Production order manual confirmation
Hi,
We have an issue in Manual confirmation to the production order using CO11N..
Our Process,
Production Order confirmation creating via other system ( shop floor system) IDOC.We did one production order confirmation ( partially) for one operation.The total component Qty is 360 for the operation when i confirmed partially via IDOC it consumed 60 Qty.. When i do the manual confirmation for the same order to system ( CO11N) system proposed the component same qty 360 instead of 300..
We are using ECC 6.00 and IS Specfic AFS 6.0
Pl help to advice
Regards.
Kumar
Edited by: Vijayakumar Ramakrishnan on May 19, 2009 9:02 AM
Hi,
u can use CO1F progress confirmations, i hope that serve ur purpose,
thanks
mohan m
Similar Messages
-
Goods Issue Production Order for Confirmed Qty Component
Dear PP Gurus,
Here is my case :
Stock Qty for Sparepart A : 100 un
First production will require 80 un A, and availability check confirmed. Second Production Order will require 70 un A, where 20 un confirmed and 50 un is not confirmed on availability check. When i try to goods issue the second production order, it is allowed to consumed all 70 un because unrestricted stock is 100. How can i forbid goods issue in second production order only for 20 un A which is confirmed before.
Thanks,
Arman LieDear
First of all what ever qty u release during production it well get copied in confirmation so as u said first production order is 80 so the balance qty is 20 out of 100 units so for 20 production order is confirmed so u need another production order for 70 in that case u have deflicit stock of 50 so for that reason ur production order not get confirmed for 50 in order to confirm this order u need t make a stock of 50.
1. check in the OPK4 enable the actual qty
2.check t-code OPJK Checking Rule and check when material availability when saving the order
and please check in the material master what availability check u have maintained in mrp
[http://help.sap.com/erp2005_ehp_04/helpdata/EN/cf/70124adf2d11d1b55e0000e82de178/frameset.htm]
With Regards
Pushpalas -
Production Order Operation Confirmations & CATS_DA
Hi All,
We are trying to reconcile a discrepancy between CATS_DA data and confirmations entered against production order operations.
I can see the Operation text in the CATS_DA report, and also the WBS element.
I can see the time entries on the confirmations on the production order.
But I can't find any link between the two, and if we sum or aggregate our data, the total hours for Production Order Confirmations are always more than the total hours in CATS.
This is driving us crazy. Can anyone help with some ideas?
Thanks,
TimothyHi Selva,
1. What is the object type for "Planned Orders" to define number range?
The object for planned order is PLAF. You can directly maintain the number range in OMI2 (for planned orders created during MRP) and OMI3 (for manually created planned orders).
2. How to define number range for reservations, operation numbers, order confirmations?
Go to SPRO on the following path: Production Planning for Process Industries - Process Order - Master Data - Order - Number Ranges
Or use the following transactions:
CO83 - reservations
CO81 - operations
CO80 - confirmations
Bonus: to define default values for operation, use transaction OPJG.
Regards,
Julian -
Production Order Partial Confirmation Report
My requirement is to write a report to get all the partial confirmation time, date and Qty of a Production Order. Which table stores the relevant information? Kindly help me.
ThanksHi,
Check with AFRD,AFRU, AFRV RESB, AFKO,& AFPO tables.
Regards,
Maha -
Changes in production order after confirmation
Hi all,
I have confirmed the production order & all the subsequent process are completed but still the system allows changes to the order which has status DELV. Please can anybody tell me how to control once when the production order status is in GMPS & DELV the system should not allow to make any changes.
Please reply, thanks in advanceShaiz,
You can control this in 2 ways
Either by User Exit or User Status
User Status can be maintained in BS22 tcode against the status DLV
Revert back if you have further queries
Reward points if useful
Regards,
SVP -
Restiction of Production Order Operation Confirmation
Dear Friends,
I need to restrict Production Order Confirmation among Production & Quality Control users i.e. production order contains both Production as well as Quality Inspection operations. I want to put restriction such that Production people should be able to confirm only Production relavant operations , same as QA people should only be able to confirm Quality Inspection operations.
Specifically I need more clarity on defining clear authorisation objects which can fulfill above requirement.
Kindly share your valuable inputs for the same.
Thanks in advance.
Regards,Bad news Teja,
I go dig deep down to authorization object someone posted C_AFRU_APL Confirmation: Authorization for actual work center. It seems like in standard SAP will check this object only if the order category is 20 (PS network orders), or 30 (PM work order) but not production orders.
So if you want to check during CO11N transaction. Maybe user exit CONF003 (PP Order Confirmation: Customer-Specific Checks after Operation selection) with the sample code can be explored.
I apologized for my mistake.
u201C Check only production order
CHECK CAUFVD_IMP-AUTYP EQ u201810u2019.
AUTHORITY-CHECK OBJECT 'C_AFRU_APL'
ID 'WERKS' FIELD AFVGD_IMP-werks
ID 'ARBPL' FIELD AFVGD_IMP-arbpl
ID 'TRTYP' FIELD u2018Hu2019.
IF NOT sy-subrc IS INITIAL.
MESSAGE ID u2018Q0u2019 TYPE u2018Eu2019 NUMBER u2018156u2019
WITH AFVGD_IMP-arbpl AFVGD_IMP-werks.
ENDIF.
This is smod u201CCONFPP03u201D. Standard message id Q0, 156 is the standard error message that you can use or you can create new customized message id.
Regards, -
Actual production order final confirmation time
Dear all,
Could you please let me know who i can get the actual time a production order was finally confirmed? I know we have the production order statuses history chnage but were is it stored?
BR and many thanksHi Mikel,
Pass order number AUFNR to AUFK and fetch OBJNR.
Pass the AUFK-OBJNR to table JCDS to fetch the status STAT, changed date UDATE and
changed time UTIME where INACT = blank.
Pass the JCDS-STAT to table TJ02 and fetch TXT30 status text.
Filter the data with respective to TXT30 = CNF and accordingly get UTIME from JCDS.
Pre-requisite config:
Date related data in table JCDS will be updated only upon selecting the Status change
documents in OPL8/COR4 under implementation tab.
Revert if you have any issues.
Thanks & Regards,
Ramagiri -
Production order operation confirmation before 261 movement
Dear All,
In a production order, components are assigned to operations.
I want to knw if there is any method to prevent the production order confirmation (CO11N) before issuing the material to production order. (261 movement).
Thanks in anticipation..
Regards,
Chetan.Dear Vivek,
Appreciate your suggestion. I tried searching the topic in the forum by using all relevant words, bt ws unable to find it in the vast sea (May b i went wrong somewhr) . Could you pls. suggest the correct way to search it what could have been the possible search words for this particular querry? - It will help to resolve the querries in future as well. (In case of repeated ones)..
Thanking u in anticipation. -
Connection between serial numbers in production order end confirmation
Hi all,
could you tell me if is possible in co11n to chose serial numbers already generated during the creation of production order?
I set an automatic generation of serial numbers in saving of co01.. can I decide in co11n which serial number of a precise prod.order to confirm?
Thanks,
ValentinaThanks for your answer,
I'm using this way to do you suggested me.. but the problem is this:
For ex:
Prod. order A
Quantity of prod. order = 100
Quantity already confirmed 50
I have to put in warehouse only 5 finished prducts, but when I use migo 101 for a GR, the system proposes to me 100 serial numbers from which I can select 5 sn; next time whene I have to select 5 others serial numbers, the system proposes to me all the 100 serial numbers again..
I'd like to find a way to eliminate from the serial numb. list in migo 101 the sn that I've already selected before.
For this I can force the storage to "blank" in the list selection, but if another production order B, for the same material exists, how can I know which of those serial numbers belongs to the order A and which to the order B?
Regards,
Valentina -
Table name& field name for production order & operation confirmation
Hi All,
I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
Thanks and Regards,
PSSHi there,
CORU(R/3 Application development: PP Confirmations )
AFFW Goods movements with errors from confirmatio
AFRC Table of planned changes to conf.: Automatic
AFRD Default values for collective confirmation
AFRH Header information for confirmation pool
AFRP1 Table of planned changes to conf.: Automatic
AFRP2 Table of planned changes for confirmation: B
AFRP3 Table of planned changes for confirmation: C
AFRP4 Table of planned changes to confirmatn: Data
AFRU Order completion confirmations
AFWI Subsequently posted goods movements for conf
TAFWD CORU: Messages that are not interpreted as e
TCORD Table for field-dependent check routines
TCORU Parameters for order confirmations
TCORV Table with Routines for structureing variabl
TCORW Confirmation: Window Control
TPARU Control parallelized confirmation processes
TPRRU Control table for process chain for confirma
TPRRUT Text table for process control of confirmati
TRUGS User status caused by deviation
CO(R/3 Application development: PP Production orders )
AFBP CIM order: Batch print requests
AFFL Work order sequence
AFKO Order header data PP orders
AFPO Order item
AFVC Operation within an order
AFVU DB structure of the user fields of the opera
AFVV DB structure of the quantities/dates/values
FAPW Index of production-/issuing plant for produ
FTIND Missing parts index
ORDCOM Communication control Operation download
T024F Production scheduler
T399X Parameters dependent on order type
T441C Profile - availability check
T441CT Texts for Profile "Display Availability Chec
T490 Transactions PP - orders - order category
T496B CIM order: Assigning document types to refer
T496D CIM: Destination/lists/spool parameters per
T496F CIM order: Form description of the list
T496K CIM order: Entity table of possible table id
T496N CIM order: List descriptions
T496P Print PP documents: Determination of output
T496R Print PP shop papers: Report control
T496T Print PP shop papers: Transaction control
T496V PP Print: Default Value for Printing Online
T496Z CIM order: Table-controlled table access
TC32 Assigning subscreen to processing location
TC34 Allocating operation to object type for the
TC62 Sequence of detail screens when processing h
TCO01 Sequence/operations control in logicstics or
TCO03 CIM order: Texts for TCO01, Description of o
TCO04 Table for controlling the screen sequence gr
TCO05 CUA status depending on panel, trans. type,
TCO06 Exclusive functions for PP orders
TCO09 CIM order: Text IDs of objects in orders
TCO10 Valuation variant for order costing
TCO11 Control table for production orders - availa
TCO12 Control table production orders - stock dete
TCO36 PP orders: Control table for calling up pop-
TCO41 CIM order: Default values for generating ope
TCO43 PP-SFC order profile
TCO43T Description of production scheduler profile
TCO60 Sequence keys for input facility and verific
TCO61 Sequence key for PP orders
TCO62 Defining screen sequences for input facility
TCO63 Sequence of detail screens when maintaining
TCODB Database fields development class CO per ord
TCOF Profile for missing parts info system
TCOFF Profile for Missing Parts Info System: Displ
TCOFFT Texts for Missing Parts Info System: Display
TCOFG Profile for missing parts info system: crite
TCOFGT Texts for Missing Parts Info System: Criteri
TCOFK Texts for functions in milestones/trigger po
TCOFS Profile for Missing Parts Info System: Sort
TCOFST Texts for Missing Parts Info System: Sort Cr
TCOFT Texts for Missing Parts Info System
TCOKO Constants for PP orders
TCOKT Account assignment categories for order
TCOP Field selection profile
TCOPS Field selection profile
TCOPT Description of Profile for Field Selection
TDUMMY Dummy structure of a table for READ with VER
TRUG Reason for variances in completion confirmat
TRUGT Text describing the reason for a variance in
TXPR1 XPRA control - missing parts info system
Regards
Hemant G -
Batch Number Not copied over from Production order to Confirmation
Dear Experts,
In the production order, I specify the batch # for the components. But when I do the confirmation, the batch number for the components is not getting copied over.
Can anyone suggest what has to be done.
Regards
TomDario, I have not saved my confirmation. But when I execute CO11N and go to "Goods Movement" tab, I expect the Batch to be copied from the production order for the components. But the batch field is Blank.
How do we make the batch field to be copied over from the production order.
Thanks in advance.
Regards
Tom -
How to confirm the CO Production Order?
Hi,all
The PP Production Order can confirm by TCode CO15.
Then how to confirm the CO Production Order(Created by KKF1)?Hi,
As you are aware that Co Production Order is being used when there is no quantity structure. Hence, there shall be no routings with details of activities and the quantity of activities, etc and we cannot use confirmation as we are doing in regular Production Corder. Consequently, we are left with one alternative of passing on the activity cost(qty x price) to the CO Production through Direct Activity Allocaiton(KB21N).
Trust this helps much!
Cheers! -
How to avoid actual cost error log while confirm production order activity
Hi
I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm in CO11N, system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.Hi
Issue is resolved thru PP forum. Thanks for ur reply.
Solution lies in Control key of routing and BOM costing relevancy. -
How to avoid Cost error log while confirming production order
Hi
I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.Sudhar,
You can make the operation not relevant for Costing by using a Customized Control key which is not relevant for Costing or else in the operation details you need to leave the "Costing relevancy" field blank.
Regards,
Prasobh -
Production order confirmation date & time not matching with MB51.
Hi All,
We are facing a problem when we confirm production order in a local time zone but when we go and check the material document MB51 , we find the posting date and time is showing System date and time and not the local date and time - in the month end we are facing the problems in reports preperation.
Please find the example as below-
Step-1
I do confirmation of Production order 101939015 for the Plant 2041
on 03/12/2007 at 11:39:33 ( USER TIME ZONE),
Step-2
Now go to the MB51 (Material document list)and check the posting time
- here the posting date and time is 03/11/2007 & 23:39:37. ( SYSTEM TIME ZONE.)
Material Document Number : 4909412794
From the above example we can see that the production order was confirmed in USER TIME ZONE ,but the document was posted in SYSTEM TIME ZONE, which is not acceptable to the USER, as in the month-end he is not getting the correct Reports. User wants a harmonized date & time.
Can anybody give some solution its very urgent.
Nitin.Hi Nitin,
Can you check the confirmation time in the system by displaying confirmation and then there look for "Admin" data.
Also let us know whether Confirmation/Goods Movment is online update or run in background as job?
Please let us know your findings,
Regards,
Prasobh
Maybe you are looking for
-
Dear professional Javaer :) I have a code with much inbeliveble: import java.util.List; import java.util.ArrayList; class Test { private List<String> listStr = this.getListOfString(); public Test() { System.out.println("Out: " + this.listStr); public
-
How to nest two or more tables in layout of an adobe form?
hi gurus, i have the requirement to loop one line item table inside that item conditions table and item shedule table... ie say the item no ,description,quantity,uom,price will be printed for each line item and then all the item conditions will be
-
my cd and dvd will not play
-
Protection of Exchange 2012 SP1 DAG with DPM 2012R2 not working - Replica is Inconsistent
We are struggling to get DPM 2012 R2 to protect our Exchange 2013 SP1 DAG, and receiving the error "Replica is inconsistent". I have copied the current versions of eseutil.exe and ese.dll to the DPM servers, and the DPM agent is the latest version on
-
Hello all, I had a problem where my archive log dir filled up last night and corrupted a datafile. I haave tried to do an incomplete recovery until just before the directory filled. When running this recovery I get errors: RMAN-03022: compiling comma