Production version selection in MRP run

Hi all
here my requirment is to select the Alternative BOM in MRP run.
i have three alternative BOMs. and two routings. to make different combinations i was created Production version. so now my requirment was while run MRP how to choose production version manually. i was mantained MRP 4 screen for selection method as 3.
my All BOM validity dates r same and same lot size.
can any one suggest me how to choose production version manually in MRP run. otherwise system by default it choosing 1st alternative.
Regards
Deviprasad

Hi All,
Thanks for all your suggestions. here my requirment was not matching with these.
my req was
1. want to select prod version while run MRP.
2. my demand was MTS.
3. i already marked in MRP 4 Screen as selection method as 3.
Constrains
my BOM validity dates r same.
lot sizes r same.
i am giving hints for this.
In Customization - BOM selection ID, Selection priority and BOM usage, Alternative selection of BOM in MRP.
i was tried to mantain this. still system picks the default as first production version.
can u try for this. how we can configure in SAP.
example.
i have one material as M-20. it has differnt grads of mixing as R1,R2,R3 alternative BOMs. all alternatives have same materials with differnt Compositions. i want to choose one alternative while run MRP. But system by default picking first alternative BOM.
regards
Deviprasad

Similar Messages

  • Produciton version selection in MRP

    Dear all,
    we have prepared alt bom scenario for MTS with two prod versions.
    I am facing one problem of production version selection while MRP.
    In MTS scenario, system is picking the prod version no. 1 by default while creating order.
    1. How we can configure/change the selection of Prod version while MRP?
    2. I need to select the prod version on my choice in MTS / MRP(depends on materail availability)?
    Thanks,
    Jeevan

    Hi,
    Production Version  in Material Master in tab page "MRP 04". If BOM or Routing changes then PV also change. In Selection method two options are available related to PV- Selection by order quant. 1 Selection by explosion date 2 Selection by production version 3 Selection only by production version 1)With Selection by order quantity, the system chooses the alternative BOM into whose lot size range the order quantity falls. The lot size range and area of validity of the BOM apply. 2)With Selection by explosion date, the system chooses the alternative BOM into whose area of validity the date falls according to the setting BOM via dates. 3)With Selection by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply. 4) With Selection only by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    1. How we can configure/change the selection of Prod version while MRP?
    =>OPL8 ->Production Version->1     Manual selection of production version
    In MD61 - You can set  in User Parameter-Requirements type  - LSF  Make-to-stock production
    2. I need to select the prod version on my choice in MTS / MRP(depends on material availability)?
    =>In MD61 - You can set  in User Parameter-Requirements type  - LSF  Make-to-stock production
    After this u can change PV while converting Plan order to production order.
    With Regards,
    Ashish

  • BOM selection during MRP running

    Hi,
       I have a question about BOM selection during MRP running...
       I have three production version and all of them are valid at the same time..I get a problem "no BOM data seletion" during MRP
    running..I suspect it is due to that I have three production version and MRP didn't know take which one..Can anyone tell me
    where can i config it or what's wrong with it in my situation?
       btw,BOM usage and stats are correct .so is the router data..since MRP is running well if i only have one PV..thanks..

    Hi Monst,
    Looking at the screenshots you uploaded, it seems that the validity of each of the production version is from 7.12.2011 to 1.12.2012.
    Please check whether for Planned order no. 36659 alternative BOM no. 1 is getting selected (Since BOM selection ID is 2).
    For planned order nos. 36660, 36661 and 36662, the start date is perhaps before 7.12.2011 and end date as we can see lies in the validity period of production version. Hence, neither of the alternatives of the BOM is getting selected.
    For verifying the above logic, please make the BOM selection method as 3 (selection only by production version) and run the MRP. I think MRP will get terminated in this case since no BOM will be chosen for first planned order.
    Just in case u need to select the BOM for planned orders, you can manually enter the production version no. in the planned order change mode.
    Please tell if this helps and revert back.
    Regards,
    Chetan.

  • Production version selection according to explosion date

    Hello
    In customizing for MRP (OPPQ), parameters for BOM explosion / routing selection is 3 (BOM explosion number/order start date).
    In MRP4 view of material master, selection method for BOM explosion is 2 (Selection by production version).
    No MRP group is assigned.
    I have 3 production versions : one for 2014, one for 2015, one for 2016 :
    I use a BOM explosion number with fixed key date 1st December 2015 :
    When manually creating a planned order with dates in 2014 and explosion number EXP_1215 (fixed key date 1st December 2015), Production Version PV1 is selected (valid for 2014), but no routing is selected because explosion date is BOM explosion number, and in PV1 there is no valid routing in 2015 :
    Is it possible to select production version according to explosion date, and not order dates ?

    Hi Tristan
    The following modification note can be used to influence the selection of production version on planned orders:
    351773 - Selection of production versions for planned order
    Alternatively, you can create your own logic using BAdI MD_MODIFY_PRODVERS.
    BR
    Caetano

  • Production version selection based on Process order type

    Hi,
    I have the following requirement.
    A material is having two production version one is for R&D and one is for regular production. Now two process order types one for R&D and one for regular production. Now during creation of process order if we use order type of R&D then it has to select production version of R&D and if we use order type of regular productionthen it has to select production version of regular production. This selection has to be happened automatically. How this can be configured.
    Thanks
    Vinamrath.

    Dear Kumar,
    Assuming the production version selection is automatic in  the order type dependent parameters,then during order creation this
    can be automated only through validity date of the production version or else by locking the production version manually which
    should not get picked or else only through different Lot Size.
    Check and revert.
    Regards
    Mangalraj.S

  • Production Order Cycle after MRP run?

    Dear PP gurus
    pl.
    Explain Production Order Cycle after run the MRP?
    thanks

    Hi,
    After MRP run you will get pl. orders for inhouse produced material.
    Double click this planned order & then convert intoi production order.
    Check the dates, material availablity,capacity availability & then click the Release (flag)icon.The order status will become REL.
    Then Save the order.
    Inmd04 you can see the new prod order.
    Now use T.code MB1A , 261movement to issue raw material (sub - components) wrt this order.
    Then use T.code CO15 to confirm the order.
    T.code CO11n can be use for confirmation by operation wise.
    Then use T.code MB31 to post the stock.
    Then delivery is made use T.code vl01n against a sale order.
    Billing is done using vf01.
    Overhead calculated using KGI2.
    Variance calculated using KKS2.
    Order settled using KO88.
    Here the cycle is completed.
    Regards,
    Senthilkumar

  • Production Version Selection - Manually

    Hello Sir,
             I created two Production Versions for my FERT.In the Order Type i am
             defining that Versions to be selected manually.But when i am converting
             my planned order , the version is selected automatically.
             When i am creating production order manually the system is asking which
             version is to be selected. I am unable to trace where i am doing mistake.
             Kindly help me in solving this problem.
      Thanks in advance.
       S.Nandhakumar.

    Hi abhi
    Could you please send the screen shots of the order type dependent parameters and the MRP4 view to my personal id [email protected] so that i ca check at my end.
    Chandra
    Message was edited by:
            chandra nalam

  • Production version selection

    Hi
    If we have two production version with same lot size quantity and same validity date
    On what basis system determines IN THE PRODUCTION OR PROCESS ORDERS.
    The selection key in Material master is Production version only
    Please explain the logic
    Regards
    Sasikanth

    What is the basis for the Selecting the production version .
    How the system identify this is the first production version ?
    system will check the validity date, from lot size and to lot size with requirement qty,  if both the PV has valid on date having same lot size, System will take first created PV, if the first created PV is locked, then system will take second PV
    If i created Version with Number 1000, 1001
    and if we kept 1001 as the first , Which version system will create ?
    System will take first created PV, if 1001 is created as first then system will take 1001

  • Automatic Production Version Selection

    Dear All,
    There are two production versions 0001 and 0002 for a finished material. When I create production order from planned order it automatically selects version 0001. If I want it to select version 0002 automatically what should I do?
    Regards
    Hammad

    Hi Hammad,
    As per your querry, you want production version 0002 should be selected automatically when you create production order instead od PV 0001. If you want PV 0002 should be selected automatically then,
    1. Maintain lot size of of PV 0002 to quantity which you usually use for the production. So when you create production order system will use PV0002 based on lot size.
    2. Or change validity period of PV0001 to a date which is outside the planning period. So it will be no longer valid in the period in which you are creating production order.
    3. As specified by experts, you can change PV selection to manual by going to transaction COR4. And change selection of PV to manual selection for your order type or you can change it by going to transaction MM02. Then lock production version by selecting locked for any usuage.
    Hope this resolve your issue, please reward if it is usefull.
    Regards,
    Avinash.

  • Selecting prod.version before MRP run

    hi all;
    can any body know about-how  the production version selecting before MRP run?
    for example: I have a material.it has 2 production version. when I run the MRP, MRP reads first production version(prd vers-1). but I want to select other production version(prd vers-2). how can I make this selection?
    Regards,
    Sema

    Hi,
    If you want to select the perticular alternative BOM define it in production version.
    Theree is option by which the PV is manually assiged
    Goto MD62
    Execute the report
    Goto Schedule line tab page
    Fallow the menu path
    Setting Production version
    Enter the Production version required
    Save
    So system will select the perticular alternative BOm which maintain in that production version.
    Regards,
    R.Brahmankar

  • How to select the production versions for MTO?

    Hi PP Experts,
    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    Example:
    Material u2013 A  -
    sale order u2013 666001 u2013Prod version - 0001
    Material u2013 A --- sale order u2013 666002 u2013 prod version - 0002
    How to map the above scenario?
    Thanks in advance.
    Regards,
    Vimal

    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    If the Production version selection is based on Lot size means No problem.
    If both the Production version is same lot size, system will select the first PV only in MRP
    In STD SAP, we can't Give Production Version  in sale order level,
    If you want after MRP run , U can assign Production version in plan order or in production order Manually

  • Automatic selection production version in MFBF

    Hello !
    I have a material setted with Selection method = 2(Selection by production version) in Material Master, so, I have two production version: V001 & V002, the last one is locked for any usage. 
    I need automatic selection of production version in MFBF , but when I'm doing the confirmation the system show the screen of  production version selection  with two versions .
    Do you know what is missing for automatic selection works ?
    Thanks a lot.
    Vero

    Hi Vernoica ,
    Good Day , PV will be selected based on the lot size and the creation dates.
    It will copy the PV (BOM & Routing ) based on Lot size or Explosion date you defind in MRP-4 view i.e. BOM selection ,BY -explosion date,1-lot size,2- by PV and 3 by PV only.
    If you would like to get rid the selection of PV,
    why dont you try created a production version than only go to material master change screen MM02 in MRP4 view and Select 2 at selection method field.
    In the IMG (OPLD) for Order Type Dependent Parameters, the production version selection is already set to manual selection.  But the production version is always defaulted as version 1 which is the first one in the material master and is not asking to select the version at the time of converting the planned order to a production order!
    You can also check settings in configue trans OPL8 to have routing selection set to automatic selection if you want to avoid placing routing versions in each individual material master. Just another way to look at it
    Hope it will resolve your problem.

  • Automactic Selection of production Version

    Hi.
    I have created a material "A"
    I maintained in material master's MRP4 view selection method "2"
    I have created two production version with same validity period & same lot size "0001" & "0002"
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    Now when i am going to create a process order system is selection production version "0001".
    But I want automatic selection of production version "0002".
    What setting shall I do?
    Regards
    Vivek

    Dear Vivek,
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    In order type dependent parameters maintain as manual selection
    Then system will raise an pop-up to select production version while creating prodiuction order
    The above setting is only useful while creating manual production order
    If you are converting plan order to production order then above setting will not play any role
    System will default take 1st PV
    All you can do is you can change manually in plan order
    Or if you want system to take automatically in MRP then you need to lock 1st PV
    Also refer my reply from this thread
    [Alternative BOM selection|Using customer to determine what BOM to use in Production order (tx:CO41);
    Regards
    Madhu

  • Production Version in costing run.

    Dear all,
    We are using 3 production versions for a single material. We have made costing run for all the 3 versions. But we found the system considering the last production version in the costing run. we need all the three production versions to be used ,so kindly suggest how to go with .
    When we run CK24, there is no option to select the version. Even if we have the option, please tell us how the cost will get updated in the material master for all the 3 production versions.
    Thanks & Regards,
    A.Anandarajan.

    Hi,
    I think you want to have a costing, which considers a mix of different ways of producing a product. Here you want to have a mix of the 2 production versions. To do this, you need to use use what we call 'mixed costing'. Here you can define a 'mix' of
    different ways to build a product. In abstract X% of method A and Y% percent method B. What I called 'method A' or method 'B' is what you now call a prod.version. In SAP mixed costing it is called 'Procurement Alternative'. I think this is the right tool to solve your problems.
    For further documentation see:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en//7e/cb938143a311d189ee0000e81ddfac/frameset.htm
    The method you are using now 'costing with prod.version A' and 'costing with prod.version B' lets the last costing be the winner, because the last one overwrites the results of the predecessor.
    regards
    Waman

  • Creation of production order while mrp run

    hi
    ppgurus
    can any body explain how to create a production order by mrp run
    ie
    sysytem should create the production order directly while mrp run not PLANNED ORDERS
    what settings i need to do for  this plz explain
    urgent requirement
    regards
    sasikanth

    HI
    you gave a good way to solve the problem
    if it is a make to stock REM
    i  need not convert planned order to production oreder right
    plz suggest in  that scenario where i need to  do availability check
    in REM for which oder type (say PE IS STANDARD)
    to be assigned for availability  check
    plz suggest because in spro (t -code opjk) at order controll
    i dint see the order type PE
    the order controll (opjk) in discreet  :- avialability checking rule assigns
    in which setting this setting to be done in REM

Maybe you are looking for

  • Get zuonr of  table bsis and bsas

    Hi All, Tried getting the zuonr of  bsas and bsis using bseg but  got Run time error long text.  Exceeded the permitted time. My condition is  c_sales_pdc type bseg-hkont value u20180000102120u2019. Need your advise on program optimization and rephra

  • How to change the layout of an input file and write to an output file

    Hi I have a .csv file which has a layout as schoolNo. , county1,county2,county3,county4,county5 It will need to go into an output file as schoolNo. repeated and a county on each record . ie., schoolNo.,county1 schoolNo.,county2 schoolNo.,county3 scho

  • Does moving SP code from DB to App Server help scale an application?

    We have an application developed using Oracle 10g Forms / 10g DB? All our processing is done using SPs. So they all run in the DB server. Even our Inserts/updates/deletes to a table are handled by SPs. The site with the maximum simultaneous users (i.

  • Tag base in HTML page from web repository

    We are using EP 6.0 SP10 with KMC SP10 on host http://ep60:55000/. We want to configure web repository for http://example.com. We have created HTTP system "ExampleSite" in KM system landscape for web site "http://example.com", created web site "Examp

  • Help needed by neophyte! - part 2

    Searching the Support files yielded this: "...error is caused by conflicts between Windows (XP and 2000) and the version of Macromedia Director used to create the auto-run menu..." Assuming that's the nature of the problem, how can I fix it without g