Production order time

Hi,
In production order creation screen when I enter Quantity & scheduling type Backward then enter finish date.
But in this screen Start time & finish time shows 00,why.
Pls reply
XXX

Hi,
After schedule system shows Start date & finished date But near to start time & finished time is 00.00.00.
I think some link to work center.
Pls reply.
XXX

Similar Messages

  • Calculate Production Order time past rate of each operation

    In QM module.  Any solution can achive this?
    Calculate Production Order time past rate of each operation. QM in production order in-processing inspection. Whether can calculate time past rate of each operation by the operation confirm.
    Past Rate = Cofirm Qty. / Total Qty. of Operation.

    Hi,
    Given the very limited info from your end, i presume it is for a Z report. If yes, you can obtain that info from tables - AFRU (for confirmations), AFVC & AFVV (for operation details). If you need any header details of the order, refer to AUFK & AFKO.
    Regards,
    Vivek

  • Production Order Time Ticket Confirmation

    Hi All,
    Hi Guys i have found out a BAPI  " BAPI_PRODORDCONF_CREATE_TT"  to post the Time related data for a production Order But i am unable to fetch the data required to be passed to the BAPI. Can u ppl please give me a example or guide how to go about it...I am new to PP Module...Any Help would be of Great Use.
    Only Information i have with me is the Production Order Number and The Activity Times Which i am getting through a Adobe Form.
    Thanks In Advance

    Hi Jagadeesan
    What you are experiencing is the standard behaviour of SAP. I will explain you.
    1.     Suppose you did confirmation of 100 PC.s . Inspection lot for 100 PC will be generated.
    2.     You did confirmation for another 80 PCs. Another Inspection lot for  80 PC will be generated.
    3.     If you cancel 1st confirmation for 100 Qty (if you cancel the material document of 101 movement) then the status of inspection lot changes to LTCA, i.e. Lot cancelled.
    4.     If you run QA32, your observation would be 2 inspection lots, whose quantity is 180= 100+80.
    5.     I think here you want  only 80 should be displayed.
    6.     Even though you have reversed the effect, inspection lot doesnu2019t get deleted from system
    7.     If you want to view the lot qty as 80 only, then apply filter on system status. Exclude LTCA lots. Then sum up.
    Best Regards,
    Anand Rao

  • Run time error while running BDC for production order creation and confirmation:

    Dear Gurus,
    We have a situation, where the users are trying to do the entries creation of order or confirmation (through manual and BDC). But, if there is any kind of a deficit quantities in consumption or GR quantity, then it is going to run time error and Dumps are coming in program SAPLCORB
    and the transaction code is coming for CO11N.
    How to avoid this error to run the production system in smoothing way...Any flash lights on this will be great full
    Regards,
    Madhu.G

    Hi Madhu,
    Expert Caetano has rightly point out. Refer Note 1840705 - RAISE_EXCEPTION short dump if running CO11N in background
    Cause
    The short dump is triggered because SAP transaction CO11N contains new GUI elements that cannot always be dealt with in a background process,
    such as the confirmation texts.
    Resolution
    SAP recommends that the standard production order BAPIs, such as BAPI_PRODORDCONF_CREATE_TT, should be used to post a confirmation in background.
    If this is not feasible, the following workaround may be uses:
    Define a confirmation profile in transaction OPK0; 
    In the detail areas, remove the area "Confirmation text"; 
    Set this profile as standard, so that it is chosen automatically by the system when a batch-job
    is started; 
    Assign this confirmation profile to the batch user with transaction SU3 using parameter CORUPROF.
    Also see Note 429432 - CO11N: Batch input in background dumps if long text is maintained
    Refer to note 1154692 - Endless loop during confirmation in background if you doing Auto GR during confirmations
    Thanks & Regards,
    Ramagiri

  • How to get Operation wise Time for a list of Production Orders

    Dear Sir,
    We have a list of Production Orders numbers and need to know the operation wise time duration for these production orers (off course the desired time is same as mentioned in the routing for the relevant component)
    Kindly guide us as how can we get these timing details .
    Rgds
    Sonia agarwal

    Sonia,
    I hope your are refering to setup time, process time, teardown time in the production order.
    use report COOIS for it.
    In the 'List choose operation.
    Give input for the production orders in the slection scren. Execute.
    In the report select the columns as per your requirement.
    Hope this helps you.
    SmanS

  • Wrong GL at the time of Production order

    Hello
    At the time of Production order settlement....its showing error that this GL is not possible to post automatically............there wrong GL(recon ac) have been assigned....where can i check this assignment in the system.................I have already checked it in OBYC.......but there i hv not found anything.......
    regards

    Hi Pari
    Check the following accounts for the relevant Val Class
    PRD-PRF (Variance acct) / GBB-AUA or AUF (COGM) /
    Also check WIP Account as well as Change in WIP assigned in IMG
    br, Ajay M

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • Selection Of BOM & Routing at the time of production order creation

    Hi guys,
    Please clarify how i can go about for the following mentioned scenario
    I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
    At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
    Awaiting for a quick response
    Vijai

    Hi vijai prasad shanmugam ,
                                              In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected  Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
    As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
    But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
    Please Let me know if I can help you in any way regarding this........
    Please reward the points......... in you find the ans helpful.....
    Thanks
    Kaushik

  • Report of List of all status changes for various production orders at a tim

    Hi,
    Can I have a standard report which shows the dates of each and every status (user & system) of a production order.
    I need to have a report for a list of productio orders at a time.
    If we go to CO03, header menu, status changes option is there, but it only caters for single production order.
    Table JCDS is available to know the dates but I need a standard one rather than a Z development.
    Or you can guide me any function module.
    Thanks,
    Kumar

    Hello,
    You will get the details of status in following table.
    JEST - for object status
    JSTO - Status Profile
    TJ02T - to Decode the status Number
    as the status data you will get from JEST is in very typical form you have to use TJ02T to find the exact status
    AM

  • How Production Order finish date and time is being comptued by SAP?

    Hello Expert,
    How Production Order finish date and time is being comptued by SAP? for example, we create a Production Order via CO01, the basic start date is 29.09.2008 and time is 04:00 it gives us basic finish date is 29.09.2008 and time is 13:28.
    how does SAP compute the time 13:28 as it finished time
    Please explain me briefly.
    Thanks
    Ryan

    Hello Guys,
    When we create Production Order in R/3 the time is calculated by routing but it is extended at SetUp machine time. It is not correct?. SetUp imachines time used only for first Production Order for the same product and it is plan manually, for others Production Order we need calculate time for production without SetUp machine time being pick up to compute finish time. how could we achieve this? only those Machine time will be check.
    thanks

  • At the time of confirmation Costs are loaded to Production order

    Dear All,
    At the time of confirmation of the Production orders the costs are not
    debited/loaded to the Production order. They are not
    credited to the cost centers although all the necessay master data (Work
    centers, Cost centers, cost rates ) is there in SAP.
    Please help me..
    Regards
    janardhan

    >
    Janardhan CH wrote:
    > Dear All,
    >
    > At the time of confirmation of the Production orders the costs are not
    > debited/loaded to the Production order. They are not
    > credited to the cost centers although all the necessay master data (Work
    > centers, Cost centers, cost rates ) is there in SAP.
    >
    > Please help me..
    > Regards
    > janardhan
    Janardhan,
    1. Check whether the operation is assigned with Costing Relevancy Indicator and has a control key relevant for costing.
    2. Check whether in the routing the activity type is seen and it has some standard values maintained.
    Regards,
    Prasobh

  • Product Delivered Status Date should be there in Standard Search and Result screen of Service Order. Product Delivered Time should be Available in Result screen and In Result screen there should be facility to filter on basis of Time

    Hi team,
    Product Delivered Status Date should be there in Standard Search and Result screen of Service Order. Product Delivered Time should be Available in Result screen and In Result screen there should be facility to filter on basis of Time.
    How to add this in search result screen.configuration is it possible? or any changes in development.
    Compnent - BT116S_SRVO
    Thanks
    Kalpana

    Hi Kalpana
    Please reread my comment. I said to try and populate "Requested End" Date.
    Make sure the date profile assigned to the transaction includes this Date Type.
    If you can populate this either manually or programmatically the solution should be quite forward.
    If you cannot do this, only then should you look at making any significant sort of enhancement.
    Regards
    Arden

  • Track production order ststes histry (Status change date, time, user)

    I want to track a production order status change history. Status change date, user name and status. Appreciate if somebody can give me a T Code, SAP report or a table.

    HI,
    You can see the the date, time and user for the status changes by following the menu path given by Mr. Mangalraj.
    However if you cant see them, then check the T Code OPL8 (for PP and COR4 for PI), implementation tab. Tick the check boxes for for Status Change Documents as your choice (for header, operations etc).
    After checking these boxes you will be able to see the status change details.
    Hope that helps.
    Regards,
    Rohit.

  • Consumption during the processing time of the production order

    Which adjustments must be made in the material master for the calculation of the lot size in the MRP run, that the consumption of the material during the processing time of the production order is considered for the calculation of the lot size.

    Hi ,
    You have to judiciously indicate  the re order point  in the material master(  the re-order point is the sum of saftey stock and consumption during replenishment lead time).
    How ever , this does not in any way influence the lot size , but only influence the no of lots i.e the procurement proposals. The lot size is determined by the lot sizing procedure selected by you , depending on various factors like agrrements with your vendor , optimum lot sizes to reduce the cost of procurment and storages etc.
    You can refer to the following url for details on lot size :http://help.sap.com/saphelp_47x200/helpdata/en/fe/819b9f643b11d3b4e40004ac160649/frameset.htm
    and  for details about re order point :
    http://help.sap.com/saphelp_47x200/helpdata/en/db/6f143ea7ec11d3a8330000e82a3c24/frameset.htm
    Hope this information will be useful.
    Regards
    Raghuramam.

  • Actual production order final confirmation time

    Dear all,
    Could you please let me know who i can get the actual time a production order was finally confirmed? I know we have the production order statuses history chnage but were is it stored?
    BR and many thanks

    Hi Mikel,
    Pass order number AUFNR to AUFK and fetch OBJNR.
    Pass the AUFK-OBJNR to table JCDS to fetch the status STAT, changed date UDATE and
    changed time UTIME where INACT = blank.
    Pass the JCDS-STAT to table TJ02 and fetch TXT30 status text.
    Filter the data with respective to TXT30 = CNF and accordingly get UTIME from JCDS.
    Pre-requisite config:
    Date related data in table JCDS will be updated only upon selecting the Status change
    documents in OPL8/COR4 under implementation tab.
    Revert if you have any issues.
    Thanks & Regards,
    Ramagiri

Maybe you are looking for

  • Distributing multiple versions of an app within a single Windows Store app

    The company I work for creates Point Of Sale (POS) software using Software As A Service (SAAS), so we host our clients' databases.  We do not force all of our clients to all be on the same version of our software; i.e. some clients are on version 3,

  • Sound out of sync on DL DVD

    The audio is out of sync by about 3 seconds on a 132-minute DL DVD I just encoded and burned in iDVD. The video was edited in Final Cut Express, using 16-bit 48Khz audio recorded using Sound Studio 3. From Final Cut Express each movie was processed w

  • TREX 7.0 installation Steps

    hi all, We need to install TREX 7.0 on solman (7.0 SP16) production server (OS is Windows 2003 server 32-bit) I want to install TREX 7.0 Multi host. Please help us by providing the following information 1)  Pre-requisites 2)  Installtion step by step

  • How to remotely fix my father's iMac

    I am often called upon to fix my 83 year old father's iMac. I would love to be able to somehow remote into his computer and fix it that way vs having to drive all the way to his house. Is there a way of doing this? I don't quite understand the differ

  • How to add the flash plugin in firefox beta linux x86_64

    Someone give me the solution in a live chat session so I share it here. If you are testing firefox under linux (x86_64 in my case) and the flash plugin is installed but not detected by firefox, it's probably because you are testing it in a single use