Hi Friends,
i have a issue with a production order fro which we built the product and the finished goods is moved to storage location, i have status set on my Production order as REL  PRT  CNF  DLV  PRC  GMPS MACM SETC. My order was for 1unit,In the quantities window , total qty shows as 1 pc and delivered as nothing (blank). Its not active were physically i can change , so how do i add the deliverd qty field by 1.And what could be the issue? PLS help Points will be rewarded.

This Delivered field in CO02-Dates/Qtys tab will get updated automatically , when the order qty is delivered to stock.
We can not manually update that.
Have you checked whether the storage location stock has been increased ? In MMBE , you place the cursor on the stock qty and choose Environment - Production orders or Material Movements and check , whether a GR has been made against this order.
Regards,
Sheik

Similar Messages

  • Hi All, can i have some production support issues with rootcasue and resolution for SAP TM?

    Hi All, can i have some production support issues with rootcasue and resolution for SAP TM?
    Thanks,
    Sreenivas

    Hi Sreenivas,
    I would recommend that you read the Rules of Engagement and other documents in the Getting Started link (top right) before posting anymore.  Your Discussion will most likely get reported as non-specific and get removed.  If you have a specific problem with TM, please post it in a new thread with error messages, version and SPs installed, and how the error occurs and what you are trying to get TM to do.
    There are a lot of resources available in the TM Overview page which can help, so start there and maybe also look at some of the MKS (Monday Knowledge Session) recordings which should also be listed.  There are also a lot of experienced people who can help resolve issues your TM installation, but you need to provide enough information on the problems you are having.  If you are just looking for information on past problems, do a Search or simply browse through past Discussions which are marked with a green Check (Correct Answer).
    Regards, Mike
    SAP Customer Experience Group - CEG (and a Moderator)

  • User Exit for Production Order confirmation with CO15

    Hi All,
    what User Exit I should use when validating batch when we do Production Order confirmation with CO15.
    Not when we create or release a Production Order.
    Will reward,
    mindaugas
    Edited by: Mindaugas Kazlauskas on Jan 30, 2008 5:03 PM

    Hi
    The Follwing Userexits available:
        Transaction Code - CO15                     Enter Production order Confirmation
    Enhancement/ Business Add-in            Description
    Enhancement
    CONFPP01                             
      PP order conf.: Determine customer specific default values
    CONFPP02                               
      PP order conf.: Customer specific input checks 1
    CONFPP03                              
       PP order conf.: Cust. specific check after op. selection
    CONFPP04                             
        PP order conf.: Customer specific input checks 2
    CONFPP05                               
       PP order conf.: Customer specific enhancements when saving
    CONFPP06                               
       PP Order Confirmations: Actual Data Transfer
    CONFPP07                               
       Single Screen Entry: Inclusion of User-Defined Subscreens
    CONFPS01                              
       PS confirmation: Determine customer specific default values
    CONFPS02                               
      PS confirmation: Customer specific input checks 1
    CONFPS03                             
        PS confirmation: Customer specific check after op. selection
    CONFPS04                              
       PS confirmation: Customer specific input checks 2
    CONFPS05                              
       PS confirmation: Customer specific enhancements when saving
    CONF0001                               
      Enhancements in order confirmation
    CONFPI01                              
       Process order conf.: Calculate cust.specific default values
    CONFPI02                               
       Process order confirmation: Customer spec. input checks 1
    CONFPI03                              
       Process order conf.: Cust. spec. check after op. selection
    CONFPI04                               
       Process order conf.: Customer specific input checks 2
    CONFPI05                              
       Process order conf.: Cust. spec. enhancements when saving
    CONFPI06                              
      Process order confirmation: Actual data transfer
    CONFPM01                             
        PM/SM order conf.: Determine cust. specific default values
    CONFPM02                             
        PM/SM order confirmation: Customer specific input checks 1
    CONFPM03                               
    PM/SM order conf.: Cust. spec. check after op. selection
    CONFPM04                              
       PM/SM order conf.: Customer specific input check 2
    CONFPM05                              
       PM/SM order conf.: Cust. specific enhancements when saving
    If it is helpful rewards points.
    Regards
    Pratp.M

  • Goods Issue Production Order for Confirmed Qty Component

    Dear PP Gurus,
    Here is my case :
    Stock Qty for Sparepart A : 100 un
    First production will require 80 un A, and availability check confirmed. Second Production Order will require 70 un A, where 20 un confirmed and 50 un is not confirmed on availability check. When i try to goods issue the second production order, it is allowed to consumed all 70 un because unrestricted stock is 100. How can i forbid goods issue in second production order only for 20 un A which is confirmed before.
    Thanks,
    Arman Lie

    Dear
    First of all what ever qty u release during production it well get copied in confirmation so as u said first production order is 80 so the balance qty is 20 out of 100 units so for 20 production order is confirmed so u need another production order for 70 in that case u have deflicit stock of 50 so for that reason ur production order not get confirmed for 50 in order to confirm this order u need t make a stock of 50.
    1. check in the OPK4 enable the actual qty
    2.check t-code OPJK Checking Rule and check when material availability when saving the order
    and please check in the material master what availability check u have maintained in mrp
    [http://help.sap.com/erp2005_ehp_04/helpdata/EN/cf/70124adf2d11d1b55e0000e82de178/frameset.htm]
    With Regards
    Pushpalas

  • Production Order GR with Planned Price

    Dear All,
    We are using following steps for production order=
    1) Create BOM, for Semifinished material with Price control = "S"
    2) Create Roting, with all Keys PP01, PP02 and PP03 with Material allocation to respective steps
    3) Standard Cost Estimation using CK11N and CK24
    4) Create Production order using CO10 with Material and WBS Element.
    5) Material issue against Reservation. But the material may be changed after releasing prodction order first time. And Actual issue for the BOM material may be more or less in qty.
    6) Final confirmation with completion of last phase confirmation of production order.
    7) Production Order TECO
    8) Prodction Order Settlement using KO88
    Now my problem is while I am doing final confirmation the GR done is with Planned price (Based on BOM) + Subcontracting charges which it is set with production order while releasing it for the first time.
    Kindly tell me is the system behaviour is correct or wrong?
    We are expecting that GR should happen with the actual material issue price + Subcontracting charges only.
    Please reply.
    Thanks & Regards,
    Vishal Kadia

    Vishal,
    This is for your information.
    If you have production order of 1 EA- Starnadar Price =10 rs
    Raw material cost=5
    Activity Cost=2
    Overhead Cost=2
    So COM=9 rs
    Suppose after production order creation plan cost is 9 rs, hence after confirmation there is no varience (plan vs actual) so actual cost is also the same 9 rs.
    Now as you said if system will go for GR against actual cost, that will post in cost of good mfg account at the time of GR.
    As per std SAP after GR also you can issue the material to that order, hence if you will go for more goods issue of new material against that order (unplanned issue) of rs 5 for the same order then the actual cost will again change (recalculated), but for that oredr material is allready GR with actual cost, then you will not able settle the cost of newwly issued material on that order.
    So whatever the plan and acual cost GR will be done against std price maintioned in material master ( 10 rs)
    This is my understanding.
    Hopes that will clear your dought.
    Tara

  • Production Order Report with Cost

    Hi,
    I am trying to create a report using query to show the production order details, including the components item code (can be inventory or non-inventory), issued qty, component cost of each component and product cost.
    Can anyone help?
    Thanks.

    Hi,
    Try this
    SELECT T0.[DocNum], T0.[Status], T0.[DueDate], T0.[ItemCode], T3.[ItemName], T3.[ItemCode],
    T3.[OnHand], T1.[BaseQty]*T2.Quantity 'Base Qty', T1.[PlannedQty]*T2.Quantity 'Planned Qty',
    (Select sum(isnull(T4.LineTotal,0)) from IGE1 T4 where T4.BaseEntry = T1.DocEntry and T4.ItemCode= T1.ItemCode and T4.BaseType = '202')as 'Cost'
    FROM [dbo].[OWOR]  T0
    INNER JOIN [dbo].[WOR1]  T1 ON T0.DocEntry = T1.DocEntry
    INNER JOIN [dbo].[ITT1]  T2 ON T1.ItemCode = T2.Father
    INNER JOIN [dbo].[OITM]  T3 ON T2.Code = T3.ItemCode
    WHERE T0.[ItemCode] = '[%0]' AND T0.[DocNum] = '[%1]'
    Regards,
    Bala

  • Production order release with batch management

    Dear All
    Our company are going to use batch managment. But someone told us the production order cannot be released if the component with batch managment is missing (requirment is lower than stock). Is that true?

    Dear,
    It depend upon the setting means if you want to automatic batch determination in production order for component then system will not allow to release if no batches are available.
    This setting come from MRP 2 view batch entry if you keep it blank then system will allow you to release the order with missing batch quantity also.
    Please try and come back if any issue.
    Regards,
    R.Brahmankar

  • Production order confirmation with Phantom Assy through CO11N

    Hi,
         We are trying use phantom assy in our production order, we have one BOM with 17 assy, now we have marked our 17 assy with special procurement as 50, we released order for the same, i confirm 10 machine say out of 15 machine through CO11N, now when i m trying to confirm remaining 5 machine through same CO11N system showing error, screen shot of which is attached,
    I tried to solve this issue, with some note in SCN but didnt able to solve it, i tried by removing back flush indicator for all Phantom assy but same error, i also tried to do partial confirmation in CO11N screen but no use, all the component are marked for Back flush indicator,
    Please help if any configuration i m missing in here, how can i start use this phantom assy, as releasing 17 order for assy is such a pain,
    Thanks,
    Pratik..

    Hi Pratik,
            You said that Auto GRN was done. Could you please clarify that do you have separate order for your assy( 15 machine as per your statement)? or you have a single order with 15 operations?
       I assume that you have separate order as you mentioned that auto GR was done. The message is clearly saying that without GI you can't do confirmation. So, please check whether GI was done against this order. If you remove the backflush indicator then you should do the GI manually against the order before doing Confirmation. Did you check the material movement against this order with 261 movement?
    Did you check any backlog record against this movement in COGI?
        It seems that customized error message, you can easily find the cause when debug this program with the help of your abaper. Please check all these things.
    Thanks

  • Production order overlapping with purchase orders for outside process

    I set up the overlap option in a router so we can send 50 pieces (total order quantity is 200) of material ahead to an outside heat treat operation.  When we try to create the purchase order for the 50 to be sent out for heat treat two problems occur.
    1. The quatity in the purchase order is for the entire order of 200, not 50.
    2. We get a message "Date /23/2010 period D is not valid.
    We currently do not use the functionality of splits and overlaps so if anyone can help or guide me to a good resource I would appreciate it.
    Regards.
    Gail
    Edited by: Gail Weeks on Nov 12, 2010 4:19 PM
    If anyone could help with this question I'd appreciate it. Thanks.

    Gail:
    the next operation would be an external operation in your order ? That is, has some external Operation Control Key?
    Then the PurReq for this operation is created at creation or release of the production order by the total operation quantity. Ovelapping allows you to reduce some total time in order, but I don think that can be applied for the purpose you describe. Let us know more details about your requirement.
    Regards

  • Production Order BOM with Variant Configurable Material

    Hi,
    I have a requirement to process the document items in the Production Order BOM for a variant configurable martial. I am not sure which Function Module will do this purpose. I checked the FM: CS_BOM_EXPL_MAT_V2 and does not seem to be working.
    Can you please help me with a suitable Function Module or program that will process the Production Order BOM? Appreciate Your Help.
    Thanks,
    Kanan
    Edited by: Kannan SA on Jul 6, 2011 8:59 PM

    What are you doing with the characteristics right now ?
    If you want operations selected based on characteristic values, you need to have dependencies written just like you do (or in your case, will do) in your BOM components.
    I understand the business-push to not do things 100% at the start and just "oh we'll add that part later" but I would really push back to get that part included initially.

  • Production Order Cancellation with "Period month/year is not open error"

    Hello friends,
    We have this scenario wherein we already "confirmed" Production Order booking for a specific operations which was booked for the month of Sept 2009 using TCODE: CO11 and our Financial transaction was also closed for the month of Sept 2009.
    However, the said booking was incorrect and we need to cancel the said Production Order booking using CO13 and unfortunately we encountered Goods Movement Error Message - "Period 009/2009 is not open for account type M and GL 115700".
    The cancellation of production order only took place on the month of Oct 2009 wherein our Sept 2009 Financial transactions were already closed.
    May I ask how we can cancel the said Confirmed Production Order Booking without opening the Sept 2009 Financial Transaction and be able to process the transaction by taking effect the changes on the month of Oct 2009.
    Thank you!
    Bong

    HI,
    4. After all, I used OB52 and rewrited as below:
    Var. 1000
    A. +
    From acct : blank
    To acct: ZZZZZZZZZZ
    From per.1: 1
    Year: 2002
    To period: 999
    Year: 9999
    From Per.2: 1
    year: 2002
    To period: 999
    Year: 9999
    AuGr: blank
    It's the same with Acc: A,D,K,M,S
    Check M once again and take a help of FI consultant
    Regards
    Kailas ugale
    Edited by: kailasugale on Jan 18, 2012 3:52 PM

  • Why user can not open Production Order form with readonly privilege?

    hi guys,
    today I got a problem when I assign the minimize privilege for a new user.
    the user only want to query status about Production Order, so I assigned the privilege with readonly on Production Order, and disabled all others.
    But when user logged on, and click on the 'Menu -> Production -> Production Order', there pops up an error message said 'To generate the document, first define the numbering series in the Administration module'.
    Do I have to find some other privileges to assign for the user account?
    thanks for your help.

    Thanks.
    But there were 10 groups look like from 'Series - Group No. 1' to 'Series - Group No. 2', How did I know which one was assigned to Production Order?

  • Production order create with BAPI in R/3

    hi,
    we want to create a production order with a simple programm: the user put's in the material number the
    quantity and the finish date - and then a production order
    should be created, saved and printed in one step.
    does anybody know the right BAPI (BAPI'S) for this action?
    thanks

    There isn't one according to the BAP explorer (txn BAPI). I'm on version 4.7 and can't see one.
    There only seem to be some for Production Order confirmations.
    Cheers
    Colin.

  • Hyperion Planning- Account dimension - Sort Order Issue with ODI 11.1.1.5

    Hello Experts,
    First of all, I thank you everybody in this forum for posting their valuable suggestions.
    I am facing a strange issue with ODI (Version 11.1.1.5) while loading metadata to Planning ACCOUNT dimension (Version 11.1.2.x). I am using a Oracle view to load metadata to this dimension. I have defined the sort order in the view and enabled SORT_ORDER_BY_INPUT. For the fresh load to the dimension, everything is working fine. But, when I move a member from one parent to another parent, and define it as the top member of new parent, it is missing its sort order.
    But it is working fine if you define it as the second, third...or last member under new parent. I have tried all the possible ways by flipping all the properties but unable to fix it.
    Please help me here to resolve this issue.
    Your help is greatly appreciated!!
    Thanks
    Edited by: user11965311 on Sep 20, 2011 7:07 PM

    To be honest I think you are best logging it with Oracle because it sounds like you are doing everything correctly so it could be a bug.
    Have you tested this on any previous versions of ODI or is it a new installation?
    If it does get logged with Oracle please keep me informed of the outcome as I would be interested to hear.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Production order settlement with 0

    Hi,
    I understand each month end Internal Order must be 0.
    When I see in production order, those production order with status teco, it is 0 in KOB1 but those production order status which not teco, i see the balance in KOB1.
    So I would like to know should production order need to be 0 when come month end for all production order status be it teco or not?
    what is the impact to costing and finance?
    Thanks

    Dear,
    Please check in your Result Analysis Version (OKG9) whether Transfer to Financial Accounting is checked. If you check this then only results analysis data saved under this results analysis version can be passed to Financial Accounting when you settle.
    For Details information please refer below ;
    Transfer Results Analysis Data to Financial Accounting?
    This indicator means that results analysis data saved under this results analysis version can be passed to Financial Accounting when you settle.
    If Profit Center Accounting is active, an additional posting is made in Profit Center Accounting on the basis of this posting if the profit center number is indicated in the object to be settled.
    Use
    You set this indicator when you want to pass results analysis data to Financial Accounting.
    Procedure
    Set this indicator if appropriate.
    To be able to pass results analysis data to Financial Accounting, you must define posting rules on the basis of which the work in process or reserves are capitalized or shown as a liability (see also: Posting rules for settlement to FI).
    Dependencies
    In results analysis it is possible to make a cross-company valuation for projects or sales orders and update under a results analysis version. The results of this valuation cannot be passed to Financial Accounting.
    The results analysis data that you transfer to Financial Accounting is also passed to the ledgers in which the transaction "KOAE" was assigned the combination company code / ledger.
    The results analysis data that you transfer to Financial Accounting is also transferred to Consolidation.
    Br,Vivek

Maybe you are looking for

  • How to make a backup without password

    I have tried to create new backups, but every time as they are with a lock on. have deleted itunes on pc n without help. bought a new computer without help. my problem is that I have two girls who have switched phones, the mobile phone that owned the

  • Running SQL*Plus

    Hello: I installed Oracle8i on WINNT 4 workstation standalone, that is I am not connected to any server in any way. When I log on to use SQL*Plus I enter internal as username and oracle as password. Host string is left blank since I am not connected

  • Eclispe e4 application in part class open with scene builder time ERROR

    com.oracle.javafx.authoring.persist.FXMLDocument$FxmlParseException: Failed to load FXML file at com.oracle.javafx.authoring.persist.FXMLDocument.makeParseException(FXMLDocument.java:400) at com.oracle.javafx.authoring.persist.FXMLDocument.load(FXMLD

  • Find Case 1 and Case 2

    Hi, An order will have both Case 1 and case 2 types. Case 1 :One ordered_item_id has multiple package _id which we call Ship Alone Case 2: One package_id has multiple ordered_item_id which we call Normal Requirement: I will give packing_id or ordered

  • DCI 10 gig connection with Encryption

    Hi, We are designing a 10 gig DCI interconnect between two DCs which are 800 miles apart in US. Please share your input on settig up a layer two link with data encryption. I am trying to address the following questions: Is there a distance limit for