Production BOM and Engineering BOM

Dear Gurus ,
                      I want to know difference between Eng BOM and Prod BOM . We have standard multilevel engineering BOM but if I use that BOM for routing assignment I can only see 1 st level components . Can I put all components in single level so that I can assign them in FG routing and pick list will have all the components ?
We are thinking of considering all assy as phantom so that there would be only one prod order for FG .
Neal

Hi,
The engineering BOM is as designed material BOM. It may include all the part upto the level of nuts & Bolts & also the engineering drawings. But in Production BOM you may not include the engg drawings & the C class material like nut & bolt, which may be planned on Reorder point planning.
I hope the answer is clear.
Regards,
Prashant

Similar Messages

  • Difference between Service BOM and Manufacturing BOM

    One fundamental question
    What is the difference between Service BOM and Manufacturing BOM. Also what is the difference between Manufacturing BOM and Engineering BOM.
    Why should a business create these 3 kinds of BOM's for their operations. cant 1 kind of BOM suffice ?

    This is a business definition that your business people should be able to tell you.
    Both are BoMs - it's just a question of which parts are defined under each category.
    Usually, "Service" BOMs are created by service org personnel as and when required, eg at new item introduction or new option introduction.
    "Manufacturing" BoMs are created by Engineering personnel and are the ones used when creating an order for a machine.
    Hope that it helps.
    Cheers,
    TC

  • Sales bom and assembly bom

    i want to make sales bom which consists of all the materials to make a product(machine).this sales bom is available to sales person and he has to select the varients depends upon customer requirement(varient configuration).
    then all materials are to be manufactured and are to be available in stock.
    after this step assembly person has to assemble the components according to the assembly procedure for that he has to refer assembly bom which consists of logical grouping of components for his easiness in assembly.
    so sales bom has to be with materials only(components which are to be produced to make final product) and assembly bom is with logical grouping of these materials according to assembly procedures and total materials are same in sales bom and assembly bom
    is there any method in sap to link sales bom and assembly bom which are different for sales and assembly?this is make to order scenario
    thanking you
    srinivas

    Hi Srina,
    The difference between them is
    In the assembly bill of materials, the finished product appears in the sales order document.
    But in Sales bill of materials, the finished product and the components appear as separate items in the sales order document.
    For example the finished product can be a set of office furniture.
    you can use the assembly bill of materials to define the composition of the set. The finished product is not stored as an entire set in the warehouse. However, the individual components of the set (for example, chairs, tables, and Almirah) are items in stock. If a customer buys a set of Office furniture, draw the components from stock and deliver them to the customer as a set.
    Hope this help,
    Regards,
    MT

  • Function Module for creating Functional Location BOM and Equipment BOM

    Hi All,
    Is there any function module for creating and changing Functional Location BOM and Equipment BOM ???

    Hi,
    Tables for Eq., BOM: EQST, STKO, STPO.
    Tables fro Fun., Loc., BOM: TPST, STKO, STPO.
    You can use FMs: CS_BOM_EXPL_TPL_V1, CS_BOM_EXPL_EQU_V2 & CS_BOM_EXPL_MAT_V2 for extracting the appropriate BOM related data.
    And for the Alternatives please check the customizing or check with your respective Module experts for the appropriate configuration.
    Hope this helps.
    Best Regards, Murugesh AS

  • E BOM AND P BOM SAME BUT WHY 2____CRITICAL HELP

    Hello Team,
    From long back when i browsed through the SDN i was able to summarize the below,
    1) E bom and P bom are always seperate.
    2) Any changes in E bom will not automatically flow to P bom is required we need to do development using Z code.
    3) IF customer requires to maintain E bom and P bom both identical then there is no need to maintain 2 boms one is enough
    When i put all these infront of my client, he stated below
    In his earlier work at automotive industry, he has seen maintenance of both E and P BOMs both are identical but there is a XYZ reason and asking me to find it out. He says he knows that XYZ reason but he wants me to find it out.
    As i am new to SAP implementation i was totally confused, can any one help me on the same.
    Critical please help.
    regards,
    satish

    Thanks Vivek,
    You suggestions are 100% correct.  Thanks for guiding me to correct channel.
    I usually first try with all my the knowledge which i have got in earlier experience, then read the docs in sap portal if any doubts.Do trials in ides, sandbox, ask seniors, go through threads, even after all these when i feel i am not sure then i post thread as i feel to deliver the correct thing to customer.
    From next time i will be still more cautious, do more home work on the same.
    Apologies to the forum if i have followed some wrong path and have disturbed a lot.
    Truth is this forum has helped me a lot in resolving many key issues.
    Thanks a lot for all the help.
    Regards,
    Satish

  • EHP5_Engg BOM and Prod bom sync

    Hello Team,
    We have upgraded our ECC 6.0 with EHP5. 
    As per the information and work i had done SAP provides the
    "Guided Structure Synchronization for transition from engineering to manufacturing (or other type) BOMs".
    whats does this mean and how it works. I am not sure whether this is the option which allows bom changes to automatic flow or flow with few clicks from engg bom to prod bom.
    Any info please share the same, because i am looking for this option desperately.
    regards,
    satish

    Hello Alok,
    Thanks a lot, it was a very great answer. I have one small doubt in this.
    1) When we change anything in Engg BOM and Production BOM using ECM process (either in same ECM or 2 different ECMS) with date or serial number effectivity. the changes will automatically reflect on that particular date or serial number?
    OR
    2) When we do any change only  in Engg BOM using ECM process with date or serial number effectivity,  the changes will automatically (or by any setting) flow to production BOM on that particular date or serial number.?
    Which of the above 2 you mean?
    regards,
    satish

  • Group BOM and Plant BOM

    Hi All,
    We have a business scenario where there is Group BOM without plant and a Plant BOM with same usage (2).
    We hava requirement below
    If we make any changes in Group BOM with a change number, Plant BOM is also updated. But if we make any changes to Plant BOM with change number, Group BOM should not be updated.
    Any ideas how we can map this requirement?
    Both BOM have same usage - engineering -> 2
    Regards,
    Aby Thomas

    Any changes in Group BOM with a change number, Plant BOM is also updated when they are referenced to each other (CS07).
    In this case both share the same BOM number and changes are always reflected both ways.
    In my opinion a solution would be :- 
    1) Dereference the BOM's (CS09) , this will remove the plant bom from system.
    2) Create the plant BOM (as a copy of group bom)
    3) And then build enhancements in CS02 to copy online the changes in group BOM to plant BOM.

  • Multiple BOM and Variant BOM

    Hi Gurus
    Just a small question...
    Can we change the technical type of the BOM from V(Variant) to M(Multiple).
    As that field is always grayed out in editing mode (CS02).
    If we can change, how ??
    Thanks Vineet

    Dear Vineet,
    If a product has more than more than one alternative BOM(more than one BOM for the same BOM
    usage) for that products under the BOM header you will be able to see the technical type as M -
    Multiple BOM.
    You cannot change this.
    variant BOM
    Production Planning and Control (PP)
    A combination of a number of bills of material that lets you describe a product, or several products that have a lot of identical parts.
    The variant BOM describes each object completely, for example, the product "lamp." Each variant BOM contains all the components. This type of BOM is not configurable.
    Procedure
    The system allocates technical types:
    according to the number of alternative BOMs
    When you create the first alternative for a BOM, the technical type is not yet defined. If you extend the BOM by creating an alternative, the system automatically assigns the technical type multiple BOM.
    according to the transaction
    If you create a BOM using the Create variant of... function, the system assigns the technical type variant BOM. After this, you can no longer create alternatives for the BOM.
    Regards
    Mangalraj.S

  • Mass Download documents related to BOM and/or BOM items

    Hi All,
    Is anyone aware of a mass download functionality of all the documents realted to a BOM - i.e all documents items of a BOM and documents attached to BOM items(part numbers).
    Thanks
    Raj

    Hi Mangesh,
    Yes, that is exactly it. The requirement is for mass downloading all the original drawings linked to all the components of a BOM to a local drive or to an ftp site.
    One possible way , i thought of, could be to use a program DMS_RELOCATE_CONTENT which as I understand relocates all the originals realated to a list of DIRs to another location. Of course, this means that we need compile a list of components related to a BOM using CS12 or similar program and get a list of parts that has drawing attached to it. Subsequently, use this list to compile DMS_RELOCATE_CONTENT. Not sure, if this is a correct way or if there is any other simple way of achieving this.
    Thanks
    Raj

  • Bapi For Bom and material Bom in cs71

    Hi,
        In CS71 we have 2 pushbuttons on the top ie create/copy BOM and create/copy Material BOM.   for these 2 funtions i need Bapi or FM for the functionality of those 2 pushbuttons.
    Duplicate thread Continue with this one - Re: How to search for BAPI or FM for some requirement
    Edited by: kishan P on Aug 20, 2010 11:54 AM

    I tried to find BAPI for transaction CS71, but it seems that its no available.
    Try using BDC method for the same.
    Regards,
    Lalit Mohan Gupta.

  • Functional location BOM and Equipment BOM

    Hi,
    I would like to know which tables store information of Functional location BOM  (TCODE 1B11) and Equipment BOM (TCODE IB01). Is there a possibility that once we create these BOM's we can create alternative BOM as in case of Material BOM (TCODE CS01).
    Regards,
    Vishal

    Hi,
    Tables for Eq., BOM: EQST, STKO, STPO.
    Tables fro Fun., Loc., BOM: TPST, STKO, STPO.
    You can use FMs: CS_BOM_EXPL_TPL_V1, CS_BOM_EXPL_EQU_V2 & CS_BOM_EXPL_MAT_V2 for extracting the appropriate BOM related data.
    And for the Alternatives please check the customizing or check with your respective Module experts for the appropriate configuration.
    Hope this helps.
    Best Regards, Murugesh AS

  • Fixed BOM and Flexible BOM

    Hello,
    Is there such thing as fixed and flexible BOM? If there is, what is the difference between the two and how could I set them up.
    Thanks!

    Hi,
    There is no such concept in SAP.  Its based on the business process and requirement we create BOM's and change it during transactions.  Normally BOMs are created with some components.  If you require to change this fixed ones, i.e., which is coming from the BOM master, then this can be done by configuring your item categories in VOV4. 
    Hope this helps.
    If you have further clarifications, pl. revert.
    Thanks
    Krishna.

  • Costing - Multiple Production Versions and Recursive BoMs

    Hi All,
    We have a production and product costing scenario as follows:
    Production versions 10, 20 and 30. It takes all three versions to manufacture the finished material and there are no intermediate products in this scenario. 10 and 30 are to be costed and 30 is a recursive BoM with the input from version 10 also being the output. 10 is the main production step with components but 30 is a recursive BoM sometimes only with the output material as the input and sometimes with a more complete BoM but which includes the output material as an input component.
    The quantity input appears to be the same as quantity output for the recursive element.
    If anyone has come across this scenario and you can let me know what design principles you followed I would appreciate it.
    We are getting iteration error messages when costing production version 30 and even reducing the input quantity below 95% of the input as per the SAP documentation does not fix the error message.
    Any help you can give will be greatefully received.
    Thanks.
    Regards,
    Tim

    Murali - Its possible to use multiple PV in sub contracting.
    Settings in ERP :
    1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
    2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
    3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
    Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
    Rgds
    Valavan

  • SO BOM and Material BOM

    Hi all,
    I am facing a problem in following scenario.
    Sales Order has many line items (100-500). For procurement, Material/WBS BOM is huge.Now the case is that after the procurement, delivery happens from project and invoicing is itemwise. By Itemwise I mean that for a SO line item there will be an advance payment and the following partial invoices based on delivery.I can map this case with the help of milestones in project. But the no. of line items is huge and hence will be milestones (advance payment and progress payments)
    One more problems here is that when the SO is made it gives high level item. But there are cases when the SO line items itself is broken down into various subcomponents for invoicing purposes.
    Can someplease throw some light on this issue.
    Thanks

    Hi Anjali,
    Can you please provide the following details:
    1. In terms of material requirement, the requirement is generated from the project or from the sales order?
    2. What do the Sales order line items signify?
    Regards,
    Jibat

  • BOM and template BOM

    Is there a setting for template BOM's which allows the BOM item to be displayed in a sales document, be defaults the item sell price to 0, regardless of the price list it is linked too?

    Hi,
    Choose BOM type is Sale when create your BOM.
    There is an option in Administration >>> System Initialization >>> Document settings >>> General Tab:
    For a Sales BOM in Documents, Display:
    Price and Total for Parent Item Only: display parent item price as your requirement
    Price for Component Items: display component item price
    Hope this helps,
    Son.

Maybe you are looking for

  • Performance issue with big CSV files as data source

    Hi, We are creating crystal reports for a large banking corporation with CSV files as data source. For some reports, we need join 2 csv files. The problem we met now is that when the 2 csv files are very large (both >200M), the performance is very ba

  • Changing the heading in the variable entry screen

    Hi, I have the varible entry in my web template where in the user enter the starting year and ending year .The heading of the Variable entry screen is defaulty Variable entry I wanto change the heading from Variable entry to Years In 3.5 WAD what eve

  • Logic Pro 9 cannot set up external midi (Roland Juno G)

    I am using Logic Pro 9 and can't seem to set up the external midi. I have a Roland Juno G which is working as a midi controller perfectly but I cannot send sound within the keyboard to Logic. I have set up everything on the keyboard side but I'm havi

  • Can i add play/pause button when playback swf file??

    Hi all i have a script to convert ms office docs to pdf then to swf files and display it in my web site, the problem is that the output files (swf file) contain each page of my documents in a separated frame and when i load the page there no possibil

  • Large Volumes - Shitty Windows

    This has nothing to do with Windows and all to do with the BIOS. If the BIOS is EFI then you can boot from GPT. How to install Windows Server 2012 with GPT partition on a clean hard drive?