Hello,
When we are trying to reverse the production order 262 happened , 102 didn't occurred. No COGI update
Afterwards we didn't confirm the order as well as we cannot reverse the existing order also. Some data inconsistency happened. 
Can anyone recommend any sort of trouble shooting or any OSS notes ?
Thanks,
Nic

Dear Nick ,
Please chek the set up in OMJJ-Cluster Maintaince-Movement Typ 102  is allowed  for production order reversal 262 movement type  in Allowed Trancstion /Update Control .
Analysis and revert back .Hope this will help you even after appling the OSS Notes : 175842.
Regards
JH

Similar Messages

  • Production Order confirmation Issues-VC Environment:

    I have the following scenario,
    My ROH is a Sheet Board. My FERT (configurable material) is a BOX.
    The manufacturing process is such that the ROH fed is converted into FERT at the end of last operation. There is no SEMIFINISHED part in between.
    All my operation details are wrt the ROH.
    Sales order would be for FERT and hence the Production Order is also for FERT.
    Currently the confirmation is taking place wrt the quantity of FERT, but it should take place wrt the ROH material quantity being fed at each operation.
    How should I confirm the Production Order at each Operation wrt the ROH Quantity?
    Thanks & Regards,
    Jags

    Dear,
             If you want operation confirmaion go to co11n t.code then enter the operation desired, then confirm the fert, Confirmation is for finished product. In any manufacturing process the raw material is consumed giving fert, hence the consumption field is present in goods movement, which is present in the top of the screen. first enter fert confirmation, then enter the tab goods movement,  automatically your RoH is visible with the quantity given in the Bom. Suppose if you want to change the quantity as desired You can change the quantity and save. The saved quantity is saved in the consumption Account. If you want you can directly get the consumption report. There are standard reports which give the report of consumption. This is the part of controlling.

  • Need help on Production order confirmation cancel issue

    Hi,
    I need your help regarding Prduction Order issue.
    We have created Production Order and issued raw materials and we done paritial confirmation also. Now the order status is PNCF.
    After that we notice that it was wrong confirmation so we went CO13 we cancel those confirmations.
    But in our zprogram still those order is showing as paritial confirmation order.
    I need in which SAP table confirmation status stored and what will be the production order status after cancel the confirmation.
    and in which table cancel production order confirmation data will be availiable.
    please guide me
    sateesh

    HI,
    There is No Standard Status for Reversing or cancelling the Confirmation.
    Generally, When you confirm the status PCNF or CNF gets active.
    When you reverse it theybecome inactive.
    also let us know, whether You cancelled or reversed the confirmation or revesed the GI postings.
    If you have reversed the GI postings using Reverse Movement type or Materail documents, it is possible to have the PCNF order status unchanged.
    Regards
    Ratan
    Edited by: Ratan on Aug 28, 2009 7:23 PM

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • URGENT: Prob with Production Order Confirmation

    Hi Gurus,
    I have a problem with Production Order Confirmation.
    When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
    I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
    While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
    Can anyone please help me out in this regard, how to solve this.
    Thanks & Regards,
    Harish Kalla

    Hi Harish,
    This problem is addressed in OSS Note : 36353
    The Symptom reads like this
    ==========================================================================
    When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
    This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
    ===========================================================================
    This Note is an elaborate one..
    Hence, go through this and ask your FI Consultant to help you in this regard.
    All the best..
    Regards,
    Siva

  • Production order confirmation in co11.

    In co11 ,   I want to post balance qty while doing the production order confirmation.  actually total qty issue is 10 but confirmed qty is 5 , here balance qty 5 shud be posted automatically while save the confirmation.

    solved . developed the custom pgm.

  • Restricting Good Receipt Unless Production Order Confirmed

    Hi
    Experts,
    I want to Restricting Good Receipt Unless Production Order Confirmed
    I am doing following thing but the error is occured.
    Use Tcode BS02 ( Customising USer status profile).
    2. Select the order type which you want to configure (eg:PP000001) and choose "Details" button.
    3. In the User status table do the following:
    a. In the status no field type"1" , status field "Sta1", short text"GR not allowed",  lowest no "1",  Highest No "2". Mark a tick in the initial stats check box.
    b.Next line, type status no field "2" ,status field "sta2", short text"Gr allowed", lowest no "2" , highest no "2".
    4. Select the STA1 line and choose details. select the "create"button.select the "GR for prod order", mark "forbidden
    radio button" and "set radio button".
    5. Select the STA2 line and choose details. Selct the "create"button. select "confirm order", mark "permitted radio button" and "set radio button". Next choose "GR for prod order" , mark "permitted radio button".
    6.Save.
    Create a prod order and check whether the required scenario is working.
    I have created user status profile as PP000001   GR
    ERROR
    First define allowed object types
    Message no. BS218
    Diagnosis
    The object types for which a status profile may be used define which business transactions are included in business transaction control.
    Procedure
    First define for which object types this status profile can be used.
    What is object type how to define?
    Thanks & Regards
    Pert

    Hi,
    Refer to the below thread which addresses the same need:
    Re: GR not allowed :BS02
    Revert if you face any issues.
    Regards,
    Vivek

  • Production order confirmation problems

    My production facility has been having problems for years centered around the production order confirmation process.  My colleagues and I are considering submitting an OSS note to SAP, but figured that we should present our problems in these forums before making that next step.
    Here are some individual issues which I believe may be related.  All of these issues occur off and on at random.  They will typically occur when more users are working in the SAP system or when SAP is running slow.
    - When an order is confirmed and a label is printed, sometimes the quantity on the label will be incorrect.  Sometimes no label will print out at all.  When the order is unconfirmed and then reconfirmed again, a label prints out with the correct quantity.
    - When a confirmation is unconfirmed, the unconfirmation will not backflush the associated materials correctly.  Sometimes this error will appear in CO1P for us to re-confirm, but not always.
    - Sometimes confirmations will only backflush certain materials and not ALL the components within the production order.  When the confirmation is unconfirmed and then reconfirmed again, the confirmation will backflush all materials correctly.
    These problems occur at random intervals and never present the user with an error.  Close to 100% of the time all the confirmation issues will be corrected by simply u201Cre-doingu201D the confirmation as we did the first time (no changes in the process).  Only the second time around there will not be any issues.  This leads me to believe there is some internal issue with SAP, perhaps involving which tables CO11N pulls from when a confirmation is made.
    Any and all help is appreciated.  We currently run the AFS version of SAP.  This is my last stop before submitting an OSS note.

    Hi,
    I have not worked on AFS, so consider the below as a pointer which might help:
    When you post confirmations & notice that the components are not being backflushed, check in COGI it could be that there are some incorrect goods movement. You will be required to clear these entries from COGI.
    I suspect that you notice these because, the confirmations are being posted even before the stock for the same has been received & hence the issue with labels as well.
    Do a check on the above, if it resolves the issue, then i would suggest re-design the process to ensure you do not have COGI or COFC entries.
    Also do a search in OSS for AFS specific notes on confirmation.
    Hope it helps.
    Regards,
    Vivek

  • Production Order Confirm/Label Printing problems

    I am currently having issues printing out labels for production orders.  Whenever I confirm an order, our printer will print out a different quantity or no label at all.  
    Here is a brief history of production order confirmations today....
    Entered                Printed
    80                           40 (2 labels of 20)
    20                           No Print
    20                           No Print
    40                           No Print
    ALL confirmations were accepted by SAP
    SAP WILL often drag during a normal confirmation when correct labels are printed
    SAP will NOT drag when a confirmation is entered and no labels are printed
    Yesterday I had a confirmation for 10 print out a label for 19.  All of the quantities in SAP are correct, it's only the printer that is creating labels for different quantities.  If all the lot sizes in SAP are correct, what do you think the issue might be?

    Hi,
    Based on what i understand of your query, would suggest to work with your technical person to have a look at the print program. The delay you notice or the incorrect data being printed might have to do with the program.
    Regards,
    Vivek

  • Without Production order confirmation How to settle the cost of prd order

    Dear all,
    How to settle the cost production order with out production order confirmation.Any setting is there Or program.
    Regards,
    Naresh Redddy.

    Dear Naresh,
    To settle the cost of production order, you need not to confirm it. But on the same time if you want to settle the order when its not confirmed then WIP amount will be posted. WIP value will be posted if your order does not have DLV or TECO status. In your case, if you not confirmed the order, only material cost if any issued for order will be calculated, no activity cost will be calculate. And if you want to post the variance then order status needs to be either DLV (Completely Delivered) or TECO (Technically Completed). Here also the cost of activity will not be considered as you didn't confirmed the order.
    So if you want to settled the order without confirmation, then Activity cost will not be added in your settled cost. So your product costing will not be accurate.
    Please revert if you have any other doubts.
    Regards,
    Hiren Ramani

  • GR qty showing less than production order confirmation qty

    Hello Experts,
    Greetings.
    My issue is while doing production order confirmation(CO12),for some materials it shows less GR quantity than the confirmation qty.I m wondering how it can be possible?
    What could be the problem?
    Plz advice.
    Thanks
    Nitin

    Confirmed qty of each operation and delivery qty at the header are two different fields.   Confirmed qty will be the same with the yield to conf. during confirmation.  Whereas, the GR qty is equal to the total sum of quantity received from the order. 
    Check whether during confirmation you create auto GR or not.  If yes, then check the COGI t-code.  There might be some error log of goods receipt in there.  If no, then check GR qty in document goods movement compared to confirmed qty during confirmation.
    Hope it helps.

  • Cancellation of Production Order confirmation (CO13) not generating TR/TO

    Hi,
    We are facing a typical issue in the PP-WM interface. When we create an order and confirm it (partial confirmation), the Goods movement happens (261 mvt type) as desired and the TO is created and confirmed in the background.
    But, when we try to reverse the movement type (cancelling the production order confirmation using CO13) then there are no TRs or TOs generated in the background (for movement type 262).
    When I manually try to post a material document for 262 movement type, it creates a TO in the background (as per the configurations that I maintained) but this does not happen when movement type 262 is called using PP interface.
    The movement type configurations are all done for Automatic TR and TO generations - this works with normal IM process (when we manually post using MB1A transaction) but not with the return Goods movement happening with PP.....here, the material comes back to the interim storage type 914. We then need to create a TO manually and confirm it to take the stock back in to the original storage type and bin.
    We want that when a process order confirmation is cancelled then the materials should be posted back in to the original storage type and bin (from where the material was issued against the order).
    For Info: COGI shows no errors during the 262 movements, also, material document is generated for 262 movement type but no TR/TO generated.
    Is there any configuration that we have missed?
    Thanks and Regards,
    Shankar

    Hi,
    Yes, you are correct in the understanding that the system creates quants in 914 when the production order confirmation is cancelled. But, it does not generate any TR or TO in the background to post the stock back into the original storage type.
    Can we not use the put away strategies so that the system determines where to place the material? My query is that despite all the configurations for automatic TO creation and confirmation for movement type 262, it does not generate a TO (or TR) in the background when a production order confirmation is cancelled using CO13.
    However, if I manually post a material using MB1A for 261 movement type and reverse it using 262, it generates a TO and confirms it as per the setting in configuration.
    The same thing does not work when we run it through PP (CO11N and then CO13).
    Any suggestions on how to approach this and where to check for missing configurations?
    Thanks and Regards,
    Gaurishankar

  • PRODUCTION ORDER CONFIRMATION INCORRECT

    Hi Gurus,
    The Issue I have at hand is related to a PRODUCTION ORDER CONFIRMATION INCORRECT. Ok here is what happened. A production order was put in for quantity of 3. But the confirmation against this order was posted for 100,XXX,XXX. This was scrapped and only 3 was confirmed and received into the inventory (So inventory movement is fine, only for 3). But the initial confirmation of 100,XXX,XXX caused posting for Labor & OH based on the activities to sec. cost elements. So now what happened is there are posting against sec. cost elements in millions, which have been settled to cost centers. Obviously this is incorrect.
    So now we have statistical postings to sec cost elements that are overstated and incorrect. The period for the prod order has closed. The prod order has status of released.
    Now my questions are as follows:
    1. How do we go about fixing this? Best practice?
    2. Can we manually post to sec cost elements to correct overstating?
    3. Can we do manual Journal entry to resolve discrepancy (But that would be a real posting).
    Also would had it been the best solution to just cancel the prod order with the wrong confirmation and re-issue another in the period of occurrence. If you need more information to provide help please let me know.
    I am new to product costing. Please help.
    Thank in Advance!!!

    Hi Ajay,
    I have some follow up questions, please help. Thank You so much. I am sure I will be able to resolve soon, now. Thanks
    2. The manual entries that were posted, can they be reversed, even though period is closed? You mentioned reverse in same
    period. So I can post a reversal document in the period of occurrence?
    No. For any FI posting, your period has to be open
    Q. Ok then if the period is closed and I have to reverse the postings, do I post a negative posting in the current period?
    3. Also should I run KB21N in the same period? (If I can, I should I believe?)
    Yes, in the same period
    Q. If the period is closed like I mentioned earlier, would I still be able to run KB21N in the same period or this should also be run in the current period?
    4. In KB21N I changed the screen variant to u201CAllu201D but I still donu2019t see sender u201Cproduction orderu201D, I just see sender cost center, sender activity type, receiving cost center, receiving order and etc?
    The field "order" is the field you should use.. It is same as Prod order / Int Order
    Q. Yes ok but in KB21N there is no sending order, there is only receiving order. Please help
    5. Also will the KB21N posting fix the Profit and loss posting of the loss?
    Yes, it will.. But you will have to re-run period end steps until settlement
    Q. re-run period end steps, can you elaborate a little more. Thanks
    Thanks again for all your great feedback.
    Arvind

  • Production Order confirmation - GI - Backflushing

    Hello,
    Our requirement is that during, production order confirmation, even if materials are not available, system should allow us to confirm the order. Later will issue GI through COGI.
    In OPK4, in the tab "Individual Entry General" we have not checked the boxes in 1) Goods Movements & 2) Termination for Incorrect movements.
    Here the important point is , we are making use of the functionality "Back Flushing". Iam afraid system should support our requirement?
    Pl. let me know, what config, should i do for this to happen?
    Best regards,
    K.kumar.

    1 Our requirement is that during, production order confirmation, even if materials are not available, system should allow us to confirm the order. Later will issue GI through COGI.
    This setting is enough for above Requiremnt
    In OPK4, in the tab "Individual Entry General" we have not checked the boxes in 1) Goods Movements & 2) Termination for Incorrect movements.
    2)   we are making use of the functionality "Back Flushing". Iam afraid system should support our requirement?
    No, Backflushing is not a problem,  System will support your requirement.
    There is no configuration is reqd to meet your requiremnt
    Regards,
    Sundaresan

  • Production Order Confirmation Default

    Hi PP Guru,
    I am a functional support and currently we have an existing issue or clarification on the defaults of Production Order Confirmation (CO11N). In the current default, Partial Confirmation is automatically ticked, what we wanted to happen is that the Final Confirmation and Clear Open Reservation be automatically ticked and should be the default whenever we access CO11N. My question is that is there any setting or configuration that we may need to change in order to fulfill the desired change?
    I would greatly appreciate your feedback on this matter.
    Thank you.
    JMTafalla

    Hello Gurus
    I have tried to go on transaction OPk0 and entered confirmation profile as this is a required field, I left the Postprocessing box unmarked, Then choose CONFIRMATION/ORDER/SEQUENCE/OPERATION/WORKCENTER as the header, then go to the default tab- confirmation function-select final confirmation and enable Post Open reservations. Then after saving, when i cheked it on CO11, still the default is Partial Confirmation. Is there other ways on how we can set the Final Confirmation and Post Open Reservations to be the default of CO11?
    Your response is very much appreciated. Thank you...