Is there anyway that I can settle the production variances into different GL accounts at the same time? For example I have $1000 as the variances on my order. It is further divided into $200 for material another $800 for material overheads.
This $1000 is posted into a price difference gl a/c when settled. I would like to capture only the material cost i.e. $200 and post it into a different account. Is that possible? If so, how please explain.
Your help is much appreciated
Regards
Shiv

Hi Shiv
Try this if it helps u in addition to KOB3
For variance analysis you can use report S_ALR_87013127 - in Object list node in cost object controlling.
This is one of the best available reports u can use since it gives variances for all order types in all plants and company codes
Once u select the parameters, go to the layout and select all variances fields listed and save your layout so that u dont have to do it everytime.
I have been providing this to clients and is used for analysis and corrections to orders etc.
Also, there are quite a few reports not only on variance analysis but on WIP but in most of these reports the selection parameter is a single order instead of all orders for a plant which limits the usage.
Let me know if you need any more clarifications
And please assign points as a way to say thanks

Similar Messages

  • Process orders in joint production: variance settlement to CO-PA

    Dear all,
    During integration test for costing based CO-PA, I have a problem regarding production variance settlement to CO-PA. I am testing CO-PA actual flows for november 2011. When I try to settle process orders with co-products for previous month, the system asks for PA transfer structure. Because of customizing setting for settlement profile being transfered later, previously created process order need to have this info, and i assigned PA structure manually in settlement rule for each process order. When I repeat variance settlement, only for process orders with co-product, the system still asks for this information, although I already had assigned PA structure to this order.
    please give some advice.
    Thanks Dusko

    Hi
    You may have 2 settlement rules for CO Products... So ensure you enter PA Trf Str at all the places... This error is never thrown by SAP w/o valid reason
    br, Ajay M

  • Production Variance settlement to COPA

    Hi Experts,
    Here I have scenario regarding the production variance.
    production requirement is 100 units
    but the actual produced quantity is 110 units.
    here we have a production variance of 10 units
    Which is reflecting the report as following
    My COGS is 10000 Rs
    Split of the COGS
    input material is 11000 Rs
    labour is 200 Rs
    machine is 300 Rs
    Here my COGS posted to GL account is less than the actual production, which is posted as per the sales order
    Here where do i get the production variance, how to find out the quantiy variance and price
    Please help
    Regards,
    Ram

    Hi
    Execute KKS1 / 2.. After that settle the prod order to COPA from KO88....
    you can see all the categories of variance in CO03...Menu Go to > Costs > Analysis and change the layout and include all the categories of variances
    Br, Ajay M

  • COPA Configuration for settlement of Production Variances

    Hi,
    Can anybody explain me detail configuration steps required to settle production variances to COPA in case of Make to Stock Scenario.
    Helpful answers will be rewarded with points.
    Regards
    Milind Nair

    Hi
    These are broadly the requirements for settling production variances:
    1.) The production variances first need to be calculated in CO-PC.
    2. Your PA transfer structure must contain assignments of variance categories to COPA value fields.
    3. In the settlement profile, you define the variances to be settled and profitability segments should be a valid receiver.
    4. The settlement rule to profitability segments is created automatically based on the information available in the production order (product, product group, plant and so on).
    5. You must have maintained number ranges for record type "C".
    6. The desired form of Profitability Analysis (costing based) must be active in the relevant controlling area.
    Hope this is useful
    S Jayaram

  • Cost elements set in KEI1 A1 Settle Production Variances?

    Dear Experts,
    What kinds of cost elements would be set in KEI1 If the PA transfer str. is A1Settle Production Variances?
    10     Input price variance
    20     Input quantity variance
    30     Resource-usage variance
    40     Remaining input variance
    50     Mixed-price variance
    60     Output price variance
    70     Lot size-/fixed-cost variance
    80     Remaining variance
    90     Scrap
    Could i say "cost elements that we can see when we do KKS1 variance caluation?
    Or else?
    Thanks in advance.

    Hello,
    You NEVER assign cost elements to value fields for mapping the settlement in COPA. Instead of that what you do is in the source tab for the line (eg 10 Scrap) select the radio button called ' varainces on production orders' and input the appropriate variance category eg. eg SCRP. In value field tab you would assign the appropriate value field. There is no need to assign cost elements. When you execute variance calculation the information is captured in the following fields and the same flow to COPA when you assign the variance category to value fields.
    PRIV      Input Price Variance
    QTYV     Input Quantity Variance
    RSUV     Resource-Usage Variance
    INPV             Remaining Input Variance
    MXPV     Mixed-Price Variance
    OPPV     Output Price Variance
    LSFV     Lot Size Variance/Fixed-Cost Variance
    REMV     Remaining Variance
    SCRP     Scrap
    The variance calculation is not just a simple difference between the cost elements it is also related to quantity as well.
    Kind Regards // Shaubhik

  • Settling production variances when the price control of the material is "V

    Hi,
    Scenario: 1) Materials are maintained at moving average price.
                    2) Production variances need to settle to material and MAP need to be adjusted.
    Issue:  When the closing stock of the material is less than the negative variance need to be settled from the production order   the system is giving the message "Moving average price for material is negative"
    Questions: 1) What is the solution for settlement of negative variance to material when there is no stock?
                       2) Is there is any way to settle these variances to price difference account only when the stock is not available. if stock is available the variance has to adjust the stock, if not settle to the price difference account. Is there anys standard settling for this?
    Advance thanks for your help
    Regards
    Koteswararao Padarti

    Hi Rao
    You should never have Price Control V for In House made material...
    That will ruin your inventory valuation forever.. Consider the eg below if your price control is V
    1. Your moving price in mat master is 100 USD
    2. You Mfr on Jan 1 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and at period end if Qty is lying in stock, 10 variance will also be inventorized
    BUT, now consider this
    1. 1. Your moving price in mat master is 100 USD
    2. You Mfr on Jan 1 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and variance lying is 10 in prod order
    3. You Mfr on Jan 10 @ Actual cost = 110 in Prod order and Qty = 1.
    Upon GR, GR will happen @ 100 and variance lying is 10 in prod order
    4. On jan 15, you consume Qty 1 and qty lying in stock is 1
    5. In period end, when you do settlement, following will happen
    a. For prod order 1: Qty Mfd 1 and Qty lying in stock 1 - Result: variance 10 will be inventorized.
    Mvg Avg price will shoot upto 110
    b. For prod order 2: Qty Mfd 1 and Qty lying in stock 1 - Result: variance 10 will be inventorized.
    Mvg Avg price (MAP) will shoot upto 120
    System wont check whether the qty lying in stock pertains to prod order 1 or 2... It will simply check if the Qty of prod order matches with qty lying in stock. hence, it will keep on inventorizing variance in this case.... and your MAP will touch the sky
    Regards
    Ajay M

  • Production order settlement variance button

    Hi,
    I check the settlement of production order and would like to clarify.
    In the settlement rule, the account assignment category is MAT, when double click the rule or click settlement variance button, it shows category PSG.
    why there are 2 settlement? for settlement to asset, there is only 1 and no settlement variance button.
    so why production order settlement has 2 settlement?
    Thanks

    Hi,
    On settlement of Production order, two documents gets created one is Accounting document for posting the variances to Accounts and the Profitability analysis documents.
    This is because, when COPA is activated, the Sold quantity in copa is valuated using the Standard cost estimate.
    For eg: if the SCE of X material is 100 Rs. and Billed quantity is 10 Qty, this billed quantity is valuated using the 100 rs and 1000 Rs is transferred to COPA as COGM.
    But when production is carried out, the actual cost can be different from that of SCE. I,e it can be 120 Rs.
    Hence there is a difference of 20 Rs with which inventory is being valuated less in both Accounts and also in COPA. Hence the same is settled to the respective module on the settlement of Production order so that you have FI and COPA gets reconciled to that extent.
    But Asset settlement we are valuating it with full amount of acquisition. and there is no standard set for the same. Hence the result.
    Thanks & Regards,
    Ravi Kumar

  • CO Substituion for Production order variance settlement

    Hi,
    In make to order production, Our client requirement was not to settle variances to sales order but directly to COPA.
    We cannot use variance categories in settlement profile/PA transfer structure as we have transfer pricing setup and direct settlement of variances categories to COPA updates only legal view of COPA and not profit center view of COPA.
    Therefore variance GL account was created as cost element in our case.
    Now that client wants to settle variances to sales order for certain plants and directly to COPA in certain plants.
    Therefore i tried with a CO substitution to clear sales order assignment for the variance GL and then in OKB9 i have set up PSG as default account assignment.
    Now when i run the settlement, in debug mode i am able to see that the substitution works and clears the sales order assignment, but when i see the FI document posted, it still has SO assignment. No COPA document is triggered and a controlling document on sales order is posted.
    Why does substitution not work for variance settlement in case of MTO process.
    Regards
    Raghu

    Hi Ajay,
    I used user exit OKC9 as suggested in SAP note 183250 (last paragraph) and SAP note 105024.
    With the user exit, we have cleared the Sales order information and also called OKB9 as per the note 105024.
    Now the settlement document is generated without Sales order assignment. A PSG is generated but no cost based COPA document. We also use account based copa. In controlling document, i can see PSG is updated as cost object against the variance GL.
    Why does not Cost based COPA automatically generated.
    We have FI settlement profile properly maintained. With a manual posting to this GL, i can see cost based copa document.
    Accounting document before changes to user exit has following object
    Dt 40600 Change in Stock, Prd Order
    Ct 44760 Production Variance, Sales Order
    Accounting document after changes to user exit has following objects
    Dt 40600 Change in Stock, Prd Order
    Ct 44760 Production Variance, Material & PSG
    In the user exit, i have cleared the material from COBL, still it appears in the posting
    Regards
    Raghu
    Edited by: Raghu Ram Thatavarthy on Nov 25, 2011 1:19 PM

  • Production order Variance Settlement

    Hi,
    Can anybody tell, what configuration settings will have to be made to settle variances in production order
    to sales order in COPA?
    Regards
    Milind Nair

    1. TA : OKOA.
    2. CHOOSE  : SETTLEMENT PROFILE
    3. SELECT SETTLEMENT PROFILE,   "PP01" FOR EXAMPLE.
    4. SET ON : VARIANCES TO COSTING BASED PA.
    5. SELECT PA TRANSFER STRUCTURE (BEFORE THAT YOU MUST HAVE CREATED PA TRANSFER STRUCTURE)
    YOU CAN CREATE PA TRASFER STREUCTURE BY  TA : OKOA
    A . CHOOSE:  PA TRANSFER STRUCTURE .
    B. CREATE PA TRANSFER STRUCTURE. FOR EXAMPLE :
        A1-  Settle production variances
    C. ENTER ASSIGNMENT  LINES:  FOR EXAMPLE :
    10     Input price variance
    20     Input quantity variance
    30     Resource-usage variance
    40     Remaining input variance
    D.  FOR EACH LINE ASSIGN  SOCURCE  (COST ELEMENT  + VARIANCE CATEGORY , f.example.)  AND VALUED FILEDS.

  • Production order variance settlement( Ko88)

    Hi All
    I belive, this will be the account entery when we do production order settlement
    Dr :PRD a/c (production variance account)
    Cr:  GBB-AUA or AUF( Inventory a/c in)
    We are not implementing material ledger.
    My question is
    what is the best practice "whether to use AUA or AUF" If we are not using materail ledger?
    For me it makes sense to use AUF .
    Please advise me
    Thanks in advance

    You don't have a choice.

  • Production Variances of semifinished goods in COPA

    Hi,
    We are using Costing based COPA, which is updated at the time of billing.
    The production variances are posted to COPA when the settlement of the production orders are done.
    The production variances if brought within the purview of COPA report (based on sales), the plan vs actuals can be compared. However, in case of actuals, the production variances would appear only to the extent of tha particular product sold (that too, to the extent of qty produced and not qty sold)..
    I have two issues:
    1. Whether system can explode the BOM and bring in the production variances of semi-finished goods into the total production variances, if I drill down only on the Finished product sold. The total actual cost would include the variances of relevant SFG also. Is this possible, if so how?
    2. Whether, by bringing production qty and sales qty, the proportionate prod variances be calculated (total prod var * sales qty / prod qty). This can surely be done by inserting formulae. But is this justified from business point of view?
    Please help me resolving this issue..
    Edited by: Swapvik on Mar 17, 2009 7:11 AM

    Hi Swapvik,
    Issue No.1:
    When you are using only Standard Costing in CO-PC, variances will not get rolled-up to the next level. Only costs get rolled-up. As per your requirement, when you see the report in COPA, when you see the details of FG and you want to see the variances of it's SFG also, this would be possible only if you have activated Material Ledger. If ML is active, variances also get rolled-up along with costs.
    Issue No.2:
    The ultimate purpose of bringing Variances into COPA and making part of them in a report is to consider COGM subject to the variances. Though it is not 100% justified, it gives you the most appropriate analysis compared to where you don't consier the variances at all. If you don't consider variances there, that means, you are considering only COGM and not taking the effect of variances, which will definitely not a correct picture of Profitability.
    Pls revert back for further explanation...
    Srikanth Munnaluri

  • Transfering Production variances to COPA

    Hi,
    I have doubts about transferring Production variances to COPA.
    Will this functionality work both for settlement of variances to GL Variances Account and at the same time for settlement of variances to COPA?
    From my experience with cost centers and internal orders, I know that if I want to settle an Internal order both to COPA char and to GL Account, I have to make 100% overhead for the  costs gathered on IO. Then I can do the settlement in both directions.
    Could you please explain to me the case of Production order variances settlement? I need to have them both on GL accounts and in COPA.
    Best wishes,
    Karol

    Hi
    At the time of settlement of production orders, FI entry also passed as well as variances are also settled to COPA
    In FI, variances will be debited (assuming production order debit is more than what it is settled to Inventory at Std cost) and Inventory changes account is credited.
    In COPA, depending on the variance categories like Price, qty and their assignment to value fields, this amount is transferred.
    For eg, if prodn order actual costs is say 12000 and is settled to Inventory is 10000 (at std cost), and the difference is 2000 and if this difference is due to Price (800) and qty (1200).
    Hope this is useful
    S Jayaram

  • Product Variances in COPA for SFG

    Hi Freinds,
    I am facing a issue relating to production variances arising from settlement of production order for SFG.
    As SFG is not sold in my case and is being used for producing 2-3 types of Finished goods, therefore client wants that the production variance of SFG should be allocated to the FG's based on Sales Quantity.
    However as all production variances are being settled to COPA, SFG production variannce are also coming to COPA, now I am not able to fine in COPA if there is anything to support this.
    Thanks

    Hi
    The answer to your question is both YES & NO
    It is possible to allocate SFG variances upon FG using top down distribution in COPA (KE28)... However, for that, you should have "Some thing in Common"
    "Some thing in Common" means  - Your SFG and FG should have a relation in SAP where by you can identify that they co-relate.. In one of our clients, we set up the system in such a way that the related SFG and FG shared the same material group...
    So, while distributing in COPA (Top Down Dist), we specified that Variances Pertaining to Mat Type = HALB & Mat Group= XX should be allocated to Mat Type = FERT and Mat Group = XX...
    Do you such a co-relation established in your system?
    Regards
    Ajay M

  • Production variance in COPA

    Hi All,
    We are settling production variances to COPA and We have 3 values fields in COPA,Material Variance,production labor variance and Other variance.
    Variance categories are mapped to material, labor variance and others value fields.but i dont see any labor variances in Variance value field.i have reviewed and this is becuase of Variance categories.which are not one to one mapping to value fields.
    we have 9 Variance categories mapped to 3 value fields.
    client requirement is labor variances to settled to Variance value field,material variance to Material value field and Overhead and other variances to settlement others value field.is this possible?if yes.how can i do this?
    Any help is appreciated.
    Thanks,
    Anusha

    Hi,
    As explained earlier by other forum colleagues,variances captured at production can be assigned to COPA under value field.This assignment is happening through PA transfer structure for variance settlement.
    Normally this can be defined broadly into 2 categories : 1.Cost element and 2.Variance categories.
    After looking at your requirement,your main interest is in cost element based production variance push to COPA for reporting.i.e.Labor variance.
    Production order shows this variance under secondary cost element labor and difference between target/actual.COPA transfer structure doesn't push 2 seprate values (target/actual) ,whereas only delta gets posted.
    I feel your requirement is not possible through PA transfer structure.
    I would suggest,you push cost center specific labor expenses under new value field,capture cost component wise break up of standard cost udner different value field.
    Comparision of cost center expense and labor part of standard cost will provide you expected value.
    I know this complex thing to do,so discuss with client do they really want from COPA?
    Same reporting they can get from cost cente i.e.expense posted(labor ) and absorbed on product under secondary cost element.
    regards,ashok

  • Production Variances in COPA   CO-PA

    Hi Gurus
    Production variances are genrated in COPA at the time of Prod Order Settlement.How can we display these in COPA reports apportioned according to Products
    If not what is the best practice to present Production Variances in COPA reports

    Hi,
    The production variances flows to copa by creating PA transfer structre in OKOA. their you have to assign value fields to variance categories.after creation of pa transfer str u have to assign it in u r settlement profile.
    Thank u
    Srinivas

Maybe you are looking for

  • SQ01 Output From Joining VBSEGK and VBSEGS tables-1 line of output per DOC

    I setup a query using SQ01 which uses tables VBSEGK and VBSEGS ( parked documents).   The VBSEGS table has multiple lines per document in that there are multiple G/L accounts, cost centers and amounts in order to distribute expense acorss multiple co

  • Dynamic change of table

    Hi all i am wrking on standard script.....in ecc6.0 i have to print th invoice no. ,date, etc....in table format.... the driver program is RFFOUS_C.... Now the requrement is lil complicated..... if the no. of invoice line items is < 40 then one table

  • Overloaded methods in stack trace

    There is a thing I thinking about. When I have overloaded methods and I want to check a stack trace where one of these overloaded methods take part I cannot decide which method was in the frame, unless I have the source and have debug information in

  • TS1389 Album says it needs authorization, but then says that this computer is already authorized.

    Album says it needs authorization, but then it says that this computer is already authorized. I have logged in and out. Deauthorized and authorized my computer again.

  • Vlpod  - error calculating component quantity

    When we do a Vlpod and put a 'diff in qty' for  header material (item) then 'diff in qty' for component material should also change as component material should be linked to header material. This is not happening in ecc6 environment. Is anybody has f