Production scheduler & profile configuration

Dear SAPper,
When i create production order, the production scheduler is automatically flled (ex.101) and then
the production scheduler profiles is automaticalled filled too.
I don;t maintain production scheduler & production scheduler profile in work scheduling in material master?
where did system pic thatt value??
Best regards,
Freddy Ha

Hi,
For your order type,
Please check if in OPL8 "Assignment" area - "substitute scheduler" field is defined.
This scheduler is picked up as default if not defined in material master.
If a PSP is attached to this defualt scheduler in OPJ9, then that will also be picked up in the order.
Hope this helps.
Regards,
Ashok

Similar Messages

  • Production scheduling profile for production order type 10 does not exist – SAP Message No.10085

    When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
    In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
    How to check whether production scheduling profile is maintained for relevant order type 10.
    To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
    Also, pls explain about  “Order Type 10” and how it is linked with material and order execution.
    Looking for a detailed explanation with screen shots , since i am new to SAP.
    Thanks With Regards,
    Dinesh Kumar V.

    Hello Dinesh,
    Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
    Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
    Production order have Order category as 10  Process Order  40 in standard SAP you can check this in OPJH.
    Best Regards,
    R.Brahmankar

  • Printing setting in Production Scheduling Profile

    Hello Guys,
    In Production Scheduling Profile (OPKP) there is a config setting "On Release" Execute Printing.
    I used this setting.
    But I could not print the production again.
    I want to re-print the production order.
    How do I enable re-printing the production order?
    Thanks
    George King

    Hi George,
    the setting simply define that the production order is printed when the order is released. This setting should not have any effect to reprint.
    Did you get any error? Are you able to print when you push the print button manually?
    Settings in OPK8 are correct ?
    Regards,
    Sabine

  • Same material with diff. Production scheduler profiles

    Hi,
    I am working on PP-PI, where the same material is being manufactured using separate order types.
    To be  more specific, one order type for the  regular manufacturing & another  with Re-work order type. The  requirement is  such that the  Order type  dependent parameters & production scheduler profile are different in  both the cases. Since my master  has the prod. scheduler for  regular manufacturing on the material master, even if i select the  Re-work order type the system is considering the Settings of the  regular manufacturing order.
    I need to keep the production scheduler profile of the regular manufacturing order as a default in the material
    master due to various  reasons. At the same  time system should consider the  settings for Re-work order only when the specific order type is  manually selected during order creation.
    Appropriate solution would be of great  help, thanks in advance

    Hi,
    Try using user exit. change the production scheduler profile during order save  based on  the order type.
    check with your technical team.
    hope this helps.
    regards
    CSN

  • Production scheduling profile

    Dear Experts,
    Can i have multiple scheduling profile ?
    Issue is that i have defined Production scheduler A and production scheduling profile A1 in material master which refer to order type A2
    Now i want to create production order of same material with order type B2 with Scheduling profle B1 how can i do that without changing the master data in matrial master.
    I tried to give order type B2 in Co01 but it is refering Sch. Profile A1 only.
    Please help me to solve the issue.
    Amit

    Hi,
    I am unable to figure out from your query what you exactly need.
    But for a given material even though you have a prod. sched. profile maintained with a certain order type, you can create an order with different order type.
    If you're converting planned order to prod. order via co40 or co41, then system will propose the order type from the prod. sched. profile, this can be overwritten.
    However if you're manually creating via co01, then you can choose the order type you want, system will not prevent you from doing so, unless there is some enhancement in-place.
    So hope the above clarifies, if it does not, then please explain with an example, it would be better.
    Regards,
    Vivek

  • HOW TO CREATE PRODUCTION SCHEDULING PROFILE

    PLEASE
    TELL ME HOW TO CREATE PRODUCTION SCHEDULING PROFILE
    EXPLAIN IN STEPS
    THANKS

    Hi,
    Check the below link and the screen shot:
    http://wiki.sdn.sap.com/wiki/display/ERPLO/Production+Order+Type+Selection
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Production Schedule Profile & shop floor paper printing.....

    Hi there ,
                   If we set the Execute Printing checkbox in the T-code <b>CORY</b>for a production scehedule profile....... then when we will release the order along with the other shop floor paper do the Transfer Order will also get printed if the material is warehouse managed.........
    Please enlighten me .....
    Thanks & Regards
    Kaushik

    Hi there ,
                   Thanks for your reply...... I am aware of the fact that the shop floor paper will be printed once the order is relased & the relevant config is done in the Production schedule Profile.........
    But in case of the material which are warehouse managed the Transfer requirement will be created & the further the Transfer Order........... I wan tto know that these will also Print the Transfer Order doucment for the warehouse managed material .......
    Thanks & Regards
    Kaushik

  • Production scheduling profile for production order type 10 does not exist

    Kindly suggest me how to resolve this error
    Production scheduling profile for production order type 10 does not exist

    Hi Archana,
    Go to material master-work scheduling view and check what is the production scheduling profile maintained for the same materisl -plant combination.
    then go to OPKP and check if production scheduliong profile is maintained for relevent order type 10 in custmizing. If not maintain one and it should resolve the error.

  • Difference mpr controller and production scheduling profile (exact)

    hi gurus
    wht is difference between mrp contoller and production scheduling profile. and which will come first at the time of planning.
    thanks in adavance
    avinash.pegarlawar

    Hi,
    MRP controller
    MRP Controller is the person responsible for a group of materials in MRP in a plant or company.
    Material that takes part in material requirements planning must be assigned to an MRP controller.
    Production scheduler
    Scheduler responsible for a material in production activity control.
    Example
    The production scheduler determines how capacity requirements are calculated for a material during a scheduling run.
    MRP Controller comes into Planning first which you need to assign in MRP-1 View in material master while production scheduler you need to assign iin Work Scheduling View in Material Master.
    Hope this helps clearing your doutb.
    Revert if still any query.
    Regards,
    Tejas

  • Details about Master production Scheduling & Variant configuration

    1)  What are the steps for Master Production Scheduling (MPS)?
    2) What are the steps for Variant Configuration?

    Hi,
    MPS:
    With in your planning time fence (maintained in mat master ) , you will get firmed planned orders because your MRP Type P1 - P4 has firming type.
    And the firmed planned orders will not change after next MRP run.
    You have to set MRP Type p1 - p4. acc to firming type. in ur mat master.
    Then run MPS .It is generally for important products and it is run single level.Because it will not change your procurement proposals as it has firming type.So you get effective planning for your imp products.
    Variant configuration:
    Go to mm01 create a material and in bd2 view mark the check box material is configurable and then save the material and go to ct04 create chara.
    Go to cl01 and create class with class type 300 and assign the charac. to it
    Go to tcode cu41 create the profile using material code and assign the class to it
    then got tcode mm02 and assign the profile there
    Variant configuration material type is KMAT (SAP std), u can use this material type alternately u can mark the indicator in basic data 2 view ->client specific configuration->Material is configurable tick.
    For further reference, check the link below
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf

  • In production scheduling profile(opkp)

    hi,
    in opkp, material availability check --- confirm available partial quantity.
    can any one tell me how it'll work in production(co01), what's the use of it.where it'll effect.
    thanks/regards
    vish

    When you have set this indicator, if only a partial quantity can be committed for one component, then only partial quantities will be committed for all components during an availability check.
    That means least committed components percentage set for all rest components.
    So that out of remaining quantity of rest components other orders can move ahead.
    Ex: Order Qty: 100 PC
    Required Compo Qty         Available Qty   %Availability
    200                                     200                   100%           
    100                                       40                     40%
    50                                         20                     40%
    B & C have only 40% of components availability so that A also allocated with 40% i.e. (80 qty)
    You can use 120 qty of A for rest orders.
    Chintan

  • Prodcution Scheduling Profile for without material process order

    Hello Gurus,
    I am creating process order without material and assigning Production Scheduling Profile in assignment tab. Production Scheduling Profile  has release on creation activated in configure, but when I save process order its not released, it remains as CRTD.
    When I am creating process order with material as you know Production Scheduling Profile is copied from material master and when I save process order, its automatically released.
    I am assigning same Production Scheduling Profile which I am using for second case listed above.
    Any ideas?
    Thanks
    Bhavesh Patel

    Dear Patel,
    I Already told, once , you are in order  screen, system status will set as CRTD, after that if U assigned, the PSP, It won't work,  In case of COR1, material have PSP, If you convert planned order to production, release is triggered in background before the status is created.
    If you have still doubt
    Create a order in COR1, When you enter the quantity and start date finish date then release is carried out and the status is set as CRTD
    in CORO
    It is not possible to  maintain PSP before entering the qty and Dates
    Once U entered the dates, Sytem set the status as created, After you assigna PSP, It won't work
    Regards,
    Sundaresan
    Edited by: Sundaresan . E. V on Sep 14, 2010 7:01 PM

  • SAP PP - production scheduler

    hi.. i am a fresher in sap pp. i want to know what is production scheduler and production scheduling profile in work scheduling view of material master?

    Hi Tuhin,
    Production sheduler is The Person who is responsible To  do all Scheduling Activities. with a aim to Maximum Utilisation of the Resources.
      Production Scheduling Profile: i am giving some useful notes about this but you have to do some excercise to get clear understanding of this like changing options and creating NEw production orders. Be clear with Scheduling Profile As it have very good impact on production order processing.
    The following controls can be set:
    a) On creation
    Automatic Order release on creation of the order (when the order status is CRTD)
    Automatic Links of header Material related documents and BOM related documents items to the order (when the order status is CRTD)
    b) On Release
    Automatic Printing of Order papers on release of order (when the order status is REL) - If you are planning to use order related shop floor papers configured in the order list or order print settings in SAP, then you can use this functionality for automatic printing of papers at order release.
    Automatic Scheduling of Order on order release (when the order status is REL) - This is recommended to be set. But donot use this if the order planning and scheduling is happening from an external system like APO or i2 etc.
    Automatic Links of header Material related documents and BOM related documents items to the order (when the order status is REL)
    c) Automatic Goods Receipt
    If you are planning to receive certain materials automatically in to the finished goods storage location upon confirmation of the final operation in the order, then you can use this indicator rather than using the control keys in the order operation. Setting automatic goods receipt at this level reduces the effort of master data creation.
    d) Capacity Planning
    If you are planning to carry out Capacity Availability checks in the order for the header materials (which would carry the production scheduler profile), then you need to select the "Confirm Capacity indicator" and the "finite scheduling indictor" and choose a leveling profile.
    The Capacity overall leveling profile is used by the system to carry out capacity availability checks in an order when the order is created or release as per the settings in the order availability controls at creation/release. SAP has provided an option to have the Capacity overall leveling profile maintained at material level rather than setting the profiles at order levels in the order availability controls. The Capacity Overall Leveling profiles once assigned here decides the way in which the capacity leveling has to be done for the materials (assigned with this production scheduling profile).
    As far as the indicators are concerned, they only come in to play during mass conversion of planned orders in to orders or mass release of orders when the user does not decide the creation or release and the system is set to create or release anyways inspite. The below indicators help the system to make decisions on capacity availability checks and helps it proceed in creating or releasing the order.
    By choosing the "finite scheduling indicator" you are forcing the system to consider all the operation work center of the header material relavent for finite scheduling during capacity availability checks, and in cases where there is no capacity availability for loading operations on work centers, the system loads operations on dates where there is sufficient capacity (automatically rescheduling to dates where their is availability).
    And by choosing the "confirm capacity indicator" for capacity availability checks, you are indirectly telling the system to incorporate loads in work center loading reports for where there is sufficient capacity available, in other words the operations for which there is no sufficinet capacity available will not be loaded on work centers in the work center loading report. You should choose this indicator wisely.
    Recommendation - Aviod using the "Confirm capacity indicator".
    e) Confirmations
    No Flor/Update of Expected Yield Surplus/Deficit - On Final Operation or order confirmation, if the confirmed quantity is less than (deficit) or more than (surplus) the operation or order quantity (confirmed scrap quantities) are not taken in to account , then the system displays the Yield Variances in the order header.
    If you set this indicator the variances (if any) donot flow in to the order and MRP. This is not recommended to be used under standard circumstances since Material requirement planning would not consider the shortages and spoil the concept of net requirement planning or netting.
    Adjust Operation/Component Quantities to Actual Value - In simple terms the system would readjust the planned operation qauntities of the order if you confirm the order with a smaller/larger yield than that planned (including the confirmed scrap quantities). Along with readjusting the planned operation quantities, the components quantities of the components assigned to the operation also changes proportionately.
    This is applicable for the operation that has a yield variance and all the operations below the operation that has a change.
    The system carries out the following in case there is a difference in the confirmation of planned quantities and the actual quantities (during order or operation confirmations)
    a) Automatically readjusts the operation quantities for all operations below the concerned operation, including the concerned operation.
    b) Automatically readjust the component quantities for all the components assigned to the operations below the concerned operation, including the concerned operation.
    c) Readjusts the planned costs for all the operations and the order, overall. Though this recosting has to be done manually and it is not triggered automatically by the system.
    d) Automatically reschedules the operations giving new dates and new capacity requirements.
    e) Automatically makes changes in the Purchase requisitions created in the order for non-stock items or for the purchase requisition created for externally operation processing.
    f) Automatically readjust the Transport requests created for WM.
    For example -
    Operation 0010 - Planned Qty = 100
    Operation 0015 - Planned Qty = 100
    Operation 0020 - Planned Qty = 100 - Component 10 - Qty = 100
    Operation 0030 - Planned Qty = 100 - Component 20 - Qty = 100, Component 0030 - Qty = 50
    Operation 0040 - Planned Qty = 100 - Component 40 - Qty = 100
    Operation 0050 - Planned Qty = 100
    If the confirmed qty in Operation 0015 is 102, then all the below operations and the component quantities are changed proportionately as shown below:
    Operation 0010 - Planned Qty = 100
    Operation 0015 - Planned Qty = 102
    Operation 0020 - Planned Qty = 102 - Component 10 - Qty = 102
    Operation 0030 - Planned Qty = 102 - Component 20 - Qty = 102, Component 0030 - Qty = 54
    Operation 0040 - Planned Qty = 102 - Component 40 - Qty = 102
    Operation 0050 - Planned Qty = 102
    f) Batch Creation at Order level
    If you want to have batch created at order level for certain header materials, then you can create a production scheduling profile and assign this profile to them.
    You can configure whether you want Order level header material batch creation at order creation or release.
    Not only, can you configure order header material batch creation, but you can also configure whether you want the batch created and classified in the order foreground or in the background (optional or mandatory).
    g) WM related Transfer Requirements
    Here you can specify whether you want to automatically create WM related transfer requirements or transfer orders for the order components (whose storage location is maintained, Storage location is relevant to WM, WM views are maintained for the component) at order release.
    h) Order Type
    In the production scheduling profile you can default order types which would be used while converting a planned order in to order or which can be used for manual creation of production order.
    Regards,
    Mahesh.

  • Production.Sched.Profile - PP-PI

    Dear Forum Members,
    While configuring the production scheduling profile in PP-PI,(using T.Code CORY) the option for setting automatic Goods receipt
    is not displayed.Is there any OSS notes to be applied for resolving this or if not what could be the reason for not providing the
    option for Auto GR in this profile particularly for PP-PI?Kindly please share your views.
    Regards
    Mangalraj.S

    Hi Mangal,
    In PP-PI , Auto goods receipt is done at the phase level, and done with the control key settings . Mostly auto GR is done in the last phase of last operation.
    Is your product serialized or non-serialized? For serialized product, you cannot have have auto GR. GI and GR to be done by two separate operations. GR by MB31. For non-serialized products, certainly you can have GI and GR together.
    Scheduling margin Key,
    The float before production, float after production and the release period are defined in the scheduling margin key (Customizing for Shop Floor Control, by choosing Operations -- Scheduling--- Define Scheduling Margin Key) . The scheduling margin key is assigned to the material ( MRP area in the material master) and is transferred when the production order is created. These values can be changed in the production order.
    You define the following floats with the scheduling margin key:
    opening period
    float after production (only in the case of in-house production)
    float before production (only in the case of in-house production)
    release period (only in the case of production order management)
    Floats are always maintained in workdays.
    Opening period- The number of working days between the date that the order is created and the planned start date.
    This time is available for the MRP controller to convert a planned order into a purchase requisition or a production order.
    float after production- The number of working days between the scheduled finish date and the order finish date; used as a float in production scheduling.
    float before production- The number of working days between the order start date and the scheduled start date; used as a float in production scheduling.
    release period- The number of workdays between the planned start date of the production order and the date for releasing the order.
    If the order release indicator is set, the production order is released by a background program that takes all dates into account.
    More Specifically ,  A schedule margin key consist of folowing  days as required in a production order
    1.Opening Period : The number of working days between the date that the order is created and the planned start date.
    2.Float After Production  :The number of working days between the scheduled finish date and the order finish date; used as a float in production scheduling
    3.Float Before Production  : The number of working days between the order start date and the scheduled start date; used as a float in production scheduling
    4.Release Period of the Production Order : The number of workdays between the planned start date of the production order and the date for releasing the
    The float before production, float after production and the release period are defined in the scheduling margin key (Customizing for Shop Floor Control, by choosing Operations  Scheduling  Define Scheduling Margin Key). The scheduling margin key is assigned to the material (MRP area in the material master) and is transferred when the production order is created. These values can be changed in the production order in CO02.
    You define Scehduling Margin Key in -OPPQ/OPPR and same has been assinged to MMR in MM02 of that FG/SFG material .
    Regards,
    Srini
    Regards,
    Srini

  • Auto GR with Control Key or Prod.Scheduling Profile

    Hi PP champs
    As we can use both i.e. Control key and Production scheduling profile for activating the Auhto GR for prodcution order confirmation ..Can some one help me which is the more <b>preferred</b> or  which is considered first by the system if we have both in <b>material master and routings respectively</b>.
    I have gone thru the documentation but couldn't get clearity as in both its mentioned as if its not activated in scheduling profile control key will take over and same thing for control key that if its not mentioned in control key system will check for production scheduling profile...
    BR
    Sumit

    Sumit,
    Generally Production scheduling profile is the prefered option, as most of the clients also prefer using to control certain auotmation at the time of order creation and release.
    To me i dont see a big difference between using control key or scheduling profile to define auto GR.
    As far as priority is concerned Control key is first checked by the system, if not available checks for scheduling profile.
    Regards,
    Prasobh

Maybe you are looking for

  • Multiple entries in ACTOR_TAB

    Hi, I am using a custom rule to get the supervisor details for the task 20000460, which is being used for CATS approval. Issue: For a pernr, there can be only one supervisor at a time, but can be more than one in a week. I am fetching the supervisor

  • NWDS 2.0.11

    Hi, I need to install NWDS 2.0.11 version. I downlaoded/installed a file 51030724_15   NW04 SR1 SAP NW DEVELOPER STUDIO 2.0  from SAP Marketplace. But it has got a version of 2.0.9. Can anyone help me in getting this editor to 2.0.11 Regards, Gandolf

  • Digital Camera RAW update 2.5 now out

    http://support.apple.com/downloads/DigitalCamera_RAW_Compatibility_Update_25 Brings support for Nikon D3X and Epson R-D1x cameras.

  • Itunes64.msi missing

    went to update my itunes and i keep getting this erra mesg im running win 7

  • AIR security issue??

    Has anyone find out AIR's file system could easily delete dll file in C:/WINDOWS/? This is a security issue that is one of my friend found out. Any explanation? Thanks first!