Production Scheduling tool

Can anyone let me know, which is the best production scheduling tool (bolt-on/in built) which can be integrated with 11.5.10 ver.
Thanks,

Can someone help me on this

Similar Messages

  • Difference bet ween Fleet Object and Production Resource Tools

    Hi all,
    Please give me the difference between Fleet Object and Production Resource Tools in Plant Maintenance
    Thanks in Advance
    Thanks,
    shriraam

    Dear,
    Production Resources/Tools (PRT)
    Unlike machines and fixed assets, production resources and tools (PRTs) are movable (not stationary) operating resources that are required to perform an activity and can be used repeatedly. For example, PRTs include documents, engineering drawings, jigs and fixtures, and measurement instruments.
    Fleet Management
    Here can map the vehicles as equipment master records and enter vehicle-specific additional data, which is displayed in the system on two additional tab pages. This means that you can now specify important fleet data such as the license plate number, load volume, consumption data, fuel card number, engine data, or fuel type and so on directly in the equipment master record.
    You can also perform maintenance planning for a fleet object. You can make the date of the next scheduled service dependent on the distance
    Please refer this link,
    [Link|http://www.nd-solutions.com/pdfs/white_EAM/EAM_ConfiguringFleetMgt.pdf]
    Regards,
    R.Brahmankar

  • Operation wise Production Scheduling Graphical Report

    Dear Expert ,
    I have multiple production orders and each operations have schedule start date and finsihe date .My client wants a graphical bar chart or grarate chart of production oreds , operations schedule  based on  vaious work centers after doing capacity leveling in CM21 graphical view  so that every week we can production manager can send the concern people those production schedule to SFC.
    Is there any functionality or SAP reporting tools are available in this requirement ? I have tried in CM21 --print - chart2 which is giving me order pool before operation despatch ..I am not able to get the same chart2 after order-operation  dispatch .
    Regard
    JH

    Hi ,
    I did not able to find out anY sap standard report of this requirement .
    How ever , I have developed an functional specification to make  a custom report based on COOIS and CM21.User will  carry out  work centre , operation and production order wise   scheduling(Operation dispatch , overload checking and scheduling )  in CM21  and same will be captured in custom developed report based on COOIS.This can have an graphical chat in PDF or excell as per business requirement  to send the concern production department as reference .
    As there is  client policy of data protection  , I am not able to share details  about this report .
    Regards
    JH

  • From Which table Production resource/tool number can be retried

    Hi Friends,
    In SAP Query I am Using MAPL,PLAS, PLPO, PLKO, I want to retrieve Production resource/tool number PLFHD-FHMNR, can any one tell in which table it is storing the value.. & what link condition I need to use to retrieve thisfield.. Transaction CA03.
    Thanks,
    Ravi.

    FHMNR is stored in table ADFSH_PRTHEAD. You may need to pass ORGEH - Org. Unit to get the Production resource/tool number.
    This may help you.
    Regards
    Karthik D
    P.S. May i know why you have mentioned FHMNR in all your answered questions today?

  • Creating/Copying a Work Centre,also a Production Scheduler and Cost Centre.

    Hi All,
    I am trying to create a new work centre based on the settings of a previous one? First of all,how I can do this?
    Secondly,after I have created the new work centre (having copied being copied from another),I need to create a new production Scheduler and Cost Centre? How I will be able to do so,also?Will the Production Scheduller and Cost Centre assignments fom the old work centre be copied,too,or I will need to create/copy these from scratch?
    All help greatly appreciated,will award points to all useful answers.
    PAPJ1.
    Edited by: PAPJ1 on May 20, 2011 11:01 AM

    Hello,
    You can create a new work center by copying an existing work center. in the cr01 screen in the copy from column put the plant name and Ref. work center name and put enter. all the existing data will be copied to the newly created work center. no need to create new assignment to  Production Scheduller and Cost Center.
    Hope it helps.
    Regards
    Alok

  • Production schedule report/Standard v/s actual report

    Dear experts,
    Need two standard report for
    1) Production schedule report- production during the perion and their cost component and items break up
    2) Standard v/s actual report - Standard defined for material  and actually consumed in term of qty and Cost for material and production order.
    regards
    RR

    Hi ajay,
    Thanks for your valuable advice,
    I did all the changes mentioned in thread.
    Cost component wise production target cost and actual cost is coming.
    Same way i did it for qty.but my actual qty of production order is not coming but input qty is coming.
    Option selected for output qty and same is not coming in report
    key figure-output qty
    value type-4actual
    version-770IVERS
    Option selected for input qty and qty is coming in reports also
    key figure-input qty
    value type-5target
    target cost version-790SVERS
    Need to ask one more question,Shall i create separate cost component for FG cogm a/c?.my fg cogm and settlement a/c is same.
    and also how to extract all data(cost component wise) in excel for all orderwise/material wise
    reards
    RR

  • MATERIAL TYPE : Production resource/Tool...

    Hi...
    MATERIAL TYPE : PRODUCTION RESOURCE/TOOL.
    Friends..i want to know about the above material .and its uses..generally i heared that this type of materials mostly used in manufacturing industries...if i want to configure this in which way i can configure..and let me know brief about material (production resource/tool..)
    (or)
    plz share with me your experience about this type of material and its configurations..
    It will be verry helpfull to me..
    Regards,
    Sirish

    Hello,
    Please go through this documentation:
    http://help.sap.com/printdocu/core/print46c/en/data/pdf/PSPRT/PSPRT.pdf
    Prase

  • Documents to be linked from DMS to Production Resource Tools

    hi, All
    I want to Link some documents to PRT through DMS.
    From DMS i choosed object link Production resourec/tools.
    I searhed PR/T no result found.
    So Now i want to Know that How i could Creat PRT and Link some document to PRT.
    Any one help me
    Rgds,
    Ben

    Hi,
    I know this post is old, but to answer the question:
    Yes, you can link, using Object Linking functionality in DMS, to a PRT.
    The object is a bit obscure in the object list, but, when selecting a object in the DMS Config>Define Document Type>Define Object Link, look for the object called CRVS_B.
    This is the PRT Object Link's definition, which will then allow Object Linking functionality as required.
    The other way, as mentioned earlier, is to simply use the PRT functionality from your transaction, i.e. IA06 to link to a DIR. This has the downside though that the bi-directional navigation from DMS<>PM for example will not exist.
    Regards,
    Freddie.

  • Production scheduling profile for production order type 10 does not exist – SAP Message No.10085

    When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
    In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
    How to check whether production scheduling profile is maintained for relevant order type 10.
    To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
    Also, pls explain about  “Order Type 10” and how it is linked with material and order execution.
    Looking for a detailed explanation with screen shots , since i am new to SAP.
    Thanks With Regards,
    Dinesh Kumar V.

    Hello Dinesh,
    Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
    Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
    Production order have Order category as 10  Process Order  40 in standard SAP you can check this in OPJH.
    Best Regards,
    R.Brahmankar

  • Printing setting in Production Scheduling Profile

    Hello Guys,
    In Production Scheduling Profile (OPKP) there is a config setting "On Release" Execute Printing.
    I used this setting.
    But I could not print the production again.
    I want to re-print the production order.
    How do I enable re-printing the production order?
    Thanks
    George King

    Hi George,
    the setting simply define that the production order is printed when the order is released. This setting should not have any effect to reprint.
    Did you get any error? Are you able to print when you push the print button manually?
    Settings in OPK8 are correct ?
    Regards,
    Sabine

  • IA07 : Key for Task List Group and Production resource tool number link

    HI abapers,
    In IA07 TCODE , i want to retrieve Key for Task List Group( PLNNR ) and Production resource tool  number ( FHMNR) .
    In technical settings for both the feilds, structure names are mentioned.
    Is there any function module or table link to retrieve both .
    thansk & regards
    Raghul

    Hi Raghul,
                    i am also facing the same issue. Kindly let me know if u get any solution for this.
    Thanks in advance.
    -AruN.

  • Same material with diff. Production scheduler profiles

    Hi,
    I am working on PP-PI, where the same material is being manufactured using separate order types.
    To be  more specific, one order type for the  regular manufacturing & another  with Re-work order type. The  requirement is  such that the  Order type  dependent parameters & production scheduler profile are different in  both the cases. Since my master  has the prod. scheduler for  regular manufacturing on the material master, even if i select the  Re-work order type the system is considering the Settings of the  regular manufacturing order.
    I need to keep the production scheduler profile of the regular manufacturing order as a default in the material
    master due to various  reasons. At the same  time system should consider the  settings for Re-work order only when the specific order type is  manually selected during order creation.
    Appropriate solution would be of great  help, thanks in advance

    Hi,
    Try using user exit. change the production scheduler profile during order save  based on  the order type.
    check with your technical team.
    hope this helps.
    regards
    CSN

  • Process Chains and 3rd party scheduling tools in 04s

    All,
    What, if any, 3rd party scheduling tools (Autosys, CTL-M, etc...) deliver certified connectivity with 04s BW?  I've had some experience with 3.x in prior lives in having to support a custom abap pgm to submit and monitor process chains via SM37.   Has the integration with 3rd party tools changed?  If we need to connect with a 3rd party tool, is a custom 'wrapper pgm' still required?
    Thanks,

    Hi Lonnie,
    SAP NetWeaver 2004s comes with the external scheduling tool Redwood Cronacle included. In the next release it will be integral part of the NetWeaver system.
    Please check the SAP Service Marketplace for further information
    <a href="http://service.sap.com/job-scheduling">SAP Service Marketplace /job-scheduling</a>
      Cheers
        SAP NetWeaver BI Organsation

  • Scheduling Process flows in scheduling tool Control M

    Hi,
    We need to schedule 3 to 4 process flows through the general scheduling tool "Control M". So how do we do this? I mean where should we login to run the OWB jobs (Process Flows) through Control M.
    Any help will be appreciated.
    Thanks,
    Harsha

    Create a shell script that will take in the required parameters you need (i.e.connection User/pwd@SID and OWB mapping inputs if required), which call sqlplus with a procedure that will run your workflow.
    My current client migrates all OWB incl Worflows created through OWB by the means of export. This is why the prefix of the workflow activity will differ from an environment from another.
    Here is a procedure that will launch the OWF and wait for the workflow to be completed before it exits and return control to CONTROL-M.
    CREATE OR REPLACE PROCEDURE XX_OWF_Daily_Load (
    ATTR01 IN VARCHAR2(10),
    ATTR02 IN VARCHAR2(10),
    ATTR03 IN VARCHAR2(10),
    ATTR04 IN VARCHAR2(10),
    ATTR05 IN VARCHAR2)
    IS
    v_ITEM_KEY VARCHAR2(40);
    v_PREFIX VARCHAR2(4);
    v_ITEM_TYPE VARCHAR2(8):= 'MY_ITEM';
    v_PROCESS VARCHAR2(32):='MY_ITEM_KEY';
    /*Mapping Inputs for OWB */
    v_ATTRIBUTETXT01 VARCHAR2(1):='ATTR01';
    v_ATTRIBUTETXT02 VARCHAR2(1):='ATTR02';
    v_ATTRIBUTETXT03 VARCHAR2(1):='ATTR03';
    v_ATTRIBUTETXT04 VARCHAR2(1):='ATTR04';
    v_ATTRIBUTETXT05 VARCHAR2(1):='ATTR01';
    v_STATUS VARCHAR2(30):='RUNNING';
    BEGIN
    /* Generate a unique key */
    SELECT 'DAILY_PROCESS'||TO_CHAR(SYSDATE,'YYYYMMDD:HH24MI') INTO v_ITEM_KEY FROM DUAL;
    SELECT TRIM(TEXT_DEFAULT)||'_' INTO v_PREFIX
    FROM WF_ACTIVITY_ATTRIBUTES_VL
    WHERE
    ACTIVITY_ITEM_TYPE = 'MY_ITEM'
    AND ACTIVITY_NAME = 'MY_ITEM_KEY'
    AND NAME = 'SYS:TLA';
    /* Creating the Workflow Process */
    Wf_Engine.createprocess(ItemType => v_ITEM_TYPE,
    ItemKey => v_ITEM_KEY,
    process => v_PROCESS);
    /* Setting all required attributes for the Workflow Process */
    Wf_Engine.SETITEMATTRTEXT(ItemType => v_ITEM_TYPE,
    ItemKey => v_ITEM_KEY,
    AName => v_PREFIX || 'LOAD_WORKAREA_POLICY',
                                  AValue => v_ATTRIBUTETXT01);
    Wf_Engine.SETITEMATTRTEXT(ItemType => v_ITEM_TYPE,
    ItemKey => v_ITEM_KEY,
    AName => v_PREFIX || 'LOAD_WORKAREA_TR_POLICY',
                                  AValue => v_ATTRIBUTETXT02);
    Wf_Engine.SETITEMATTRTEXT(ItemType => v_ITEM_TYPE,
    ItemKey => v_ITEM_KEY,
    AName => v_PREFIX || 'LOAD_USER_DIM',
                                  AValue => v_LOAD_USER_DIM);
    Wf_Engine.SETITEMATTRTEXT(ItemType => v_ITEM_TYPE,
    ItemKey => v_ITEM_KEY,
    AName => v_PREFIX || 'LOAD_VEHICLE_DIM',
                                  AValue => v_ATTRIBUTETXT05);
    Wf_Engine.setitemowner(ItemType => v_ITEM_TYPE,
    ItemKey => v_ITEM_KEY,
    Owner => 'OWF_MGR');
    /* Starting the Workflow Process */
    Wf_Engine.startprocess (itemtype => v_ITEM_TYPE,
    itemkey => v_ITEM_KEY);
    WHILE (v_status <> 'COMPLETED')
    LOOP                              
    SELECT ACTIVITY_STATUS INTO v_status
         FROM WF_ITEM_ACTIVITY_STATUSES
    WHERE ITEM_TYPE='MY_ITEM' AND ITEM_KEY=v_ITEM_KEY;
    SYS.DBMS_LOCK.SLEEP(600);
    END LOOP;
    END;
    /

  • Production scheduling profile

    Dear Experts,
    Can i have multiple scheduling profile ?
    Issue is that i have defined Production scheduler A and production scheduling profile A1 in material master which refer to order type A2
    Now i want to create production order of same material with order type B2 with Scheduling profle B1 how can i do that without changing the master data in matrial master.
    I tried to give order type B2 in Co01 but it is refering Sch. Profile A1 only.
    Please help me to solve the issue.
    Amit

    Hi,
    I am unable to figure out from your query what you exactly need.
    But for a given material even though you have a prod. sched. profile maintained with a certain order type, you can create an order with different order type.
    If you're converting planned order to prod. order via co40 or co41, then system will propose the order type from the prod. sched. profile, this can be overwritten.
    However if you're manually creating via co01, then you can choose the order type you want, system will not prevent you from doing so, unless there is some enhancement in-place.
    So hope the above clarifies, if it does not, then please explain with an example, it would be better.
    Regards,
    Vivek

Maybe you are looking for

  • How can I get all of my calendars and recurring events to synch via iCloud with my iPad2?

    Not all of my recurring events sych via the iCloud with my Mac and IOS devices - most specifically my iPad2. For example, my anniversary appears on my Mac and my iPhone, but not on my iPad2. I notice that when I click on "Calendars" when the iCal app

  • We have uploaded years of CDs to iTunes and they can not be found!

    Everything we had in iTunes is gone!  Uploaded CDs and purchased CDs from iTunes is gone!  How do we get it back?

  • Using color statement

    Hi All, I have one internal table , in which i have only two fields of type char15. I want to have the contents of first field in black color (by default it is black) and corresponding contents of second field in Red color. Please help me in solving

  • Default image viewer iPad

    Weird.  My third gen iPad using iOS 6 just started showing a different default image viewer when looking at pictures in emails.  In the past, I've not had any trouble with downloading images that were in emails. However just recently, I've noticed th

  • 6.2 to 6.5

    We're looking into upgrading. Does anyone have a list of what has been upgraded? I can't find anything on the Hyperion web site. Thanks.