Hello Experts,
We have some of production orders where the goods receipt is done with 101 moment type on confirmations without consuming the components i.e not 261 moment type not happened.
We have checked the backflush for the components and also the stock and every thing is fine.
But we have observed the Resevations for corrsponding Production orders the "moment allowed" is not checked and hence the 261 moment is not happened, But not sure why it is not active.
Could any one let me know why this RESB-XWAOK is not checked in the reservations and aslo on what are the possible conditions this happens.
Please help...Thanks in advance
Regards
Madan

check directly in MB1C transaction with the reference of order movement type 261 material would be consume.
also check batch enter field in MRP 2 view control this make it blank and then system will not determine batches in production order and you can select batches in MB1A/B/C transaction.
Regards,
Sanjeev

Similar Messages

  • STOs and Productions order are not lined up. Dates are off

    Hi Experts
    I have a production order and STO with different dates. I would expect no gap between Prod order and the STO. I have checked Planned delivery time,GR/GI at both supplying and receiving plant . Everything looks fine. Please Advice

    Ganpath,
    In general, both of those objects are executables.  In most applications, the relationship between the dates of STOs and the dates of Production Orders is not directly determined by the software,  It is only through careful design and execution of the overall process that you achieve dates that line up; assuming, of course, that is your business requirement (not everyone wants dates to line up).
    So, it depends upon how these two objects were created.  Can you please describe how they were created?
    Best Regards,
    DB49

  • Production Order Settlement Process with respect to  a Project

    Hello All,
    I know about normal Production Order Settlement Process in discrete industries.
    Can anyone give me the steps for the Production Order Settlement Process if the Production Order is created with respect to a Project in SAP PP- PS Integration Scenario.
    Thanks in advance for your support.

    Hi Experts,
    Can anyone clarify my above queries.
    Thanks in advance for your support

  • Detected use of SPRequest for previously closed SPWeb object. Please close SPWeb objects when you are done with all objects obtained from them

    HI
    i am keep seeing this message in ulsviewer of splogs in a webfront end server
    Detected use of SPRequest for previously closed SPWeb object.  Please close SPWeb objects when you are done with all objects obtained from them, but not before.  Stack trace:  
    at Microsoft.SharePoint.SPWeb.get_Exists()   
    at Microsoft.SharePoint.WebControls.CssLink.OnLoad(EventArgs e)   
    at System.Web.UI.Control.LoadRecursive()   
    at System.Web.UI.Control.LoadRecursive()   
    at System.Web.UI.Control.LoadRecursive()   
    at System.Web.UI.Control.LoadRecursive()   
    at System.Web.UI.Control.LoadRecursive()   
    at System.Web.UI.Page.ProcessRequestMain(Boolean includeStagesBeforeAsyncPoint, Boolean includeStagesAfterAsyncPoint)   
    at System.Web.UI.Page.ProcessRequest(Boolean includeStagesBeforeAsyncPoint, Boolean includeStagesAfterAsyncPoint)   
    at System.Web.UI.Page.ProcessRequest()   
    at System.Web.UI.Page.ProcessRequest(HttpContext context)   
    at ASP._layouts_icc_icc_scan_view_aspx.ProcessRequest(HttpContext context)   
    at System.Web.HttpApplication.CallHandlerExecutionStep.System.Web.HttpApplication.IExecutionStep.Execute()   
    at System.Web.HttpApplication.ExecuteStep(IExecutionStep step, Boolean& completedSynchronously)   
    at System.Web.HttpApplication.PipelineStepManager.ResumeSteps(Exception error)   
    at System.Web.HttpApplication.BeginProcessRequestNotification(HttpContext context, AsyncCallback cb)   
    at System.Web.HttpRuntime.ProcessRequestNotificationPrivate(IIS7WorkerRequest wr, HttpContext context)   
    at System.Web.Hosting.PipelineRuntime.ProcessRequestNotificationHelper(IntPtr managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32 flags)   
    at System.Web.Hosting.PipelineRuntime.ProcessRequestNotification(IntPtr managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32 flags)   
    at System.Web.Hosting.PipelineRuntime.ProcessRequestNotificationHelper(IntPtr managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32 flags)   
    at System.Web.Hosting.PipelineRuntime.ProcessRequestNotification(IntPtr managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32 flags)
    adil

    Hi,
    Your SPweb object is not disposed properly.
    http://social.msdn.microsoft.com/Forums/sharepoint/en-US/3a25eb86-8415-4053-b319-9dd84a1fd71f/detected-use-of-sprequest-for-previously-closed-spweb-object-please-close-spweb-objects-when-you?forum=sharepointdevelopmentprevious
    http://sharepoint.stackexchange.com/questions/50793/detected-use-of-sprequest-for-previously-closed-spweb-object-after-spquery
    Please remember to click 'Mark as Answer' on the answer if it helps you

  • Detected use of SPRequest for previously closed SPWeb object. Please close SPWeb objects when you are done with all objects obtained from them, but not before.

    I have develop a custom solution for SharePoint Foundation 2010 that provide PDF documents filled with lists data and attachemnts.
    If the Customer run the solution to get the PDF we found in the ULS log following entry:
    03/07/2014 12:07:20.69  w3wp.exe (0x0B10) 0x18EC 
    SharePoint Foundation General                        90hv Unexpected 
    Detected use of SPRequest for previously closed SPWeb object.  Please close SPWeb objects when you are done with all objects obtained from them, but not before.  Stack trace:    at Microsoft.SharePoint.Utilities.SPUtility.GetLocalizedString(String
    source, String defaultResourceFile, UInt32 language)     at Microsoft.SharePoint.SPFieldCollection.get_DisplayNameDict()     at Microsoft.SharePoint.SPFieldCollection.GetFieldByDisplayName(String strDisplayName, Boolean
    bThrowException)     at Microsoft.SharePoint.SPFieldCollection.GetField(String strName, Boolean bThrowException)     at Microsoft.SharePoint.SPListItem.GetValue(String strName, Boolean bThrowException)    
    at Microsoft.SharePoint.SPListItem.get_Item(String fieldName)    
    at ECM_PDF_Excel.ListClicked.GetECOs(Dictionary`2 searchedEC... e918ecd4-7ed6-44bb-9e4f-d764586a2f79 ...RECONumber)    
    at ECM_PDF_Excel.PDF.Create()     at ECM_PDF_Excel.Layouts.ECM_PDF_Excel.ECMPDFExcel.ProcessRequest(HttpContext context)     at System.Web.HttpApplication.CallHandlerExecutionStep.System.Web.HttpApplication.IExecutionStep.Execute()    
    at System.Web.HttpApplication.ExecuteStep(IExecutionStep step, Boolean& completedSynchronously)     at System.Web.HttpApplication.PipelineStepManager.ResumeSteps(Exception error)     at System.Web.HttpApplication.BeginProcessRequestNotification(HttpContext
    context, AsyncCallback cb)     at System.Web.HttpRuntime.ProcessRequestNotificationPrivate(IIS7WorkerRequest wr, HttpContext context)     at System.Web.Hosting.PipelineRuntime.ProcessRequestNotificationHelper(IntPtr
    managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32 f... e918ecd4-7ed6-44bb-9e4f-d764586a2f79
    03/07/2014 12:07:20.69* w3wp.exe (0x0B10)                        0x18EC SharePoint Foundation        
     General                        90hv Unexpected ...lags)     at System.Web.Hosting.PipelineRuntime.ProcessRequestNotification(IntPtr
    managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32 flags)     at System.Web.Hosting.PipelineRuntime.ProcessRequestNotificationHelper(IntPtr managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32
    flags)     at System.Web.Hosting.PipelineRuntime.ProcessRequestNotification(IntPtr managedHttpContext, IntPtr nativeRequestContext, IntPtr moduleData, Int32 flags)   e918ecd4-7ed6-44bb-9e4f-d764586a2f79
    We check the method
            /// <summary>
            /// Returns the ECOs in a Dictionary: ECO Number, Suffix
            /// </summary>
            /// <param name="searchedECRECONumber">Dictionary, with the search ECR/ECO Number</param>
            /// <returns>Dictionary ECO Number, Suffix</returns>
            public static Dictionary<string, string> GetECOs(Dictionary<String, String> searchedECRECONumber)
                SPSite siteContx = SPContext.Current.Site;
                SPWeb webContx = siteContx.RootWeb;
                Dictionary<string, string> listECOs = new Dictionary<string, string>();
                string ecoNumber = string.Empty;
                string ecoSuffix = string.Empty;
                if (searchedECRECONumber.ContainsKey(ConstantData.listClickedECONumberDictionary))
                    ecoNumber = searchedECRECONumber[ConstantData.listClickedECONumberDictionary];
                else
                    return listECOs;
                // Ich suche die ECO Nummber bei gegebener ECR Nummer
                // Ich brauche den Listen Namen der in den Spalten Realtion ECR Number & Realtion ECO Number einen Wert hat
                SPList dataList = webContx.Lists.TryGetList(ConstantData.listName_ECMExcelTemplateDataLists);
                if (dataList != null)
                    SPListItemCollection dataListItems = webContx.Lists.TryGetList(ConstantData.listName_ECMExcelTemplateDataLists).Items;
                    foreach (SPItem dataListItem in dataListItems)
                        Object relationECRColumnName = (String)dataListItem[ConstantData.listFieldName_ECMExcelTemplateDataLists_RelationECRNumber];
                        Object relationECOColumnName = (String)dataListItem[ConstantData.listFieldName_ECMExcelTemplateDataLists_RelationECONumber];
                        if (relationECRColumnName != null && relationECOColumnName != null)
                            // Ich habe den Listennamen gefunden in dem Spalten Realtion ECR Number & Realtion ECO Number einen Wert haben
                            string searchedListName = (String)dataListItem[ConstantData.listFieldName_ECMExcelTemplateDataLists_Title];
                            string searchedECOSuffixColumnName = (String)dataListItem[ConstantData.listFieldName_ECMExcelTemplateDataLists_RelationECONumber];
                            // Get the List from variable listName
                            listECOs = GetECOsDictionary(searchedListName, searchedECOSuffixColumnName, ecoNumber, relationECOColumnName);
                return listECOs;
    - What take we wrong?
    - How can we avoid this message?
    Regards
    Jonnyenglisch
    Ralf Happe - Christobal Colón N° 1 ES 07670 Portocolom Tel.: +34 6961 0375 7 @: [email protected] Skype: ralfhappe msm: [email protected] www.ralfhappe.com ralfhappe | soluciónes

    Here the code of GetECOsDictionary:
             /// <summary>
            /// Fill the dicionary with related ECO Numbers/Suffix
            /// </summary>
            /// <param name="searchedListName">String: the name of the list</param>
            /// <param name="ecoNumber">String: the ECO Number</param>
            /// <param name="relationECOColumnName"></param>
            /// <returns>Dictionary</returns>
            private static Dictionary<string, string> GetECOsDictionary(string searchedListName, string ecoNumber, Object relationECOColumnName)
                SPSite siteContx = SPContext.Current.Site;
                SPWeb webContx = siteContx.RootWeb;
                Dictionary<string, string> listECOs = new Dictionary<string, string>();
                SPQuery oQuery = new SPQuery();
                oQuery.Query = "<OrderBy>" +
                                    "<FieldRef Name='" + "Title" + "' Ascending='TRUE'></FieldRef>"
    +
                                "</OrderBy>" +
                                "<Where><BeginsWith>" +
                                    "<FieldRef Name='" + "Title" + "'/>" +
                                    "<Value Type='Text'>" + ecoNumber + "</Value>" +
                                "</BeginsWith></Where>";
                SPListItemCollection searchedListItems = webContx.Lists.TryGetList(searchedListName).GetItems(oQuery);
                foreach (SPItem searchedListItem in searchedListItems)
                    // Wenn die geclickte ECO Nummer gleich der Listen ECO Nummer ist dann setze die gefundene ECO Nummer
                    string foundECONumber = (String)searchedListItem[relationECOColumnName.ToString()];
                    string[] splitECONumber = foundECONumber.Split(ConstantData.splitBy_Slash);
                    if (ecoNumber == splitECONumber[0])
                        ecoNumber = splitECONumber[0];
                        if (splitECONumber.Count() == 1)
                            listECOs.Add(foundECONumber, "0");
                        if (splitECONumber.Count() > 1)
                            listECOs.Add(foundECONumber, splitECONumber[1]);
                return listECOs;
    Ralf Happe - Christobal Colón N° 1 ES 07670 Portocolom Tel.: +34 6961 0375 7 @: [email protected] Skype: ralfhappe msm: [email protected] www.ralfhappe.com ralfhappe | soluciónes

  • Production Order For Project with plant stock

    Hi,
    We have a scenario where in we are required to create a production order for a project.
    But the material(raw material) is in a storage location and is a stock item. Even the header material is also a stock item and it to stored in the storage location.
    But the order is to be created for Project and to be settled to the Project. Now the system is not allowing me to create the order.
    The error is :
    "Project  does not allow make-to-order stock
    Message no. CO746
    Diagnosis
    There is no project stock for the project.
    To create a production order with reference to a WBS element the project must allow project stock to be maintained.
    Procedure
    You should select a project that allows project stock."
    Now,
    I don't want to have a project stock. How to go forward...
    Regards
    Pavan

    Hi,
    What is the strategy you are using. If you are using strategy 20, then chnage it to 40.
    Also maintain individual/collective indicator to "1" - individual in MRP-4 view. So that when the order is created, the stock will be reserved as Q-project stock.
    thanks and regards
    Murugesan

  • Production order confirmation cancellation with auto goods receipt

    Hi expers,
    I've got a production order using backflush and Auto GR for last operation(Control Key with Auto GR Tick). After the confirmation operation had been done,the end user cancelled the goods receipt using T-code/MvT:MIGO/ 102 by mistake,and then using T-code CO13 cancelld the confirmation.Now  the delivered qty of the production order is negative, the material document generated by using MIGO/102 by mistake can't be cancelled, i also tried to do a migo with 101,the abap program dump.  the production order can not even be viewed by using CO03.The ABAP program dump.
    Any help would be much appreciated!

    Here is some of the dump message:Runtime errors DYNPRO_FIELD_CONVERSION
    Short text  Conversion error .
    Error analysis
    The program has been interrupted and cannot resume. 
    Program "SAPLMIGO" attempted to display fields on screen 0200. 
    An error occurred during the conversion of this data.
    How to correct the error
    There was a conversion error in the output of fields to the screen.
    The formats of the ABAP output field and the screen field may not match.
    Some field types require more space on the screen than in the ABAP
    program. For example, a date output field on the screen requires two
    more characters than the corresponding field in the ABAP program. When
    the date is displayed on the screen, an error occurs resulting in this
    error message.
    Screen name.............. "SAPLMIGO"
    Screen number............ 0200
    Screen field............. "GOITEM-WEMNG"
    Error text............... "FX015: Sign lost."
    Other data:

  • Multiple production orders  are generated for same requirement

    hello guru's
    For a MTO (make to Order) scenario, where the Material requirement quantities are generated from Sales Orders.
    Ex: Sales Order created for 500 Qty.
    I had run the MRP using MD03 with the following parameters
    Processing key              NETCH      Net Change in Total Horizon
    Create purchase req.     1                  Purchase requisitions in opening period
    Delivery schedules       3                  Schedule lines
    Create MRP list            1                  MRP list
    Planning mode              1                  Adapt planning data (normal mode)
    Scheduling                    1                  Determination of Basic Dates for Planned
    System had generated Planned Orders for Qty 500 and these are converted to Production order for Qty 500 for which the Purchase Order for 500 are created.
    Goods receipt of 480 has been made against the Purchase Order for the Ordered 500 Qty.
    When I re-run the MD03 the system is generating the new Production Order Qty 0f 20 which is not supposed to be as this 20 Qty was already part of the existing Purchase Order and yet to be delivered .
    Could you please explain me why this is happening?
    regards

    Dear,
    MRP will consider the firmed PR for the completion date contained in the PR. If the requirements date is different, then MRP will create a new proposal (PR).
    If you wish for MRP to RESCHEDULE the dates of existing firmed purchase reqs, instead of just creating new proposals, you have to set the Rescheduling horizon. OPPQ> Rescheduling (plant) or OPPR >Recheduling Horizon (MRP Groups). Start with a small horizon,  Also check the tick mark for firm reciept there.
    Are you getting any expection message in front of PR?
    MRP will 'assume' rescheduling by configuration, by managing the rescheduling horizon, and by setting the rescheduling tolerances. These config can be found in
    OPPQ select Rescheduling
    or, for MRP groups
    Please check and come back.
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/f4/7d2c9744af11d182b40000e829fbfe/frameset.htm
    Regards,
    R.Brahmankar

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • How to release a collective production order in CO05N with MSPT?

    The issue was: I want to release a collective order by co05n, e.g. the structure of this collective production order 10000 like this:
    10000----20000
    30000---40000
                                 ---50000
    if order 50000 with material shortage, keep the customizing OPJK  release order=3, how to release this collective
    order. If it is not possible in standard, can the parallel order 40000 be released??
    Thank you, all.
    Edited by: Stephen Wang on Apr 15, 2010 3:12 PM

    Dear,
    In Transaction CO05N, you execute a collective release. For one of the orders, the availability check determines missing part although it has been set in Customizing of the availability check (OPJK) that a release can be executed for missing part per user decision. Therefore, a dialog box is processed on which options a.) 'Release order', b.) 'Missing parts list' and c.) 'Cancel' are displayed.
    If you first branch to the missing parts list and then press 'Cancel' on the dialog box there it self
    Else you can do this with these options,
    1)Use T Code COHVOMRELEASE here select order as you want and release accordingly.
    2) Use Transaction SE38 to create the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE if want in background.
    3) use BAPI BAPI_PRODORD_RELEASE
    Please try and come back.
    Regards,
    R.Brahmankar

  • Production Order Closed incompletely with a warning message

    hi all,
    Production order is allowing to close with a warning message("Not all item were issue be careful check before closing") even completed quantity is less than planned quantity.
    System should have options in document settings for production order as 'Warning Only' or
    "Block Release" in order to block production order from closing as per above case.
    SAP should bring these new feature in next patch releases.
    We are using SAP B1 2005B PL36.
    Jeyakanthan

    Hi ,
    Following are prerequisites for closing a production order
    1 The order must have the status Released (REL) or Technically completed (TECO)
    2 The order balance must be 0
    3 There can be no open purchase requisitions, purchase orders.
    4 There can be no future change records from confirmation processes.
    Then look into the Transaction; COFC.You can handle this from there.To settle the order use tcode KO88
    Before that do Overhead calculation by KGI2, WIP calculation by KKAX, variance calculation KKS2.
    Regards,
    R.Brahmankar

  • Collective production order link based on parent production order in MTS with strategy 10

    Dear Team,
    Now we are using MTS Production order system with strategy 10,As per my Business requirement we need to take all the child components production
    orders based on the Parent component production order .In this case for planned order conversion we are using CO40 transaction code(i.e. Collective conversion) as well as all planned orders  generated through MRP. As per my business process we are using Route cards which are Z smart forms with all Production orders from parent to child component with quantity is taken as a PDF printout,As per our customer requirement we will store those Route cards up to next 15 years. When user has to check Production order linking at any point of time, this functionality is not available for MTS. I tried MD4C but it is not a best solution for my business requirement.So please provide any another standard solution available for this requirement.
    Thanks in advance,
    Regards,
    Krishna.

    There is another suggestion that you can determine the costing indicator in the requirement class. you can get the requirement type from procurement page in the sales order header, then go the customizing menu to find out which requirement class has been assigned to the requirement type. Then you can get the "costing" and "mark" indicator.
    The customizing menu is the node of controlling - cost object controlling -> CO PC for sales order.
    Correct me if i am wrong, thanks.
    Best Regards!
    Flex Yang

  • How to track/check on which production orders are not confirmed yet?

    Dear Experts,
    Is there any transaction or processes to check,only those production orders which are not confirmed yet?
    Besides the transaction code, I would kindly like to request you to provide me a small overview of it. Your support will be really  appreciated.
    Thank you in advance!
    wishes,
    jeevan

    Hi,
    Please refer the below screen for COOIS report. Please check on Sys status as CNF Excl. It will show you all the orders which is not with CNF.
    COOIS/COOISPI (For process industries) is very useful report where you can see entire details of orders. You can see report both on planned order and production/process order. As well the report can be seen in several level like header, component, operations etc..
    Different layout for display is also possible for different users.
    Please try it by different options. You will find the functionality of the Transaction.
    Regards,
    Krishnendu.

  • Production Order Compoent Rounding with a Scrap Factor

    Hi all,
    We are using a 3 decimal unit mesure. And I'm having a problem when the component have a Scrap factor.
    Instead of rounding up to the nearest whole number it is keeping the decimal place so a component with a scrap factor of 1% and a requirement of 10 come out to 10.1 in the production order instead of 11.
    Does anybody know of a userexit, BADI or other solution?
    Points will be given
    Thanks

    Dear
    Changing directly the base UoM of components related with component scrap may  not work either as far as I have read and according to the note SAP 931971.
    Otherwise , try to check Decimal places and rouding of decimal place is maintain properly for the base unit of measure of that component in T.code CUNI. Is there any Rounding value (value = 1) is maintain in MRP 1 data of that component ?
    I think , you should keep Decimal Place Rouding field in CUNI -Conversion Tab  -as 1 or 2 if you want to round to 10.1 as 11
    Try and revert
    Regards
    JH

  • GR  for  Production order not possible with  settlement receiver as IO

    Hi
    I   have  created a  production order  and  the settlement rule is  to  an internal order.  But  it  does not  allow me to do  goods receipt.    Pl  tell me  what to do.
    Thanks
    kamala

    Hi,
    SAP recommands production order settlment to be beow object and additional CO Object COPA.
    Settlement Receivers Depending on the Scenario
    1.Make-to-stock production >>The make-to-stock inventory (receiver = material) >> COPA
    2.Sales-order-related production with a valuated sales order stock>>The valuated sales order stock (receiver = material)>>COPA
    3. Sales-order-related production with a nonvaluated sales order stock>>The sales order item (receiver = sales order)>>COPA
    The scenario you are trying is doesn't fit into standard SAP framework for production order so please try said scenario with CO production order. Again CO production orders mostly recommondable without PP so figure out impact on cross modules.
    Regards,Ashok.

Maybe you are looking for

  • ERROR IN PCUI WHILE EXECUTING LAYOUT

    Hi All, I have done the customization in PCUI. When I m going to Tcode CRMC_PCUITOOLS the system is throwing this error. I m displaying thuis error here                                                                                The URL http://inc

  • Printers not shown in gtk apps under KDE 4.7

    Sorry if asked before, I searched a lot and tried many things but couldn't find a fix. No gtk based app are showing my configured printers. This includes LibreOffice, GIMP and Chromium. The printers are, however, shown properly in every kde app and i

  • Is it called axis??

    Please excuse the vauge-ness of the email: hope you can help... First off i'm trying to find out what the process is called when you have numbers that correspond with pictures. Basically I'm creating a display box with around 20 pictures that will be

  • Safari can't open Web with Fash??!!

    Okay I have my inteliMac for some time now and just two days ago my safari has been acting up. Ever since I bought my iMac I've never had any problem opening web pages with flash through safari except now. Everytime I try to open a page with flash it

  • IPhone 4S Night time settings

    This is my first Iphone - I use my phone as an alarm to wake me up in the morning.  I have found texts and notifications are kind of obnoxious while I am sleeping but if I turn the sound down too much, I miss my alarm.  Is there a setting that can si