Production  finish date

When i do MRP run  (MD50 ), I get planned order. In MD04, Iam getting receipt date for planned order as per basic finish date. I want to get production end date as a receipt date in MD04. How to get it?

Hi,
For this you need to make the GR processing time as "0" and the schedule margin key, float after production order needs to make as '0'. Then the system will not consider any floats after the production, and system will not consider any GR processing time. Then you will get the production end date as goods receipt date.
Regards,
V. Suresh

Similar Messages

  • Production finish date differs from basic finish date in backward schedulin

    Hi, experts.
    When i do scheduling the planned order,
    production finish date differs from basic finish date in backward scheduling as below.
    Scheduling: Backward
    Basic finish date : 2010.01.22
    Basic start date : 2010.01.21
    Production finish date : 2010.01.23  09:00:00
    Production start date ; 2010.01.22 03:57:09
    *GR time : 0.
    *Scheduling Margin key : 0.
    I don't know why production finish date set in 2010.01.23 09:00. ( Basic finish date +1 day)
    Please reply me.
    Thanks.

    Dear Jong,
    1) what is the parameter used in MRP run, Basic scheduling or lead time scheduling
    2) you must find a exception Mssg for that plan order in MD04
    3) basic scheduling take the time from material master & lead time scheduling will take time
    from Routing
    Regards
    Madhu

  • Production finish date is later than order finish date?

    In my company, most of the plan orders in MD04 have an exception message "64 Production finish date is later than order finish date". The plan strategy of the materials are 40. The plan orders are created from Scheduling Agreements or Independent Requirements.  We set 'Scheduling' as 2(lead time) in the MD01/MD02. The self-production time in material master data is 0. The schedule margin code is 000 which all the parameters are 0.
    For a example, we create a requirement on 2007.04.24. After MRP run, plan order generate. It's basic date will be 2007.04.24, but the production date IS 2007.04.25. All the plan order like that, the production date are always later than the basic date for one day.
    Could someone tell me why? and how to settle this problem?
    Thank you in advance!

    Hi,
    check scheduling parameters for planned orders and scheduling parameters
    for production orders.In that set the various indicators like
    adjust basic dates to order start date
    do not adjust basic dates to order start dates and try.
    Tcode opu3 / opu5
    Thanks,
    s.nandhakumar

  • RE:  MTO Production Finish Date

    Hi,
    We have an MTO Scenario. Example below.
    Sales Order for Material A:  Delievery Date 01/01/2010
    Production Order for Material A linked to above SO: Finish Date 01/03/2010.
    Now using the above data when I do an availability check on the Sales order, it gives me the available date as the current date or if I have a total replenishment lead time it takes that in to account.
    Quaestion is why doesn't it look at the finish date on the production order as the avaiable date? Sales orders and the production order is linked so the available date should be the finish date?
    Any missing configuration?
    Thanks
    Adeel

    Adeel,
    The way you are changing configuration settings, I hope you are working in a development system and not in a production system.
    Just changed the scope of check to include 'No storage loc insp" checked" and "Check without RLT" checked. This seems to work now. Can you explain why does it work now just for information really?
    With the small amount of information I have to go on, I believe that your sales doc was relevant for a different storage location than your production order.  Once you selected "No storage loc insp", the system began to ignore storage location for ATP purposes, and performed its calculations at the plant level.
    Is this correct? Or should we be getting the material available date on creation of sales order?
    Now you are talking about yet another scenario: a new sales order, w/no existing production orders.
    The answer to this question is a business decision.  How does your company want to respond to your customers?
    Some companies do not wish to confirm their sales orders until they have an exact date that has been validated by the manufacturing group.  For these companies, the settings you have just made would be best.  A typical process flow would mean you would probably not confirm based on a planned order, but only on a production order.  So, MRP runs.  MRP creates a planned order.  You send the info to Manufacturing.  Manufacturing group tells you when they can produce the product.  You convert the planned to a Production, using the dates given to you by Manufacturing.  Then, run ATP on the order to confirm.  There are lots of variations on this theme.
    Other companies wish to confirm the sales orders immediately, based on a 'lead time'.  This would be the situation where manufacturing comes to you periodically and says "regardless of the order, we can have that material ready to ship in 6 weeks".  Here, you would enter 6 weeks in either Total Replenishment Lead time in the material master, or just leave that field blank and enter 6 weeks in In House Production Time.  Then, change the scope of check by un-checking "Check without RLT".  Here, the order will confirm based on existing supply inside of lead time, and if there is inadequate supply, then the sales order will automatically confirm at lead time.  MRP runs, 'someone' converts the planned to Production, and then releases when appropriate to the manufacturing group.
    In ATP, there are many 'right' answers (and many 'wrong' ones as well).  The 'best' atp solution depends on the business requirements.
    Rgds,
    DB49

  • ATP check based on production finish date

    Hi all,
    customer order goods for the 02.06.09.
    Transportation take 10 days so,  by itinerary , I'll have the material avaiability date for the 15.05.2009.
    All' it's OK.
    Mrp planner , based on customer calendar, insert demand for customer date 02.06.09
    We have insert 10 days on material master as Goods receipt processing time, this for anticipate the end of production 10 days before .
    Now we need that atp check production order date not including the Good receipt processing time
    Is it possible ?
    Regards
    Sil
    When I do atp check by sales order , ato check see the 02.06.09 as avaiability date and not the desidered 15.05.09
    Any idea about haw to realised atp check on

    Hi,
    This requirement can not be fulfilled by Standard SAP. But you can address this issue via Z development.
    You need to maintain Z table with Customer and lead time. Write a BDC and run this BDC once sales order is created. So that system will change requirement date as per the Z table.
    I hope this will resolve your issue.
    Regards,
    Shailendra

  • Why the basic finish date is not adjusted in planned orders

    Hi, all.
    Can anybody help me to understand:
    "Why the basic finish date is not adjusted in planned orders during
    forward scheduling, but in production order basic finish date is adjusted?
    It is look like non-coordination between groups of developers.
    And lead to situation, when planner don't see in MD04 when he can really wait material receipt. He must go to planed order and check production data there, it's unusable."
    Am I right, or SAP have it's own logic.

    Hi,
    Production orders are different story. Since production order is a constant element, they are not created in the course of MRP, basic dates can be adjusted. In production order basic finish date is adjusted, but you won't see for the upper level materials', basic dates of the planned orders adjusted according to the prodcution order you create. Production order is consistent within itself in terms of date and is not dependent to other elements of MRP, but planned orders are not like that.
    MRP creates planned orders whose basic finish dates are calculated by subtracting goods receipt time from production start date of the source of requirement. MRP works backwards without changing directions. Meanwhile if any production finish date is calculated different than the basic finish date due to forward scheduling, in order not to violate the alignment between the basic finish date and source of requirement's start date, basic finish date is not adjusted. If it was, dates of all the planned orders calculated so far at the upper levels of the BOMs had to be recalculated, otherwise all the consistency of all the dates is violated. This cannot be done because changes in any level affects all lower levels.

  • How to get the finished date of production order

    hi guys
    now i want to get the finished date of production date.  when i search in the table afko , i found the field GLTRI is '0000.00.00'.
    BUT IN the production order display view , the confirm date is '2007.1.1'. so how can i get the confirm date with the production order number? thanks.

    For costing report, you have to read the following tables: based on material Qty/value/ Machine rate and machine posting date , machine rate ( T-code kp26)  and also types of material Raw, finished and semi finished ..
    AFRU ,AFPO,AFKO,AFVV,AFVC,CAUFV FOR PRODUCTION ORDER.
    For material calculation MARA, MSEG and MKPF as well as MAKT...
    Hope this’ll help you .
    Thanks

  • Production Order confirmed finish date

    Good morning,
    I have a question concerning the confirmed finish date (GLTRI) on the general tab of the production order header. We have an order that a partial confirmation was done on the last operation with no yield. This was the first confirmation of the order. The general tab shows a confirmed start date and a confirmed finish date. First question is why the confirmed finish date if nothing was completed. The confirmation was then canceled and the start confirmed date was removed but the confirmed finish date remained. More testing revealed if a final confirmation was performed on the last operation where it is set to do an automatic goods movement the start and finish confirm date was filled in. When the confirmation was canceled the start and finish confirmed dates were removed. Has anyone come across this before?

    dear John,
    I played in our TST system and found the same behaviour (which I consider is a standard).
    I can't see this "confirmed dates" settings in config.
    It seems like as soon the first entry comes in AFRU system sets the 'Start Confirmed' date even if LMNGA is zero
    After cancellation system cleans this field date because the order status comes back to REL (the was only the one zero partial confirmation which was cancelled later). but keeps 'Finished Confirmd' field populated. Of course, the second record in AFRU (the cancellation) is created.
    To avoid a misunderstanding I suggest advise your users to run CO14 (display prod.order confirmation) or just use COOIS.
    good luck!

  • How Production Order finish date and time is being comptued by SAP?

    Hello Expert,
    How Production Order finish date and time is being comptued by SAP? for example, we create a Production Order via CO01, the basic start date is 29.09.2008 and time is 04:00 it gives us basic finish date is 29.09.2008 and time is 13:28.
    how does SAP compute the time 13:28 as it finished time
    Please explain me briefly.
    Thanks
    Ryan

    Hello Guys,
    When we create Production Order in R/3 the time is calculated by routing but it is extended at SetUp machine time. It is not correct?. SetUp imachines time used only for first Production Order for the same product and it is plan manually, for others Production Order we need calculate time for production without SetUp machine time being pick up to compute finish time. how could we achieve this? only those Machine time will be check.
    thanks

  • Production Order Basic Finish Dates

    Our plant managers expect production order start and finish dates to freeze at release, even when operation confirmations are not made according to schedule or when the component availability situation changes.  Is there a way to freeze the production dates without affecting the sales order schedule line dates--we're in a static assembly world.
    Thanks,
    Amy

    Dear Friend,
    As i said, in Production order, under Production order - Setting - Scheduling maintain the number of days in past (says 100 days).
    Now in below select the scheduling type as backward scheduling and in Finish date give the date which is in past and now enter (or schedule the order). Because of this system will propose the start date which will also be in past.
    Regards,
    JItendra

  • Production Order: warning when Basic finish date is before scheduled finish

    Hello experts,
    We will set in config OPU3 (scheduling parameters for prod order) Adjust dates = 2 Do not adjust basic dates, ... Essentially this will allow the shop floor controller to change scheduled date ie. production dates without affecting basic dates.
    With this setup the system may display in the header of an order the scheduling note "Basic finish date is before scheduled finish" as well as generate a scheduling log "Scheduled finish is after basic finish date" (message 36 mess class C7).
    These messages are not enough visible for our planners. I would like to find a way to generate a warning before save. I tried to add a record in OPJB: message class CO no. 533 "Scheduled date & is after the requirements date &" but this doesn't work.
    Note: I tried to add message class C7 no 36 in OPJB but got the error "Please enter a legal value".
    Have you been able to add message in table OPJB ? Is it a good idea or the only option is enhancement?
    Thanks for sharing your ideas.
    Francois P.
    Edited by: Francois Paquet on Sep 30, 2010 5:30 PM

    Hi Francois
    I'm trying to do the same (also for C7 035).
    Have you already found out how to do this?
    Arno

  • Production Orders - Scheduled Finished Date Basic Finish Date

    In production orders, it is being noticed scheduled finished date lies further than basic finish date, what could be the
    reason? what configuration should we need to do in order to make scheduled finish date matches (or) lies before basic finish date

    Eshwer,
    Basic dates of production orders can be made to match scheduled date.
    Config is at OPU3.  Under the "adjust scheduling" section, select either 1 or 'blank'.
    Best Regards,
    DB49

  • Production order finish date

    While creating a production order  I  am using forward scheduling order start date is today and finish date proposed by the system is 07.02.2011 but the problem is in house production time is 10 days. then why the system has proposed finish date as 07.02.2011 instead of 14th or 15th or 16th

    Dear Kumar,
    Always system picks the timings from routing when you create production order manually
    System will not check the filed in house production time from material master while creation of production order
    So check in routing, for the timings that you have given
    It will solve your issue
    Regards
    Madhu

  • Actual Finish date in production order

    Hi All
    Iam using AFKO-GLTRI  ( ACTUAL FINISH DATE) field in some Z-report.
    Iam having only one operation in production order which does not have AUTOGR key.
    Iam using serial number and doing GR through migo.
    Date in AFKO-GLTRI  field does not get populated when i do partial or final confirmation with full yeild. -- WHICH Standard SAP and right
    After final confirmation when i do goods receipt then i can able to see Actual finish  date in CO03  screen but it is not available in AFKO-GLTRI.
    If i do partial confirmation With or without any hours after  GR then   Date gets populated in AFKO-GLTRI.
    Please can you guide why date is not appearing in AFKO-GLTRI when I do GR --  iam missing any config ?

    you probably can use the AFRU-IEDD (Confirmed date for execution finish).
    the logic could be - look at all confirmations(or just one) and get the last one.

  • Set Order finish date in planned order on Production order creation CO41

    Hi experts,
    I'm trying to set the order finish date, field SFC_POCO-PEDTR on transaction CO41, into Scheduled finish, field CAUFVD-GLTRS, of production order transaction.
    The issue is get the value of PEDTR. For change the value GLTRS i'm using the exit PPCO0007 and it works, but i haven't the value of field PEDTR.
    I hope to have been clear.
    anybody can help me??
    Thanks in advance
    Marco
    Edited by: Menegazzo Marco on Aug 3, 2010 5:20 PM

    Hi  DwarakanathS         
    Thanks for you reply....
    But if in the exit i try with the code you suggest, when i do the assign:
    FIELD-SYMBOLS <my_fs> TYPE SFC_POCO.
    ASSIGN SAPLCOUP(SFC_POCO) TO <my_fs>.        
    the program give me an error "Field "SAPLCOUP" is unknown. It is neither in one of the specified"...
    and if i try with this:
    FIELD-SYMBOLS <my_fs> TYPE SFC_POCO.
    ASSIGN 'SAPLCOUP(SFC_POCO)' TO <my_fs>.        
    the error is "SAPLCOUP(SFC_POCO)'" and "<MY_FS>" are type-incompatible."
    what's wrong?
    thanks
    Marco
    Edited by: Menegazzo Marco on Aug 4, 2010 10:16 AM
    Edited by: Menegazzo Marco on Aug 4, 2010 10:53 AM

Maybe you are looking for

  • Create a web photo gallery, in PSE8????

    In a old version of elements, like verssion 2, you could create a web photo gallery.  You can also do this in Photshop. I just purchased PSE8 and I cannot find it in there.  Since this the bulk of my work, uploading photo galleries to car websites I

  • Missing Panels in all three Edit Modes (Mac -- PSE 8)

    Hello: Anyone have any ideas on this? Installed PSE 8 on my MacBook tonight, and thanks to this forum I've been able to troubleshoot a couple of glitches. But this one has me stumped. When i select any of the three edit options on the right side of t

  • I updated to 3.6.8 and now have web page previews in my tabs - how do i get rid of these

    When I upgraded to 3.6.8 all my tabs now are twice the size and have a thumbnail preview of the webpage in them - how do i get rid of these and go back to the normal tabs == This happened == Every time Firefox opened == i upgarded to 3.6.8

  • ILap or similar to MacBook Pro?

    Is anyone using iLap or something similar for the MacBook Pro? I am looking for something similar to allow the computer to cool while holding in my lap. Thanks! http://www.raindesigninc.com/ilap.html

  • What does "item XUL is in use" mean and how do I turn it off?

    It trying to install upgrade, I am asked to replace older item with newer one and I click Replace. Then I get a message "The operations can't be completed because the item "XUL" is in use. What does that mean and how do I proceed?