Production of a Component (sub-assly) in alternate plant

Hello All
    Am having a scenario wherein X is FG with its sub assly    X-SA, & this sub assly X-SA is having two components which are raw materials XR-1 & XR-2. FG X is planned and manufactured in plant 1400, wehreas production of component X-SA is done in plant 1200.
    The scenarios is as briefed: components (XR-1 & XR-2) for sub assly (X-SA) is procured in plant 1400 & send to plant 1200 through a challan for further processing to produce X-SA at plant 1200. I am using special procurement key 80 for X-SA, here am facing an issue whenever i run MRP for FG X planned order is created for X in plant 1400, planned order for X-SA is getting created in plant 1200 which is all OK, but in the system purchase requisition for raw materials (XR-1 & XR-2) is not getting created for plant 1400 instead purchase requisitions for these materials are getting created in plant 1200. This shall not be the case with the procurement elements for raw materials XR-1 & XR-2. Kindly guide me to the solution for this issue, am looking forward to your valuable inputs.
Regards,
J K Tharwani

Hi Jitender,
For your components XR-1 & XR-2.
Following scenario would be suitable.
Here your planning plant is 1400 & Ordering plant is 1200.
Please maintain following settings for both the raw materials..
1. For both the raw materials in Plant 1400 Mintain Mixed MRP indicator 1
In Plant 1200, for thse materials put special procurement key "40"
Please follow the link:
http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm
Hope this helps..
Regards,
Siva

Similar Messages

  • Report for planned or prodcution order for production in Alternate plants

    Hai gurus,
    I have two plants - X and Y
    Plant x have finished goods A and B to be produced  and procured from plant - Y
    plant Y have finished goods C and D to be produced  and procured from plant - X
    The production in alternate plant concept is used in plant X  for Product A and B
    The production in alternate plant concept is used in Plant Y for Product C and D.
    Now my requirement is how to get the report for the Purchase order raised by the
    plant X for the Finished product A and B , also how to know the planned order
    and production order with reference to purchase order for Finished product A and B
    under plant - Y
    and VIce versa for the Finished product C and B in plant X and Y
    Waiting for the positive reply.
    Regards,
    Sekar chand

    There are a few reports that you can use to display STO requisitions and orders, by supplying plant, material, or MD04 like was mentioned.
    The only thing that you don't have in a report is the link to the production order. In SAP in a MTS situation there's no fixed link (pegging) between the requirement (STO) and the supply (prod Ord).
    You can view the pegging dynamically, for example in MD04.
    Edited by: Mario Adler on Oct 27, 2011 12:13 PM

  • Good receipt for Production in alternate plant

    Hi,
    I have scenario where i have using production in alternate plant. when i do GR in production plant the stock is getting updated in planning plant.
    But physical material movement from production plant to planning plant will take 2days.
    Is there anyway i can do GR in production plant and then do plant to plant transfer, so that i can ensure there is no mismatch between to physical stock and system stock.
    or
    is there any other process to overcome this problem.
    kindly give a solution..
    Thanks and Regards,
    Sen

    Hi,
    SAP Help
    Stock Transfer from Plant to Plant
    Within the stock transfer procedure, goods are produced and delivered within a company. The plant that is to receive the goods (receiving plant) orders the goods internally from another plant that is in a position to deliver the goods (issuing plant). The dependent requirements for the components to be transferred are determined in the receiving plant.
    You use the stock transfer procedure, if two plants are located far away from each other, as the transport of materials to be transferred is taken into account in MRP with this type of procedure
    So , pls try with 40 - Stock Transfer  from Alt plant . Then , you can use combination of either 303 & 305 or 351 & 101 .With this procedure , there will be no mismatch bw the physical stock and system stock in the receiving plant.
    also refer ,
    http://help.sap.com/saphelp_470/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm

  • Dummy Product & Dummy Logical component???

    Hello SolMan Gurus,
    Can anybody throw some light on how to create Dummy Product & Dummy Logical component?
    Your replies will be greately appreciated.
    best regds,
    Alagammai.

    hi Alagammai 
    I would add that you could try creating servers, databases, systems and logical components, just by connecting Solution Manager to itself, could it be?
    Cheers,
    Cesar Aranda

  • Transport products and software component version

    Hi,
    I created a Products and its Software Component Version in System Landscape Directory of XI development.
    I imported this Software Component Version into Integration Builder and developed design and configuration objects.
    The scenario is completed and now I want to transport the Products and Software Component Version to XI Production.
    Could someone please explain the transport procedure.

    Hi Shravan,
    Thanks four your instructions. I would like to have more details on the export/import procedure. Please confirm the following steps are correct:
    From SLD of XI development:
    1/ Edit new product and its software component version.
    2/ Click on icon Export: XI generates a zip file and downloads it in c drive.
    From SLD of XI Production:
    1/ Select Import utility under system catalog.
    2/ Browse and select the zip file
    In XI production there are existing third party products, and I do not want the transport of this new product causes any problem.
    Design and configuration objects will be exported/import ed after the successful transport of product and software component version transport. 
    Regards,
    Daniel

  • Product and Software component in SLD

    Hi,
    What is the basic concept of product and Software component.I have few questions.
    If our company is going for Sap implementation of ISmedia
    and XI as middleware for interfacing with other systems then what do we need to do for product and SWC.
    Do we need to create a third party product and SWC for this project in sld?
    We can create differnt Software component under the existing Product of SAP ISM
    What are the best practices
    Thanks,
    Naveen.

    Hi,
    about Software Product and component go thru this part of SAP help-
    http://help.sap.com/saphelp_nw2004s/helpdata/en/a2/2999ef97ea2b4790165f9ca5c05c41/frameset.htm
    <i>Do we need to create a third party product and SWC for this project in sld?</i>
    >>yea, you can create a thridparty product.
    <i>We can create differnt Software component under the existing Product of SAP ISM</i>
    >>>You can create software components for the product.
    I think, the documentation will help you understand this.
    Regards,
    Moorthy

  • Material check in alternate plant

    Hi friend,
    In MTO scenarion I have same (component) material in two different plant within the same client. During MRP run dependent requirement should be checked in the alternate plant's and if material is available reservation should be generated.
    Or is it possible to convert planned order generated in plant 1100 be transfered to plant 1200 and also converted to production order.
    Pls suggest the solution.
    amol

    Yes you can do by using the special procuement key in material master for STO from other plant.
    Rewards the Point

  • Bulk Material behaviour in alternate plants

    Hi,
       how bulk material concept behaves with planning and procurement in different plants with consumption based (VB) in MTO/MTS  scenario.what are the conditions to be maintained with Sp procurement key with drawal from alternate plant and stock transfer from alternate plant for bulk materials.
    regards
    kishore

    Hi Kishor,
    Bulk material is always consumption based because it is not planned during MRP and not related to costing also. Bulk materials are those which are low cost.
    If you are having more than one plants and components required at one plant for finish product is either produced as a finish product in other plant or it is available as a unrestricted stock then you can use special propcurement key for that component.
    For production at alternate plant set special procurement key. In BOM assign that component and design key in customisation that u enter plant where it is being produced. Again create a BOM for finish product.
    First take MRP run where it is used as a component so that it will create dependent requirement for another plant.Then take MRP run where it is as finish product so that planned order will be produced.
    Same as for stock transfer use another key. You have to decide first then assign key.
    I think it will help you. Reward pts.
    If any problem ask.
    Regard,
    Suhas

  • Copy Production Area Planned Orders to a corresponding processing plant

    Hi All,
       I am in need of design a dialog program which copy production area planned orders to a corresponding processing plant, In my requirement i am not able to find what are the tables involved and what is the bapi must be used to update the tables.
      I appreciate if anyone come with tips to start with this requirement.
    Thanks and Regards,
    Babu

    Hi folks,
          Thanks for the prompt reply, i have one basic doubt, whether the order no must be passed by us, if i am not giving order no it will returns the error.
    Thanks and Regards
    babu

  • Video wont play in custom component sub-state

    I can't get a video to work while in a sub-state... Basically I have links that play to each sub-state in the component, and one contains a video. When I test it the video will not play not do the buttons on the wire-frame work. Any suggestions?

    Hummm....
    Have you tried having the video and its controls placed at the top level of the project and see if they work there? That will make sure that the video is playable and the controls are wired up correctly. If that works then we can see if it is something else...
    Chris

  • Production in alternate plant

    Hi,
    There are two plants called as Plant A - Planning plant, B - Production plant.
    If I use spl.procurement key 80 in plant A material, when MRP run production process will trigger in Plant B.
    While doing GR in plant B, system will update the stock qty in plant A.
    Now my problem is while doing GI in plant B, system consuming the stock from plant B, but my requirement is, it has to consume stock from Plant A.
    Can we do any configuration in spl.procurement key or Is there any std setting available?
    Regards,
    Dharma

    Dharma,
    Please check the configuration of Special Procurement key "80" in your system in transaction OMD9 for Plant A.
    You should not have any defination as BOM Component level, I suspect you have activated withdraw from alternative plant and you have an Issuing Plant as Plant B. Or else in the BOM Item level where this material is used a component check whether there is any SPK assigned.
    Regards,
    Prasobh

  • Subcontracting Semifinished Product, without providing component to Subcon.

    Dear all
    I have the following scenario for subcontracting, all involvoing placing Subcon PO for Semifinished Product, GI raw materials and GR Semifnished Product back for further production processing in the own factory.
    Scenario:
    My factory places a subcon PO for chroming a raw metal (FG = Chromed Metal). We only provide the raw metal but do not provide the Chroming paint (GI only raw metal to subcontractor), Subcontractor will use their own Chroming paint. After chroming the raw metal, we will perform a GR for Chromed Metal from the subcontractor.
    My question, how do we tackle this in subcontracting? As we never provide the Chroming Paint. Does it mean I create a single item single level bom and at the time of Invoice verification, I will put in 2 lines item Subcon Service + Chroming Paint?
    Please advise.

    Sorry, YMREDDY, I just want to confirm.
    Hi
    Question: In that case, I just changed the BOM Header to put HALB (Chromed Metal) and Component as ROH?
    Question: In that case, I will only GI Raw Metal (ROH Material in BOM Component) and then GR the HALB, that is it?
    If you are doing as above , you can as well go ahead with subcon it self ?
    And you include the cost of chrome paint in your subcontrating cost.
    Pl. try.
    Regards
    YMREDDY
    You put a question mark at "you can as well go ahead with subcon itself?". What does it mean? Is my previous 2 quesions set the correct logic?
    Thanks.

  • Block component in production order change: component overview

    Hi Gurus,
    I want to block the component field (set as gray field) when clicking the component overview during creation/change of production order.
    How can I configure this field and set as display only.
    Can somebody tell me how to do this? We are using 4.6C.
    Thanks in advance.
    Rgds,
    Chad

    Hi,
    Please try the following,
    In transaction BS22 choose the status CRTD & double click. Then for the business transaction "Change routing" choose the radio button "Forbid".
    Regards,
    Senthilkumar

  • Error in product costing cost component structure with quantity...

    Dear sap gurus
    I am creating material cost estimation with quantity structure while doing in T CODE CK11N the following error is coming Message no. 213 Cost component structure z9 is not active. But I am not using the particular Cost component structure z9. I am using the standard Cost component structure 01 and I have activated it at OKTZ and the z9 is deactivated. Plz, tell me where I can fix this error
    Awaiting for you kind reply.
    Naveen

    Hai MoH
    Thanks for yuor reply, yes you are correct. i have checked in OKKN where i found that the cost component structure z9 is assigned to my co. code that is not mine i am using the standard cost componet structure. plz, tell me where i should go and change the assignment plz, give the T.CODE
    regards
    Naveen

  • GR for production done in Alternate plant

    HI All
    In scenario there are 4 plants (say mother plant P1,P2,P3,P4) , All sales order will come to main plant i.e P1 , i have maintained spl proc key 80 In mrp view so that when an order comes the planned order will be created in P1 & and in of P2,P3,P4.
    This scenario is working fine
    But when comes to GR using MB31 the GR is posting to main plant only(P1) ., it is not posting to their respestive plant FG location ., this is an issue
    Pls help me to sort it out
    Regards
    Anand Srinivasan

    Dear Annad,
    As per SPK 40. if u run the MRP at Planning plant, based on stock system will create stock transport PR at Planning plant and Rel order for it at Production plant. if there is no enough stock at Production plant it will create planned order for That rel order. It will work as teh same in MTS.
    Since i have not tried it, with MTO please Try  and update
    For more help please Refer below sap link.
    [Stock Transfer from Plant to Plant |http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d2d5a44af11d182b40000e829fbfe/content.htm]
    I hope this will solve your problem
    Pradeep