In which table , the status for the production order printing is stored, say , it printed n times or never printed etc,,
Thanks for the help
Nic

Hi,
The table JEST stores the status PRT indicating that order was printed (Original), any subsequent printing is only a reprint.
There is no logging of reprints.
Regards,
Vivek

Similar Messages

  • Production order Relase status Batch is picked in Delivery

    Hi friends,
    Presently in system, Production order Relase status Batch is allocated in Delivery due to Availability checking group & rule.Now as per requirement only Confirmed  Production order  Batch should allocat in delivery,then what setting should be done in Batch search stratergy & Availability checking group & rule so that system will consider only Confirmed  Production order  Batch in Availability check.?
    Please revert ASAP.
    Thanks & regards,
    NITIN M.PAWAR

    good analysis

  • Production order print out

    Hi friends,
    i would like to know the configuration setting required for shop floor paper print out like producton order, confirmation, time ticket etc. i have checked execute printing in opkp. in control key, print, print time ticket, print confirmation  are checked . in co04, and co04n i am not able to get the production order print out.
    in opk8 please tell the required confirmation in detail (step by step)
    regards'
    Arun

    Need to do the setting in OPK8
    first check the configutaion link below and then come bsck w/yr doubt
    http://help.sap.com/saphelp_40b/helpdata/en/3a/72369adc56d11195100060b03c6b76/frameset.htm

  • Production Order Printing has no WBS Reference

    Dear Sir,
    We have Make-To_order scenario and using PP & PS both . All our Production Order have Assignment as "WBS Element" .  In the Production Order Print , we are not getting WBS Element printed . We need that WBS Element also must be printed on the Production Order Print .
    I request SAP experts , to kindly guide me as how can we resolve the problem .
    Regards
    S M Mittal

    Dear Sir,
    Thanks for reply .
    We are using Strategy 40 .
    Regards
    B Mittal

  • Production order print out in CRTD status.

    Dear Expert,
    Please guide me for how to take print out in CRTD status for production order.Has a work around I try to create status profile but still not able to make it.
    I dont want to change the settings in BS22,since its effect globally.Please let me know how to create the status profile for the same to allow system to take print out in CRTD status,since I read the others thread mentioning that it is possible with status profile.
    Regards.
    Swapnil

    Swapnil,
    This is not possible without changing system status in BS22 for business transaction RMDR for status I0001.
    Check below SAP note 157422 - PM/SM: Printing orders in status Created for more details.
    And I do not think this can be done with Status Profile in oder.
    Br
    KK

  • Print Production Order with status CRTD

    Hi gurus,
    Our system is configured to print production order when the order is released, but when the order is in status CRTD,Created, (not Released) we try print the order an error message appears "Object ORD xxxxxx has system status CRTD (Created).  According to this status, transaction 'Print order (original)' is not allowed".
    Is it possible print orders before release action?
    Thank you, I have points for the best answers.

    Through transaction  BS22 you can configure the system to Print the Order even at CRTD status.

  • Production Order Printing CO04N

    Hi,
    We have a issue while printing production order with T Code CO04N. The print output shows all operations other than those which are subcontrated. I have tried changing the print option in contol key but it doesnt work.
    can anyone please suggest any probable cause of the same.
    Thanks
    Rohit

    Hi
    check below SAP help: What is the status of the operation for subcontracting?
    Lists of Operations
    Note the following when you print lists of operations:
    Is Customizing set up in such a way that the control key for the operations is checked when printing lists?
    If this is the case, you must check whether the control key:
    permits the printing of operations
    permits the printing of time tickets
    permits the printing of confirmation slips
    If the control key check is not activated in Customizing, the system does not check the control key or the status. In this case, the system also does not set a print status.
    Does the status of the order and the status of the operation permit the list to be printed?
    If the order status does not permit printing, the system does not print a list.
    If the order status permits printing, the system prints a list. Operations whose status does not permit printing are not included in this list.
    The printing of lists is permitted if
    the order is either released or partially released
    the order is neither technically complete nor deleted
    The printing of individual operations in an order is permitted if
    the order is partially released or released
    the operation is released and not deleted
    Do you want to print time tickets or confirmation slips?
    In this case, you should ensure that the specified number of time tickets or confirmation slips for the operation is greater than zero.
    The number of time tickets or confirmation slips is proposed from the work center. However, you can change this on the General operation detail screen. To reach this screen choose  in the production order. Select the relevant operation and choose .

  • Production Order User Status

    Dear Experts,
    I have created User Status with T-Code BS02 and assigned to the production Order. With the User Status I am blocking the GR, if confirmation is not carried out.
    Everything is working fine along the process. System is blocking the GR if confirmations are not done. Upon confirming the user status is changing in Prd Ord and then allowing the Goods Movement.
    But now if I cancel the confirmation, the user status is not rolling back (Block GR Condition). After cancelling the confirmation even I am able to do the GR, which should be blocked. How to do this?
    Also, in confirmation parameters, I have given "Error if sequence is not adhered to". This is blocking the confirmation of operation if previous opn is not confirmed, But here I can delete the previous confirmation (CO13), after confirmaing the later operation. The deletion of previous confirmation should not be allowed if later operation is confirmed. How to achieve this?
    Kindly advice me what are the settings required for this.
    Regards,
    Rohit.

    Rohit,
    After cancelling the confirmation does the order get back the user status as defined by in BS02?
    Please check out this.
    Regarding your query about CO13, although you have made necessary setings in OPK4, it will be effective only for process of confirmation & not for cancellation.
    But you can certainly achieve the control of cancellation of confrimation as per your requirement by using userexits available in CO13. Those are listed below.
    CONFPP01
    CONFPP02
    CONFPP03
    CONFPP04
    CONFPP05
    CONFPP06
    Kindly take help of you ABAP guy.
    Hope this helps you.
    SmanS

  • Production order system status after being settled

    Hello,
    I am currently in ECC 605 project. I remembered once production order is variance calculated and settled,new system status, VCAL , is set at production order.  And sometimes the production order won't be set with status VCAL even though it's variance calcualted. Does anyone have any experience at ECC release 605? Is it normal that settled order doesn't possess VCAL status?
    And another weird behavior is that production order can be settled without variance calculated. At earlier release, system will
    pop up error message if I try to settle a production order which isn't variance calculated. Can anyone confirm if at release 605 it's normal system behavior that system won't block order settlement of production order which variance calculation isn't done yet?
    B. Regards,
    Nancy
    Edited by: Nancy Lin on Jul 14, 2011 9:45 PM

    Hi Rose,
    Try out ..
    STATUS_READ
    http://www.sap-basis-abap.com/sappp016.htm
    Re: Status of the Production Order
    Re: Production order status
    Hope it will solve ur problem
    Thanks & Regards
    ilesh 24x7

  • Production Order Header Status

    Hi
    I am having a production order with 4 operations. when i am confirming the first operation as partial confirmation because i am just confirming only partial quantity, the whole production order status is set to PCNF. Even though i am finally confirming the same operation finally and confirming all the other operations also finally, the order status is not changing to CNF. it is still in the PCNF . how do i get it to CNF status? because the PCNF status for the order will create other problems.
    The operation statuses for the same order give correct statuses as PCNF or CNF or milestone. The problem is only with order header status.
    Can someone please solve this issue. Points assured
    Regards
    Chandra

    Hi,
    In tcode OPK4 - Define confirmation parameter select your plant & order type.
    In 2nd tab page, select Confirmation type - Automatic final confirmation.
    So when doing opn confirmation if the qty is equal or more than order qty, system automatically set to Final confirmation.
    If the confirmation qty is less than order qty, system automatically set to partial confirmation.
    Regards,
    Dharma

  • Closing the Production Order with status PCNF

    Hi Experts,
    May I kindly ask if I can close an order with status Partially confirmed? If not, how can I cancel the confirmation if I had already reversed the goods movement in the confirmation thereby flagging an error of a deficit in the material quantity during cancellation of the confirmation?
    I really need your help since I need to close the production orders with this case.
    Hoping so much for your replies.
    Many thanks in advance.
    Sincerely,
    Ria

    Ria,
    I am not so clear about the exact situation.
    When you say you have reversed the goods movement with MIGO, is it reversal of the documents posted with confirmation or the individual documents?
    You can only cancle the document with MIGO which are independent of the confirmation.
    The  documents which are with the confirmation can not be reversed in any case with MIGO.
    I suggets you go this way,
    1. Check why system is giving you error as 'Deficit......'. The one thing I suspect that you must have performed auto GR & moved out the stock of FG from that location.
    If it's so then bring back the stock to it's original location & cancel the confirmation.
    While cancelling the confirmation where you might have executed goods issue with backflush this error won't arise as the stock will be bring back to storage location form the order.
    Don't reverse the cancellation of the of the documents youhave performed with MIGO for independent material posting on the order. Keep it as it is.
    This way the cancellation of confirmation & material movement will be done & now cost on the order will be zero.
    You can assign the status CLSD as well as DLFL to the order.
    2. In case you find the above activities can not be carried out for some reason then give status TECO to the order.
    Sttle the order so that the cost on the order will be zero, then give status CLSD.
    As far as possible stick to solution no. 1 only.
    Go for solution no. 2 when you don't have any other option.
    Hope this helps you.
    SmanS

  • Materials/Production Order/Document Status Report

    Hello All,
    I am trying to create a report that gives the following
    Production Number
    Material Number on Production Order
    Document Number on Material (DRAW-DOKNR)
    Document Status (TDWST-STABK)
    I tried creating this in a join and have the tables for Doc Number and Docu Number on Material but I can't seem to find a match between the part number on the Production Order and the Document Number.
    What table has the parts on a production order?
    Thanks,
    Linda

    OK I have the Production Order and the attached BOM now all I need to do is add the DRAW and TDWST - unfortunately they don't have similar keys to do a join with what I just created. When I try to join with MARC it doesn't pull anything - doesn't like that join.
    In order to get the Production Order and it'e related BOM use the following:
    I created a join between tables AUFK and RESB
    Output of the query looks like the following:
    Order Type: AUFK-AUART
    Order Number: AUFK-AUFNR
    Plant: AUFK-WERKS
    Material Number: RESB-MATNR
    BOM Number: RESB-POSNR
    In Order to get it into BOM Order all you do is sort on RESB-POSNR

  • Production order change status report

    Dear All,
    I created production order in PP. suppose I make changes in production order while confirmation i.e. i change prodn. order qty. 50 to 40 at stage 30(i.e. atrouting stage-- 3rd operation). From where i will get the status of this changes in production order qty ?
    I tried in TC: COOIS , but it shows changed qty. 40. I want the diff. 50 -40 = 10 which i have cancelled whilw prodn.confimation.
    Pl' reply....

    we r using strategy '30'. we can not use make to order strategy as our planning has flexibility. So we r creating production orders manually@ 8000 materials from excel to SAP (using BDC program). So there is no linking with sales orders and production orders.
    we r uploading material and qty. in mass to create prodn. orders manually.
    while prodn. orders confirmation of new plan , sometimes to accomodate spill (pending orders--incomplete orders of last month) we have to cancel some new prodn. orders.
    So how to cancel those and from which report i will get change qty. status?
    thanks.

  • Production order Printing issue

    Hello,
    when we are trying to print the production order and pick list through co01 or co04 ,it is printing two times, where we can control the settings, we want only one printing , Thanks for the help
    Nick

    Hi Nick,
    Check in the OPK8 in the 'List control for transactions' in that whether you have given in column number of printout - 2. There are two fields "Number of printouts"  check both and Remove it put it one.
    regards
    ramakant
    Edited by: ramakant shekapure on May 18, 2010 12:25 PM
    Edited by: ramakant shekapure on May 18, 2010 12:54 PM

  • CO Production order(KKF1) Status Profile

    Hi,
    We are using CO production order(KKF1)
    as per user requirement eventough order status is REL they want to run the settlement(KO88)
    but once we run KO88 system showing the error like order status should be DEL or TECO 
    I think its possible through STATUS PROFILE but I donu2019t know how we can put the conditions in the Profile
    so any one help me on this
    Regards,
    Ram

    Hi Ram,
    You may consider to deactivate the message KV011 by using transaction OPR4_KKS and
    OPR4_KKS1???
    Regards,Declan

Maybe you are looking for

  • 1 SWF works all other 3 do not in IE

    Folks, This is my first time posting here and I can not seem to find an issue to this problem... Ok, I have a website that the main page has a flash header that works just fine in both IE & FireFox; below that on the body I have 3 small flash movies

  • NetBeans VWP: help w/ AJAX, is it possible to refresh more than one field?

    I have a form with lots of fields. Some of them the value is retrieved from the database, for example the service field, where the user types the service id and at the onChange event the form is submitted, executing the processValueChange handler. In

  • Copy and Paste Problems with Images

    I'm having the strangest problems with images. I copy an image off of the web for one of my art history classes and I go to paste into another program but, whether it's Keynote, Powerpoint, Photoshop, or Graphic Converter, something always goes wrong

  • Compressor/QMaster - Render box saying media is offline...

    Hello, Now, I know when FC says "Media Is Offline", that's exactly the case. However, this will be on an automated machine that I don't want to touch. Any way to bypass this when Compressor/Qmaster opens Final Cut Studio on the render node(s)? That w

  • Trying to import contacts from added email account?

    I Have added a Gmail email account in Settings, which a colleague has been using to communicate with our choir members. I have ensured Contacts is on ( showing green). When I go into my contacts, I cannot see any of the new contacts, although I can a