Production order operation confirmation before 261 movement

Dear All,
In a production order, components are assigned to operations.
I want to knw if there is any method to prevent the production order confirmation (CO11N) before issuing the material to production order. (261 movement).
Thanks in anticipation..
Regards,
Chetan.

Dear Vivek,
Appreciate your suggestion. I tried searching the topic in the forum by using all relevant words, bt ws unable to find it in the vast sea (May b i went wrong somewhr) . Could you pls. suggest the correct way to search it what could have been the possible search words for this particular querry?  - It will  help to resolve the querries in future as well. (In case of repeated ones)..
Thanking u in anticipation.

Similar Messages

  • Production Order Operation Confirmations & CATS_DA

    Hi All,
    We are trying to reconcile a discrepancy between CATS_DA data and confirmations entered against production order operations.
    I can see the Operation text in the CATS_DA report, and also the WBS element.
    I can see the time entries on the confirmations on the production order.
    But I can't find any link between the two, and if we sum or aggregate our data, the total hours for Production Order Confirmations are always more than the total hours in CATS.
    This is driving us crazy.  Can anyone help with some ideas?
    Thanks,
    Timothy

    Hi Selva,
    1. What is the  object type for "Planned Orders" to define number range?
    The object for planned order is PLAF. You can directly maintain the number range in OMI2 (for planned orders created during MRP) and OMI3 (for manually created planned orders).
    2. How to define number range for reservations, operation numbers, order confirmations?
    Go to SPRO on the following path: Production Planning for Process Industries - Process Order - Master Data - Order - Number Ranges
    Or use the following transactions:
    CO83 - reservations
    CO81 - operations
    CO80 - confirmations
    Bonus: to define default values for operation, use transaction OPJG.
    Regards,
    Julian

  • Table name& field name for production order  & operation confirmation

    Hi All,
              I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
    Thanks and Regards,
    PSS

    Hi there,
    CORU(R/3 Application development: PP Confirmations )
    AFFW       Goods movements with errors from confirmatio
    AFRC       Table of planned changes to conf.: Automatic
    AFRD       Default values for collective confirmation 
    AFRH       Header information for confirmation pool   
    AFRP1      Table of planned changes to conf.: Automatic
    AFRP2      Table of planned changes for confirmation: B
    AFRP3      Table of planned changes for confirmation: C
    AFRP4      Table of planned changes to confirmatn: Data
    AFRU       Order completion confirmations             
    AFWI       Subsequently posted goods movements for conf
    TAFWD      CORU: Messages that are not interpreted as e
    TCORD      Table for field-dependent check routines   
    TCORU      Parameters for order confirmations         
    TCORV      Table with Routines for structureing variabl
    TCORW      Confirmation: Window Control               
    TPARU      Control parallelized confirmation processes
    TPRRU      Control table for process chain for confirma
    TPRRUT     Text table for process control of confirmati
    TRUGS      User status caused by deviation            
    CO(R/3 Application development: PP Production orders )
    AFBP        CIM order: Batch print requests            
    AFFL        Work order sequence                        
    AFKO        Order header data PP orders                
    AFPO        Order item                                 
    AFVC        Operation within an order                  
    AFVU        DB structure of the user fields of the opera
    AFVV        DB structure of the quantities/dates/values
    FAPW        Index of production-/issuing plant for produ
    FTIND       Missing parts index                        
    ORDCOM      Communication control Operation download   
    T024F       Production scheduler                       
    T399X       Parameters dependent on order type         
    T441C       Profile - availability check               
    T441CT      Texts for Profile "Display Availability Chec
    T490        Transactions PP - orders - order category  
    T496B       CIM order: Assigning document types to refer
    T496D       CIM: Destination/lists/spool parameters per
    T496F       CIM order: Form description of the list    
    T496K       CIM order: Entity table of possible table id
    T496N       CIM order: List descriptions               
    T496P       Print PP documents: Determination of output
    T496R       Print PP shop papers: Report control       
    T496T       Print PP shop papers: Transaction control  
    T496V       PP Print: Default Value for Printing Online
    T496Z       CIM order: Table-controlled table access   
    TC32        Assigning subscreen to processing location 
    TC34        Allocating operation to object type for the 
    TC62        Sequence of detail screens when processing h
    TCO01       Sequence/operations control in logicstics or
    TCO03       CIM order: Texts for TCO01, Description of o
    TCO04       Table for controlling the screen sequence gr
    TCO05       CUA status depending on panel, trans. type, 
    TCO06       Exclusive functions for PP orders           
    TCO09       CIM order: Text IDs of objects in orders    
    TCO10       Valuation variant for order costing         
    TCO11       Control table for production orders - availa
    TCO12       Control table production orders - stock dete
    TCO36       PP orders: Control table for calling up pop-
    TCO41       CIM order: Default values for generating ope
    TCO43       PP-SFC order profile                        
    TCO43T      Description of production scheduler profile 
    TCO60       Sequence keys for input facility and verific
    TCO61       Sequence key for PP orders                  
    TCO62       Defining screen sequences for input facility
    TCO63       Sequence of detail screens when maintaining 
    TCODB       Database fields development class CO per ord
    TCOF        Profile for missing parts info system       
    TCOFF       Profile for Missing Parts Info System: Displ
    TCOFFT      Texts for Missing Parts Info System: Display
    TCOFG       Profile for missing parts info system: crite
    TCOFGT      Texts for Missing Parts Info System: Criteri
    TCOFK       Texts for functions in milestones/trigger po
    TCOFS       Profile for Missing Parts Info System: Sort
    TCOFST      Texts for Missing Parts Info System: Sort Cr
    TCOFT       Texts for Missing Parts Info System        
    TCOKO       Constants for PP orders                    
    TCOKT       Account assignment categories for order    
    TCOP        Field selection profile                    
    TCOPS       Field selection profile                    
    TCOPT       Description of Profile for Field Selection 
    TDUMMY      Dummy structure of a table for READ with VER
    TRUG        Reason for variances in completion confirmat
    TRUGT       Text describing the reason for a variance in
    TXPR1       XPRA control - missing parts info system   
    Regards
    Hemant G

  • Restiction of Production Order Operation Confirmation

    Dear Friends,
    I need to restrict Production Order Confirmation among Production & Quality Control users i.e. production order contains both Production as well as Quality Inspection operations. I want to put restriction such that Production people should be able to confirm only Production relavant operations , same as QA people should only be able to confirm Quality Inspection operations.
    Specifically I need more clarity on defining clear authorisation objects which can fulfill above requirement.
    Kindly share your valuable inputs for the same.
    Thanks in advance.
    Regards,

    Bad news Teja,
    I go dig deep down to authorization object someone posted C_AFRU_APL Confirmation: Authorization for actual work center.  It seems like in standard SAP will check this object only if the order category is 20 (PS network orders), or 30 (PM work order) but not production orders.
    So if you want to check during CO11N transaction.  Maybe user exit CONF003 (PP Order Confirmation: Customer-Specific Checks after Operation selection) with the sample code can be explored. 
    I apologized for my mistake.
    u201C Check only production order
    CHECK CAUFVD_IMP-AUTYP EQ u201810u2019.  
    AUTHORITY-CHECK OBJECT 'C_AFRU_APL'
               ID 'WERKS' FIELD AFVGD_IMP-werks
               ID 'ARBPL' FIELD AFVGD_IMP-arbpl
               ID 'TRTYP' FIELD u2018Hu2019.
    IF NOT sy-subrc IS INITIAL.
          MESSAGE ID u2018Q0u2019 TYPE u2018Eu2019 NUMBER u2018156u2019
                   WITH AFVGD_IMP-arbpl AFVGD_IMP-werks.
    ENDIF.
    This is smod  u201CCONFPP03u201D.  Standard message id Q0, 156 is the standard error message that you can use or you can create new customized message id.
    Regards,

  • Report for Production order operation

    Hi
    Is there any standard  report which will give the list of production orders which are confirmed upto a particular operation.
    For Ex: Lets say routing has  operations 0010,0020 and 0030. I want to know which production orders are  confirmed upto operation 0020 and not beyond that.
    Thanks in advance.
    Maruthi Ram

    Hi,
    Options:
    1. Use COOIS.
    In the drop down LIST options select Operations. In the Select at Operation Level specify the Syst. Status as CNF & CRTD, click exclude check box, specify the Plant at Select at Header Level & execute the report.
    The output will display all operations which are not confirmed or created, now you can set filter on the operation column & get the info you're looking for.
    2. Use MCP1 - Check if this report helps.
    Hope the above answers your query.
    Regards,
    Vivek

  • Goods Issue Production Order for Confirmed Qty Component

    Dear PP Gurus,
    Here is my case :
    Stock Qty for Sparepart A : 100 un
    First production will require 80 un A, and availability check confirmed. Second Production Order will require 70 un A, where 20 un confirmed and 50 un is not confirmed on availability check. When i try to goods issue the second production order, it is allowed to consumed all 70 un because unrestricted stock is 100. How can i forbid goods issue in second production order only for 20 un A which is confirmed before.
    Thanks,
    Arman Lie

    Dear
    First of all what ever qty u release during production it well get copied in confirmation so as u said first production order is 80 so the balance qty is 20 out of 100 units so for 20 production order is confirmed so u need another production order for 70 in that case u have deflicit stock of 50 so for that reason ur production order not get confirmed for 50 in order to confirm this order u need t make a stock of 50.
    1. check in the OPK4 enable the actual qty
    2.check t-code OPJK Checking Rule and check when material availability when saving the order
    and please check in the material master what availability check u have maintained in mrp
    [http://help.sap.com/erp2005_ehp_04/helpdata/EN/cf/70124adf2d11d1b55e0000e82de178/frameset.htm]
    With Regards
    Pushpalas

  • Functional module for production order operation standard values

    Hi,
    Is there any functional module/BAPI available where I can get the 'Standard Valuse' (Setup/Machine/Labor) from production order operations directly?
    Regards,

    Hi Caetano,
    Thank you for your reply.
    I checked suggested BAPI BAPI_PRODORD_GET_DETAIL, it gives me the operation details like control key, Activity name (like KMCH, KMOD) but not its standard values (values for: Setup/Machine/Labor).
    Could you please check and confirm?
    The FM: PM_ORDER_DATA_READ gives me all details but as name start with PM, I am not sure if its only related to 'Plant maintenance' orders and if its ok to use this FM for PP production orders.
    Please suggest.
    Regards,

  • Standard Report for missing parts at production order operation level?

    Hi PP Gurus,
                We have standard report for missing parts at production orders level.
    For our client, they need a report for missing parts analysis at production order operation level. Do we have any such standard report in the SAP?
    Please help.
    Thanks,
    Reddy.

    Hi Arvind,
          Thanks for for your response.
    1. List: Components,  Layout: Standard layout          set the Missing part
           It shows the component requirement/withdrawn  quantity for each operation of production order. It is not showing the commit quantity.
    2. List: Components,  Layout: Pick list          set the Missing part
           It shows the component requirement/withdrawn  quantity for each production order.
    3. List: Components,  Layout: Missing Parts List-Material View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
    4. List: Components,  Layout: Missing Parts List-Order View          set the Missing part
           It shows the component requirement/commit quantity for each production order. It is not showing the commit quantity at opertion level.
          We are unable to get the solution from all these 1 to 4 reports from COOIS.
    Do we have any option to change the existing layout (ex: 3 ) to get the commit quantity for operation with missing parts indicator?
    If avilable, what is the procedure to be followed?
    Thanks,
    Reddy.

  • Service PR from production order operation!

    Hi All,
    I just want to check whether it is possible to trigger service purchase requisitions (with item category D) for an external vendor from a production order operation?
    If it is, please let me know the procedure to do so...
    Regards.
    V S

    >
    V S wrote:
    > but how do i get the item category in PR as D for service?
    Hi,
    Item category D is not possible but u can use that pr as Service PR ... We were using this process only.
    Now we are creating manualy.
    Arun

  • Production Order Operations System Status

    Hello Friends,
    I want to include Production order operations status in customized report. Can you pls suggest me how to fetch Operations status since I am unable to find the same from any of the Production Order Operation table (AFVC, AFRU, AFVU, AFRH etc) Also JEST, TJ02 tables provide Prod  Order header level status. I want to fetch Operation level status.
    Hope to have your valuable inputs for the same.
    Thanks & Regards,
    Tejas

    Dear Mr Brahmankar & Mr Vivek,
    Thanks for your answers.
    I am working with the ways you suggested.
    In case any issue will ask to you.
    I really appreciate your timely help.
    Regards,
    Tejas

  • Production order operation's standard value

    hi,
    can anyone shed some lights where does the production order operation's standard values derive from?
    thanks.

    hi there,
    see in work centre inital screen u define the std value key . depending upon the std value key u get the fields for  execution time . set up time , labour time ....etc
    u define here that wether timmings by clicking the drop down .
    should be maintainned ,
    can be maintained ,.......
    if u define here that the timming for execution time should be maintained ,the system while ,creating the operation by using this workcentre ,system will ask u to put a value which will define the operation time for the operation on that work centre .
    depending upon the drop down in workcentre for the execution time should be maintained or can be maintained system will either will allow u to go ahead or not with out entering the operation timming

  • For a Production order - Operation wise Inspection Lot

    Hi Experts,
    Please help me out to resolve the following problems.
    1. How can we create inspection lot for each operation for a production order?
    If a production order has 10 operations, I will have to have 10 inspection lots for that order.
    2. I have a final assembly called A with components B & C. Some other material called D has similar characteristics of B.
        But sometimes, for A, instead of B (if stock is not available), i want to use D also. Please note that, if B is not available, then
        only, I will use D. Otherwise always B only, so we cannot go with probability.
    How can we map this scenario? and MRP run also should consider D if B is not there.
    Thanks in advance.
    Regards,
    Vijay.

    Dear
    Answer Q1 : Go to SPRO > Production> Shop floor control> operations > confirmation> define confirmation parameters
    Maintain
    1)Operation sequence u2013 error when operation sequence is not adhered to
    2) Over delivery u2013 Error when over delivery tolerance is exceeded
    3) Results Rec. (QM)- Error message if no Insp results exist
    So what these setting helps is that  :
    1)All operation has to be confirmed operation wise means 0010 has to be confirmed for confirming 0020 operation. SO production guys can only confirm 0040 operations only after 0030 operations is confirmed by quality personal.
    2)Over delivery is not allowed means of in 0030 operation if only 50 quantity is confirmed in 0040 operation only 50 can be confirmed. Production people cannot confirm more than 50 quantities
    3) Also PP personal cannot confirm operation 0030 through C011N till the result recording of that operation is done through QA32.
    4)Maintain Operation Control Key -PP01 with marked Inspection Character Marked -OPJ8  and maintain this Control Key for   those operation which are required for Inspection Lot .
    Now For QM stand point , activate inspection type 03 and 04 in material master. For 03 type of inspection, you have to make routing in CA01. So when you release your production order, an inspection lot will be generated. This lot will not be stock relevant. This is just to check that you production is in accordance with quality norms. Only after clearing this lot from quality you can do your order confirmation, otherwise system will give hard error due to 3rd point of prev post.
    For 04 type of inspections, prepare inspection plan in QP01. Now when order is confirmed, an inspection lot of 04 origin will be created in quality, and this is stock relevant and for final inspection of production order material.
    If you need you can set for early inspection as well. That will give you another intermediate stage before final inspection. Inspection points are also an option if suites your requirement.
    If you need more inspections, I suggest go for manual inspection lots of 04 origins, they are created in ref to order and are not stock relevant.
    Q2 : Please explore this thread for options explained for Alternative Item selection .
    Alternate Item in BOM
    Regards
    JH

  • Production Order Receipt Block before Usage Decision is Made

    Dear all,
    I have a requirement to block production order receipt through MIGO into any storage location before the usage decision has been made for that production order.
    This should be the rule for all non serial items, meaning that it should only apply to batch controlled and neither batch nor serial controlled materials.
    Could someone please help me on this?
    Thanks,
    Sergiy

    Hi,
    Is it possible through by maintaining the inspection type for the material master. Then the material will be moved to quality stock after usage decision then you can move that material to unrestricted material.
    For Batch managed or serial number profile defined material don't activate the inspection type.
    Hope this might help you.
    Regards
    Ravi shankar.

  • Rework order Operation Confirmation and quantity posting to main order oper

    Hi Friends,
    I have confirmed first operation of production order by CO11N. While confirming the operation, i entered 5 qty. as Rework Quantity. Due to trigger point function, Rework order gtets generated. After completion of Rework , i confirmed rework Order. Now i want to add this Rework Quantity in the second operation of main order . So i can be able to make confirmation of whole quantity of second operation. How to do this?
    Normally system takes the first operation yield quantity as next operation quantity for confirmation.
    Waiting for Reply!
    Thanks!

    Dear,
    If a separate rework order is created using the trigger point, the system assumes that both the rework and all subsequent operations are processed via this rework order. As if first operation confirmed as 10  5 as rework quantity.
    It means that you can second operation you can confirm as 5 only. So you need to add all operation in reference operation set so confirm all operation quantity here and remaining quantity in main order. So your confirmation yield will remains same.
    Or it is only possible to return the successfully reworked quantity to the original order if the quantity check which is executed against the confirmed yield of the predecessor is deactivated using Customizing of the confirmation OPK4. In this case, only the confirmed yield is indeed proposed without the confirmed rework quantity. However, with the quantity check being deactivated it is allowed to overwrite the default value with a larger quantity.
    Note that you cannot enter a goods receipt for the rework order since it is defined without header material. Instead, you can enter goods receipts for the original order manually.
    Regards,
    R.Brahmankar

  • Production Order, Operation Release Manually System Status Table:

    Hi Expert,
    1) i am creating Production Order for only Reporting purpose, we have 38 Operations and it will doing different different users, customers wants to status for Operation what time and date it operation is release, and what time confirm, in two activity during period we wants capture, release>> Confirm, i found table for Confirmation operation Date and Time, but now i need to what time operation release, date and time, Table, also i config. done in OPK8 in implementation tab, release versions HEADER, ITEM, OPERATION all tick.
    but i cnt able to find where it is store. operation release time and date.
    when we show in CO02, operation overview, select operation, click on status (i)> extras> change doc. >> all >>click on release > sys show there correct time and date.
    pl. suggest
    MANOJ

    Hi,
    You can make use of the standard SAP Order info system transaction COOIS for order confirmations , also you can make use of the table AFRU.
    Please give suitable points if answer found helpful/suitable.
    Regards,
    Amol Kale

Maybe you are looking for

  • ITunes x64 does not install in Windows 7. Shows that there is problem with windows installer package

    These images below show the error message I retrieve. I downloaded iTunes 10.5 x64 Edition for windows from Apple Official Website. When I try to install, it shows me these errors. I even tried removing the old version iTunes, and installing this ver

  • I DELETED ALL MY PICTURES ON ACCIDENT

    Ok so it's 3:30 in the morning, and I am uploading pictures from my digital onto my powerbook and I decide to save space on my computer by deleting all my originals. Little did I know that if the original is deleted I cannot open the picture on iphot

  • CO-PA Extraction into BW

    Hi all, We are looking to extracting CO-PA data into BW for use in reporting. I understand that the COPA utilises four tables namely: CE1XXXX-Actual line items CE2XXXX-Plan line items CE3XXXX-Summary table CE4XXXX-Segment table Some of our reports re

  • ORA-00205: error in identifying control file

    Hi DBAs, I am using Oracle 11g R2, My db is up and running, I thought to Multiplexing the controlfile in another location. My DB is up with help of sp file. While it was up, I have given a comment like this, without specifying the filename.ctl , I wr

  • Best workflow: multiple documents or multiple sheets?

    I'm new to spreadsheets, but growing to like them a lot. One question I have is what the best practice is for maintaining things like a finance/income spreadsheet for multiple years - is is better to have a new sheet for every year, or to create a ne