Hi, experts.
When i do scheduling the planned order,
production finish date differs from basic finish date in backward scheduling as below.
Scheduling: Backward
Basic finish date : 2010.01.22
Basic start date : 2010.01.21
Production finish date : 2010.01.23  09:00:00
Production start date ; 2010.01.22 03:57:09
*GR time : 0.
*Scheduling Margin key : 0.
I don't know why production finish date set in 2010.01.23 09:00. ( Basic finish date +1 day)
Please reply me.
Thanks.

Dear Jong,
1) what is the parameter used in MRP run, Basic scheduling or lead time scheduling
2) you must find a exception Mssg for that plan order in MD04
3) basic scheduling take the time from material master & lead time scheduling will take time
from Routing
Regards
Madhu

Similar Messages

  • Medical Collection date different from actual EOB date Central State Recovery

    Hi,  New posting to this particular forum as I usually stay on the Mortgage site, but this issue might be more suited and possibly get an answer here. So I have been disputing the charge for the last two years, but since I am trying to buy a house, I called and asked if they would do a PFD and from others' posts I knew that this particular company would not do so.  It was just $25.20 so I paid it.  The issue is that the date they say the EOB shows is Sept 2011 but the date the CA reports on my report is 02/21/2012.  Is that something that can be changed or am I stuck with that date until June 2018?  They do not report to TU just EX and EQ.  Any advise would be appreciated.   Equifax FICO 850/ Score 5 710TU 826/ Score 4 797Experian 840/ Score 2 699

    lilbitinok wrote:
    Hi,  New posting to this particular forum as I usually stay on the Mortgage site, but this issue might be more suited and possibly get an answer here. So I have been disputing the charge for the last two years, but since I am trying to buy a house, I called and asked if they would do a PFD and from others' posts I knew that this particular company would not do so.  It was just $25.20 so I paid it.  The issue is that the date they say the EOB shows is Sept 2011 but the date the CA reports on my report is 02/21/2012.  Is that something that can be changed or am I stuck with that date until June 2018?  They do not report to TU just EX and EQ.  Any advise would be appreciated.   Equifax FICO 850/ Score 5 710TU 826/ Score 4 797Experian 840/ Score 2 699If the EOB is the billing date from the OC the date in 2012 is the date the CA got the collection, they still have to operate from the accounts DoFD as far as the max time it can remain on file. I would start a GW letter campaign to the CA asking for its removal.

  • Invoice date different from GL date

    I have several invoices where the GL Date is different from the Invoice Date. For example, the Invoice Date is 10-JUN-2002 and the GL Date is 01-JUL-2002. In all the invoices from another month, the Invoice Date is equal to GL Date. Anyone knows how can I fix this problem? Thanks

    I think this problem is not a problem.
    The date must be changed by the preparer

  • How to change a date value from "java.util.Date" to "java.sql.Date"?

    Hi all,
    How to change a date value from "java.util.Date" to "java.sql.Date"?
    I m still confusing what's the difference between them.....
    thanks
    Regards,
    Kin

    Thanks
    but my sql statement can only accept the format (yyyy-MM-dd)
    such as "select * from xx where somedate = '2004-12-31'
    but when i show it to screen, i want to show it as dd-MM-yyyy
    I m using the following to change the jave.util.Date to str and vice versa. But it cannot shows the dd-MM-yyyy. I tried to change the format from yyyy-MM-dd to dd-MM-yyyy, it shows the wrong date in my application.
         public String date2str(java.util.Date thisdate)     {
              if (thisdate != null)     {
                   java.sql.Date thissDate = new java.sql.Date(thisdate.getTime());
                   return date2str(thissDate);
              }     else     {
                   return "";
         public String date2str(java.sql.Date thisdate)     {
              if (thisdate != null)     {
                   SimpleDateFormat sdf = new SimpleDateFormat("yyyy-MM-dd");
                   return sdf.format(thisdate);
              }     else     {
                   return "";
         public java.util.Date str2date(String thisdate)     {
              String dateFormat = "yyyy-MM-dd"; // = 1998-12-31
              java.util.Date returndate = null;
              if (thisdate != null)     {
                   SimpleDateFormat dateFormatter = new SimpleDateFormat(dateFormat);
                   try {
                        returndate = dateFormatter.parse(thisdate);
                   } catch (ParseException pe) {
                        System.out.println (pe.getMessage());
              return returndate;
         }

  • Material Availability Date and Corresponding Basic finish date

    Hi experts,
    I have one requirement from my Business for updating Basic Finish date based on the Material availability date
    Requirement goes like this, When we enter a Component of 100 qty  in the service order , if stock is not available we get system status as MSPT and IWBK we can see how much quantity confirmed
    But i dont see any table or report which shows when this material can be available for further delivery. Based on the next available material date i have to change the basic finish date in the service Order
    Please let me know if you any report available for this or any standard approach. I want to know if any exist to leverage this functionality and logic how to get this accomplished
    thanks
    sarvan

    Sarvan,
    You would need to perform this check when saving the work order as there could be multiple components all with differing ATP dates.
    But a development could do something like:
    Read all active/open components/materials on the work order
    Determine the availability data for each component/material
    Determine the latest of the above dates
    Apply this date to the order Basic Finish Date
    You would need to ensure your scheduling parameters do not set this date back to its original value (OPU7).
    You could achiev the above through user-exit IWO10009 (SMOD) or BADI WORKORDER_UPDATE (SE18).
    PeteA

  • Basic finish date earlier than basic start date while backward scheduling

    I am encountering an issue where in when I am selecting backward scheduling for a process order and I am entering the Basic finish date, afte which system is giving me a Basic startdate which is after the basic finish date.
    For eg:- When i give the basic finish date as 08.12.2011, system is giving me basic start date as 09.12.2011
    I have checked the recipe of the material. In the recipe one major flaw that i found out was that all the activity timings were maintained as 0. But when i created a similar scenario in the testing client, i am not getting the issue.
    Please help.

    Hi,
    Check what is maintawined in number of days the start day is allowed to be in the past in scheduling parameters of the order type, in OPU3. If there is an opening float defined in schedule margin key of the order, and concerning this float backward scheduling finds a start date which falls into past, lead time scheduling will automatically switch to forward scheduling starting from today. 9.12.2011 could have been deducted this way. Also check the factory calendar if days upto 9.12.2011 are defined as working days.
    Regards.

  • GL date different from Payment Date

    Dear All,
    I got problem related to Oracle Payables. I wonder how this happen. The problem appears as below:
    In practices, GL Date will default to be same as Payment Date. Suddently the GL date had changed to 1st dec (which is suppose to be 4th Nov). I had checked one payments at TEST instant, GL Date & Payment Date are same (eg: Payment date=04-NOV-2008, GL Date=04-NOV-2008). However, when check the same payment at PROD instant, GL Date previously generated on 4-NOV-2008 had changed to 1st Dec 2008.
    Is it possible to change back the date to the original date which is the Payment Date?
    Please advices
    Thank you.

    Dear All,
    Just to share explanation received from Metalink FYI;
    A : As per standard functionality, once the transactions are sweeped to next period the date will also change to 1st day of next open period. So if the invoices for which the GL date has changed in production are the one which were found in unaccounted transaction report during period closure process, then this is intended functionality.
    Q : Is it possible if we disable the function, so that the GL Date will not change to next open period when sweep activity is done.
    A : The reason for including this functionality is to facilitate the period end closure process even when all the transactions are not complete in AP. The system warns you to either correct and complete the transactions in current or Sweep them to next period. If you disable this feature you cannot close the period as unless you complete all the transaction in Payables. This is not advisible. Rest would be the business decision.
    Thank you.
    Regards
    Edited by: mish on Dec 24, 2008 5:29 PM

  • Display only data different from the previous row

    Hello,
    I will use a simple example to explain what I would like to do with a query.
    I have a table 'test' with 4 columns (col1, col2, col3, col4).
    The table 'test' contains the following data:
    A  B  C  D
    A  E  C  D
    A  F  G  D
    K  F  G  HI would like to create a query ordered on the first column with the following result:
    A  B  C  D
       E
       F  G
    K        HOnly data that are different from the previous row have to be displayed.
    Do you have ideas on how to do this.
    Thanks for your help

    SQL> l
      1  select
      2  decode(a,lag(a) over (order by a),null,a) a,
      3  decode(b,lag(b) over (order by a),null,b) b,
      4  decode(c,lag(c) over (order by a),null,c) c,
      5  decode(d,lag(d) over (order by a),null,d) d
      6  from
      7  (
      8  select 'A' a,'B' b,'C' c , 'D' d from dual
      9  union
    10  select 'A' a,'E' b,'C' c , 'D' d from dual
    11  union
    12  select 'A' a,'F' b,'G' c , 'D' d from dual
    13  union
    14  select 'K' a,'F' b,'G' c , 'H' d from dual
    15* )
    SQL> /
    A B C D
    A B C D
      E
      F G
    K     H

  • Order GI date different from Delivery Planned GI date

    Hi Gurus, I noticed on one order-delivery that the order's GI date (in the schedule line) is different from the delivery's planned GI date. What could be the cause of that?

    hello dear
    System is nowhere stopping to change the planned GI date in billing. If orders schedule date is say 15.10.2007, i can change the planned GI date to 16.10.2007 and so the billing date also.
    regards
    Inder

  • App launch date different from apperance date - help !

    Hello
    I have just searched and trawled through the forum and am unable to find a post regarding the launch date of an app being different from its actual appearance on the store.
    My app launched yesterday 20th August but the date showing is the 14th August(date of submission) - hence it has not appeared in the new apps list - this is a little frustrating as it immediately receives no "free" publicity for a few hours whilst it is on the list of new applications.
    Has anyone else experienced this yet? - as I seem to remember seing a post regarding tjis issue but cannot find it anymore. I have emailed the dev email and will await a reply but thought the collective knowledge of this forum may be able to help!
    Regards
    Steve

    Steve, any update on your date situation? Did you hear from Apple? What was the final outcome?
    I'm having a similar problem outlined in this thread http://discussions.apple.com/thread.jspa?messageID=8140542#8140542

  • Why is the INVOICE date different than the ORDER date?

    Something odd is happening... I'm receiving workflow notifications from Business Catalyst for Invoices, but sometimes the date of the order is the day before I receive the invoice. This is causing havoc on the shipping side because when I print out the invoice packing slips and export the order files, they don't match up and sometimes customers get missed.
    Any idea why the invoice date would be different than the order date and how do I fix it to make them the same?
    Thanks in advance!

    Hey there,
    An invoice is not an order. That is an important thing to know.
    An order is generated through a few means but mainly as soon as one product is added to a cart - that order exists and the date marked. An invoice is a purchase and comes from an order.
    Create an order in the admin yourself and save it but add no invoice number. You can see you just made an order and you will see the button to generate invoice.
    API can make an order and no invoice, a person can add items to cart and finish it the next day if they have their session open that long... Lots of reasons why these dates may differ.

  • Difference in Maintenance Plan date to Order basic start date

    If i creat a strategy plan and schedule, i am getting difference in PLan date in Maint plan to Basic start date. What is making this difference. How to overcome this. I need Order start date same as PLan date.
    Plz help me frnds.
    Guruprasad

    hi
    can you explain in details with your maintenance plan with the dates.Normally your call date and plan date will be different becase of call horizon ,but the order basic start date and plan date will be equal only
    kindly revert back
    regards
    thyagarajan
    your order basic date will be when you have maintenance call is generated.kindly check
    Edited by: thyagarajan krishnamurthy on Feb 25, 2009 9:46 AM

  • How can I use "date modified" from metadata to date iphoto events?

    I am very frustrated trying to move photos from windows to iMac.  I have a number of photos, all of them have some metadata with date created and date modified.  This worked well in Picasa in Windows and kept everything in order.  Now it seems iphoto will not read date modified or assigns date created (if there is no date in the metadata) as the date everything was switched over.  I looked over some of the wrongly organized photos (there are thousands) and realized that under the old sustem, Picasa in windows must have used either date created or date modified, which ever came earlier or perhaps whichever was available.  In iphoto, it doesn't read "date modified" or does this crazy thing where even if the modification date is before the creation date, puts all photos in the order or when they were brought over from windows.  I have a lot of photos dated September 18 -- thousands.
    Is there any way to get either iphoto or some other program (I'm not terribly impressed by iphoto) that will properly organize the photos in an imac environment. In other words, I want a program to look at (1) creation date or (2) modification date (which-ever is earlier).
    Even Picasa is now confused (in the mac envirnoment). 
    Thanks,
    Mark

    No, as this is file metadata not photo metadata.
    You can adjust the date and time using the Photos -> Adjust Date and Time or even the Photos -> Batch Change command.
    Regards
    TD

  • Unable to display the Content of a data file from within another data file in Oracle webcenter portal.

    We have a Content Presenter taskflow. This task flow is added to a jspx page. The taskflow fetches the content from the contributor data file. The contributor data file is having a WYSIWYG editor. The content of the WYSIWYG editor is being displayed correctly through the task flow.
    We have some links in the WYSIWYG editor. These links again point to some data files. When we click on these links from within the portal, then we are getting a blank page(the url of this blank page is: http://localhost:7101/eWSIBPortal/faces/oracle/webcenter/sitestructure/render.jspx?datasource=UCM%23dDocName%3AWSIB_ARTICLE) and not displaying the content of the data file that we are pointing to from the WYSIWYG editor.
    We want to display the content of these data files(which we have pointed from WYSIWYG editor) in-line within the portal.
    Please help us to resolve this issue and let us know if any information is required from our end.

    Thanks for reply. However, can I use XSQL to dump the formated text to a file? or just can display to client through web browsers?

  • Displaying different currency(different from sales area data) in Web shop

    Hi
    I have a B2B scenario where only one sales area is maintained for the sold to party. And the currency is maintained for the sold to party is USD.
    the requirement is to show a different display currency(EUR) for contact persons of the sold to party ordering through webshop.
    I have tried changing the Product catalog variant currency, also added the currency 2 field in the product catalog variant.
    But the currency is still being picked from the Sold to party sales area master data. I am not able to figure out any usage of currency 2.
    Is there any other workaround available to display a different currency? (I am ruling out the option of Creation of new sale area as thats not possible in this scenario)
    regards
    Subhasis

    Subhasis,
    I think you have to maintain the different currencies in customer master data.
    If it is not possible  you can do the following method.
    Create a custom field to show different currencies after selecting the currencies convert that into the currency which is maintained in the customer master data.
    Thanks and Regards
    shanto aloor

Maybe you are looking for

  • CS3 Removing effect from one object changes all other images on page-!???

    I'm reusing an 80 page document that I created last year as the template for an updated version of the same document. There are images on almost every page. In the previous version of the document most images had a drop shadow applied, but this year

  • Can't find fieldpoint vi's

    All: Stange question:  I've installed a cfp-2100, reading 9- 4 to 20 mA signals.  I can configure this unit using MAX, and have crated an .iak file. However, I can't find any tools in Labview to acutally go in ad build with. I can't find any of the i

  • Jdbc:BatchUpdate!help:)

    I 'm writing a program where I have to read many lines of record from a table and write it to another. I use PreparedStatement.addBatch()/executeBatch(). But the efficiency is so low that writing 7562 lines of records have taken 45 minutes.How to imp

  • Trouble importing stored photos from 60g ipod to iphoto.

    I downloaded 500 photos while on vacation to 60 g ipod. I go to iphoto and select import which opens a window but don't know where to locate the stored photos. imac G5 and 60g ipod   Mac OS X (10.4.7)  

  • AIR for iOS, Library Project

    Is there (or will there be) any way to compile an actionscript mobile project, using AIR for iOS, as a library project so that other objective c applications could integrate the AIR library project within them ?