Production order creation from sales order

Hi PP Gurus,
I am creating a production order automatically from sales order by using strategy group exactly similar to 82. Once i create the sales order , its showing missing parts error in prouction order and if i check missing parts overview,it says over all confirmation date is not determine.We have stock in MMBE for that material and storage location combination.
I have also chekced the requierement class and type and found ok.
Please help me resolving this issue.
Thanks in advance.!
Regards,
Sudheer

Hi Mario,
Yes, the availability check will check other stock types also. My concern is why the availability check is  failing and giving missing parts even if the components are there in stock after considering the reservations.
I checked OPJJ setting, availability check is active and we did that.
Can you please help me in this as we are stuck up at this point.
Regards,
sudheer

Similar Messages

  • Service order creation from sale order

    Hi Friends,
       Could you please tell me where is the setting for the automatic creation of service order from sale order.
        Iam using LEIS , TAD and CD as the sales documents and SM01 as service order document.
        Am I missing something?
        Please let me know.
        Regards,
        satish

    Hi Satish,
    The setting for creation of a service order from sales order can be found in the Requirement class configuration.
    To know how to link, check the procurement tab in the sales order, note down the requirement type associated to the line item. Requirement type is linked to requirement class. In requirement class you find the configuration.
    Standard SAP creates SM03 (refurbishment) type of service order from sales order.
    Reward points if useful.
    Regards
    Ananth

  • PLANNED ORDER CREATION FROM SALES ORDER SAVING (REQUIREMENT CLASS 200)

    Dear All,
    By using requirement class 200, assembly type 4 (dinamic planned order) Iwould like that at sales order registration the planned order for the sales order material is created.
    I have two problems.
    The system doesn't schedule the planned order, even if the scheduling parametres are entered for planned order type (relation between routing id and planned order type).
    So I have a planned order in which i have to manually schedule it.
    The second problem is that the planned order is firmed at creation. I would like that it was not firmed to adjust by MPS procedure the components from BOM modification. Infact at the creation of the sales order The complete BOM is not defined, and I don't want to unfirm the planned order so run th mps procedure.
    Can anyone answer to these questions?
    Thank's in advance
    Luca Pastura

    Hi Luca Pastura,
    For Scheduling
    1. You need to Give the appropriate check mark ( 1 or 2 ) In the capccity check of the requirement class configuration (ovzg)
    For Firming
    1. Since youare using dyanamic processing ""During dynamic assembly processing, you can not change the quantities and deadlines"
    2. kindly refer the F1 help for the assembly type inthe OVZG.
    Check and confirm
    Reg
    Dsk
    1.

  • Purchase order creation from sale order (Third party )

    Hii..
    I have a requirement where i create a sale order for third party, system automatically creates purchase requisition,
    my requirement is i dont want to  convert purchase requistion everytime into PO when ever sale order is created.
    can i automate the process where the moment i crete s sale order purchase order is created direclty.
    Suggestions will be worth rewarding..
    Regards
    SARFRAZ

    Hi
    first you need to do seeting for Automatic PO creation from PR
    1.You need to check the Auto POcheck box in Purchasing view of the material master
    2.You need check the Autoamic PO check box in Vendor master in Purchasing org data
    3.You need to maintai the source list with one of the vendor as fixed vendor
    4.Purchasing info record for Vendor and material
    Then you need to schedule the batch job for ME59N with the variant (Required input selection parameters) with the time intervals.
    One third party order created, PR will be generated automatically based on the item category defined in the sales order and source will be assigned in PR.Based o time interval schduled for batch job, the PRs will be automatically converted into PO.
    Regards
    Ramakrishna

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

  • Automatic PR Creation from Sales order

    Hi All,
              This is with respect to PR creation from Sales order for 3rd party items.
    I am able to create PR from standard sales order and i dont have any issues with that.  I have used schedule line categories which is configured with Order type Z2, Item rel for dlvy checked and Acct assigment group as E.
    Now my question is , I want to copy partners from sales order to Purchas req. Currently some partners are getting transferred from Sales order to P.Req, But not all there in sales order. Where do we control the data that can be copied from Sales order to P. Req
    Thank you
    Kris

    Hi,
    Genrating PR, Mostely depends on shedule line,see which shedule line u r determining for HIGH LEVEL ITEM ,for that shedule line maintain setting is VOV6.
    kapil

  • TCODE for Process order creation against Sales order

    Hi gurus,
    Pls tell me what is the TCODE for Process order creation against Sales order
    Eg. CO07 is for production order from sales orde

    Typically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
    Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
    please check and revert back.

  • PO creation from sales order

    Hi 
    we have a scenario where in we are creating a manufacturing order ( This is a sales order with no delivery relevance and billing relevance ), we use this to transfer requirement fo sales order to production( production is not in SAP) via interface .
    We need to create  PO when we get the confirmed dates from legacy system . We planned to create the PO from sales order directly . How can we do this ?
    Also my dubt is when we get the confirmed dates from  legacy system in to SAP , do we need to update the PO which in turn would need to update sales order schedule lines or can we directly update schedule lines in Sales order .
    IPlease let me know in detail if possible .
    Regards
    Ramanathan

    Hi
    You can use BAPI : BAPIPO_CREATE1_   for creating PO from sales order , you can pass the SALES ORDER no into the item level field : CRM_SALES_ORDER_NO---'' YOUR SALES ORDER '' . and fill the corresponding ITEMX for the field .
    Regards
    Swapnil

  • Goods receipt not ticked in production order converted from sales order req

    Hi all,
    In MTO scenario, where requirement trigger from Inquiry -> Quotatation -> Sales Order -> Plan Order -> Production Order, goods receipt indicator in production order was not checked if requirement is triggering from sales order, however it is ticked if requirement trigger from inquiry, therefore we are not able to do confirmation. Appreciate if anyone able to assist us as soon as possible.
    Thanks in advanced.

    Hi,
    I understood that---
    If u r creating Sales order directly without Quotation u r  not able to do the GR.
    If u create from Quotation, u r able to do GR. right?
    I think, Problem with Settlement. Please Look into that.
    Kiran.

  • Goods receipt not marked for production order trigger from sales order

    Hi all,
    In MTO scenario, where requirement trigger from Inquiry -> Quotatation -> Sales Order -> Plan Order -> Production Order, goods receipt indicator in production order was not checked if requirement is triggering from sales order, however it is ticked if requirement trigger from inquiry, therefore we are not able to do confirmation. Appreciate if anyone able to assist us as soon as possible.
    Thanks in advanced.

    Hi,
    I understood that---
    If u r creating Sales order directly without Quotation u r  not able to do the GR.
    If u create from Quotation, u r able to do GR. right?
    I think, Problem with Settlement. Please Look into that.
    Kiran.

  • Automatic project creation from sales order

    Hi,
    I am creating project from the sales order. I have all necessary configuration and maintained master data.
    But during the creation of the project, I am getting 2 errors
    1. I have to maintain network start date (maintained forward scheduling in customization) and systems prompts for availability check
    2. After maintaining start date and confirming the ATP check, when I try to save the sales order, I get error like "Create Network: Project Allocation" where in I can see 2 standard projects, one SAP standard project and another which I created by copying this standard, against which there are 2 black fields for project definition. and below 3 options. COPY, ALLOCATE WBS ELEM and CREATE.
    If cancel this, system asks ' Copy project allocation in the network?' if i say yes then i cant leave the above window and if i say no then new window pops up asking me for WBS element acc assgn and billing WBS elem.
    Does anybody aware of this issue?
    Please help.
    Thanks

    Hi,
    If you want to have availability check on sales order then customize accordingly using OVZ9 & OVZ0. if you don't want availability check then you remove that customization with reference requirement class.
    If you don't want have availability check in project with reference to network type, which I hope has been maintained in the system right now, you can skip that.
    Secondly, your business requires where stock to be release (Sale order/ Project). For the same, kindly check in OVZG what has been maintained for special stock and for account assignment cat.
    If you want to have through sale order, kindly use sale order stock.
    Third, check in CN08, which all values has been defaulted with respect material number, generally if you want to run project through sale order and then header assigned network type is used.
    I hope it would be helpful in resolving the issue.
    Regards
    Avisek Bhardwaj

  • Auto Po creation from sales order.

    Hi ,
              I have a requirement to create a PO automatically from sales order.
    We will be creating a third party sales order, corresponding to which system creates an purchase requisition. Now the requirement is that this Purchase requisition should be converted in to PO automatically.
    For this in the item category config i have ticked the auto Po check box . Also the source of supply is unique so that  purchase requisition is automatically assigned with source of supply.
    But still the PO is not created automatically. What are all the configuration and workflow  needs to be done for this.?
    Kindly help me.
    ram.

    Hi
    From SD settings i dont think a purchase order can be directly created based on sales order thro standards
    You can trigger only purchase requestion
    In VOV6 if you mention order type NB for your schedule line category then a Purchase requestion is only created up on saving your sales order
    Item category in VOV6 should be 5 (third party)
    Account assignment category should be X
    This is third party sales settings
    In MM01 also in the purchasing tab of that material create automatic PO check box is there
    If you tick that also it generates purchase requestion only not purchase order
    In VOV7 create automatic PO check box is there
    If you tick that also it generates purchase requestion only not purchase order
    Involve your MM people also for this requirement
    In MM people can create automatically PO from PR and there are a lot of threads in MM forum regarding that
    For automatic PO creation from PR, follow the steps. taken from MM forum
    1) Material Master purchasing view tick automatic PO check box
    2) Vendor Master purchasing view tick automatic PO check box.
    3) Maintain Source list for Vendor & Material.(ME01)
    4) Maintain Purchase Info Record.(ME11)
    5) Create a Purchase Requisition.(ME51)
    6) Use T .Code: ME59 & execute for PR for vendor, you will be able to create automatic PO.
    7) Note-1:
    During creation of PR , select check box of Source Determination in the 1st screen of ME51
    Ensure that Purchase Info Record should be there.
    If you have more than one vendor then fixes only one vendor in source list.
    Regards
    Raja

  • Issues to Production Orders created from Sales Order

    We have multiline Sales Orders that create a Production order for each sales order line (can be up to 70 or 80 per SO). We normally backflush these via multiple MB1A transactions after the SO has been completed. It is a lot of work doing the required issues to reduce stock levels and consequently they are always "late" being done and the stock is always out of date until the movements (type 261) are processed - generally monthly!!
    As a result, an Access Database has been created that reduces stock in that by entering the SO number and this is used for Stock enquiries. I would like to get rid of this Access database so as I'm sure other people have hit this same problem, is there a way of doing the same in SAP i.e. enter SO number and then relevant stocks are reduced accordingly.
    Any help would be appreciated.
    Thanks in advance
    Jim

    Hi,
    I am not clear why you are manually doing the process? When the production order is confirmed for each operation (CO11) the goods movement should be posted then, backflush selected in work centre or in the production order.
    Any failures can be processed via COGI rather than a database.
    Thanks.

  • PO Creation from Sales Order User Exit

    Hi,
    I have a business requirement where I need to  create a Stock Transport Order (STO) for a particular kind of sales order. I outlined different options for achieving this functionality.
    1. Trigger a workflow for creating STO.
    2. Configure it an EDI output for sales orders. Using the EDI document, create STO in the same system.
    3. Create STO using BAPI from the sales order exit 'USEREXIT_SAVE_DOCUMENT'.
    I am trying to understand the issues if I go with option of creating STO from sales order user-exit. I tested it and it is working fine. But what concerns is me transaction integrity. In other words I am trying to  execute another transaction within a transaction. Both Transactions (VA01 and ME21N/BAPI) may be trying to access same tables. Anyways I havent see any potential overlap.
    I would like to know anybody implemented such a solution?
    What could be the potential issues? Does it really affect transaction integrity?
    Thanks A Lot
    Anil

    I would also be concerned with the possibility of the order failing to update AFTER you call the BAPI.  You could create a custom output type that processes on order create for that order type.  You could add your BAPI call to the processing routine of the output type.

  • Purchase order created from sale order ( third party)

    Hi...
    In third party sale, when sale order is created in SAP system will automatically creates Purchase requisition which can be converted into Purchase order,
    My requirement is i need to identify against which sale order the above purchase order is created, do this purchase order has any reference of sale order.
    Is there any way where i can track the purchase order number entered while cretion of sale order in the purchase order generated after creation of sales order.
    Suggestion will be worth rewarding.
    Regards
    SARFARZ

    Hi
    I think you are little bit confused.The PO number entered while creating the Sales order is nothing but the customer Purchase order.This we may receive in different forms.Hard copy or Mail etc.We will give this number as a reference in sales order.
    Where as for third party orders, depending on the schedule line category (SD), PR will be generated.This will PR will be converted in to PO.In PO item detail, you can find account assignment tab, where you can find the sales order number.
    If you want to link customer PO to the SAP PO, then you need to link the two tables.
    Regards
    Ramakrishna

Maybe you are looking for

  • How to clear the clipboard and empty drawings ?

    Similar question has been in the Sketch Forum for half a year already, with no satisfying answer... My clipboard is becoming an extremely messy merry-go-round. Isn't there even some kind of hack ? And how can I delete cleared or empty drawings from a

  • Price conditions on PO ?

    Hi expert; Is it possible to prohibit the entry of a condition when another exists on a post of a purchase order. For example: I have two conditions price ZC1 and ZC2 that exist in the pricing scheme. On the item of the PO I must permit ZC1 or ZC2 bu

  • Comments/discussion on an approval task/item

    The business has given me a new requirement to an existing approval workflow system, and I'm trying to figure out the best way to do it. A list item is created, and then works its way through three or four sequential approval workflows.  Occasionally

  • Can I Trust External Hard Drives??????

    Hello, I'm a newbie to the organization, partitioning and volumes conversation of drives and external drives. I just purchased a G-Drive 250 GB capacity and successfully set it up, transferred files, so far so good! After reading through some of the

  • Aperture "data base inconsistency"

    I'm shooting a project in the middle of Sudan and Aperture (2.13) has suddenly quit. My library is on a correctly formated external, the vault on another one. I got a message saying Aperture had detected a database inconsistency, and directed me to r