got multiple MOT for a source destination combination to be considered for SNP heuristic?
    Just check your design again and explain the problem again as this is not the standard expected behavior.
    Thanks,
    Sanjog

  • Planned Delivery Time and Transportation duration- Tlane and Means of Transportation

    Dear Experts ,
    I have question regarding lead time calculation my SNP
    I have
    Start Location : A
    Destination location: B
    I maintained Planned delivery time in ECC- material master as 10 days  and cifed to Tlane Product procurement as 10 days
    and leave empty in the transportation duration empty so the total lead time is 10 days from start location A to destination location  B
    now
    I maintain 24 hours in Means of transport as transportation duration by truck
    now the lead time is 11 days from start location A to destination location B
    Now
    i leave empty planned delivery time empty and maintain Means of transport duration as 48 hours
    so the lead time is 2 days from A to B
    does my understanding is correct or not advise please
    Regards
    Raj

    Hi Raj,
    Take a look of these notes. Specially SAP note 379006. This note explains how the system sets the times in ECC and APO. Basically, It recommends a BAdI in order to match the delivery date in ECC and APO (transit time). What I recommend is to set delivery time equal to 0 if this is possible in your company.. This is not an SAP recommendation, because the delivery date is a key master data in the purchasing process and making it equal to 0 could not be allowed.. Now, if its possible in your case, it is the easiest way to ensure consistency...
    These are the notes:
    379006
    - Transport duration and planned delivery time in APO and R/3
    441622
    - Supplying-plant-dependent planned del. time/trans. time
    624982
    - Incorrect dates for RBA controlled stock transfer
    Kind Regards,
    Mariano

  • Stock tranport order APO - R/3: means of transport

    Situation: we are publishing stock transport orders from SNP to R/3. It can happen that we are publishing orders of different means of transportation between same locations (several means of transportation maintained on the lane). Do anyone have any idea how to transfer information of the means of transport within certain order to R/3 ?
    Dmitry

    Sorry, I haven't been able to find a way...
    R/3 really doesn't care...
    I definitely think its a short fall of the integration between SNP and R/3.
    Like you said, if SNP selects air ship vs ground, how does R/3 know?   How will planners know in R/3 to air ship the product?
    He wouldn't...
    TPVS may remedy this problem.  As there is more integration points...
    Ken Snyder

  • TLB Order changes means of transport

    Hi Experts.
    We are using TLB to create transport loads.
    We have a pair of source location and destination location, where a product is maintained for two means of transport MODE1 & MODE2
    When TLB order is created in APO it is created for MODE1 and saved in APO.  When It is transferred to R/3 the order coming back from R/3, it shifts to other means of transport.
    Let me know why this happens and what is the way out.
    Thanks in advance.
    Nitin Thatte

    Hi Nitin,
    Before we get the reason of the change in Mode od Transport, please tell me when the order goes into SAP from APO does it have the same mode of transport in SAP as was in APO. Is there any manual intervention in SAP side for changing the mode of transport ?
    Thanks,
    Harsh

  • Changing of Means of Transport for deployment order

    Hi All,
    Is it possible to manually/ programatically change the means of transport of a deployment order ? for example once deployment has run, it has created a deployment order with means of transport, lets say, 0001 ( Truck). Now i want to change the means of Transport to 0003 ( Air). Is it possible using some BADI etc ?
    Pls note that i know that by assigning product speciic means of product of 0003, it is possible to directly create deployment order for 003 means of transport. Due to some requirement, we want to change it manually.
    Regards,
    Pawan.

    Hi Senthil,
    I tried that option already. Infact there is no need to delete existing deployment order, you can simply run deployment with replan all option. This will create deployment orders on the new means of transport. What i wanted is, without running deployment, is there some option possible wherein i can change the means of transport of an existing order, which is already created on another means of transport ?
    regards,
    Pawan.

  • How to check open deliveries and open sales order using means of transport

    Hi,
    I want to check open sales order and open delivries which is having "ABXP" means of transport type .Can anybody suggest me to check in which table or any transa

    means of transport type
    Please reconfirm whether the above statement is correct.  Moreover, you yourself can check at your end by opening any sale order, go to that field, press F1 and press the "Technical Information" icon so that you can see the corresponding table name and field name over there.
    G. Lakshmipathi

  • How to make means of transport field as a mandatory field  in MV45AFZZ

    Hi All,
    I am new to User-Exits.
    In Sales Order creation I have got a requirement In such a way that based on Sold to and Shipto Party Combination of sales order
    I have to make Means of Transport Field as a Mandatory Field.
    I have gone through the Program MV45AFZZ.
    Please let me know how to do it .
    Regards.
    Rohit.

    Hi ,
    Write code in Save_Document_prepare In program MV45AFZZ.
    Constant :c_flag type c .
    if c_flag  eq space.
    IF VBAK-VSBED EQ '01' AND VBKD-TRATY IS INITIAL.
      MESSAGE E0001(SABAPDOCU) WITH 'Enter means of transport'.
    endif.
    c_flag   = 'X'.
    endif.
    Regards.
    Eshwar.

  • The necessary shipping materials and the means of transport

    The answer of the question below is "d. Shipping point". On the other hand, shipping type (shipment type determines how the goods will be transported - tuck, train, ship etc....) is entered in the "shipment type" at the customization.
    Taking into consideration this fact, why is the answer of this question is given as "shipping point"?
    What part of the company is responsible for the type of shipping, the necessary shipping materials and the means of transport?
    Only one answer is correct.
    a. Sales Organization
    b. Transportation planning point
    c. Shipping condition
    d. Shipping point
    e. Warehouse

    hi
    As per my knowledge, normally goods are transported from Plant through shipping point, So ultimately shipping point is the responsible for that.

  • Means of transport in sales order

    Hi all,
    i want to enter some data in field "means of transport" in sales order Header data in shipping tab, but i dont have any values maintained there, where do i maintain the data of means of transport so that i ll reflect in F4 values of my sales order.
    plz advice.
    thanks in advance.
    kumar.

    Hi.,
      SPRO-LOGISTIC EXECUTION-Transportation-Basic transportation functions-routes-define routesdefine mode of transportation
    REWARD If helpfull
    Srini is right
    Thanks & Regards
    Narayana

  • Extending Validity of Means of Transport in TL

    Dear All,
    Couple of questions:
    1) Is it possible to extend the validity of a Means of Transport in a Transportation Lane by increasing the 
        End Date?
    2)  Is it possible to increase the end date for SKU maintained on this lane?
    If yes? how?
    Many Thanks and Regards
    Amod

    Hi Vaibhav,
    Thanks for your inputs.
    I knew the entries could not be edited. I had tried it earlier before posting this message. Neither the means of transport nor the SKU end date is editable.
    As you have mentioned, I had already tried deleting the entire entry in means of transport and SKU list. Before trying to delete the entries I had deleted all transaction data on this particular TL for all SKUs existing on this lane. But the meassge I get every time is "There are orders existing on that particular means of transport or for that particular SKU".
    Futher investigation reveals that both the means of Transport and the SKU still have orders existing in test version which I have copied.
    I know I can create a new means of transport with validity start date matching with the end date of the earlier means of transport. The same thing can be done for SKU's on this TL as well.
    My question to you and other experts on this forum  "Is there still some way in which I can increase the validity and avoid creating multiple entry for same means of transport and same SKU on a particular TL?"
    Thanks for your help
    Regards
    Amod

  • Means of transport change update to SNC5.1

    If we change the Means of trasport in r/3 sales order, then this update should be send to SNC5.1 Is this mapping is done thru ORDERCH ?
    We have done ORDERSP mappings for order confirmation. Now issue is that when we do the change in r/3 sales order in means of transport that should be updated in SNC.
    Thx

    Hi Vaibhav
    Means of transport is the basic master data and in general it is created in SNC system manually even though the data is available in SAP ERP
    The behavior can be changed so that the SNC does not create means of transport  from SNC master data and the data should be picked from IDOC with the help of coding.
    Now question is how many different means of transport does this customer have? I could imagine many resources, but means of transport is mostly just  a few
    Upon which basis does the planner decide which means of transport should be taken???
    Best Regards
    Vinod

Maybe you are looking for

  • How can I send text messages to a group?

    Cant find an option to send a text message to a group that I have created in my contacts...either via the standard messaging app or with the Verizon messaging app.  Does that mean that neither of these apps have that capability?

  • SMARTFORM:  How to print on document per row in an internal table

    Hi. I have created a SmatForm that is a one-page document to be printed once for every row in an itab I'm sending it via the Table Interface. I hope I didn't waste my time designing this form but I created several Windows for each section (header, re

  • Custom UserManager and Enterprise Manager administration

    Can Enterprise Manager be used to Add/Remove Users and Groups for a Customer UserManager? I remember reading somewhere that Add/Remove only worked for the XML-file based implementations. Now I can't find where I read that.

  • Query on Actions

    Hi Guys Working on Actions, what is the need to schedule an action when you can set a condition and initiate the action using the start condition ? Hope I make sense... Cheers Jessy

  • How to Obtain Listing of Crystal Reports History Limits

    Post Author: djp CA Forum: Other Does anyone know of a way to extract a listing of the History Limits settings for all reports from the database?  I've looked throught he SDK documentation and I am unable to determine where that information is stored