Production Scheduler

We are just starting to use the Production Scheduler and are trying to get it going. when I get in the responsibility of Production Scheduler, I click on Names to create the master schedule. Gettng and error saying
ORA-01403: no data found
FRM-40735: PRE-FORM trigger raised unhandled exception ORA-06508.
Anyone know what setup I may be missing????
Thanks for any assistance you can lend.

Which release are you using? Please validate that all PS & integration patches are installed correctly.
Please see the list of patches below:
The following patches for V2 11.5.10 integration are available on Metalink, along with new user guides for PS and SNO. The patch numbers for released platforms are
PS:
6354819 - for Linux 32 Bit Server
6669822 - for HP 64 Bit Server
6669824 - for SUN 64 Bit Server
6669828 - for AIX 64 Bit Server
6669834 - for Windows 32-bit
Important note: the EBS 11i10 v2 integration with PS and SNO should not be used by R12 customers. Instead, they can use the EBS 12 v1 integration which was made available with 12.03.
PS/SNO 11.5.10 V2 RUP#1
PS/SNO 11.5.10 V2 RUP#1 patches are released to Metalink. Following are the PS/SNO patch numbers. Please read the patch ReadMe for details about the patches and bugs fixed.
PS:
7000789 – PS for Linux 32 bit server
7317866 – PS for AIX 64 bit server
7317881 – PS for HP 64 bit server
7317882 – PS for SUN 64 bit server
7317883 – PS for WIN 32 bit server
PS/SNO 11.5.10 V2 RUP#2
PS/SNO 11.5.10 V2 Integration RUP#2 is released to Metalink. Following are the PS/SNO patch numbers. Please read the patch ReadMe for details about the patches and bugs fixed.
Following are the patch nos:
PS:
7351815 – For Linux32 bit server
7599231 – For AIX 64 bit server
7599236 – For HP 64 bit server
7599240 – For SUN 64 bit server
7599244 – For WIN 32 bit server
Thanks
Navneet Goel

Similar Messages

  • Creating/Copying a Work Centre,also a Production Scheduler and Cost Centre.

    Hi All,
    I am trying to create a new work centre based on the settings of a previous one? First of all,how I can do this?
    Secondly,after I have created the new work centre (having copied being copied from another),I need to create a new production Scheduler and Cost Centre? How I will be able to do so,also?Will the Production Scheduller and Cost Centre assignments fom the old work centre be copied,too,or I will need to create/copy these from scratch?
    All help greatly appreciated,will award points to all useful answers.
    PAPJ1.
    Edited by: PAPJ1 on May 20, 2011 11:01 AM

    Hello,
    You can create a new work center by copying an existing work center. in the cr01 screen in the copy from column put the plant name and Ref. work center name and put enter. all the existing data will be copied to the newly created work center. no need to create new assignment to  Production Scheduller and Cost Center.
    Hope it helps.
    Regards
    Alok

  • Production schedule report/Standard v/s actual report

    Dear experts,
    Need two standard report for
    1) Production schedule report- production during the perion and their cost component and items break up
    2) Standard v/s actual report - Standard defined for material  and actually consumed in term of qty and Cost for material and production order.
    regards
    RR

    Hi ajay,
    Thanks for your valuable advice,
    I did all the changes mentioned in thread.
    Cost component wise production target cost and actual cost is coming.
    Same way i did it for qty.but my actual qty of production order is not coming but input qty is coming.
    Option selected for output qty and same is not coming in report
    key figure-output qty
    value type-4actual
    version-770IVERS
    Option selected for input qty and qty is coming in reports also
    key figure-input qty
    value type-5target
    target cost version-790SVERS
    Need to ask one more question,Shall i create separate cost component for FG cogm a/c?.my fg cogm and settlement a/c is same.
    and also how to extract all data(cost component wise) in excel for all orderwise/material wise
    reards
    RR

  • Production scheduling profile for production order type 10 does not exist – SAP Message No.10085

    When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
    In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
    How to check whether production scheduling profile is maintained for relevant order type 10.
    To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
    Also, pls explain about  “Order Type 10” and how it is linked with material and order execution.
    Looking for a detailed explanation with screen shots , since i am new to SAP.
    Thanks With Regards,
    Dinesh Kumar V.

    Hello Dinesh,
    Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
    Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
    Production order have Order category as 10  Process Order  40 in standard SAP you can check this in OPJH.
    Best Regards,
    R.Brahmankar

  • Printing setting in Production Scheduling Profile

    Hello Guys,
    In Production Scheduling Profile (OPKP) there is a config setting "On Release" Execute Printing.
    I used this setting.
    But I could not print the production again.
    I want to re-print the production order.
    How do I enable re-printing the production order?
    Thanks
    George King

    Hi George,
    the setting simply define that the production order is printed when the order is released. This setting should not have any effect to reprint.
    Did you get any error? Are you able to print when you push the print button manually?
    Settings in OPK8 are correct ?
    Regards,
    Sabine

  • Same material with diff. Production scheduler profiles

    Hi,
    I am working on PP-PI, where the same material is being manufactured using separate order types.
    To be  more specific, one order type for the  regular manufacturing & another  with Re-work order type. The  requirement is  such that the  Order type  dependent parameters & production scheduler profile are different in  both the cases. Since my master  has the prod. scheduler for  regular manufacturing on the material master, even if i select the  Re-work order type the system is considering the Settings of the  regular manufacturing order.
    I need to keep the production scheduler profile of the regular manufacturing order as a default in the material
    master due to various  reasons. At the same  time system should consider the  settings for Re-work order only when the specific order type is  manually selected during order creation.
    Appropriate solution would be of great  help, thanks in advance

    Hi,
    Try using user exit. change the production scheduler profile during order save  based on  the order type.
    check with your technical team.
    hope this helps.
    regards
    CSN

  • Production scheduling profile

    Dear Experts,
    Can i have multiple scheduling profile ?
    Issue is that i have defined Production scheduler A and production scheduling profile A1 in material master which refer to order type A2
    Now i want to create production order of same material with order type B2 with Scheduling profle B1 how can i do that without changing the master data in matrial master.
    I tried to give order type B2 in Co01 but it is refering Sch. Profile A1 only.
    Please help me to solve the issue.
    Amit

    Hi,
    I am unable to figure out from your query what you exactly need.
    But for a given material even though you have a prod. sched. profile maintained with a certain order type, you can create an order with different order type.
    If you're converting planned order to prod. order via co40 or co41, then system will propose the order type from the prod. sched. profile, this can be overwritten.
    However if you're manually creating via co01, then you can choose the order type you want, system will not prevent you from doing so, unless there is some enhancement in-place.
    So hope the above clarifies, if it does not, then please explain with an example, it would be better.
    Regards,
    Vivek

  • XI/PI ANSI/ISA-95 Content For Production Schedule; Production Performance

    Hello experts,
    Can you please let me know what the correct name of the package is on SAP Market Place for the pre-defined ANSI/ISA-95 Content (for Production Schedules; Production Performance; Maintenance Requests;Maintenance Workorders etc. for SAP MII scenarios) .
    Thanks and regards,
    Brendon

    Hi Brendon,
    If you are trying to find out packages for MII, the best link is this: http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/webcontent/uuid/90537bfe-fd6b-2910-fda3-b04f1177c51e. [original link is broken] The specific link for standard MII templates (version 12.1) is: http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e090ef23-dbc5-2a10-0994-b589d869cd92. NOTE: It requires a S user and also SDN user to download.
    I tried to find out what ANSI/ISA-95 refers and I guess what you need is into PP templates into the link above. It doesnu2019t make sense u201CXI contentu201D if you need MII content, my advice is trying to download and install into your MII this templatesu2026
    Regards,
    Marcelo Cabrera

  • Details about Master production Scheduling & Variant configuration

    1)  What are the steps for Master Production Scheduling (MPS)?
    2) What are the steps for Variant Configuration?

    Hi,
    MPS:
    With in your planning time fence (maintained in mat master ) , you will get firmed planned orders because your MRP Type P1 - P4 has firming type.
    And the firmed planned orders will not change after next MRP run.
    You have to set MRP Type p1 - p4. acc to firming type. in ur mat master.
    Then run MPS .It is generally for important products and it is run single level.Because it will not change your procurement proposals as it has firming type.So you get effective planning for your imp products.
    Variant configuration:
    Go to mm01 create a material and in bd2 view mark the check box material is configurable and then save the material and go to ct04 create chara.
    Go to cl01 and create class with class type 300 and assign the charac. to it
    Go to tcode cu41 create the profile using material code and assign the class to it
    then got tcode mm02 and assign the profile there
    Variant configuration material type is KMAT (SAP std), u can use this material type alternately u can mark the indicator in basic data 2 view ->client specific configuration->Material is configurable tick.
    For further reference, check the link below
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf

  • HOW TO CREATE PRODUCTION SCHEDULING PROFILE

    PLEASE
    TELL ME HOW TO CREATE PRODUCTION SCHEDULING PROFILE
    EXPLAIN IN STEPS
    THANKS

    Hi,
    Check the below link and the screen shot:
    http://wiki.sdn.sap.com/wiki/display/ERPLO/Production+Order+Type+Selection
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Production scheduler & profile configuration

    Dear SAPper,
    When i create production order, the production scheduler is automatically flled (ex.101) and then
    the production scheduler profiles is automaticalled filled too.
    I don;t maintain production scheduler & production scheduler profile in work scheduling in material master?
    where did system pic thatt value??
    Best regards,
    Freddy Ha

    Hi,
    For your order type,
    Please check if in OPL8 "Assignment" area - "substitute scheduler" field is defined.
    This scheduler is picked up as default if not defined in material master.
    If a PSP is attached to this defualt scheduler in OPJ9, then that will also be picked up in the order.
    Hope this helps.
    Regards,
    Ashok

  • Production Schedule Profile & shop floor paper printing.....

    Hi there ,
                   If we set the Execute Printing checkbox in the T-code <b>CORY</b>for a production scehedule profile....... then when we will release the order along with the other shop floor paper do the Transfer Order will also get printed if the material is warehouse managed.........
    Please enlighten me .....
    Thanks & Regards
    Kaushik

    Hi there ,
                   Thanks for your reply...... I am aware of the fact that the shop floor paper will be printed once the order is relased & the relevant config is done in the Production schedule Profile.........
    But in case of the material which are warehouse managed the Transfer requirement will be created & the further the Transfer Order........... I wan tto know that these will also Print the Transfer Order doucment for the warehouse managed material .......
    Thanks & Regards
    Kaushik

  • Production Scheduling

    We are currently creating process orders and scheduling them to a date.  We then take the order numbers and schedule dates and put them in an Excel sheet to create our weekly schedule.
    My question: Is there a way to create a production schedule in SAP 710 with either a summary report or log that is date defined.  If there is, were do I find it?  What section?
    Thank you in advance for your help,
    TC

    You can use R12 instance, but if latest rollup patch not applied then PS will not work.

  • Production Scheduling 11i

    We are planing to use Production Scheduling module iin 11i our EBS environment,i got metalink note Production Scheduling (PS) Installation [ID 454651.1]
    document says apply the patch 5899674,Patch readme.txt is little bit confusing me, readme says apply patches in source side/destination side,what does it mean,we have multi node EBS(dbtier/mtier) please clarify me.

    Thank you very much, so i don't need to apply patches( Planning instance as the destination) target mentioned in patch right..?

  • Production Scheduling tool

    Can anyone let me know, which is the best production scheduling tool (bolt-on/in built) which can be integrated with 11.5.10 ver.
    Thanks,

    Can someone help me on this

  • SAP PP - production scheduler

    hi.. i am a fresher in sap pp. i want to know what is production scheduler and production scheduling profile in work scheduling view of material master?

    Hi Tuhin,
    Production sheduler is The Person who is responsible To  do all Scheduling Activities. with a aim to Maximum Utilisation of the Resources.
      Production Scheduling Profile: i am giving some useful notes about this but you have to do some excercise to get clear understanding of this like changing options and creating NEw production orders. Be clear with Scheduling Profile As it have very good impact on production order processing.
    The following controls can be set:
    a) On creation
    Automatic Order release on creation of the order (when the order status is CRTD)
    Automatic Links of header Material related documents and BOM related documents items to the order (when the order status is CRTD)
    b) On Release
    Automatic Printing of Order papers on release of order (when the order status is REL) - If you are planning to use order related shop floor papers configured in the order list or order print settings in SAP, then you can use this functionality for automatic printing of papers at order release.
    Automatic Scheduling of Order on order release (when the order status is REL) - This is recommended to be set. But donot use this if the order planning and scheduling is happening from an external system like APO or i2 etc.
    Automatic Links of header Material related documents and BOM related documents items to the order (when the order status is REL)
    c) Automatic Goods Receipt
    If you are planning to receive certain materials automatically in to the finished goods storage location upon confirmation of the final operation in the order, then you can use this indicator rather than using the control keys in the order operation. Setting automatic goods receipt at this level reduces the effort of master data creation.
    d) Capacity Planning
    If you are planning to carry out Capacity Availability checks in the order for the header materials (which would carry the production scheduler profile), then you need to select the "Confirm Capacity indicator" and the "finite scheduling indictor" and choose a leveling profile.
    The Capacity overall leveling profile is used by the system to carry out capacity availability checks in an order when the order is created or release as per the settings in the order availability controls at creation/release. SAP has provided an option to have the Capacity overall leveling profile maintained at material level rather than setting the profiles at order levels in the order availability controls. The Capacity Overall Leveling profiles once assigned here decides the way in which the capacity leveling has to be done for the materials (assigned with this production scheduling profile).
    As far as the indicators are concerned, they only come in to play during mass conversion of planned orders in to orders or mass release of orders when the user does not decide the creation or release and the system is set to create or release anyways inspite. The below indicators help the system to make decisions on capacity availability checks and helps it proceed in creating or releasing the order.
    By choosing the "finite scheduling indicator" you are forcing the system to consider all the operation work center of the header material relavent for finite scheduling during capacity availability checks, and in cases where there is no capacity availability for loading operations on work centers, the system loads operations on dates where there is sufficient capacity (automatically rescheduling to dates where their is availability).
    And by choosing the "confirm capacity indicator" for capacity availability checks, you are indirectly telling the system to incorporate loads in work center loading reports for where there is sufficient capacity available, in other words the operations for which there is no sufficinet capacity available will not be loaded on work centers in the work center loading report. You should choose this indicator wisely.
    Recommendation - Aviod using the "Confirm capacity indicator".
    e) Confirmations
    No Flor/Update of Expected Yield Surplus/Deficit - On Final Operation or order confirmation, if the confirmed quantity is less than (deficit) or more than (surplus) the operation or order quantity (confirmed scrap quantities) are not taken in to account , then the system displays the Yield Variances in the order header.
    If you set this indicator the variances (if any) donot flow in to the order and MRP. This is not recommended to be used under standard circumstances since Material requirement planning would not consider the shortages and spoil the concept of net requirement planning or netting.
    Adjust Operation/Component Quantities to Actual Value - In simple terms the system would readjust the planned operation qauntities of the order if you confirm the order with a smaller/larger yield than that planned (including the confirmed scrap quantities). Along with readjusting the planned operation quantities, the components quantities of the components assigned to the operation also changes proportionately.
    This is applicable for the operation that has a yield variance and all the operations below the operation that has a change.
    The system carries out the following in case there is a difference in the confirmation of planned quantities and the actual quantities (during order or operation confirmations)
    a) Automatically readjusts the operation quantities for all operations below the concerned operation, including the concerned operation.
    b) Automatically readjust the component quantities for all the components assigned to the operations below the concerned operation, including the concerned operation.
    c) Readjusts the planned costs for all the operations and the order, overall. Though this recosting has to be done manually and it is not triggered automatically by the system.
    d) Automatically reschedules the operations giving new dates and new capacity requirements.
    e) Automatically makes changes in the Purchase requisitions created in the order for non-stock items or for the purchase requisition created for externally operation processing.
    f) Automatically readjust the Transport requests created for WM.
    For example -
    Operation 0010 - Planned Qty = 100
    Operation 0015 - Planned Qty = 100
    Operation 0020 - Planned Qty = 100 - Component 10 - Qty = 100
    Operation 0030 - Planned Qty = 100 - Component 20 - Qty = 100, Component 0030 - Qty = 50
    Operation 0040 - Planned Qty = 100 - Component 40 - Qty = 100
    Operation 0050 - Planned Qty = 100
    If the confirmed qty in Operation 0015 is 102, then all the below operations and the component quantities are changed proportionately as shown below:
    Operation 0010 - Planned Qty = 100
    Operation 0015 - Planned Qty = 102
    Operation 0020 - Planned Qty = 102 - Component 10 - Qty = 102
    Operation 0030 - Planned Qty = 102 - Component 20 - Qty = 102, Component 0030 - Qty = 54
    Operation 0040 - Planned Qty = 102 - Component 40 - Qty = 102
    Operation 0050 - Planned Qty = 102
    f) Batch Creation at Order level
    If you want to have batch created at order level for certain header materials, then you can create a production scheduling profile and assign this profile to them.
    You can configure whether you want Order level header material batch creation at order creation or release.
    Not only, can you configure order header material batch creation, but you can also configure whether you want the batch created and classified in the order foreground or in the background (optional or mandatory).
    g) WM related Transfer Requirements
    Here you can specify whether you want to automatically create WM related transfer requirements or transfer orders for the order components (whose storage location is maintained, Storage location is relevant to WM, WM views are maintained for the component) at order release.
    h) Order Type
    In the production scheduling profile you can default order types which would be used while converting a planned order in to order or which can be used for manual creation of production order.
    Regards,
    Mahesh.