Production performance report against work center.

Hi PP Gurus,
There is a requirement to develop a production line (work center) performance report in BI which is comprising of Planned setup time, Actual setup time and their variance against a production plant and work center. Input parameters will be Material, Plant, Work center, Date/Week/Month. The scenario is PP Discrete Manufacturing.
Could anyone please tell me how to fetch data from different tables and how to interlink them?
Thanks & Regards,
Abu Arbab

Hi Brijesh,
Thanks for reply
As I told in my first post that I need tables,fields/infostructure that should contain Planned setup time, Actual setup time. I got some infostructure like S022, S024, S281, S282, but I'm not getting exact link between one of them related to input criteria.
If anybody worked on such requirement please reply
Thanks & Regards,
Abu Arbab

Similar Messages

  • Performance report in ops center.

    It is possible to create performance reports in ops center like PRM module in SunMC is doing for CPU Usage, Disk, Memory, Network.. etc.. ?
    Thanks
    Antonio

    Hi Antonio,
    You can also look at the Halcyon Neuron Performance Manager (http://www.halcyoninc.com/products/PerformanceManager/index.php). It hooks into Ops Center and/or SunMC to automate a lot of the reports (on top of what Ops Center provides out-of-the-box).
    Note: I work for Halcyon, but part of my day job is also deploying and configuring Ops Center, so I hope this post is considered relevant.
    Regards,
    [email protected]

  • How to get a list of production orders for a work center?

    Hello SDN Community, 
    I have an requirement to display in a pop-up window a list of production orders for a work center.
    Does anyone know which screens/transactions would show this relationship?
    Or better yet, does anyone know how to demonstrate this from the tables themselves?
    Thank you,
    Dean Atteberry.

    Hello Mangalraj.S
    >>Goto COOIS-->For the field List select PPIOO000 - operations and layout -->standard layout
    >>and execute,by this you will be able to see the operations for each order and to which
    >>work center they are assigned.
    The system I am working on is ECC 6.0.
    For this system the values in the dropdown for the "List" field are "Capacities, Items, Order Headers, Sequences, Trigger Points, etc".  But nothing that says PPIOO000 - operations and layout.
    >>Or else in the in input screen of COOIS,enter the work center for which you want to see which
    >>are the production order's assigned and execute.
    For system I am working in, I do get a grid display when entering a work center.  It has columns like "Order, Material, Icon, Order Type, MRP cntrlr, etc."   But no column with Work Center.
    Any further insight into how to use this transaction to display a list of production orders for a work center would be greatly appreciated.
    Thank you,
    Dean Atteberry.

  • Report for work center hours , maintenance order wise for SAP 3.1i version.

    Hi Team,
    We are using older version of SAP, that is SAP 3.1i. Here we don't have any transaction code such as IW47. Is there any other way to get report of work center and work center hours-order wise.
    Please respond.
    Regards,
    Kiran

    Have a look at table AFRU
    PeteA

  • How to find the reporting for work center machine wise

    hi gurus
    My question is . In one work center machine capacity category 2 machines are used. Client is asking the report machine wise. i.e as 2 machines are available .What is the capacity utilisation for each machine.Provide me the information for this. Thanks in advance
    kalyan

    Hi Kalyan
    you have to make some settings in production order & work center first.
    In work center capacity header ,you have to make indiovidual capacities as 2.
    In the same capacity header screen by going through the menu Goto--->individual capacitities  define these different individual machines.
    In the production order operation detail screen goto " capacity reqmt assignment " assign the quantities for different work centers.
    Adfter this in the confirmation CO11N you have to fill the split field accordingly& confirm different wortk centers seoperatley.
    Then you can the report in the CO14 for diferent work centers.
    you try this.
    Regards
    YMREDDY

  • Production Orders Controls by Work Center

    Hi PP Gurus!
    We have to check the production orders by work center. Can we do it? If yes, could you inform us which conditions are necessary to do it?
    Our release is 4.6C and we are using PP-Manufacture discrete.
    I would like to thank you for help us with this issue...
    Best Regards,
    Valdevair

    Hi Krishna,
    Thanks for your reply...
    We've executed the transaction according your suggestion, but the values for this column are in Blank in the report.
    Is there any specific condition for the SAP shows us?
    We are using transaction CO11n to register the hours per operation.
    Once more...thanks a lot.
    BR
    Valdevair

  • REPORTS FOR WORK CENTER EFICIENCY

    Hi All,
    I´m trying to find reports that shows work center eficiency. Anyone knows any standard report like this?
    Regards,
    Felipe Tavares

    Dear
    If you are looking for Work Centre Effiency report , then you should check the Utilisation of Work Centre in production in every months or you can compare the production actual and planned by work centre to know the effiency .
    Some of the standrd txn :
    1.MCPQ
    2.MCP7
    Customised report : http://www.onestopsap.com/sap-PM/compare.asp or with the following SAP Table :
    WERKS         LIKE  AUFK-WERKS,                     "Plant
          AUFNR    LIKE  AFKO-AUFNR,              "Prod. Order No.
          PLNBEZ   LIKE  AFKO-PLNBEZ,             "Header Material No.
          GSTRI      LIKE  AFKO-GSTRI,              "Actual Start Date
          GLTRI      LIKE  AFKO-GLTRI,              "Actual Finish Date
          GAMNG    LIKE  AFKO-GAMNG,             "Prod. Order Qty.
          AUFPL      LIKE  AFKO-AUFPL,              "Planned No. Of Operation
          AUART    LIKE  AUFK-AUART,              "Order Type
          BUKRS    LIKE  AUFK-BUKRS,              "Company Code
          OBJNR    LIKE  AUFK-OBJNR,              "Object No. For Order Status
          KDAUF    LIKE  AUFK-KDAUF,              "Sales Order No.
          KDPOS    LIKE  AUFK-KDPOS,              "Sales Order Status
          IDAT2      LIKE  AUFK-IDAT2,              "Order Completion Date
           ISM01   LIKE  AFRU-ISM01,              "Required Qty.
          VGW01    LIKE  AFVV-VGW01,              "Quantity Withdrawn
          VGE01    LIKE  AFVV-VGE01,              "Unit Of Measure
          EFFPERC  LIKE  AFVV-VGW01,              "Eficiency %age
          MAKTX    LIKE  MAKT-MAKTX,              "Material Descriptio
    Try and come back
    Regards
    JH

  • Automatic release of production order for perticular work center

    hello,
    any body please help me how to set automatic release of production order when creation for a particular work center. please suggest me.
    Thanks & Regards
    Bhakta

    Dear,
    Use T Code COHVOMRELEASE here select work center as ZPACK then in header menu Program--Schedule in background here define as perodic job and set ferquency as Hr.
    Or Use Transaction SE38 to create  the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE.
    Please try and come back.
    Regards,
    R.Brahmankar

  • Standard Values in Production Order for Alternate Work Center

    Hi SAP Expert,
    I would like to find out whether there is possible solution for the requirements as below:
    e.g.
    >>> Routing for Product A only has one Operation 0010.
    >>> 4 Work Centers/Resources (A,B, C, D) can be assigned to run this operation where all these 4 Work centers/resources are having different capacities (Setup, Labour, Machine hour & Electricity are different).
    >>> Out of these 4 work centers, only one work center will be selected (Selection criteria will be based on the capacities & availability).
    >>> In my current setting, only one preferred work center (A) is maintained in the routing for operation 0010.
    Issue:
    >>> If I select the work center B manually in APO during the planned order creation, the Production Order created will be tied to work center B but the standard values captured in the Production Order are still referred to the standard value of A.
    Question:
    1. Is there any way I can maintained in the routing so that it will captured all the different standard values for each work centers?
    2. If the answer is yes for Q1, then can the SAP auto populate the correct standard value into the Production Order according to the work center I selected before the planned order is converted into Production Order?
    Thanks.
    Regards,
    Hooi Chia

    Hi,
    You can use alternative sequence in routing and mainain three different sequence for all 4 workcenter.
    At APO side you can maintain priority for alternative sequence in PPM/PDS.
    Now when you execute the scheduling Heuristic depending on priority and capacity workcenter will be assigned.
    Regards,
    Vishal

  • Production Order Confirmations by Work Center

    Using COOIS, I can see confirmations for production orders by work center, but it doesn't give me the option to display the material number and material number description.
    Is there an easy way to create a quick view for this?
    Could someone help me out?

    Hi,
      Try with tcode co28 ,choose order header
      Enter order category as production orders.
      Enter the profile as standard one
      Enter order number and execute.
      select the displayed order order number and choose the ALL Fields icon.
      OR
      Try with tcode co28 ,choose order header
      Enter order category as production orders.
      Enter the profile as standard one
      Enter order number and execute.
       Choose the  Fileds icon and selet the fileds you need and save .
    Regards
    nandha

  • Production output releated to work center

    Hi Sap Guru,
    I am working in steel industry there coil manufacture for different workcenter they get different output of Finshed production.I want my production order output depend upon workcenter such as 100% input if using for any work center then in confermetion it output of Finished product should be fix 90% if i want to use other work center it wil gives output 80% because scrap is generated depend upon work center.
    Please guide me whre this scenarion we map.
    Thanks in advance

    Hi ,
    Just my 2 cent advise , you should use production version with different Alternative Bom with different operation scarp rate.
    Because based on what i know , Operation scrap Is defined in the BOM item. But you will need different operation based on different work center. by using operation scarp It shows the percentage of the component that is lost as scrap in a specific operation.
    Example :
    Production version A --- Work Center A ---Alt BOM 1 with Scrap rate 0%
    Production version B --- Work Center B ---Alt BOM 2 with Scrap rate 10%
    Production version C --- Work Center C ---Alt BOM 3 with Scrap rate 20%
    Of course all need based on business requirement need , so there's some others configuration need as well.
    TQ.

  • Production performance report

    Dear all,
    I ran the Prod performance report. i got some discrepencies in the report for Total line Hrs and Labour Hrs.with respect to used Hrs and detail per prod order. i am not able to find from  where these discrepancies comes.Please help.

    Hi,
    Which PP report you have executed for this purpose?
    It seems this is a Z report..
    Regards,
    Siva

  • Shift report for work center

    hello
    is it possible to hav shift report workcentewise? if yes how config is done?

    In T.code : SHR0 (zero) Shift Report overview.
    Enter Report Type and Usage as workcentre, please do the this customazation then you find workcentres in F4.
    http://help.sap.com/erp2005_ehp_03/helpdata/en/45/c9ba093c512e96e10000000a155369/frameset.htm
    Please read the information from above link this should help.
    Jim

  • In the report level user wants two persons against each work center.

    Hi Experts,
    Please let me know the solution, I have provided scenario below.
    check the query which the user is referring to report:
    Example
    Work center     Person
    KNE33102     44003850
    According to the user, the names for the Work centers should be as follows:
    Work center          Person
    KNE33102         44003850,
    KNE33102        44003603
    I have check the data in T-code-CR03, each work center getting two persons, as can be shown below.
    Work center        Person
    KNE33102           44003850,
    KNE33102           44003603
    In RSA3 it can be seen that both the records are being extracted
    Work center     Start date     End date     Person
    KNE33102     09.02.2009     31.12.2009     44003850
    KNE33102     09.02.2009     31.12.2009     44003603
    In BI , when checking in PSA, it can be seen that the data is also being loaded to BI (Two persons loaded against Work center-KNE33102)
    Work center     Start date     End date     Person
    KNE33102     09.02.2009     31.12.2009     44003850
    KNE33102     09.02.2009     31.12.2009     44003603
    But when loading to the Info Object, one person has deleted. Because of this, in the report level displaying one person.
    Note:-Please let me know what is the procedure, in the report level user wants two persons against each work center.

    Hi,
    As you said in your post the data has mentioned up to 2009. can you try execute the query till to date .
    Regards
    sivaraju

  • Employee Responsible for a work center

    Good Morning,
    We use Project Systems in order to do project management within SAP.  We use the work center to define the team structure.  I know that there is a place to maintain the person responsible for a work center in the config, but the entry here is a text field.  We are trying to link the owner of a workcenter back to the reporting structure that can be pulled from HRP1001, and a text field makes it more difficult to track this back to the HR side.  We currently enter the name of a manager in this field, and if there is no other place to define the person responsible using a pernr, we'll have to start using this field to enter personnel number.  This will allow ABAP to pull the pernr and trace it to a position number on HRP1001.  I'd like to keep the manager name in this field if at all possible though.  Any help will be much appreciated.  Thanks in advance.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

Maybe you are looking for

  • HP all in one J4550-won't print blue

    I have a 5 month old printer, HP all in one J4550.  Last month we put in a new color cartridge (from Rapid Refill, a very reputable place for re-manufactured ink cartridges) & now we are totally missing one color, blue. I have gotten a replacement th

  • Partner Bank in Down Payment request

    Hi Friends, While making a Down payment request the partner bank field is not getting populated. I clicked on 'More data' tab but it is not there. Can somebody please help me with that ? Rgds, NK

  • Lost photos and programs

    i'm a new mac user and now i have some problems and i don't know whats going on...it started with i photo one day all my photos where there the next more than half were gone and i don't know what happened? now the whole i photo looks like it restarte

  • MARS 6.1.1 device discovery timeout

    Hello, MARS 6.1.1 can not discover IOS 12.4 router using telnet or ssh, when router uses AAA tacacs+ login authentication. After login prompt there is no response from MARS, and connection times out. Manual SSH connection to this router works, direct

  • How do I transfer or download Pages which was on my previous laptop?

    How do I transfer or download Pages which was on my previous laptop? I can see it in iCloud but do not know how to download to my new laptop. Thank You