Production Order Compoent Rounding with a Scrap Factor

Hi all,
We are using a 3 decimal unit mesure. And I'm having a problem when the component have a Scrap factor.
Instead of rounding up to the nearest whole number it is keeping the decimal place so a component with a scrap factor of 1% and a requirement of 10 come out to 10.1 in the production order instead of 11.
Does anybody know of a userexit, BADI or other solution?
Points will be given
Thanks

Dear
Changing directly the base UoM of components related with component scrap may  not work either as far as I have read and according to the note SAP 931971.
Otherwise , try to check Decimal places and rouding of decimal place is maintain properly for the base unit of measure of that component in T.code CUNI. Is there any Rounding value (value = 1) is maintain in MRP 1 data of that component ?
I think , you should keep Decimal Place Rouding field in CUNI -Conversion Tab  -as 1 or 2 if you want to round to 10.1 as 11
Try and revert
Regards
JH

Similar Messages

  • Production Order Settlement Process with respect to  a Project

    Hello All,
    I know about normal Production Order Settlement Process in discrete industries.
    Can anyone give me the steps for the Production Order Settlement Process if the Production Order is created with respect to a Project in SAP PP- PS Integration Scenario.
    Thanks in advance for your support.

    Hi Experts,
    Can anyone clarify my above queries.
    Thanks in advance for your support

  • Production Order For Project with plant stock

    Hi,
    We have a scenario where in we are required to create a production order for a project.
    But the material(raw material) is in a storage location and is a stock item. Even the header material is also a stock item and it to stored in the storage location.
    But the order is to be created for Project and to be settled to the Project. Now the system is not allowing me to create the order.
    The error is :
    "Project  does not allow make-to-order stock
    Message no. CO746
    Diagnosis
    There is no project stock for the project.
    To create a production order with reference to a WBS element the project must allow project stock to be maintained.
    Procedure
    You should select a project that allows project stock."
    Now,
    I don't want to have a project stock. How to go forward...
    Regards
    Pavan

    Hi,
    What is the strategy you are using. If you are using strategy 20, then chnage it to 40.
    Also maintain individual/collective indicator to "1" - individual in MRP-4 view. So that when the order is created, the stock will be reserved as Q-project stock.
    thanks and regards
    Murugesan

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • How to release a collective production order in CO05N with MSPT?

    The issue was: I want to release a collective order by co05n, e.g. the structure of this collective production order 10000 like this:
    10000----20000
    30000---40000
                                 ---50000
    if order 50000 with material shortage, keep the customizing OPJK  release order=3, how to release this collective
    order. If it is not possible in standard, can the parallel order 40000 be released??
    Thank you, all.
    Edited by: Stephen Wang on Apr 15, 2010 3:12 PM

    Dear,
    In Transaction CO05N, you execute a collective release. For one of the orders, the availability check determines missing part although it has been set in Customizing of the availability check (OPJK) that a release can be executed for missing part per user decision. Therefore, a dialog box is processed on which options a.) 'Release order', b.) 'Missing parts list' and c.) 'Cancel' are displayed.
    If you first branch to the missing parts list and then press 'Cancel' on the dialog box there it self
    Else you can do this with these options,
    1)Use T Code COHVOMRELEASE here select order as you want and release accordingly.
    2) Use Transaction SE38 to create the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE if want in background.
    3) use BAPI BAPI_PRODORD_RELEASE
    Please try and come back.
    Regards,
    R.Brahmankar

  • Notification on Receipt and Purchase documents getting fired on Production order having Items with planning method as MRP

    I have written a SP Notification to block adding of documents if block number is not provided. Notification is working fine on Purchase and Receipt documents. This notification also gets executed on Production Order where items included in Production order have planning method as MRP.
    Can anyone explain me the relationship between
    "MRP planned items"
    and
    "Purchase documents (Purchase Order; GRPO; Purchase Return; AP Invoice and Credit Memo) and Receipt of Production."
    Thanks & Regards
    Sonil Bhardwaj

    Hi Sonil,
    Can you post your SP , to look if there is any problem with SP ..
    Regards

  • Production Order Closed incompletely with a warning message

    hi all,
    Production order is allowing to close with a warning message("Not all item were issue be careful check before closing") even completed quantity is less than planned quantity.
    System should have options in document settings for production order as 'Warning Only' or
    "Block Release" in order to block production order from closing as per above case.
    SAP should bring these new feature in next patch releases.
    We are using SAP B1 2005B PL36.
    Jeyakanthan

    Hi ,
    Following are prerequisites for closing a production order
    1 The order must have the status Released (REL) or Technically completed (TECO)
    2 The order balance must be 0
    3 There can be no open purchase requisitions, purchase orders.
    4 There can be no future change records from confirmation processes.
    Then look into the Transaction; COFC.You can handle this from there.To settle the order use tcode KO88
    Before that do Overhead calculation by KGI2, WIP calculation by KKAX, variance calculation KKS2.
    Regards,
    R.Brahmankar

  • Collective production order link based on parent production order in MTS with strategy 10

    Dear Team,
    Now we are using MTS Production order system with strategy 10,As per my Business requirement we need to take all the child components production
    orders based on the Parent component production order .In this case for planned order conversion we are using CO40 transaction code(i.e. Collective conversion) as well as all planned orders  generated through MRP. As per my business process we are using Route cards which are Z smart forms with all Production orders from parent to child component with quantity is taken as a PDF printout,As per our customer requirement we will store those Route cards up to next 15 years. When user has to check Production order linking at any point of time, this functionality is not available for MTS. I tried MD4C but it is not a best solution for my business requirement.So please provide any another standard solution available for this requirement.
    Thanks in advance,
    Regards,
    Krishna.

    There is another suggestion that you can determine the costing indicator in the requirement class. you can get the requirement type from procurement page in the sales order header, then go the customizing menu to find out which requirement class has been assigned to the requirement type. Then you can get the "costing" and "mark" indicator.
    The customizing menu is the node of controlling - cost object controlling -> CO PC for sales order.
    Correct me if i am wrong, thanks.
    Best Regards!
    Flex Yang

  • To close the unclosed production orders without imbalancing with invoice

    Hi MRP Experts,
    I want solution for following situation.
    Mrp was not implemeted during software implementation.
    Now we need to implement.
    But since manual production entry was not done according to invoice there is no link between them.
    At present i have unclosed production orders which was actually manually closed and at present if i try to close it it might show imbalance during the mrp implementation with respect to mismatch in date.
    Please give me some suggestions to close the unclosed production orders without imbalancing
    Thanks and regards,
    Tejaswini

    Hi,
    Once the production order is active then only these orders will be considered for MRP.
    So, you go with setting the System Status of the Orders with TECO.
    Select your Orders and in the Transaction: COHV you can do the Mass processing for TECO.
    TECO status will not look for production order settlement etc..
    You enter the demand and execute MRP..
    Planned orders will be genearted, convert them to Prod. Orders work on those orders..
    But it is same as having prod. orders earlier to MRP or Creating fresh production orders..
    System will calculate the Net requirements first in the MRP, so ther will not be inconsistencies..
    Revert for further discussion..
    Regards,
    Siva

  • GR  for  Production order not possible with  settlement receiver as IO

    Hi
    I   have  created a  production order  and  the settlement rule is  to  an internal order.  But  it  does not  allow me to do  goods receipt.    Pl  tell me  what to do.
    Thanks
    kamala

    Hi,
    SAP recommands production order settlment to be beow object and additional CO Object COPA.
    Settlement Receivers Depending on the Scenario
    1.Make-to-stock production >>The make-to-stock inventory (receiver = material) >> COPA
    2.Sales-order-related production with a valuated sales order stock>>The valuated sales order stock (receiver = material)>>COPA
    3. Sales-order-related production with a nonvaluated sales order stock>>The sales order item (receiver = sales order)>>COPA
    The scenario you are trying is doesn't fit into standard SAP framework for production order so please try said scenario with CO production order. Again CO production orders mostly recommondable without PP so figure out impact on cross modules.
    Regards,Ashok.

  • Production orders are done with GR 101 moment type without material consumption(261)

    Hello Experts,
    We have some of production orders where the goods receipt is done with 101 moment type on confirmations without consuming the components i.e not 261 moment type not happened.
    We have checked the backflush for the components and also the stock and every thing is fine.
    But we have observed the Resevations for corrsponding Production orders the "moment allowed" is not checked and hence the 261 moment is not happened, But not sure why it is not active.
    Could any one let me know why this RESB-XWAOK is not checked in the reservations and aslo on what are the possible conditions this happens.
    Please help...Thanks in advance
    Regards
    Madan

    check directly in MB1C transaction with the reference of order movement type 261 material would be consume.
    also check batch enter field in MRP 2 view control this make it blank and then system will not determine batches in production order and you can select batches in MB1A/B/C transaction.
    Regards,
    Sanjeev

  • Production order confirmation cancellation with auto goods receipt

    Hi expers,
    I've got a production order using backflush and Auto GR for last operation(Control Key with Auto GR Tick). After the confirmation operation had been done,the end user cancelled the goods receipt using T-code/MvT:MIGO/ 102 by mistake,and then using T-code CO13 cancelld the confirmation.Now  the delivered qty of the production order is negative, the material document generated by using MIGO/102 by mistake can't be cancelled, i also tried to do a migo with 101,the abap program dump.  the production order can not even be viewed by using CO03.The ABAP program dump.
    Any help would be much appreciated!

    Here is some of the dump message:Runtime errors DYNPRO_FIELD_CONVERSION
    Short text  Conversion error .
    Error analysis
    The program has been interrupted and cannot resume. 
    Program "SAPLMIGO" attempted to display fields on screen 0200. 
    An error occurred during the conversion of this data.
    How to correct the error
    There was a conversion error in the output of fields to the screen.
    The formats of the ABAP output field and the screen field may not match.
    Some field types require more space on the screen than in the ABAP
    program. For example, a date output field on the screen requires two
    more characters than the corresponding field in the ABAP program. When
    the date is displayed on the screen, an error occurs resulting in this
    error message.
    Screen name.............. "SAPLMIGO"
    Screen number............ 0200
    Screen field............. "GOITEM-WEMNG"
    Error text............... "FX015: Sign lost."
    Other data:

  • Material Cost Not Shown in Production Order if planned with MD50

    Hi,
    We have run MRP MD50 for a sale order item ie FERT material which has BOM Items. All the stock of the BOM items is tranfered from Unrestricted Stock to Sales order stock. FERT ITEM planned order is converted to Production Order and all the BOM items sales order stock is issued against PO & Sales order no with Movement Type 261E.
    After confirmation and goods receipt stock of FERT is shown under sales order Stock of Fert Material.
    We can see the cost of operations but cost of materials consumed against the Production order is not displayed in Production order Cost analysis..How material cost can be displayed????
    If i create PO with out refering the sale order that is normal process i can see the cost of materials triggering in Production Order.
    Can we settle the varience when we are planning against sale order???
    Some one Pl help us.
    John

    Dear,
    Check your variant which showes the cost. See the following report
    KKAC - For Sales Order with Assigned Orders  or
    KKBC_KUN - For Sales Order or
    KOB1 - Actual Costs

  • Batch selection in production order compoent overview

    Dear Friends,
    when i see production compoent view ,inwhich there is selection for storage location & batch.
    when F4 for storage location field ,i get storage location available qty
    but when F4 in batch selection field,i dont get batch available stock,just showing batch number
    How can i get batch numebr along with storage loacation qty & also if batch have classification values
    how can i see them with batch stock
    We dont using batch determination.
    Thanks in advance
    Umesh
    Edited by: umesh kadu on Nov 23, 2010 4:01 PM

    Hello Umesh,
    you can create a special search help using a view on MCHB structure, selecting only those records with CLABS > 0 eg. View: Z_MCHB_F4HELP with fields MANDT. MATNR, WERKS, LGORT, CHARG, CLABS, MEINS and condition CLABS > 0.
    Then create an elementary search help using this view and add it to the collective search help MCH1.
    If you press then F4 on the batch you can choose the new search help and select the batch of the materials with stock.
    Best regards
    Rabanus Diehl

  • Different Production order number ranges with same order type

    Dear Friends,
    I am working on live project implementation.I am having four manufacturing plants.I am having one order type say PPLE, I am having two different versions say CM and CN.Now my requirement is can I maintain  two different number ranges for same order types within single plant .
    number ranges should be like,
    Plant          Version     Number ranges
    1210            CM           CM121008...
    1210            CN            CN121008
    1220            CM           CM121008
    1220             CN           CN121008
    and so on.here first two digit should be version,then plant and year followed by order number .
    Regards,
    Manoj Jadhav

    Hi manoj,
    You cant have two different number ranges for an order type in internal number range, but in external number range you can have two diffrent number ranges
    for example for one order you can start with CM1210080001 and other starting from CN1210080001.
    Just convince the client to have external number range
    Regards,
    Srini

Maybe you are looking for

  • Synching issues between Palm Desktop 4.1.2 and Sun ONE Synch 1.1p2

    This has been vaguely mentioned in a thread elsewhere. I thought I'd document my issues for anyone else searching. Downloaded and isntalled PD 4.1.2. Synched fine with my Palm Vx. Installed Sun's synch software 1.1p2. Synched with Calender Server. Sy

  • Transform entity problem!

    I need to print a " " string in HTML so I write this in my xsl file : "&;nbsp;" But the XSLProcessor turns it into " "...... Any comment?

  • ./emca -config dbcontrol db -repos create

    Hi, i would like to configure the EM and i get the following message Jul 20, 2010 10:37:19 AM oracle.sysman.emcp.EMConfig perform INFO: This operation is being logged at /oracle/db1/102_64/cfgtoollogs/emca/db1/emca_2010-07-20_10-36-36-AM.log. Jul 20,

  • Cllick send; mail never makes to mail server

    For some, but not all emails, I click send and it appears it is being sent but later I discover that it never went out, there is no record of it in the sent folder and the email never hits my company's IMAP server so there is no record there either.

  • Serial Number for the invoiced item

    Hi All, I need to find out the serial number for the invoiced item. For ex: I have an order with an item with qty 3 and they all the received in the inventory (drop ship case). But I have invoiced only one qty of the item and I need to find out seria