Production order splitting

Dear All ,
We have discrete Mfg scenario.
Say i have created a production order for qty 100 with Prodn version 01 in Workcenter W01.
I have partially confirmed 50 Qty for the same in confimation .
Now remaining 50 qty have to be confirmed by using Prod Version 02 in workcenter w02.
How to carry the same ?Pl guide
regards

Dear,
It can be possible though the  business function
LOG_PP_PROD_ORD_SPLIT.
to split an order using the entire open order quantity or the open operation quantity.
Example: A production order has a planned quantity of ten pieces. All operations of the order are already partially confirmed with a quantity of one piece. Therefore, the order quantity and the operation quantity that are still open both amount to nine pieces.
If you specify nine pieces as the split quantity during the order split you can use the another production live for it also.
Please refer this link for details,
http://help.sap.com/erp2005_ehp_04/helpdata/EN/95/21a524ec9c40c8840f7cef07d3ef32/frameset.htm
Regards,
R.Brahmankar

Similar Messages

  • Production Order : Split of variance in COPA

    Hi,
    I am testing the variance flow to COPA in production order settlement scenario..
    Below is the cost trend of the production order.
    Below is the resulting copa document whic is generated from settlement
    Below are the cost element and value field assignments.(in PA transfer structure configuration)
    I want to know, how the variance split happened in the COPA document. Because in cost trend , the entire variance is during GI stage.
    SO this pertains to the GL account 50000 , as seen in the cost trend. How did the system split the amount in COPA document
    Regards
    SR

    Dear Rajan,
    Please find the following Link:
    Transferring Production Variances:
    Transferring Production Variances - Profitability Analysis (COPA) - SAP Library
    Regards,
    Pavan Kumar Arvapally

  • Production order split for configurable products

    Hello
    Is it possible to convert an APO planned order for configurable product to a production order in ECC and then to split this order in ECC?
    What will be the visibility in APO regarding pegging, GATP...
    thanks in advance for your help
    regards
    patrice

    Hi,
    What strategy are you using
    Startegy 25 is used for MTO configurable material.
    Regards,
    Vishal

  • Production Order Split

    I am exploring the functionality in LOG_PP_PROD_ORD_SPLIT in our sandbox region.  We are currently at EHP 4, thus rendering OSS note 170819 not relevant.  I have activated  LOG_PP_PROD_ORD_SPLIT  via SFW5.  I am trying to split a production order for a MTO end item that is NOT batch managed.  Also, since we have ECC 6.0 EHP 4 the requirement of a product cost collector is no longer there.
    I select the operation in the parent order that I want the split to occur and always get a message "Missing by-product/missing batch for cost transfer material".  I tried creating a by-product that is batch managed. When I add that material in the by-product field in the material for cost transfer, I get the message "No batch numbers could be determined".  So now I enter a batch number and get the message "Material uses internal batch number assignment (Entry will be deleted)".  I have also tried to add an existing batch with no inventory that I manually created and get the Batch number already exists message. 
    I have not activated the business function LOG_PP_WIP_BATCH, as I do not wish to use WIP batches. 
    Questions: 
    How do I get around the fact that our MTO end items are NOT batch mangaged?  Do I use a generic by-product as the material for cost transfer?  If so, how do I get past the need to add a batch number or get the system to accept the internally assigned number as outlined above?  It is not an option to batch manage the end item.
    What is the purpose/reason for needing this material for cost transfer to be batch managed?
    Thanks for any help you may be able to provide.

    Shrek66 wrote:
    I am exploring the functionality in LOG_PP_PROD_ORD_SPLIT in our sandbox region.  We are currently at EHP 4, thus rendering OSS note 170819 not relevant.  I have activated  LOG_PP_PROD_ORD_SPLIT  via SFW5.  I am trying to split a production order for a MTO end item that is NOT batch managed.  Also, since we have ECC 6.0 EHP 4 the requirement of a product cost collector is no longer there.
    >
    > I select the operation in the parent order that I want the split to occur and always get a message "Missing by-product/missing batch for cost transfer material".  I tried creating a by-product that is batch managed. When I add that material in the by-product field in the material for cost transfer, I get the message "No batch numbers could be determined".  So now I enter a batch number and get the message "Material uses internal batch number assignment (Entry will be deleted)".  I have also tried to add an existing batch with no inventory that I manually created and get the Batch number already exists message. 
    >
    > I have not activated the business function LOG_PP_WIP_BATCH, as I do not wish to use WIP batches. 
    >
    > Questions: 
    > How do I get around the fact that our MTO end items are NOT batch mangaged?  Do I use a generic by-product as the material for cost transfer?  If so, how do I get past the need to add a batch number or get the system to accept the internally assigned number as outlined above?  It is not an option to batch manage the end item.
    >
    > What is the purpose/reason for needing this material for cost transfer to be batch managed?
    >
    > Thanks for any help you may be able to provide.
    Hi,
    Assume you have to do 5 operations to get the product
    creating the production order .
    confirm the first two  operations using Co11N
    now open the production order in the change mode using Co02
    In production order operation overview, select the operation 0030 and go to functions menu and click on split order.
    System will display a  screen with all parameters for order split.
    enter split quantity and order type(you can select different order type for child order)
    Click execute Split Order
    operation quantity for the current order will be reduced based on the split quantity
    Balance quantity would be assigned to the new production order created because of order split .
    Regards,
    Raj

  • Assemble-to-order with spliting the Production Order

    Hello,
    I'm new to SAP and we just implemented the SAP System.
    My Experince is from one year as Process Owner for PP in our Project.
    I have a specific Question regarding the assemble to order process.
    So far we did not implemet Capacity Planning in the System, but I would like to use it.
    The Idea is the following:
    1. There is a sales order coming for 1pc of Product. The scheduling is carried out, ATP-Check and so on. The production order is created and at least the capa is placed on the end of the chain (using quetimes). One Product needs 60min to assemble.
    2. more orders are comeing in, all consuming 60min of capa on that day. If the capa is used, move to later date until capa is back again. this also should be now Problem to set as far as I understand what I have learned already  
    3. What i do not like... If I get orders with too many qty.... I would like to hav a maximum qty. where the order gets splited and moved forward to the next day... so... Customer orders 10, 5 are placed on Tuesday, 5 on wednesday and so on.
    Each of those "Splits" should have one production order header.
    Any idea how I can reach that?
    Thanks, hope I will find a solution
    BR Marian

    Marian,
    Standard ERP Sales order ATP cannot be made to confirm Sales orders based on capacity availability.  All capacity related conflicts and resolutions are done during dispatching, which is a separate step.
    If you need SO ATP to consider available capacity while confirming the Sales order, you could use functionality that exists in APO.  Otherwise, in ERP, you are facing custom development.
    Assemble to order in general is restrictive as to what types of scheduling can be permitted.  There is no automatic production order splitting in standard SAP ATO.  Some manual manipulation is permitted.  Of course, with custom development, you are only limted by your imagination.
    Best Regards,
    DB49

  • GR quantity less than Production Order quantity

    Hello all
    I am working at a client where they produce Make-To-Order items specific to a Sales Order by triggering an Assembly Order (Production Order).
    Now I am facing a tricky situation & hence want some advice from you guys.
    In a generac scenario when an order comes for a MTO material ABC, a Production Order is triggerred for that item.
    I can navigate to this Production Order from the Sales Order > Schedule Line tab (Just FYI)
    Now once the Production Order is confirmed for each Operation on the floor using CO11N, the material is receipted in the Inventory & the requirement gets fulfilled.
    Now sometimes the Production Order is Goods Receipted for a Lesser quantity as compared to the Production Order Quantity.
    e.g. Sales Order Quantity = Production Order Quantity = 3 EA & the Delivered Quantity (GR qty) = 1 EA
    In such a case, in MD04 the system still shows an open requirement for 2 EA on the same Production Order Number
    Is there a way to trigger another Production Order for the remaining quantity automatically ?
    If anyone can share their thoughts proposing possible solutions to handle such a scenario, it would be a great help.
    I am an SD consultant & hence cant think ways to handle the scenario & propose it to the Business.
    Any help will be appreciated
    Thanks
    Vin

    Hello
    Thanks for all your replies.
    As of now the 1st scenario is no more an issue. The business process is modified to fix the problem.
    Now my main problem is the 2nd scenario which I will explain better here.
    In our scenario MTO items when placed in a Sales Order triggers a Production Order.
    This Production Order needs to be confirmed for each operation & at the final step the MTO item is pushed into the inventory.
    The Production BOM & the operation overview for the MTO item is as shown below:
    E.g.
    Operation Overview:
    Operation            Work center                  Control key
      0010                    Prod                               PP01
      0020                    Pack                               PP01
      0070                    Confirm                          PP03
    Routing:
    Item                Material             QTY        Unit            Operation
    0010               ABC                  100         G                0010
    0020               XYZ                  10           G                0020
    Now as shown above, the business users who produce the MTO item will confirm operation 10 & consume raw material ABC at the Work Center = Prod.
    Then at the Work Center = Pack, the packaging material is used & operation 20 is confirmed.
    Finally after the packing is done, at the Work center = Confirm, the operation 70 is confirmed when the MTO item is receipted in the Inventory.
    Before it is receipted at the Confirm work center, a user monitors the quality of this produced item. If it is good only then it is receipted in the inventory.
    Now depending on when the Sales Order is fulfilled, this MTO item will be shipped.
    Issue:
    Now when the MTO item produced passes thru the high level quality check, it gets receipted in the inventory at operation 70.
    However in a case where the some or all the qty of the MTO item ordered doesn't pass the quality check, they will be scrapped physically.
    Thus my understanding is that e.g. 3 qty of the MTO was ordered & 1 got rejected, then the user confirming the step 70 will enter YIELD = 2 ea & Scrap = 1 ea and do the final confirmation.
    This means that the original demand of 3 ea is still incomplete. 1 Ea still need to be made as a Sales Order Stock.
    Now the function needed is that the system should automatically generate a Production order for the remaining 1 Ea as a Sales Order stock.
    I dont know if this can be achieved by receipting the 1 EA as REWORK on the CO11n screen at operation 70.
    Also I am not sure if Production Order Split case would work in this case.
    I would need some input from all the PP gurus. Any solution which be close to what functionality is needed will be greatly appreciated.
    Thanks
    Vin
    Edited by: vinit parkar on Mar 3, 2010 5:04 PM

  • Process to split production order based on the raw material batches

    Hi All, below is a business situation which needs some some SAP process to help overcoming this issue.
    We are working on process industry, where the core fabric (SFG) are produced from different machines and which are used as raw material in the subsequent process (Coating).  Business wants SAP to generate individual planned orders for Coating when it uses this materials
    e.g
    Current situation.
    SFG1  is the component of SFG2
    SFG2 is  the component of FG.
    When the demand for FG is 100, you get 2 planned orders  SFG1- 100 yd and  SFG2- 100 yds
    During production, the Planned order for SFG1 is split for 2 production order  each producing 50 yds each.
    Now I have SFG1 - 50 yds ( Batch A001), and SFG1- 50 yds ( Batch A002).
    Now Business wants  SAP to automatically propose 2 order for SFG2, However based on MRP it will  only show 1 planned order of 100 yds required for SFG2 since the demand of FG is 100.
    We want to split the planned orders of the higher level to look at lower level stock.
    Any ideas or thought process.
    Regards
    Sarvan

    Sarvan,
    You can have MRP propose two lots of SFG2 based upon lot sizing.  For instance, if you always will want SFG2 to have orders of 50 each, then one way to achieve this would be to set the 'maximum lot size' to 50.  MRP1 Tab of the material master.
    There are other lotsizing methodologies that may be better suited to your business requirements as well.
    Lot-Size Calculation - Consumption-Based Planning (MM-CBP) - SAP Library
    Best Regards,
    DB49

  • Batch split  during  production order confirmation

    Hi All,
    This is the process which  is followed  at our  customer  end, they want  to  split the batches  during  confirmation,
    1.Production order created
    2.While  going through each operation, some components are failing in the in-process inspection and  they need to be quarantained  for  further  process,(it may be rework, scrap, etc)
    3.Now  the  question is  we  want  to create  individual  batches, say  for  example out  of  100qty  which went  operation number 10,   50  were found  to be o.k.  and  the  remaining  50 are  having  defects, we want  to  create  two  different  batches  for this  scenario at  the  time  of  confirmation.
    Is there anyway  in SAP todo  this , like userexit
    Has anybody  has  gone through  similar  scenario's
    Thanks in advance
    Regards
    Venkat.

    Dear Vanket,
    In the operation you can confirm Yield, Scrap and rework quantity.
    In your case in each operation you need to create a batch for each qty what you enter.
    As I told you before batch can be created either production order release or during GR.
    In each operation you are not going to perform GR, hence batch creation is not possible.
    You have 2 options as I see.
    1. Create different intermediate materials and have production orders for each operation so that you can do the GR for each production order.
    You can have the same batch for each stage material so that issuing material and production materials are different but batch is same.
    If there is any defective quantity you need to decide you want to scrap it or you want to go for rework. If you want to go for rework then, using trigger point function you can create a auto rework order for the qty of rework entered during confirmation.
    2. Second option is you can create a production order as you are doing now, but you need to create batch manually in MSC1n transaction for rework as well as yield qty.
    You can confirm the yield qty and rework qty, but you cannot assign the batch as you are not performing GR. You can enter the batch number in the confirmation text field for information purpose. During the final operation when you do the GR, assign the batch to yield qty and post. About the rework qty you are not going to post qty to store, you need to create rework order and confirm the qty, during GR you can assign the batch and do GR.
    If you ask me if you need to strict process to represent your case you need to go for first case.
    Please go through the above carefully and test the cycle and come back if you need any clarification.

  • To split an operation quantity in a single production order into different work centers.

    Detailed Process:
       Our client have 17 factories. Inside each factory there are 15-20 Sewing lines (Work Centers). In each line 15-20 machines (individual capacities) are there. The standard manufacturing scenario practiced here is MTO. Merchandisers create sales order and allot it to a particular plant. Now line level planning happens inside the factory. Based on the order delivery date to meet the requirements they split the production order and allot it to several sewing lines (work centers).  In SAP we can have work around solution to partially convert planned order to production order and allot it to particular line. The challenge here is to have same production order number which can be allotted to several sewing lines with a mandatory option to enter the quantity for each sewing line
    We have proposed alternative and multiple routing for converting planned order into number of production orders but the solution was not meeting their requirements.
    Please provide your valuable opinions on this issue.

    Hi,
    Please explore the option of using the concept called Parallel sequence in routing...
    Check the below thread...
    parallel sequence in Routing
    Routing - Parallel Sequence
    Hope this helps
    Thanks
    Kumar

  • Splitting the cost of Production Order

    Hello Sapians,
    We have a situation where a purchase order has all of its costs going to one production order but the services provided
    on the purchase order were actual for three production orders. What is the process for adjusting this amount for the
    production order costing?
    For example, PO number is 10001 and this is currently all being charged to production order 60003. I would like
    15000 USD be moved to both production orders 60001 and 60002.
    Do we have any process of splitting the amount to two different Production Orders in SAP?
    Thank you,
    -Harter.

    Hi Ajay,
    I checked the Order and there are some actions after the Production Order is settled.
    For example: The Order got settled twice in 12/10/2010 and 01/31/2011. And the Variance was there when settling the Order second time and it was also settled on 01/31/2011.
    There are some operations that are on the Production Order before and after the second settlement dates. Even after 01/31/2011 month's settlement I can see some charges on the Production Order from the operations (Subcontracting, Overhead PRD, Personnel Hr)
    My questions and doubts are
    1. Do I need to reverse both the months settlements?
    2. What are the impacts of the reversing the settlements on the other operations that were executed before and after the Order is settled? (Operations are Subcontracting, Overhead PRD, Personnel Hr).
    Thank you,
    -Harter.

  • Production Order (automatic splitting)

    Hi All,
    At present when i convert a planned order to production order, the BOM items are copied & a single work order is created. But some of the components in that order are not in stock & hence shows up as shortage. What i would want to do is, while creating the order, create one work order which has a list of all materials which has no material shortage & another work order which contains the remaining items which has shortage. In short a splitting of the planned order into 2 work orders, one which contains no shortage of material & other which has those items which at the moment has shortage. I want to do this automatically, so is there any way i can customize this? I hope my question is clear, await inputs.
    Vivek

    Hi,
    You can check the stock qty manually & then do partial convertion manually.
    I am not sure of automatic splitting.
    Also you can do a setting in the availablity check (opjk) that no order should be created if there is a material shortage.This will help you since if there is a shortage then no prod. orders will be created. You can then check the stock available & create a prod order by partial convertion.
    pl refer the foll. link,(checking control inside shop floor)
    http://help.sap.com/saphelp_46c/helpdata/en/3a/72369adc56d11195100060b03c6b76/frameset.htm
    Regards,
    SDS
    Message was edited by:
            Senthilkumar SD

  • Batch split ina Production order

    I am doing a batch determination for a component in a Production order. The component qty in the Production order is say 600.  I do a batch determination for the component all the available batches are diplayed with a suggested batch based on the SORT rule provided. If I try to change the qty on the batch determination screen which is less than 600 then by default it still picks up 600. In a way it does not allow me to determine a batch qty which is less than 600.
    But on the batch determination screen if I select multiple batches ( batch 1 = 100, batch 2 = 400 )whose sum total qty less than 600 example say 500 , then it creates split batch records for batch 1 and batch 2 and creates another record for the component called as 'batch total records' for quantity 100.
    1) My question is ..is there a way that the system gives a warning message saying that selected batches have only qty = 500 and not 600.
    2) When I do a confirmation for the order using CO15 , on the goods movement screen only qts batch 1= 100  and batch 2 = 400 are proposed for the component But NOT  the remaining qty of 100 for the unallocated 100.
    Am i missing something here

    May be the sort rule is based on the quantity and not on Batch.
    Please check this. If this is based on the FIFO for batch then it should select the batch which was posted first rather than on quantity.
    Hope this helps you.

  • Split Allocation Date in production order

    Hi,
    I need to get the value of the field Date for capacity splits in production order but I don't know how to do it. I haven't found the sap table where this value is recorded.
    ¿Can you help me?
    Thanks a lot.
    Regards.

    Ocr Cs,
    Did you check KBED table if not found any can you please let us know data element name by clicking on F1 on same field?
    BR
    KK

  • Production Order Variance Split based on Cost Component Split

    Hi All,
    We want the material/labor/overhead variances on the production Order to go to different value fields in the P&L.
    We will be issuing Actual Material/Overheads to the Production order and there will variances for both Material and Overheads due to differene in Standard and Actual Qty issued.
    But Standard SAP Variance Split Functionality will club the Material/Labor/Overhead Variances as Input Qty Variances so we cannot split it into different lines in the P&L.
    Any ideas on how this can be done.
    Thanks and regards,
    Ankur

    Hi Ankur
    Its not possble in FI, but certainly possible in COPA
    Create as many assignment lines in PA Trf Str as your Cost Comp Structure...
    Assign the relevant GL/Cost ele in the SOURCE and choose the radio button "Costs/Revenues", instead of "Variances"
    You can then assign each assignment to a separate Val Field in COPA
    br, Ajay M

  • Selecting New Production version while Splitting a Production Order

    Hi SAP Gurus,
    Is there any option of selecting a New Production Version for a split Production Order?
    I have a production Order with three operations 10.20 and 30. This production Order is curently using the Production Version 001. Now , i have split the production order at Operation 30 and want to select new production Version 002 for the same.
    Can you please let me know if this is possible?

    Hi Sandeep,
       If you don't mind can you please let me know for what purpose you want to assign a new production version to production order after splitting at operation 30?
       To quickly recap, Production version is used if you have alternative BOM or alternative routings for a material. Based on Production Version that you have assigned in Material Master - MRP screen, your Routing and BOM details are selected.
        So how is this Production Version 002 different from Production Version 001 - is it in terms of routing or bom?
      With Best Regards,
    Srinivas