Hi everyone,
I´m looking for some standard report that shows the quantity and cost based on the Bill of Material and the actual quantity consumed in Production Order.
When the production order is created, the BOM is copied to the order, but the materials and quantities could be changed before production.
Reports like KOC4 compares the actual consumed quantity with the planned quantities from Production Order, not from the original BOM.

Hi Fabio
There is no such standard report in my opinion. You can develop it based on below logic
1. Read bom number from Prod order
2. Read components of bom from STPO table
3. Actual qty consumed can be fetched from LIS tables like S03* or from mseg/mkpf or Corp
Br. Ajay M

Similar Messages

  • Planned and actual consumption for each confirmation

    Dear All,
    There is a production order. it has two operations. i have made three confirmations of each operation for that order. now i want to see the planned and actual consumption for each confirmation. how is it possible.
    However i know that on order we can see planned and actual consumption but it is for total order but i want to see planned and actual consumption for each confirmation. Actually client wants that on 2nd confirmation what is planned consumption and what they consumed on actual. thanks

    Hi,
            In standard SAP this type of report not be there, but u can make it by using BOM,Confirmation table, & material document table.
    Use AFRU to get posted document no for confirmation & detail by joining it with MSEG by mblnr & MAZHR.
    now u get plan component qty by using mast & stpo if ur bom not changed in Production order , if in order component may be change then use afko & resb table & by comparing base qty or order qty & confirmation qty get plan component qty for confirmation.
    Thanks
    Rakesh

  • Planning for  product using multiple bom and multiple recipe involving SOP

    Hi friends,
    The problem. Currently we have maintained single BOM and single recipe (The BOM and Recipe used for MRP) for long term planning run. The FMCG sector of Client requested to have multiple BOMs and multiple recipes in the long term planning run. I.e. The planning is done quarterly and they wanted to use different BOMs and Different recipes for each quarter. But since the existing system has configured to use a single BOM and a single recipe we have a problem to use the long term planning run with the current setups.The problem we have is in this ‘001’ planning scenario.
    appreciate if you can help me how to accommodate multiple BOMs and recepis in the long term planning run.
    thanks and regards
    om

    HI Mr. Ready,
    We create PIR though a submit Job and in this case how to mention the production version while creating PIRs . Also if I am creating PIR through MD61 how to record the version.
    Please advice.
    Thanks and Regards,
    Om

  • Mapping between products in a BOM and var. config. characteristic attribute

    Hi,
    probably this is a "beginner's" question but we would need to know which tables are used to link products in a BOM material and the according VC characteristic attributes.
    We have the following scenario:
    - The user enters a configurable material in a sales quotation and starts the configuration. When saving the quotation the BOM explosion will be triggered.
    --> Question: Is this based on a 1-1 relationship or based on complicated determination rules and/or dependencies?
    What we would like to know is the other way round - from the product to the characteristic attribute.
    Thanks a lot for any hint!
    Regards,
    Wolfhard

    Closed as of now a we found a link between BOM item position and selection dependency.

  • Difference between MC46 date and actual consumption date

    Hi,
    I found there is always the date difference between the MC46 date for the last consumption and actual last posting date for consumption.
    What could be the reason for that?
    Or what is the date apprearing in MC46 if you click on triple line option.
    Thanks in advance
    Ramesh
    Edited by: ramesh varma on Jun 17, 2011 3:45 PM

    Hi Jürgen.
    Thanks for your solution. It solved my problem
    Regards
    Ramesh

  • Production order creating without BOM and Routing

    create the production orders without bom and routing
    they confirm the order
    they want to stop confirmation if production without bom and routing
    is it possible to set error or warning message
    my first doubt is how can we confirm the order without bom and routing
    i think it can be solved by production order type
    please reply

    Hi,
    You can make it mandatory by following ways :
    Go to OPPQ -> Select your plant-> Go to BOM / Routing Selection in that you need to maintain BOM Sel ID & Routing Sel ID which is having selection ID with usage 1 Production which will make it mandatory to create BOM & ROuting with usage 1 & need to be selected while creation & saving Production ORder.
    Also, you can maintain another config. for making routing mandatory at Order type level :
    Go to OPL8 -> Select Plant & Order type-> Routing Selection
    Maintain 5     Routing/ref. op. set mandatory (manual selection)
    or          6     Routing mandatory (automatic selection)
    This setting will ensure without routing your order will not be saved.
    Hope this helps.
    Regards,
    Tejas

  • Do we have the report to show PO Price and invoice actual price

    Dear Guru,
    I'm finding the report to show PO Price and Actual Price after invoice.
    The actual price is mean that we may have other debit/credit price as subsequent posting in MIRO.
    So we would like to compare PO price and actual Price.
    Please kindly advice.
    Thank you very much.
    Best Regards,
    Saiya

    Hi,
    Please check ME81N --> Order value analysis.
    SAM
    Edited by: Saminathan Gopalan on Jul 22, 2010 6:05 PM

  • In which table production order planned cost and actual cost i can see?

    Dear PP Guru,s,
    from which table i can see productuion order planned and actaul cost. i checked following tables AUFK, AFVC, AFVV, CAUFV, AFRU, AFKO, AFPO. but i did not found planned cost and actual cost field. is there any other way to get this data with respect production order?
    Regards,
    sree

    Dear,
    Planned and actual costs of prod order from COEP, COSS, COSP  S027 tables
    production order shows the planned cost based on the quantity structure.
    Please refer my reply in this thread for details,
    Re: Actual Halb Material Cost
    Regards,
    R.Brahmankar

  • Confirmation planned and actual time

    Hi All,
    I am doing operation confirmatio by CO11N with milestone confirmation. While confirmation system giving planned time base on production quantity and here i have enter the actual time required.
    Is there any report which will give planned and actual time of confirmation?
    Regards
    Rajesh

    hi
    thanks...
    is there any report which suffices the same.
    Regards
    rajesh

  • Standard consumption vs actual consumption

    Hi experts,
    How can we we get standard consumption (as per bom) vs actual consumption (qty withdrawn) during production order confirmation co11n.
    suppose we made production order for 100 nos but we confirmed only 60, then we technically completed the prodution order then system should give standard consumption and qty withdrawn of 60 nos not for 100 nos, here MCRE report is not correct, how we can get the desired report, what are the other t-codes that can be used or some other way round.
    Please help me
    Regards
    GR

    Dear,
    There no such a report in standard SAP you need to develop it.
    Onlt you can get some details through,
    COOIS   Select components again List
    then give the plant,Order details
    execute
    You can find 2 fields reqmn qty( planned qty) & qty Withdrawn(Actual consumption) in the report.
    Check this link,
    BOM V/s Actual Consumption
    Regards,
    R.Brahmankar

  • Report  for bom wise target and actual cost as well as qty at line item

    Dear Experts,
    Is there any standard tcode for bom wise target and actual cost as well as qty at line item level for the month.
    there is one tcode s_alr_87013127 but user has to double click in order to get line item details.
    I want to see line item wise breakup/bom wise target and cost cost as well as qty.
    Thanks in advance.
    regards
    RK

    Dear experts,
    I am still looking for a revert.
    regards
    RK

  • How to compare sale order bom and production order bom.

    i would like to provide report with respect to comparation of sale order bom and production order bom, but i am not familiar with SD and PP, can anyone give me some clue? i only know sale order bom is created via 'CS61', afterwards run mrp to get production order, the process appears complicated, i needn't know the process detail, just want to know how to get sale order bom and relative production order bom. please guide me.

    Hi,
    Check Tcode:CS14 to SD/PP BOM's
    Chidambaram

  • Report that would display difference against BOM and Final Prod Orders

    Hello SAP Gurus,
    Is there a report that would display BOM and Final Materials that are used in production orders?
    Thanks in advance.

    Nanz,
    You can use COOIS as well as CO28 for this.
    In COOIS, select 'Components' in the 'List'.
    Give desired selection input & execute.
    In CO28, select 'Components in the initial screen.
    In the next screen give input as required & execute.
    Hope this helps you.
    SmanS

  • Report BOM and routing

    Hello, Is there any transaction in which I can see both the order-BOM and the routing of all components?

    Hi,
    There's a transaction called "product structure browser" (don't remember the T code, and don't have now access to a system). You can find it in the SAP menu under "Engineering".
    It is a comprehensive report that shows all the information.
    Regards,
    Mario

  • Production Order for a material without BOM and Routing

    Is it possible to create a production order for a given material without routing and BOM, I know we can
    create a production order for a material without a BOM (with a default routing) just wanted to check with
    the above criteria
    Thanks in Advance!!

    Members:
    Thank you for your valuable replies and time
    Santosh:
    Tried what you have mentioned, but system still picks up a default routing
    Kaushik:
    Maintained Default values in OPJG for the given order type, but system still picks up
    default routing
    Mangalraj:
    have no issue in creating a production order without a BOM, but I am trying to see
    is there a way where I can create a production order without a BOM and routing (not
    even default operation )
    Any suggestions on how to create a production order for a material without a BOM
    and routing (not even default one )

Maybe you are looking for

  • How to get user name as a calculated column in Analytic View or Calculation Graphical View?

    Hi Folks, I needed something like this. In the output, I needed a column which displays the SESSION USER who is seeing the results of the model. In Script , we can have something like this SELECT SESSION_USER FROM DUMMY How can I do the same using ca

  • Safari and twitter with 2 accounts?

    Hello All Me and brother live in the same house and use the same Desktop in our computer room.We are having a problem having both of our twitter page open at the same time. For example, when I go on first to tweet, he is not able to log in to his acc

  • My IPOD won't update due to a playlist problem...

    Okay, so I have restored my IPOD, deleted ITUNES, and updated several times and I am still unable to get my IPOD to update. its ays its unable to because the playlists on the IPOD are no longer available. It is really frustrating and I have no clue h

  • Opportunity "Status" required in component BT111H_OPPT

    Dear All, I have a requirement where i need to disable the delete button in opportunity when the status is  "in Process".  Now when the user searches for all the opportunities with 'in process' status in search opportunities. The user selects any opp

  • SD - situation/effort analysis, sizing questions.

    Hi, do not you know if there is some SAP methodology or template which will enable me to get an overview about size of the AS IS situation from sales and distribution point of view in an company? I am looking for ideally list of questions which will