Production order with pipe line material

Production ordre created and got confirmed  and found pipe line materials got stuck in COGI and on analysis found in that specific ordrer ordre pipe line material are not activated with special stock key indicator i.e. 4.
Due to this it got stuck in cogi and for the same material created an order and found there is a allocation and  activated with special stock key indicator i.e. 4.
Help me to resolve the existing Goods issue from COGI and cause of not activated with special stock key indicator i.e. 4. in production order.

Dear ,
did the pipe line material is showing in  production reservation  as one of the BOM compoenent?
If it is the case , then cancel the confirmation in CO13 and try to connfirm the operation with Clear Reservation Option .
Refer the below thread which may help you to figure out the issue :
Re : How to consider Power and Steam in power plants and paper mills
Re : Power and steam
Regards
JH

Similar Messages

  • Reservation problem in production order for PIPE line materials

    while releasing the specific production order reservation number generated but in generated reservation pipe line materials are not existig hence while doing confimation as backflush indicator activated hence this got stucked in COGI.
    On observation found this specific order generated with  refernce to other oreder which is not confirmed yet.
    & for the same materials orders been created for long time they got confirmed successfully with goods movement.
    what could be reason for this order ,please suggest to over come this.

    please cancel this question

  • Production Order with follow-up material unble to save due to error CKBK009

    Dear Expert,
    When we apply discontintion/follow-up material setting, production order is not able to save. <b>Error message "CKBK009 - No price could be determine for material....."</b>.
    <b><u>SAP Help indicates :</u></b>
    "No price could be determined for material .......... Message no. CKBK009
    <b>Diagnosis :</b>
    The system could not determine a price for valuation view 0, because no valuation 
    strategy succeeded from valuation variant 006.
    <b>System Response :</b>
    Since the input quantity is zero for this material item, the costing result is not   
    affected by this error at the pricing stage.
    The standard system defines this message as an error message. However, you
    can use user-defined error management to specify that the message is a warning
    or an information message, or that it is not issed at all.
    <b>However, in Controlling's User-Defined Error Management, CKBK009 is already  warning only.
    What other setting is needed ?</b>
    Thanks for helping !

    Dear all,
            Manage to solve the problem via Note 1008643, per following.
           <b> THANK YOU for all your guidance & Have a nice day !</b>
    <u><b>NOTE 1008643 :</b></u>Symptom
    In a production order error message CKBK-009 is raised during cost calculation.
    This message cannot be modified into a warning or information message.
    Other terms
    CKBK009, CO01, CO02, CO03
    Reason and Prerequisites
    System design
    Solution
    Please make a new entry in TA OPR8 with the following characteristics:
    ErrorManagID    ApplicationArea   MsgNo  MinMsgType    MaxMsgType
    PPCO            CKBK              009
    Then run TA OPR4_PPCO to modify the message type for CKBK009.

  • Pipe Line Material Creation

    HI
    can we creatte process order for pipe line material for example electricity/steam. and can we create pipe line material without info record mean without any vender detail.
    Regards

    Dear Mr.R.Brahmankar,
    This is my problem also i will explain you  the scenario
    In Industrial Battery manufacturing The electrolyte is a material  (Like Potassium Hydroxide and sulphuric acid )which  are produced with  a certain concentration% in acid reactors in-house and used in Battery manufacturing heavily.
    We have assigned these materials thru Activity types in-spite of the requirement of pipe line material. Can we assign this materials which are produced in house (but Category similar to pipe line materials)as pipe line materials in BOM and what would be the Impact on the system.
    Pavan

  • Error message while creating production order with KMAT material strategy25

    Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
    Sales order & MRP Picked the components correctly as per the dependencies
    written. So Planned order generated against sale order.
    When I tried to convert planned order to Production order...I am getting the
    below error message..
    Error Message:
    You cannot make an assignment to make-to-order stock Message no. CO684
    Diagnosis The component cannot be allocated to an individual stock because
    make-to-order production and engineer-to-order production cannot be executed
    with this order.
    A possible cause is that you are trying to create an order with reference to a
    sales-order/project, where an account assignment to a sales order/project is not
    allowed in the settlement profile that is assigned to the chosen order type.
    This is inconsistant.
    System response The following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure Choose another order type.
    I used order type with SD1 as settelement profile.
    OVZG: default 046, settlement profile = SD1
    OPJH: Settlement profile = SD1
    Plz through some light on this if u have worked on Variant Configuration/MTO
    settlements.
    Question:
    1) Is creation of production order with KMAT material supported by SAP?
    2) If yes, why the above error occurs?
    Waiting for Ur reply
    With Best Regards

    Dear R.Brahmankar,
    I have check on the note, but it is not relevant to ecc6. The current system default setting is :
    Standrad setting for reqt class 046
    Special Stock E
    Acct Assgt Cat. M
    Valuation M
    Settlmt Profile SD1
    However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
    Config in Acct Assgt M
    Consumption Posting = E
    Config in Acct Assgt E
    Consumption Posting = '  '
    In F1 key of Consumption Posting field it shown following:
    To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
    If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
    Dependencies
    If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
    If you are working with valuated sales order stock:
      In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
      In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
    Should we change to E?
    Regards,
    Ong

  • Pipe Line Material Scenario- interesting

    Hi Gurus,
    I have a very genuine scenario but not getting any SAP standard solution.
    Scenario is, my plant A (power plant) is producing material POWER as FERT  and my another plant B  consuming ELECTRICITY as pipe line material. So having two plants (different company code) & two material codes.
    Now I can consume ELECTRICITY as pipe line material in production order as non stock material and invoice is generating which I can forward that to my Power Plant but in Plant A which is producing POWER I donu2019t have means to reduce Stock.
    My Q is
    How can I consume or reduce stock in plant A? With reference of invoice is it possible?
    It looks me genuine situation of Customer and vendor where, customer is having Pipe line material in its R/3 and Vendor is declared it as finished product in its R/3. So isnu2019t we have any standard process to address this business situation.
    thanks in advance

    Hi,
    Refer the thread in which the sap experts discussed on the similar issue in detail, after going thro this  hope you will understand easily how you should map your scenario
    Re : Power and steam
    Pipe Line Material Creation
    Re : How to consider Power and Steam in power plants and paper mills
    ch pavan

  • Report for Production orders with name of Customers

    Dear Expert,
    Kindly suggest to view the production orders with customer numbers for which the sales orders is created.
    I tried in MB51 with layout settings but the customer number comes out be blank despite the sales order number is populated for an production order.
    Kindly suggst a way or any report in the system  to get the corresponding information of production order number and corresponding customer name mentioned in the sales order .
    Thanks in advance for your help and inputs..
    Best regards,
    Nitish jain

    Nitish,
    MB51 is a Material Document list.  Many production orders exist that have no entries in this report, so it would be an unlikely candidate to be a solution for your requirement..
    The standard production order reporting tool is COOIS.  The output for MTO orders can be configured to display Sales order and Item and Soldto.
    Obviously, displaying even the customer order number in COOIS is impossible in a MTS scenario.
    In addition, a user experienced in using SAP Query  (SQVI or SQ01/SQ02/SQ03) could also create a production order report without having to know ABAP, by properly linking tables AFKO, AUFK, AFPO (production order data) with VBAK (sales order header data) to get customer number, and KNA1 to get customer name..
    If you are not expert in SAP Query, I suggest you discuss this requirement with a local ABAPer.
    If you are feeling like educating yourself in the wonders of SAP query, try this doc.  Although old, SAP query hasn't changed very much since this document was written.
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCSRVQUE/BCSRVQUE.pdf
    Rgds,
    DB49
    Edited by: Dogboy49 on Apr 20, 2010 10:47 PM

  • Creation of production order with reference to sales order

    dear all guru's,
                       i m having a requirement of creating production order with ref to sales order but without changing my old strategy of make to stock.
    regards
    ujwal

    Hi,
    For the purpose of creation of production order with reference to sales order while maintaing MTS strategy you need to maintain Make to stock strategy 40 in strategy group in MRP-3 View of Material Master.
    This is the only Make-to-Stock Strategy which enables you create Production Order against both Sales order as well as Demand / PIR.
    So if your strategy group is already 40 then you need not change it.
    However if you are using any other Make-to - Stock strategy like 10, 11 etc. then it is not possible to create Production Order against Sales Order since they dont consider Sales Order in planning.So you need to change them and set strategy group as 40.
    Hope this helps.
    Revert if you have any doubt.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Sep 27, 2008 8:50 AM

  • EXTERNAL OPERATION in a production order with  different company code plant

    Hi,
    in my case i am having a production order with  4 operations.
      0010 milling
      0020 winding
      0030 cutting
      0040 milling
    among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
    in this case whether i should proceed with PP01 Control key  with opearion plant as that plant which is lieing in diffent company code or
    i should specify  PP02 control key saying that plant as an external vendor for me and do PR  and PO for that service .
    which should i follow for my case and how cost gets updated .

    Hi,
          For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
    Before that create purchase info record.
    Enter subcontract info record in routing.
    after running MRP , convert the PR to PO.
    Send the material by MB1B by 541 mvt
    Receive the material by MIGO  by 101 mvt.
    Regards,
    Raja sd

  • Production order with reference to sales order

    Hi experts,
    I have created one sales order.
    I am getting an error as "sales order has no CO object" while creating production order with reference to that sales order. Can anyone help me on this ?
    Thanks in advance.
    Rgds,
    Parul.

    Dear singh,
    pls check this given by yadav
    T. Code: OKKP - Maintaining Controlloing Area
    Select your Controlling Area and Click: Activate components/control indicators (left-hand Dialog Structure)
    Here, Under Tab: Activate, check Boxes: Sales Order, Cost Objects, etc..
    Check whether Strategy Group is maintained in Material Master (MM02) --> View: MRP3.
    T. Code: VA02/ VA03 --> Tab: Procurement -> Column: RqTy
    There, Check whether requirement type is relevant for MTO.
    More information:
    Req. type: KE (if, Reqmts class: 040 Mke-to-ord.w/o cons. - possible to create Production order)
    Req. type: KEK (If, Reqmts class: 020)
    Req. type: KSV (used for Make to stock - Planning with Assembly Planning Strategy 40 is being used in the MRP3 view of the material)
    Also, Check other relevant settings in:
    SPRO --> IMG --> Sales & Distribution --> Basic Functions --> Availability Check and Transfer of Requirements --> Transfer of Requirements
    Best Regards,
    vraj

  • Production order link to raw Material

    Hi
    Experts
    We have manual Production order system (NO MRP)
    System works like this
    Work order (Manually given to Production) Part name Material Qty and Dispatch date.
    Finish Material A
         This contains semi finish material X, Y, Z
    X contains Raw material and Scrap Generated
    Y contains X and Scrap
    Z Contains Y and Scrap
    Finish A Contains Z material
    Then Production people create the sub semi finish Production order of X before he checks raw material from store and accordingly by calculating he create Production order of X then Production order of Y and Z and then Create Production Order Of Finish Material.
    Our problem is that as we create manually Production order the material issued from store we are not able to link with the production order.
    As this material is issued to this production order. How to map this?
    The other issue is regarding consumables we also want to map this to Production order. Like Coolant used and inserts used on work center how to map?
    Please guide me.
    Thanks & Regards
    Pert

    Hi,
    If you are creating production orders with CO08 (With reference to sales order ) then RM tracking can easily be done.
    Just need to give sales order number in COOIS report or in table AFPO it will give you all the production orders and RM can be traced till FG.
    But if you have MTS then the calculation must be assumption basis .
    If the same RM used in same SFG with different production orders then that might be impossible to trace without batch and sales order.
    Now you want to trace tool then use PRT
    You need to create material as PRT .
    Assign that PRT in routing with Usage formula .
    So PRT will be copied on production order with routing . When ever you will confirm the operation the usage value of PRT will be updated.
    Regards,
    Vishal

  • Transacciu00F3n MFN1 - Error KA465: Production order with an actual activity up

    Hi Exerts,
    I am executing transaction MFN1 with "Update of Activity Consumption in the Quantity Structure" = 2 and the following error ocurrs: "KA465 Production order with an actual activity update.".
    I changed the customizing "Update of Activity Consumption in the Quantity Structure" to "Activity update not relevant to price determination", after this I exectuted transaction MFN1 again and the error didn't occur.
    I need to understand what is the impact of changing this customizing, and if I set the "Update of Activity Consumption..." equal 2, the activity actual values are revaluated in the CKM3N? If the answer is yes, in what point of the CKMLCP this value is revaluated?.
    Regards

    Hi,
    please check CKM9 for the relevant plant how you define the Activity update. Please note KA465 is justified to avoid posting the credits and debits twice if the indicator is '2'.
    If you are using activity update '2', the differences between planned and actual activity prices are not distributed to the orders but via multilevel price determination directly to the materials.
    The system determines the actual prices by means of the multi-level price determination in the actual calculation.
    In the actual calculation, the system also already debits the materials and credits the cost centers or vice versa.
    In this case, the revaluation must not be executed because otherwise the system posts the debits and credits twice. In this case, the system ought to display error message KA465.
    Note 686588 explains under what circumstances error KA465 may be raised, that is, if you have activated Material Ledger/Actual Costing with Activity Consumption '2'. Please check your Material Ledger settings in relation to note 686588.
    If you use activity update '1' then revaluation is done via the orders and no longer via Material Ledger.
    regards
    Waman

  • Closing the Production Order with status PCNF

    Hi Experts,
    May I kindly ask if I can close an order with status Partially confirmed? If not, how can I cancel the confirmation if I had already reversed the goods movement in the confirmation thereby flagging an error of a deficit in the material quantity during cancellation of the confirmation?
    I really need your help since I need to close the production orders with this case.
    Hoping so much for your replies.
    Many thanks in advance.
    Sincerely,
    Ria

    Ria,
    I am not so clear about the exact situation.
    When you say you have reversed the goods movement with MIGO, is it reversal of the documents posted with confirmation or the individual documents?
    You can only cancle the document with MIGO which are independent of the confirmation.
    The  documents which are with the confirmation can not be reversed in any case with MIGO.
    I suggets you go this way,
    1. Check why system is giving you error as 'Deficit......'. The one thing I suspect that you must have performed auto GR & moved out the stock of FG from that location.
    If it's so then bring back the stock to it's original location & cancel the confirmation.
    While cancelling the confirmation where you might have executed goods issue with backflush this error won't arise as the stock will be bring back to storage location form the order.
    Don't reverse the cancellation of the of the documents youhave performed with MIGO for independent material posting on the order. Keep it as it is.
    This way the cancellation of confirmation & material movement will be done & now cost on the order will be zero.
    You can assign the status CLSD as well as DLFL to the order.
    2. In case you find the above activities can not be carried out for some reason then give status TECO to the order.
    Sttle the order so that the cost on the order will be zero, then give status CLSD.
    As far as possible stick to solution no. 1 only.
    Go for solution no. 2 when you don't have any other option.
    Hope this helps you.
    SmanS

  • WHATS THE FLOW OF A PURCHASE ORDER WITH REGARS TO MATERIAL MANAGEMENT ?

    WHATS THE FLOW OF A PURCHASE ORDER WITH REGARDS TO MATERIAL MANAGEMENT ?

    Hi
    see the MM flow with related Transaction codes
    MM Cycle:
    Purchase Requisition-> Staff in an orgn places Pur requisition for want of some goods/products - ME51
    Request for Quotation(RFQ)-> The Purchase dept in the orgn calls/requests for the quotation for the products against which PR was raised. - ME41
    Vendor Evaluation->After receving the RFQ's, after comparison a Vendor is finalised based on the terms and conditions.
    Purchase Order(PO)-> Pur order was issued to that vendor asking him to supply the goods/products -ME21N
    Goods Receipt Note(GRN)->Vendor supplies the material/Products to the orgn-
    MB01
    Goods Issue (GI)  -> People receives their respective itesm for which they have placed the Requisitions
    Invoice Verification-> ALong with the Material Vendor submits a Invoice for which the Company Pays the amount - .MIRO
    Data to FI -> data will be posted to FI as per the vendor invoices
    you better go through all these links u will get all the info what ever u need
    for mm
    http://www.sapgenie.com/abap/tables_mm.htm
    http://www.sap-img.com/sap-download/sap-tables.zip
    http://www.allsaplinks.com/material_management.html
    http://www.training-classes.com/course_hierarchy/courses/2614_SAP_R_3_MM_Invoice_Verification_-_Rel_4_x.php
    http://www.sapfriends.com/sapstuff.html
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PSMAT/PSMAT.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CAARCMM/CAARCMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MYSAP/SR_MM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOMDMM/LOMDMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCBMTWFMMM/BCBMTWFMMM.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMIVMVAL/MMIVMVAL.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMWMLVS/MMWMLVS.pdf
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMISVE/MMISVE.pdf
    Reward points if useful
    regards
    Anji

  • QM for Pipe line Material

    Hi Experts
    Scenario: We have water as Pipe line material. We have activated 89 inspection type & user is creating manual Inspection lot for the same.
    Since this is a Pipe line material, there will not be any PO, GR so no inspection lot at GR. We do the GI with 201-P against the cost centre & vendor.
    So my requirement is that, can it be possible to somehow create the inspection lot at the time of above GI OR
    Any other way to create the inspection lot apart from creating it manually by Inspection type 89?
    Looking forward for the favourable reply
    Thanks
    Sachin

    Hi Sachin,
    For 201-P u can have GI inspection type 02.Again it is not a stock relevant like 89.
    Regards,
    Nitin

Maybe you are looking for

  • I would like to add a solid state drive to my 27" iMac i7 (Jul 2010). Can this be done?

    Good day all I would like to add a solid state drive to my imac 27" which currently has 1TB drive.  I know that you can by the imac with a ssd and an hdd but can a dealer install a ssd after the fact?

  • Logical XOR operator in T-SQL (SQL Server 2000)

    Hi all.... I was wondering why SQL Server 2000 lacks a logical XOR operator. Do you have a ready to use function that implements it? How can I program one by myself? I know that A XOR B is equivalent to NOT A * B + A * NOT B. So I tried to create thi

  • Fields required based on a value in another field

    Hi, I am looking to have fields required (Annual Revenues and # of Employees) based on the value of another field (Ownership). Basically, if the value is Public the user is required to enter the Annual Revenue and Employees fields. I thought about us

  • Slide duration

    Hello - For some reason, I am not able to change the slide duration. The slide is currently 67 seconds. I try changing the slide duration in the properties panel - nothing. I try moving the playhead. It just doesn't every change from 67 seconds. any

  • ACR 5.6 won't install

    We're trying to install ACR 5.6 on our 32 bit XP laptop.  We download the file, extract it from the zip file and run the installer.  The installer starts and within a minute we get the error message "Adobe Setup has encountered a problem and needs to