Hi guys,
can I kindly ask for a concept on how the field "Withdrawal Qty" works in the Production Order?
Thanks

Hi,
When a production order is created, the system automatically creates a reservation for the necessary material components. Each material component in the order is dealt with under a different item number in the reservation. The reserved materials cannot be issued from stock until the operation or phase to which they are allocated in the order has been released. There are two ways in which you can post a goods movement:
· Manually in inventory management
· As part of process control by transferring a material consumption in production order confiramtion
If the‘backflush’ indicator is set for a component contained in the material list, the goods issue is posted automatically when you create the confirmation for the respective phase.
For information about how you can control whether a material is to be backflushed, see Backflushing.
The withdrawal of the components causes the value of the components issued to be debited to the order for each cost element and origin as actual costs.
To issue material components from stock, you can either refer to the order number or to the reservation number. The reservation number is displayed on the General Data screen for the component.
Regards
Tao

Similar Messages

  • Production Order - other quantity in goods issue

    Hi experts,
    I have a problem where I don't really see the cause.
    In a production order we have 1 FOZ + 12 FOZ of one Material.
    The base unit of the material is GAL.
    However, if we do the goods issue with MIGO or MB1A we get 128 FOZ for goods issue.
    Does anybody know, wherefrom that quantity is coming?
    Kind regards

    Hello Christian,
    You have got the correct reason for this behaviour, as the Base unit is GAL which is without decimals, it cannot withdraw a fraction of quantity from the inventory, hence its trying to withdraw 1 GAL = 128 FOZ.
    You can consider changing the CUNI set-up for GAL to handle 3 dec places. Please refer the note 362932 - Conversion with proportion/product units it mentions if you are working with metric and  non metric UOM then the affected UOM in the same dimension should have 3 del places. This chnage should not have any side effect. How ever a thorough testing is recomended.
    OR
    If you plan to use a measurement unit without decimals then the base unit of measurement should be the smallest one, in this case FOZ. If you are already live changing might be tricky. Else you can consider this option also.
    Regards
    Abhishek

  • Table for production order Activity Quantity

    Hi Experts,
    Can anybody please tell me the name of table where Production order planned and Actual activity quantity with reference to production order number gets saved ?
    Thanks in advance.
    Regards,
    Bijay

    Hi bhatiya,
    when ever you want to see the table or field name u just click F1 where the data entred field and click on technical button which is screwdriver type icon and u can find out the table name and field names.
    if it is useful to you please assign points.
    regards,
    Gopi.

  • Production order conformation quantity control

    Dear friends,
    Requirement is : Against a production order quantity say 100, with milestone confirmation in 3 operations, the actual yeild is only say 80 with indicator delivery completed in the final operation. System is still allowing to do the GR for the balance quantity which is not exisiting. Please guide how to address this .
    Thanks in advance,
    Muralee

    Hi,
    Order qty is 100 no's. Yield is  80 no's. So system will allow you to make confirmation  for 20 no's more.
    Enter 20 no's in scrap field. Then only system will not allow you to do GR more than 80 no's.
    In tcode OPK4 , you can set under delivery over delivery tolerance.Say 10% tolerance given in work scheduling view.
    System allow you to do GR for 90 no's(under delivery) 110 no's (over delivery) without showing any error message.
    If you beyond these limit, system will give error or warning message according to your setting in OPK4.
    Regards,
    Dharma

  • Production order confirmed quantity

    hello!
    can i change the settings, that production order atp-check confirms quantities from e.g. purchase requisitions, not only stock in warehouse?
    best regards,
    matthias

    hello!
    every supplies are ticked in OPJJ. it works for receipts before demand from production order, but no receipts in future are confirmed.
    Date                          MRP element                           Req/rec     Confirm     ***. ATP
    04.03.2009     Stock                                                  1      0      
    12.03.2009     OrdRes     Totals record     3-     1      0
    14.03.2009     PurRqs     Totals record     1      0      1
    02.06.2009     -
    >     End lead time     0      0      0
    02.06.2009     PurRqs     Totals record     3      0      0
    i would expect that the order confirms the quantity from the purchase requisition.
    best regards,
    matthias

  • Issue  -  production order planned quantity decimals

    hi,
    In general setting decimal places for Quantity is set as 3.
    In production order row level planned quantity is shown upto 2 decimal places,
    for example planned qty header is 55.2 , Base qty - row level - 0.601
    Planned qty - rows - 33.17 instead of 33.175
    How to show/extend decimal places upto 3 places for planned qty-rows in production order ?
    Whether any one faces this issue ?
    Jeyakanthan

    hi sudha,
    Thanks we have set unit as 3.
    Problem solved.
    Jeyakanthan

  • Production order-committed quantity

    Dear all
    PLz through out the  light on committed quantity in component overview screen in production order .
    give me detail

    Hi
    During creation of production order you will do material availability check,, if materials are avialable  it will commited the quantity means automatically reserved the quantity..
    During Goods Issue what ever the materials issued it will come as quantity with drawn
    comitted qunatity will check Stock/Purchase Orders/Purchase requistations  like as per your availability check createria
    regards,
    srihari.m

  • Production order change (quantity) doubt.

    Hi pp experts,
        I have a problem, while changing order quantity in the production order through Coois or co02, i am not getting the changed quantity. how to display that.
    for ex,
    The order qty is 10 Nos , through Coois i change this qty to 4, i want to display the order qty 10 with change qty 4. give some soln.
    Thanks,
    Gowri

    Gowrisankar,
    Check if the refresh button is there. Click that. If not there then you have to come out and come back in.
    Rgds
    Ram

  • Special production order change Quantity

    Hi i'm a new user. I'd like to know if is possible to change base quantity in special production order, by default it is set to 1, but i need to set it to 1000 kg, is it possible do it without the use of bills of material and standard production order?
    Regards

    Maybe my english is not so good, but with my question i tried to semplify my job. I do always different BOM for the same Parent item. When i change the BOM of that item i'm not able to reuse a BOM used two months ago.
    In case of special production order i can search the one next the BOM i intend to use, and edit it.
    With standard productione order I can not do it because of i use child item also in 1/1000 and the quantity is only 1/100, 2 decimal.
    I've tried to increase the decimal but the system answer with "impossible update another user connected" but is not true.
    Another question, is it possibile to insert in the BOM or in order production the batch of child item?
    Is it possible to use as child item the parent item i order to produce with other batch?
    regards

  • WM-production order supply quantity is not reduced after confirmation,GRN

    Dear Gurus
                   i am configured the WM-PP , in the production order after material staging and TR-TO process , i did confirmed the
                   production order and GRN.  Raw material stock is not reduced from the storage type 100.... 
                   kindly, suggest me where i missed the configuration.
    BR
    DEVA

    Hi Ismini,
    For the first question, there could be several reasons, like for example, 13.1 is not week 4. So if the consumption parameters did not allow forward for at least around 7-10 days (to get to the date of the first day in week 4), then consumtion didn't take place. Another reason could be that you defined planning strategy 10 for the material AFTER the sales order was already created.
    Point 2: I really don't know he details of these LTP scenarios that you mention.
    Point 3: if it really is from 2007 I think that you can delete the PIR without fear.
    Regards,
    Mario

  • Control Production Order plan quantity

    Currently the system does not prompt warning/error if the plan quantity is changed in CO02 to be lower than the confirmation quantity.
    Any ways to restrict that?

    No that method cannot restrict.
    e.g.
    CO01 quantity 30 PC.
    Confirmation done of 30 PC. Order becomes CNF.
    CO02 change plan quantity to 2 PC. System allows that.

  • Production Order Base quantity

    Any suggestions please on a work around for a current issue where Bill of Material child items are as below:
    Planned Qty  Item
      200,000      A
                1       B
                1       C
                1       D
    Because items B,C,D are all single units the Base qty can't be shown as under Administration Initialization set up the Item Qty  decimal places is set to 3. An error message appears stating that the base qty is required! without changing the decimal places to 5 (which will be irreversible, and will have an impact else where on the system) is there any other work around. As no orders can be produced

    Hi,
    I think in BOM you are entering the Base Qty for Finished Goods as 2 00 000 and Base Qty for Components as 1.
    Then while doing ProductionOrder it will not allow you to do below 1000 Qty.
    If this is the problem, change the Unit of Measurement and then maintain your stock movements.
    For. Eg.
         2 00 000 Milli Gram of A required the child item
        Convert it to
        2 Kg of A required ..........................
    Hope this is the problem

  • Quantity Withdrawn field in production order

    Hi all,
    I have a doubt
    there is a component A in production order
    Required quantity is 10
    Initially i issue 15 qty's then the same qty gets updated in "Quantity withdrawn" field (component overview screesn)
    Then i reverse 3 qty's of component A,which is very much visible in documented goods movement
    Whereas the same is not getting update in the ""Quantity withdrawn" field ,Still 15 qty is appearing against "Quantity withdrawn" field
    This may be normal behaviour of the system,I'm not sure
    Can you please confirm on this
    If not then please give me possible reasons why it is not getting updated ?
    Thanks,
    SVP

    Hi all,
    I also wonder about this (actually it's an issue for this customer ... ). As same as production order, Network order (it's activity more correctly) also show withdrawn quantity in CN25 transaction.
    In my case, I've done good issue quantity 2 EA, then I reverse it. and same again. finally I do good issue 2 EA.
    GI         -2 EA : CN25
    cancel GI 2 EA : CN29
    GI         -2 EA : CN25
    cancel GI 2 EA : CN29
    GI         -2 EA : CN25
    (Yeah, normally it will not happen often but it can.)
    I expect withdrawn Quantity 2 EA but it shows 10 EA. So have wonder with actual data table MSEG. It has SMBLN value (referred document number to cancel) as I think. It's very normal.
    Why withdrawn field doesn't count that cancel quantity?
    Is there any configuration that I missed ? or Is it normal result?
    But System should do show 'Cancelled GI Quantity' (so that end-user can notify actual GI quantity) to make it understand.
    Regards,
    Yeum
    Edited by: Hee Chul Yeum on Jan 22, 2009 10:50 AM

  • Production Order Header - Committed Quantity

    Hi Team,
    I have created the production order with quantity 2. In order to produce the 2 header item, i need to 2 components (BOM item). But currently i have only 1 quantity of  BOM item in stock. With this condition, i am performing the ATP check in my production order. Since i have only one BOM item in stock, i can able to produce only one header item. So after executing ATP check in my production order, i am expecting the below field to be updated as "ONE" (refer the screen shot). But it is not getting updated. Why? When this field will be updated?
    Thanks

    I have tried testing this in various ways on my system but I cannot get the committed quantity to 0 unless there is 0 available. The quantity is always updated for me.
    Can you do the following?
    Set a breakpoint here:
    Function AVAILABILITY_CHECK_CONTROLLER
    CALL FUNCTION 'AVAILABILITY_CHECK'  <<<<<<<< Breakpoint here
           EXPORTING
                P_SCHEDSH     = P_SCHEDSH
                P_SCHEDTR     = P_SCHEDTR
    When your breakpoint is hit during the availability check, hit "F6" and then check the values in table P_MDVEX. If possible, post the results back here; ensure that you have included the MNG01 and MNG01 fields.
    This internal table holds the result of the availability check. By looking at this, we might be able to narrow down if this is an availability or PP issue.

  • GR quantity more than production order quantity triggering cost difference

    Hi Gurus,
    We have observed a scenario where the cost(price) dfference account getting hit whenever the GR quantity is greater than the production order total quantity. The dollars posted to this acount are directly propotional to the difference between the GR quantity and the production order quantity.
    The total quantity specified in production order is 1 M2U and GR quantity is 1,000 M2U.Material price is $195.65.
    Accounting Document;
    Inventory account           - 195.65
    Offset account                - 200.00
    Cost difference account  -    4.35
    If we do GR for less than or same quantity as in the production order, this account is not getting triggered.
    Any idea what is causing this scenario? I really appreciate if you can share with any SAP note related to this.
    Thanks,
    Mano.

    Hello Gurus,
    One  more observation is,
    The palnned costs and actual costs are always different when dealing huge quantities. But the cost difference account is only getting triggered if the actual quantity is  more than the palnned quantity.
    And,
    when the difference between atual quantity and palnned quantity is huge then
    Planned costs are booked to the inventory account
    Actual costs are booked to the prodcution cost account.
    Significant cost variance is booked to the cost variance account.
    When the difference between actual quantity is less than/equal to planned quantity is not so huge then
    Actual costs are booked to the inventory account
    Actual costs are booked to the prodcution cost account.
    Is this a standard behaviour?
    Thanks,
    Mano.

Maybe you are looking for

  • Airport Connected Printer No Longer Working - Please Help!

    I have an Airport Extreme connected to Road Runner Cable Modem serving a the Main Base Station. I have a Xerox Phaser 7750DN Color Laser Printer connected via USB to another Airport Extreme serving as a Remote Base Station. I have an Airport Express

  • Revoke Acceptance of Service Entry sheet

    Hi Experts, I am trying to delete an already accepted Service entry sheet using the standard BAPI_EntrySheet_Delete. But I have to revoke the acceptance of the service entry sheet prior to deletion of SES. I am aware that we can manually revoke the a

  • Cannot deathorize computer-- menus are all greyed out

    I'm trying to deauthorize an existing computer before I sell it.  But when I click on the menus, they are mostly greyed out, including the Store menu.  so i cannot apparently login/logout much less authorize/deauthorize.  but I CAN access the store i

  • SAP Hosting for the EP implementation?

    I have been asked to investigate the hosting options available for EP 6.0. Can anyone offer any experience or advice that I may use? Thanks, Ron Jones [email protected]

  • Dynamic add component to panel, it does't work

    I want to add a label in a panel when you click button. I used revalidate() and revalidate() method, but it didn't appear in panel. HELP ME?? WHAT'S WRONG! private void jButton1ActionPerformed(java.awt.event.ActionEvent evt) {