Production order status for wm staging for production

Hi Friends,
What should be the status of production order for wm staging of raw for production.
In production order status Confirmed & delivered will I be able to do staging for the production order.
Thanks,
Kiran

Hi
Material staging should be allowed following the Release of the Production Order.
Then, as an example, you could have your first operation in the order (OP10) to Consume Materials. This will then backflush the materials in the PSA (Production Supply Area) that the staged materials were taken to. Ensure that the materials are set for Backflushing in the material master in MRP2.
If the OP10 is confirmed before materials have been staged then they will not appear in the LP12 staging report.
It's all about timing
Regards
Darren

Similar Messages

  • User exit for Production Order status

    Hi all ,
    Pl tell me about the : user exit for Production Order status
    ( i want CLSD status after settlement of the Production order .)
    regards,

    Hi,
    for production order you have exits PPCO0001 - PPCO0023. In transaction SMOD you can see the documentation for all this exits. Actually I think exit PPCO0007 could be a possiblity for you. This exit is called by saving the order.
    But maybe it would be better for you to use a special status profile? A user status is set if settlement status is set.
    Also BADI WORKORDER_UPDATE could be interessting for you.
    Regards,
    Sabine

  • Table for production order status in ABAP

    In which table we get production order status like ( TECO , CRTD, etc......) ?
    Thanks..

    it should be JEST Table
    get the production order Object number from AUFK-OBJNR
    Goto JEST Table -> use value into jest table ,you get status.
    Thanks
    Seshu

  • Table : Production order status

    Hi all ,
    i need the Table in which the Production order status will appear .
    i tried AFKO and AFRU but not finding the same .
    Pl tell me the field name if possible .
    Regards

    Goto CAUFV
    get the field - CAUFV-OBJNR
         Pass this in JEST in field = OBJNR, object number and INACT = space
         you will get severail entries for field STAT.
         pass this field entries STAT to tabel TJ02T and field - ISTAT, language = EN
         you will get status in the field TJ02T-TXT04 and text in field - TJ02T-TXT30.
    or simply use FM- STATUS_TEXT_EDIT
    pl come back if required
    Edited by: Rajesha Vittal on Mar 27, 2008 10:17 AM

  • Mass change of Production Orders status from TECO to CLSD

    Hi All,
    I want to do mass change of Production Orders status from TECO to CLSD. could you tell me is there any t-code by which i can mass change Production orders status from TECO to CLSD. I want Production Orders to be closed, so that further confirmation shouldn't be done for these Production Orders. please let me know the solution.
    Regards,
    Ram

    Hi Girish/Dogboy,
    I can set the status 'Complete' if Order is fully confirmed/fully delivered. When ever i run COHV for partially confirmed/delivered Orders, i get error log saying 'Balance of ORD................ is not zero'. Actually we have lot of Production Orders, where there may be Production Orders released only, partially confirmed etc. so i want them to be closed once for all.
    Regards,
    Ram

  • Production order status reverse

    Dear all
    My production order status is
    "REL
    MSPT
    PCNF
    DLV
    PRC
    GMPS
    MANC
    SETC
    VCAL
    Now i want to reserve a Vcal status . is it possible ? then i wnt to do "Read PP master data "
    Plz guide me brifly

    Dear,
    If the variances were calculated in a target cost version relevant to settlement, the order receives the status VCAL (Variances calculated). So it is not possible to reserves it.
    During the variance calculation process, the system also reads the orders for which the status DLV or TECO has been active. If the status was withdrawn, any variances and scrap variances are canceled.
    Regards,
    R.Brahmankar

  • Production order status TECO-Revoke implications in FI/CO

    Production order status TECO can be revoked functions -
    > restrict processing -
    >revoke
    Can any one tell me the activities happening while revoking teco.
    is it possible to revoke the teco for an order which has been closed in the past and financial closing also over for that period.still if we want to do what kind of implications r there in system point of view.

    Hello
    Production orders pass through various phases. These phases are expressed by the status of the production order:
    The production orders are first created (CRTD).
    The orders are then released (REL).
    The shop floor papers are printed out (PRT).
    The production orders are carried out. The produced quantities, services, and deadlines are continuously (partially) confirmed (PCNF).
    Final confirmation takes place (CNF).
    The production orders are technically completed (TECO).
    Finally, the production orders are flagged for deletion (DLFL).
    Process Flow
    When you create a production order, a workflow can be started to inform the MRP controller of the current production order phase.
    Note that a large number of work items may be created in this scenario. If a large volume of production orders is created in your production system, therefore, you should not use this scenario.
    The work items are deleted at the latest if a deletion flag was set for the order in question.
    If this scenario does not fulfill your requirements, you can use it as a template to create your own scenario.
    regards

  • Production Order Status - MACM

    Hello Champs
    have a query on Production Order Status.
    We have Prodcution Order setup and Bom components are managed in WM.
    So the process is  - Release only if all componenets are available and then create the Transfer Order.
    Now issue is tht when a  Prodcution Order was released it was showing the all materials componenets are available ( as per out settings..No Rlease if Missing parts).. but it didn't create TO , when We are checking material availability now..it showing the missing pasrt.
    Why System is allowing some one to pick the materials if its already reserved for a Prodcution Order?
    In this case wht the meaning of material committed (MACM)..as it was showing tht material commited status ..
    Helpful answers will be rewarded..
    Thanks in advance
    BR

    Sam,
    The material was committed based on the availability situation at the time of releasing the order. But there is no check in the system preventing any one to issue material. Stock could be issued without reference to order. Also it is possible to issue stock to an order for which no coommitment has been made. SAP has given the facility for planners to use to make decisions. But SAP does not prevent them to overrule this. Its the responsibility if the issuer how he wants to control this.
    Regards
    Ram

  • Production order status CLSD, TECO

    Dear friends,
      What is the diffrence between  production order status CLSD and TECO?
    In what kind of situation should i enable these statuses to my production order?
    Thnanks
    Shri

    Hi Shri,
    Status TECO:
    Purpose/When:
              TECO, Technical Completion refers to an logical ending of Production Order from a Logistical point of view. This status we generally use if,
    1. The order is completely executed from the Logistics point
    2. If the order has to end prematurely for any reason and we wanted to have all the open requirements (Like Capacity & Material reservations) to be deleted.
    What it does:
              Once the order is given a status TECO, what system does is
    1. The order will not be considered for MRP planning and it will not appear in Stock Vs Requirements list (MD04)
    2. Capacity & Material reservations against the order gets deleted.
    3. Purchase requisations for Non stock materials & External operations gets deleted.
    4. The operations and the order header get TECO status.
    Followup after TECO status:
    1. You wont be able to make any further changes in the fields of the order even in change mode. However you will be able to revoke the TECO status.
    2. It can still allow to post confirmations or good movement and it allows all Finance and Controlling period end activites for the order.
    Status CLSD:
    Purpose/When:
         CLSD status refers to completion of all business activites for the order interms of Logistics and Finance and Controlling. This status is generally a prerequiste for an Production order  to be archived and deleted from the SAP database, also to have a control on the orders on which we do not want to have any further Cost posting. But for having a production order to CLSD status, certain Prerequisites have to be met.
    Prerequisites:
    1. The Order must have a TECO or REL status in it.
    2.  Open Purchase requisations & Purchase order with commitments to Production order should not exists          
    3. There cannot be any future change records in terms of goods movement or confirmation errors in COGI.
    4. The order balance should be 0.
    What is does:
    1. It executes all the functions listed for TECO status if the order is in REL status.
    Followup after CLSD status:
    1. Goods Movement, Confirmation and Finance & Controlling cost postings to the order is not allowed.
    2. It will allow the order to be flagged for deletion.
    3. It will allow revoking of CLSD.
    Hope this helps you in understanding the status TECO & CLSD with respect to logistics.
    Thanks & Regards,
    Prasobh.
    <b></b><u></u>Dont forget to reward points, or ask for further clarification if needed

  • Production order status as "Change by external system"

    Hi,
    I am come across the production order status as "Change by external system"
    In what condition above status is maintain in production order.
    Please help me.
    Sanjay

    Any change in the order done in the external system other than SAP, this status is set by the System.
    For example XMII.
    Regards
    Ratan

  • Production order status & Material reservation

    Hi
    Experts
    We are creating Production order manually but most of the production orders are created 2 or 3 times with same Product and quantity is there any way to avoid the repetition of Production order of the same material? How to avoid this? We donu2019t have MRP
    When the material for production order is reserved we have lot of Orders with status
    CRTD MSPT PRC  BCRQ SETC and also against reservation number these order shows  GI 261 movement in MB23 what it mean?
    is the Material is reserved to this order?
    Please explain in details
    Thanks
    Pert

    Dear Pert,
    1) As ur saying there is no MRP then the orders might have created manually i.e Via CO01
    2) now this manual control. there is only one authorized person for creating production orders
    3) Just contact ur Basis Guy & tell him to remove CO01 transaction authorization for all users
    expect for main person
    4) more over before creating Prd order you can check in COOIS for that particular
    Material already Prd order is created or not
    Regards
    Madhu

  • Report on production order status and shortage report

    I want to know standard report on production order status and shortage report. Kindly suggest.

    COOIS - Production order information system . In this report you can give system status in selection screen  and in report you can get complete status details (both system and user status) .
    shortage report - CO24

  • Production order status was not changed to 'CNF' after final confirmation.

    Hi guru.
    I experienced very special case that production order status was not changed to CNF after final confirmation.
    I did final confirmation and canceled confirmation. (CNF -> REL)
    And I did final confirmation again because of fixing activity quantity.
    the strange thing is that production order status wasn't changed from REL to CNF.
    I did  confirmation again with 0 activity, thereby  I solved this problem
    BUT i don't know why this case happened.
    Please, explain the reason.
    Thanks.

    Hi,
    As per my observation, their is not any change in the status of the order REL with confirmation CNF, instead of this, it has change from CRTD & then to TECO.
       Sequence of the status of the order as below
    1) CRTD MANC NMAT SETC
    2) REL  NMAT SETC - Changes from CRTD to REL after releasing of the order
    3) REL  CNF  PRC  CSER ERTR OPGN SETC -  After confirmation, it updated after the order REL status.
    Rgd,
    Chetan

  • Production Order status FM

    Dear All,
    Is there any function module which return the production order status in internal
    table format when we key in the production order number.
    Basically I am looking if i pass aufk-aufnr or objnr i am expecting order status which are in jest table.
    Thanks
    Cris

    Use FM - STATUS_READ
    Below is the example code :
    Data : d_objnr        like jsto-objnr,
    t_status        like jstat          occurs 0 with header line.
    loop at int_orders.
        clear d_objnr.
        refresh: t_status.
        concatenate 'OR' int_orders-aufnr into d_objnr.
        call function 'STATUS_READ'
             EXPORTING
                  client          = sy-mandt
                  objnr           = d_objnr
             TABLES
                  status          = t_status
             EXCEPTIONS
                  object_not_found.
        if sy-subrc eq 0.
      Start of change Seshu 01/15/2007
      Reason - Short dump got on 01/14/2007 - Deletion of internal table
      Put continue command Properly.
          delete t_status where stat gt 'I0099'.
          delete t_status where inact eq 'X'.  "Delete Inactive Status(es).
          read table t_status with key stat = 'I0076'. "Deletion Indicator
          if sy-subrc eq 0.
            delete int_orders.
            clear int_orders.
            continue.
          endif.
          read table t_status with key stat = 'I0045'. "Tech. Complete
          if sy-subrc eq 0.
            delete int_orders.
            clear int_orders.
            continue.
          endif.
          if p_open eq 'X'.
            read table t_status with key stat = 'I0009'. "Confirmed
            if sy-subrc eq 0.
              delete int_orders.
              clear int_orders.
              continue.
            endif.
          endif.
        endif.
    Reward points if it is helpful
    Thanks
    Seshu

  • Production order status REL to CRTD

    Hi Gurus,
    Can we convert production order status from REL to CRTD. Please explain under what circumstances we revert the status from release to created and how?
    Regards,
    Jejesh

    HI,
    You can convert Production Order status REL to CRTD by following way:
    GO to CO02 -
    > Functions -
    > Read PP Master Data
    where you can again reread BOM & Routing
    So after doing Read PP Master Data your production order status will be CRTD from REL provided you should not have carried out any other transaction like GI, Confirmations etc.
    Hope this resolves your issue.
    Revert if any doubt and reward if useful.
    Regards,
    Tejas

Maybe you are looking for

  • Reconnect Media - Will only do one file at a time. (all files is checked)

    I found one Google search that said this may be a bug... http://forums.creativecow.net/thread/8/1047891 and it's really bothering me since I have about 500 more media files to connect. When I select multiple files in my Project File Browser, right cl

  • How do I restore iCloud mailboxes from Time Machine without losing new mail?

    This morning when I opened my laptop and checked my email, Apple Mail decided to flag every single email in my three separate Apple-related accounts ([email protected],[email protected], and [email protected])—some 14,500+ emails total. None of the emails in my comcast or

  • Firmware Upgrade for WRT54G

    I have download latest firmware Version 8, I completed the firmware upgrade successfully, however on the router page right on the top it still show the earlier version 1.02. How do I checked whether I upgraded to Version 8. I have followed the firmwa

  • HP LaserJet 6L windows 7 32 bit

    I am using a Netgear PS110 print severs.  I can get the Port to work in windows 7 but cannot find the driver for HP LaserJet 6L. I have, one of three, windows 7 system running SP1 that has a driver that will load on the windows 7, but two other windo

  • Retrieving entire path of metadata column

    To emulate document permissions based on metadata, I'm trying to create my own document routing logic through a workflow retrieving the value from a metadata column and moving the file to the appropriate folder. It works fine except for the fact that