Product Variances in COPA for SFG

Hi Freinds,
I am facing a issue relating to production variances arising from settlement of production order for SFG.
As SFG is not sold in my case and is being used for producing 2-3 types of Finished goods, therefore client wants that the production variance of SFG should be allocated to the FG's based on Sales Quantity.
However as all production variances are being settled to COPA, SFG production variannce are also coming to COPA, now I am not able to fine in COPA if there is anything to support this.
Thanks

Hi
The answer to your question is both YES & NO
It is possible to allocate SFG variances upon FG using top down distribution in COPA (KE28)... However, for that, you should have "Some thing in Common"
"Some thing in Common" means  - Your SFG and FG should have a relation in SAP where by you can identify that they co-relate.. In one of our clients, we set up the system in such a way that the related SFG and FG shared the same material group...
So, while distributing in COPA (Top Down Dist), we specified that Variances Pertaining to Mat Type = HALB & Mat Group= XX should be allocated to Mat Type = FERT and Mat Group = XX...
Do you such a co-relation established in your system?
Regards
Ajay M

Similar Messages

  • Transfering Production variances to COPA

    Hi,
    I have doubts about transferring Production variances to COPA.
    Will this functionality work both for settlement of variances to GL Variances Account and at the same time for settlement of variances to COPA?
    From my experience with cost centers and internal orders, I know that if I want to settle an Internal order both to COPA char and to GL Account, I have to make 100% overhead for the  costs gathered on IO. Then I can do the settlement in both directions.
    Could you please explain to me the case of Production order variances settlement? I need to have them both on GL accounts and in COPA.
    Best wishes,
    Karol

    Hi
    At the time of settlement of production orders, FI entry also passed as well as variances are also settled to COPA
    In FI, variances will be debited (assuming production order debit is more than what it is settled to Inventory at Std cost) and Inventory changes account is credited.
    In COPA, depending on the variance categories like Price, qty and their assignment to value fields, this amount is transferred.
    For eg, if prodn order actual costs is say 12000 and is settled to Inventory is 10000 (at std cost), and the difference is 2000 and if this difference is due to Price (800) and qty (1200).
    Hope this is useful
    S Jayaram

  • Production variance in COPA

    Hi All,
    We are settling production variances to COPA and We have 3 values fields in COPA,Material Variance,production labor variance and Other variance.
    Variance categories are mapped to material, labor variance and others value fields.but i dont see any labor variances in Variance value field.i have reviewed and this is becuase of Variance categories.which are not one to one mapping to value fields.
    we have 9 Variance categories mapped to 3 value fields.
    client requirement is labor variances to settled to Variance value field,material variance to Material value field and Overhead and other variances to settlement others value field.is this possible?if yes.how can i do this?
    Any help is appreciated.
    Thanks,
    Anusha

    Hi,
    As explained earlier by other forum colleagues,variances captured at production can be assigned to COPA under value field.This assignment is happening through PA transfer structure for variance settlement.
    Normally this can be defined broadly into 2 categories : 1.Cost element and 2.Variance categories.
    After looking at your requirement,your main interest is in cost element based production variance push to COPA for reporting.i.e.Labor variance.
    Production order shows this variance under secondary cost element labor and difference between target/actual.COPA transfer structure doesn't push 2 seprate values (target/actual) ,whereas only delta gets posted.
    I feel your requirement is not possible through PA transfer structure.
    I would suggest,you push cost center specific labor expenses under new value field,capture cost component wise break up of standard cost udner different value field.
    Comparision of cost center expense and labor part of standard cost will provide you expected value.
    I know this complex thing to do,so discuss with client do they really want from COPA?
    Same reporting they can get from cost cente i.e.expense posted(labor ) and absorbed on product under secondary cost element.
    regards,ashok

  • Production Variances in COPA   CO-PA

    Hi Gurus
    Production variances are genrated in COPA at the time of Prod Order Settlement.How can we display these in COPA reports apportioned according to Products
    If not what is the best practice to present Production Variances in COPA reports

    Hi,
    The production variances flows to copa by creating PA transfer structre in OKOA. their you have to assign value fields to variance categories.after creation of pa transfer str u have to assign it in u r settlement profile.
    Thank u
    Srinivas

  • Settle Production Variances to COPA- Cost elements and Value fields

    Dear All,
    I know this question has been discussed in the past, but I have one specific doubt regarding this topic.:
    When assigning cost elements to variance categories in t-code KEI1, how do we figure out what combination of cost elements (in the top half of the screen) constitute Input Price Variance, Scrap variance etc (in the bottom half of the screen)? I know the net of the postings on those cost elements tells us what variances we are looking it, but how do we get the cost elements (group) for let's say, 'Input/Output Quanity Varinace or 'Lot size Variance' ?
    Or is this a futile exercise? May be I should just create three types of variances: Labor, Machine and Overhead. And I know what cost elements (net of the postings) would, in total, make up the $ variance in each of those categories. I can then use them in my report painter reports.
    Please help clear the fog for me.
    Ajay?
    Thanks a lot,
    Deepak

    Hi Deepak,
    Welcome to SDN!!
    There are 2 ways of updating variances in COPA... I Prefer the 2nd option always...
    1. Category wise variances (Input Prc, Usage var, etc) - Here, create a Cost ele group, where in you include all the Cost elements that can be posted to the Prod orders
    For the sake of simplicity, you can include Cost elements 1 to 99999999 in the Cost element group...
    2. Cost Comp Structure wise variances -
    a. Create as many assignment lines in PA Trf Structure as in your Cost Comp Str...
    Eg: If your Cost Comp Str in OKTZ has Raw Mat, Labor, Overhead - Create 3 Assignments in PA Trf Structure..
    b. Assign the same cost elements in the SOURCE as in the Cost Comp Str
    c. Choose the radio button "Costs/Revenues" in your assignment line, instead of " Variance on Production orders"
    d. Assign each Assignment line to a separate Value Field
    br, Ajay M

  • Actual COGS and Production Variances to COPA (KE27)

    Dear all,
    if the COGS is revaluated with the ML (revaluation of consumption)
    if the COGS is mapped as a dedicated value field in COPA
    if the COGS @ actual is passed to the COPA (KE27)
    Hence  is no longer needed to settle the production order variances to COPA!???
    Thanks

    Hello Francesco,
    Yes. Very True.
    Actual Costing will roll up the Cost for every next level. Without ML, the entry normally posted to FI when we run settlement.
    Dr/Cr. Production Variance
    Cr/Dr. COGM
    This is where it remains for information, since Both GL accounts belongs to P & L.
    When ML is activated, the variance is added to the next level of the product. Here , if we observe, settlement of variance neither impacted FI, When there is no ML Activation, nor impacted FI when ML is activated.

  • COPA Configuration for settlement of Production Variances

    Hi,
    Can anybody explain me detail configuration steps required to settle production variances to COPA in case of Make to Stock Scenario.
    Helpful answers will be rewarded with points.
    Regards
    Milind Nair

    Hi
    These are broadly the requirements for settling production variances:
    1.) The production variances first need to be calculated in CO-PC.
    2. Your PA transfer structure must contain assignments of variance categories to COPA value fields.
    3. In the settlement profile, you define the variances to be settled and profitability segments should be a valid receiver.
    4. The settlement rule to profitability segments is created automatically based on the information available in the production order (product, product group, plant and so on).
    5. You must have maintained number ranges for record type "C".
    6. The desired form of Profitability Analysis (costing based) must be active in the relevant controlling area.
    Hope this is useful
    S Jayaram

  • Production variance issue

    Hi experts,
                Regarding to one production order, production variance happened for the amount 743,517.67. But in KE30(CO-PA report) it is showing only 641,843.67.  For the balance amount 101,674, COPA document has not been generated. Generally at the time of settlement, for each line item of production variance, two COPA documents will generate, i.e one is production variance (statistical) with record type "B" and second one is with production variance with record type "C". Here only one COPA doc with record type B is generated and other one with record type "C" is not generated. Hence it is showing difference with G/L balance. How to solve this issue?
    Regards
    Jay

    Hi Jay Jay,
    1. check the settings of Settlement Profile assigned to your production order type, to make sure the settlement profile has been assigned the correct PA transfer structure
    2. check the PA trasnfer structure, to make sure the source and value fields are correctly assgined (tc: KEI1)
    3. check the valuation strategy, to make sure the point of valuation, record type and plan version are assgined to the valuation strategy (tc: KE4U)
    Wish helpful to you

  • Production Variances of semifinished goods in COPA

    Hi,
    We are using Costing based COPA, which is updated at the time of billing.
    The production variances are posted to COPA when the settlement of the production orders are done.
    The production variances if brought within the purview of COPA report (based on sales), the plan vs actuals can be compared. However, in case of actuals, the production variances would appear only to the extent of tha particular product sold (that too, to the extent of qty produced and not qty sold)..
    I have two issues:
    1. Whether system can explode the BOM and bring in the production variances of semi-finished goods into the total production variances, if I drill down only on the Finished product sold. The total actual cost would include the variances of relevant SFG also. Is this possible, if so how?
    2. Whether, by bringing production qty and sales qty, the proportionate prod variances be calculated (total prod var * sales qty / prod qty). This can surely be done by inserting formulae. But is this justified from business point of view?
    Please help me resolving this issue..
    Edited by: Swapvik on Mar 17, 2009 7:11 AM

    Hi Swapvik,
    Issue No.1:
    When you are using only Standard Costing in CO-PC, variances will not get rolled-up to the next level. Only costs get rolled-up. As per your requirement, when you see the report in COPA, when you see the details of FG and you want to see the variances of it's SFG also, this would be possible only if you have activated Material Ledger. If ML is active, variances also get rolled-up along with costs.
    Issue No.2:
    The ultimate purpose of bringing Variances into COPA and making part of them in a report is to consider COGM subject to the variances. Though it is not 100% justified, it gives you the most appropriate analysis compared to where you don't consier the variances at all. If you don't consider variances there, that means, you are considering only COGM and not taking the effect of variances, which will definitely not a correct picture of Profitability.
    Pls revert back for further explanation...
    Srikanth Munnaluri

  • COPA Production Variances

    Hi,
    Would Production variance GL account be a cost element for the purpose of flowing data to COPA?

    If you have activated Costing based COPA then NO
    If you have activated Account based COPA then YES
    Enjoy.
    Venkat.

  • Activity variance and production variance seperate in COPA

    Dear experts,
    My client wanted to break production variance(ko88 in two parts in COPA reports
    Total material variance
    Total Activity variance
    What i am thinking- In PA transfer structure of Production order.I will create four assignements
    1)Material price variance-Only RM cost element(Cost element Group)-Price variance category-Material Variance(value field)
    2)Material QTY variance-Only RM cost element(Cost element Group)-Qty variance category-Material Variance(value field)
    So both assignment linked to material variance value fields.
    same way for activity
    1)Activity price variance-Only Activity cost element with 43 categoryt(Cost element Group)-Price variance category-Activity Variance(value field)
    2)Activity QTY variance-Only Activity cost element with 43 category(Cost element Group)-Qty variance-category-Activity Variance(value field)
    So both assignment linked to activity variance value fields.
    Is it works for the above requirements or I will face any technical difficulties.
    regards
    RR

    Hi
    For sure, it will work....
    Another approach can be to update the variance as per cost component structure instead of variance categories in COPA.... Stil the category wise variances can be seen in Other CO reports like Co03 / KKBC_HOE/KKO0 reports
    br, Ajay M

  • GL assignment for production variance

    Hi,
    Production variance GL assignment is to GL89961000 and value fields VV455.
    Question: Where is the settings (automatic GL booking to GL89961000) for this production variance?
    Thanks in advance.

    Hi,
    In OBYC you have to maintain gl account for production variance in PRD Transaction event key. If you want this field is to flow to COPA Then in PA Transfer structure you have to maintain allocation structure with this value field assignment.
    Regards,
    Sreekanth

  • Post implementation COPA Issue - Variances not setteled for process orders

    Hi Experts,
    The client implemented COPA in the FY 2011. There were many process orders existing in the system prior to implementation of COPA. Now the client trying to archive the old process order and trying to set deletion flag  and system throwing error message u2018variances were not calculated fullyu2019.
    But client saying orders were settled and no variances existing prior to COPA implementation.
    My queries are:
    1. The orders are created prior to COPA Implementation and they were settled as well long back.  After COPA implementation why system calculating variances once again.
    2. How can I check whether the variances got settled for the process order?  Please give me the report or transaction code?
    3. Can I settle the variances to COPA Transfer structure now for the orders which were created before COPA Implementation and what will be the impact?
    Regards
    Sri laxmi

    Hi Sri,
    It should be settle the process orders before COPA implementations and find below my answers point by point.
    1.System will not calculate again variance, once you settle the process orders, you can close the orders, so it will improve the system efficiency and system will those orders in future to calculate the variances.
    2.are u try to close the order, if it is settle the order, system will allow to close the order or vice-versa.(T.code-ask PP consultants).
    3.i have mentioned clearly, previous reply,it should not be open orders.
    please let me know any further information is required.
    thanks and regards
    nagaraju sami

  • Production Order : Split of variance in COPA

    Hi,
    I am testing the variance flow to COPA in production order settlement scenario..
    Below is the cost trend of the production order.
    Below is the resulting copa document whic is generated from settlement
    Below are the cost element and value field assignments.(in PA transfer structure configuration)
    I want to know, how the variance split happened in the COPA document. Because in cost trend , the entire variance is during GI stage.
    SO this pertains to the GL account 50000 , as seen in the cost trend. How did the system split the amount in COPA document
    Regards
    SR

    Dear Rajan,
    Please find the following Link:
    Transferring Production Variances:
    Transferring Production Variances - Profitability Analysis (COPA) - SAP Library
    Regards,
    Pavan Kumar Arvapally

  • Auto Production order for SFG

    Dear Experts...
    We release somany order for 1 fg.. I mean we relase 1 order for Finished goods and another  4 to 5 order for Semifinished goods..
    Is there any possiblity to auto release the SFG order while releasing the FG order...
    Pls reply....

    Hi Sri Ram,
    Normally to start the production of FG, we need the stock available for SFG.If there are many production orders to release then you can use CO05 (manually) or you can schedule a back ground job (automatically) using the program PPIO_ENTRY program.
    Regards,
    Rajarao.

Maybe you are looking for

  • How to change the sid in "sqlplusw"

    hi, I have two database in my windows machine. "sid1" and "sid2". whenever i log in using "sqlplusw" it takes me to "sid2" but i want to access "sid1" using sqlplusw as default. as of now i am using "sys@sid1 as sysdba". is there any way like we used

  • Recovering music library after restoring iPod Touch

    My uncle bought a used iPod Touch, which came with a bunch of music on it.  At some point, it froze on him, and he restarted it, and then restored it.  At that point, he lost all that music.  He is hoping to get it back.  I told him that the music is

  • How to get oracle.jbo.domain.date from page to controller

    Hi All, I want to get date from my Advanced table bean to Controller. I am getting date as java.sql.Date i want to convert it to oracle.jbo.domain.Date. Any pointers in this will be helpful. Thanks in advance. With Regards, Anjani.

  • Firefox 31.0 google old search engine :(

    i had to format my computer , after that i downloaded FF , and when searching in google i see the OLD engine , not the new 1 , how thats possible?

  • Run procedure in background

    Hello everybody. Happy chrismast and happy new year to all. One simple question. How I can call a PL/SQL procedure and run it in background mode from other PL/SQL procedure? Thanks in advanced & best regards to all.