Production version for different periode

Hello Expert,
I have a requirement like below please suggest some solution
One of my finished material having two alternative BOM  say 1 and 2 and I have a requirement in MD61 for 500 pcs in current month and another requirmnet in next month for 1000 pcs
Now the when we run MRP I want system should take alternative bom 1 for current month requirement(500 pcs) and system need to take alternative bom 2 for next month requirement(1000 pcs)
Any body have any idea about this solution with less master data maintenance for user
Thanks in Advance
Abu fathima

Hi,
       You can resolve your issue by two ways , either using lot size procedure or using validity period.
    Case I:- Using Lot size
       You can use lot size procedure in production version in material master MRP 4 view. Kindly note that selection method should be
3
Selection only by production version
1.  Lot size  0 -500 lot quantity select first BOM in production version
2.  Lot size 501 - 9999 or 501 - 1000 quantity select second alternative BOM
This will be used for every time production process.
     Case II:- Using Validity period
If you are using this scenario for specific period then you can use this option of validity. Validity can be applied at different level like BOM validity or production version validity date in your case.
a)If you have use validity start date of second BOM from next month then it will not explode in current month for MRP to achieve this use selection method in MRP4 view in material master as follows
1
Selection by explosion date
b) You can also restrict selection of BOM for specific period using production version validity
Start validity of second production version from second month to avoid selection in current month MRP.
To achieve this use selection method in MRP4 view in material master as follows
3
Selection only by production version
Hope you will get brief idea of selection correct BOM in MRP.
Apart from this there are various different method depends on business scenarios you can adopt your best. For more details of other method see following
Correct BOM selection in multiple BOMS for same FG Product for the same month
Hope above explanation will help you to resolve your issue.
Regards,
Shyam

Similar Messages

  • Use of different production versions for MRP and costing

    Dear PP Gurus ,
    We have a scenario in which there are multiple production versions for a particular product .The MRP run as welll as costing run considers only the production version 0001.
    We would like the system to consider different production versions for MRP and costing ..that is 0001 for MRP and 0005 for costing .
    Is this possible ... if yes ...Kindly suggest the config and master settings for this to happen .
    Ram ~

    Dear Ramakrishna,
    For doing the costing for a specific production version use CK11N,under quantity structure tab key you
    can assign the prod.version which is to be used for costing purpose.
    While taking MRP if you want to consider the particular Prod.version,assign the demand to the
    correct prod.version under schedule line tab in MD61.
    Otherwise the system always picksup the first prod.version for MRP.
    One more alternative is you have to lock the other prod.versions if you want the system to consider a
    particular prod.version.
    Check and revert back.
    Regards
    Mangalraj.S

  • How can we change the  color of the image for product display for different

    Hi All,
    How can we change the  color of the image for product display for different colors, to be displayed on site.
    jeff

    Hi priya,
    The requirement that you have stated is not a standard feature in ISA CRM. In order to do the same, you will need to modify the standard ISA code in Java. A common path for the solution would be as follows:
    1. Colours
        a. Maintain a text type for Color under the object - PCAT_ITM in Customizing.
        b. Modify the standard search of ISA to search within your new text type as well. (In standard it only searches in Description.
       c. Maintain all shirts colour data in the new type created in step a.
       d. Your requirement will be done!
    2. Price
      a. Use list prices for your shop and assign the appropriate condition type, acces in your catalog.
      b. Modify the standard search of ISA to search on the list prices as well.
      c. This too will be done!
    3. Accessories - This is very tricky, and will require some exploration. However, here's my opinion,
    a. Search for the standard function module, which will return the accessories when provided the product as an input.
    b. Modify this function module according to your requirement and ensure that it can be accessed remotely.
    c. Modify the JSP as in steps 1b and 2b above to call this new remote-enabled function module.
    d. Now you're done!!
    The ISA modification part is not so simple, you need a really good guy like "Sateesh Chandra" who'll be able to handle your requirements. This is all I could manage, hope it is some help to you!
    Thanks & Regards,
    Nelson.

  • Creative ALchemy different version for different cards or one for a

    Hello,
    if there are different versions from Creative ALchemy
    In the forums i found somthing about
    - ALchemy for Audigy,
    - ALchemy X-FI Editon
    and on the Creative Download Page i found "Creative ALchemy .20.04". Also on my driver CD was an ALchemy X-FI Editon.
    Whats the different between this versions and what the different to "Creative ALchemy .20.04" (all in one)
    Maybee ALchemy for Audigy and ALchemy X-FI Editon are older version and now are only on version for all cards
    Regards, Henry

    Hi,
    Previously Creative maintained a version of ALchemy for the Audigy and X-Fi's as seperate applications.
    Acouple of weeks/months ago, Creative announced that as of .20.04, all Audigy and X-Fi's would be supported by the one application.
    Just download and install the version you have found on the Creative Download Page.
    Andrew.

  • How to create production version for multiple BOM & Routing ?

    If I have 3 BOMs ( A, B & C ) and 2 Routing ( 1 & 2 ) for material XYZ then how then production version will be created ? I feel that there will be 6 PVs.
    combination of A1, A2, B1, B2, C1 & C2. but some one told me that  I have to create duplicate routing of 1 & 2
    with number 3 & 4 and use it for bom B, and another duplicate Routing with number 5&6 and use it for BOM C.
    in this case my PV data will be like this A1, A2, B3, B4, C5, C6.
    Please guide me which way is correct. I feel that the first way is right, because in that case I have 2 routing in system, and in second way I have total 6 routings for that product. please guide me.

    Hi Archana
      If you are doing component allocation with routing ,
    routing for material 1  counter 1 you are choosing alternate Bom  1 or 2 for material.
    similarly for Material 1 counter 2 you are choosing alternate Bom 1 0r 2 according to your choice
    like this   3 routing groups will get created with each have 2 counters
    if you allocate similar kind of material in one group in material allocation tab & you are going for component allocation it will assign one material bom.
    second material bom will not get assigned to the operation.
    if you are not going assign the component at the routing level than you can follow first process.
    if you are planning to allocate components at routing level than you have to follow second process.
    If have any more doubt kindly revert back with your query.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • How to select the production versions for MTO?

    Hi PP Experts,
    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    Example:
    Material u2013 A  -
    sale order u2013 666001 u2013Prod version - 0001
    Material u2013 A --- sale order u2013 666002 u2013 prod version - 0002
    How to map the above scenario?
    Thanks in advance.
    Regards,
    Vimal

    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    If the Production version selection is based on Lot size means No problem.
    If both the Production version is same lot size, system will select the first PV only in MRP
    In STD SAP, we can't Give Production Version  in sale order level,
    If you want after MRP run , U can assign Production version in plan order or in production order Manually

  • How to maintain production version for material and how it will work

    Dear Friends,
                          i  have created alternative bom for a material , My FG is having two  RM1 and RM2. like below, 
                    FG --->RM1
                    FG---->RM2
    i created alternative BOM. how it will fetch raw materils from BOM while doing production confimation.  what is meant by production  version and how to configure that. how it will work
    regards
    RK

    Dear Raja karthik,
    1.Production version is a combination of BOM & Routing in Discrete scenario & in REM scenario its a
    combination of BOM & Rate routing/Routing.The same can also be created only containing the BOM incase if it is going to be
    used for a sub-contracting purchase info record.
    2.Production version is a method or technique which's is used to produce a material.
    3.A Material may be having one or more than one production version.
    4.Production version can be differentiated by using either the validity date or Lot size range.
    5.Say For Eg: Prod.Version1 --> Alt BOM1 & Routing1
    Prod.Version2---> Alt BOM2 & Routing 1.
    6.It has the status Locked and unlock.We can lock it when it is to blocked for any usage purpose.
    6.Generally its created using T code MM02,by selecting MRP4 view and clicking on Production version key.
    7.It's a master data in REM scenario.
    8.Production versions can also be created using T code C223 for more than one material.
    9.Planned independent requirements can be created production version specific in MD61.
    Regards
    Mangalraj.S

  • Setting different JDK versions for Different webapp in Tomcat

    Hi All,
    I have 2 web-applications in Tomcat 5. Now for Java I have j2sdk1.4.2 & j2sdk1.3..
    Now One of my application needs j2sdk1.4.2 while other can run only with
    j2sdk1.3.. (This is an old project & there are java class package norms - like every class should be in a package to import it now. But earlier it was not strict).
    Means this is absoulte for me to run one application with version 1.3 while other with 1.4.
    But I can set Java_Home env. varibale only once. How can I tell my each web-application to take thier own jdk version in compiling & running.
    Is this allowed in J2EE/Web-Containers.
    Please suggest if there is any such setting which makes it possible.
    THanks you all in advance...
    Manoj :confused:

    wouldn't matter if you could.
    The package enforcement is NOT something from J2SDK 1.4 but from the version of Tomcat used.
    Each Tomcat instance will use the same JVM for all webapps running inside it. You'll need a separate Tomcat instance of an older version for the older webapp (or better yet change it around to the new rules).

  • Plan Versions for different country payroll implementation

    We implemented Indian Payroll Now we are in process of implementing USA Payroll for my company
    what would be the plan version Already we have one plan version in place that is for indian payroll Can we create one more plan version for usa payroll? How do i go ahead with confis please let me know experts

    Hi Priya,
    Please read this thread it is clearly explained. may it helpful to understand the process
    Plan Versions in SAP HR

  • Maintenance optimizer transaction dont see product version for a solution

    Hi,
    I am having a very difficult time in understanding the concept of solution manager product system,instance,solution. Now, in Technical Administration >> Solutions >> I click on a solution, in the solution the product column is missing. Then it appears after some configuration.
    Now, when I create a maintenance optimizer transaction, I select the solution but I don't see the see product version, nothing appears.
    Please guide

    Hi Shashank,
    If I am getting you correctly then you are not getting product version in drop down in a new MOPZ transaction ?
    Use below steps:
    Run Transaction Solman_Workcenter.
    Select the Solution Manager Administration tab.
    Click Solutions.
    Either.
    Create a new Solution to add the logical component, or add it to an existing solution.
    If a new solution...
    Click on New.
    Give the solution a name.
    Set the Solution Data settings.
    Now the Solution exists.
    Select an existing solution that you want the System to be placed (can be the new one).
    Add the Logical Component to the Solution.
    If the system is other than Type Production then...
    Go to change edit mode.
    Right click on the SID, and select “Put in Solution” the cell the SID is in will turn green.
    Save.
    Regards,
    Divyanshu

  • Chart of Map versions for different models

    Does Nokia publish a matrix or chart of up-to-date map versions for the various phone models? I note that amongst newer models that qualify for the free navigation (i.e. maps v3.03 and up), there are some that can run v3.04 (such as E73), and others that run even newer maps versions, such as v3.06. Thanks.

    kurtkaufman wrote:
    Does Nokia publish a matrix or chart of up-to-date map versions for the various phone models? 
    Not aware of it.
    S60 3rd Ed. FP1 devices Nokia_maps_3.01_09wk44_b01_s60_3.1 apart from E71 & E66 which run Nokia_maps_3.03_10wk11_b04_s60_3.1
    S60 3rd Ed. FP2 devices v3.04_10wk17_b07_s60_3.2.Nocs.sis
    S60 5th Ed. devices up to latest v3.06 http://nds1.nokia.com/files/support/global/phones/software/ovi_maps_installer_3.06_11wk23_b05_s60_5....
    Symbian^3 + Symbian Anna Ovi_maps_inst_3_06_11wk23_b05_tb9_2 but can run OVI Maps v3.08 Beta
    Happy to have helped forum with a Support Ratio = 42.5

  • Different Depreciation Rate for Different Period

    Hi Sapgurus,
    We have legal requirement which is as follows :
    1) Asset purchase 11/02/2011 for Rs. 10000/= and it can depreciated at fixed Rate on Straight Line Method till it reaches its net book value 30 % (3000)
    For Eg.
    Purchase on 11/02/2011 for Rs. 10000/=
    It should depreciated fixed Rate @ 5% so 500/= per year and it should depreciated upt o 70 % of total value
    so 7000/500 = 14 Years.
    So Net Book Value = 10000 (Minus) 7000 : 3000/=
    2) As soon as it reaches Net Book Value of Rs. 3000/= it will be depreciated at another rate.
    For Eg.
    In 15th year it reaches Net Book Value 3000, now from that period onwards it will be depreciated at 7% Written Down Value not 5% Straight line Method.
    Also what about any old asset which is procured in previous years ?
    Awaiting for feedback
    Thanks in advance

    Hi,
    for this cases we use the following changeover method in the depreciation key:
    7     Changeover when net book value percent less or same as x%
    regards Bernhard

  • Trial Balance and/or FSG for different period than calendar

    Hi
    We have a calendar which is from Jan 08 to Dec 08. We need to have a Trial balance from April to March.
    How can this be done from General ledger
    Thanks
    Ninad

    Ninad,
    The issue you are pointing out here is that your accounting year that is setup in oracle is between Jan to Dec but your desired reporting accounting year is between Apr to Mar. Meaning all the year end activity that happens in Dec ideally should happen in March. Is that correct?
    One way is to mirror another set of books and have calendar setup between Apr to Mar. This is a pain to maintain two setup of books but works OK if you use consolidation feature to transfer all the balances as is. You can report trial balance or FSGs off of that SOB.
    Or if you know what happens in year end closing in your system (apart from standard oracle processes for retained earnings account among others), you can change the reports to show that balances in the month of Mar or Apr rather than in Jan.
    Thanks
    Nagamohan

  • How to see top liked content for different period?

    On any space you can only see top liked content for one month. What if I want to see top liked content for whole year or for 2 years?
    Is there any option where I can choose?
    Some contents are very useful but they got lost in all other discussions.

    You can't do this in the space's content tab other than scrolling through and looking for the content items with the most likes.  What you'll have to do is use an alternative site search engine SCN has and then sort the content by likes.
    Go to http://scn.sap.com/search.jspa
    Search for sap (there's no search wildcard available but "sap" appears on just about all SCN content, so does "a")
    Then select Sort by = Likes
    Other filters:
    The default is anytime (all time) but you can narrow this down to past day, week, month or year. However, the total number of all time likes will always be displayed!
    Search withing specific spaces ("Restrict to a Group or Space:") and content type ("What:")
    You can also sort by ratings
    For examples, here's a query for the most likes blog posts in About SCN over the past month: http://scn.sap.com/search.jspa?view=content&resultTypes=blogpost&dateRange=last30days&q=sap&rankBy=likes&contentType=blo…

  • Different fix lot size depending on the production version

    Hi all,
    I have the next scenario:
    2 production versions. 2 different fix lot size por each. So:
    Prod Version 1 - Fix lot size 200
    Prod Version 2 - Fix lot size 300
    I created the Quota Arrangement just to make SAP to take my favourite version. And trought the quota, I can define the lot size for each version. BUT.
    If I change the version in the order or in the planned order, the quantity don't change.
    So: How can I manage 2 different fix lot size for 2 different product versions? If I change the version once the order is created, how can I do the system change de quantity to the right one?
    Thanks in advante
    << Please do not offer points >>
    Edited by: Rob Burbank on Oct 1, 2010 2:53 PM

    I have n't  tried this scenario,
    This is my Idea
    Create a two production version
    for ex: lot size 100 to 1000, set the rounding profile qty as 1000
    for lot size 1001 to 99999, set the lot rounding profile value to 5000
    BY this way u can get the two lot based on the rounding profie
    Expert; please correct if i am wrong
    Edited by: Sundaresan . E. V on Oct 1, 2010 4:12 PM

Maybe you are looking for

  • Merging files in BPM using correlation

    Hi all, I am dng a file merging senario using BPM.Please let me knw any blogs or some help in dng the same. Rgds Aditya

  • Custom grid spread in Hyperion Planning v 11.1.2.3

    Hello In Hyperion Planning version 11.1.2.0 one could add custom grid spread methods to be used in planning forms. To add methods one had to add entries to the HSP_SPREAD_PATTERN table On migrating to version 11.1.2.3 the values still exist in the ab

  • Received thrugh cheque from customer

    Dear all SAP Guru's, Hi i have a problem regarding with collecting cheque from customer. i explain our client business process for that and i need suggestion for that. 1. Customer invoice amount of 50000 2. Collecting from customer amount of 1, 00,00

  • Is there a way to find files by their location or drive?

    Hi there. I have moved most of my photos over to an external hard drive, but it looks like a few got missed and I don't really feel like searching through 10K photos to see which ones don't have the offline icon. Is there a way to search for which on

  • Flash Player 10.2.152.32 / Firefox 3.6.15 / XP Pro SP3

    I have just installed (after uninstalling earlier version). I get sound but no picture on some sites (e.g. YouTube) and nothing at all on others BBC. Is this a known issue and is there a fix? I've tried several re-installs without sucess. Running out