Production Version Selection - Manually

Hello Sir,
         I created two Production Versions for my FERT.In the Order Type i am
         defining that Versions to be selected manually.But when i am converting
         my planned order , the version is selected automatically.
         When i am creating production order manually the system is asking which
         version is to be selected. I am unable to trace where i am doing mistake.
         Kindly help me in solving this problem.
  Thanks in advance.
   S.Nandhakumar.

Hi abhi
Could you please send the screen shots of the order type dependent parameters and the MRP4 view to my personal id [email protected] so that i ca check at my end.
Chandra
Message was edited by:
        chandra nalam

Similar Messages

  • Production version selection based on Process order type

    Hi,
    I have the following requirement.
    A material is having two production version one is for R&D and one is for regular production. Now two process order types one for R&D and one for regular production. Now during creation of process order if we use order type of R&D then it has to select production version of R&D and if we use order type of regular productionthen it has to select production version of regular production. This selection has to be happened automatically. How this can be configured.
    Thanks
    Vinamrath.

    Dear Kumar,
    Assuming the production version selection is automatic in  the order type dependent parameters,then during order creation this
    can be automated only through validity date of the production version or else by locking the production version manually which
    should not get picked or else only through different Lot Size.
    Check and revert.
    Regards
    Mangalraj.S

  • Automatic Production Version Selection

    Dear All,
    There are two production versions 0001 and 0002 for a finished material. When I create production order from planned order it automatically selects version 0001. If I want it to select version 0002 automatically what should I do?
    Regards
    Hammad

    Hi Hammad,
    As per your querry, you want production version 0002 should be selected automatically when you create production order instead od PV 0001. If you want PV 0002 should be selected automatically then,
    1. Maintain lot size of of PV 0002 to quantity which you usually use for the production. So when you create production order system will use PV0002 based on lot size.
    2. Or change validity period of PV0001 to a date which is outside the planning period. So it will be no longer valid in the period in which you are creating production order.
    3. As specified by experts, you can change PV selection to manual by going to transaction COR4. And change selection of PV to manual selection for your order type or you can change it by going to transaction MM02. Then lock production version by selecting locked for any usuage.
    Hope this resolve your issue, please reward if it is usefull.
    Regards,
    Avinash.

  • Production version selection according to explosion date

    Hello
    In customizing for MRP (OPPQ), parameters for BOM explosion / routing selection is 3 (BOM explosion number/order start date).
    In MRP4 view of material master, selection method for BOM explosion is 2 (Selection by production version).
    No MRP group is assigned.
    I have 3 production versions : one for 2014, one for 2015, one for 2016 :
    I use a BOM explosion number with fixed key date 1st December 2015 :
    When manually creating a planned order with dates in 2014 and explosion number EXP_1215 (fixed key date 1st December 2015), Production Version PV1 is selected (valid for 2014), but no routing is selected because explosion date is BOM explosion number, and in PV1 there is no valid routing in 2015 :
    Is it possible to select production version according to explosion date, and not order dates ?

    Hi Tristan
    The following modification note can be used to influence the selection of production version on planned orders:
    351773 - Selection of production versions for planned order
    Alternatively, you can create your own logic using BAdI MD_MODIFY_PRODVERS.
    BR
    Caetano

  • Production version selection in MRP run

    Hi all
    here my requirment is to select the Alternative BOM in MRP run.
    i have three alternative BOMs. and two routings. to make different combinations i was created Production version. so now my requirment was while run MRP how to choose production version manually. i was mantained MRP 4 screen for selection method as 3.
    my All BOM validity dates r same and same lot size.
    can any one suggest me how to choose production version manually in MRP run. otherwise system by default it choosing 1st alternative.
    Regards
    Deviprasad

    Hi All,
    Thanks for all your suggestions. here my requirment was not matching with these.
    my req was
    1. want to select prod version while run MRP.
    2. my demand was MTS.
    3. i already marked in MRP 4 Screen as selection method as 3.
    Constrains
    my BOM validity dates r same.
    lot sizes r same.
    i am giving hints for this.
    In Customization - BOM selection ID, Selection priority and BOM usage, Alternative selection of BOM in MRP.
    i was tried to mantain this. still system picks the default as first production version.
    can u try for this. how we can configure in SAP.
    example.
    i have one material as M-20. it has differnt grads of mixing as R1,R2,R3 alternative BOMs. all alternatives have same materials with differnt Compositions. i want to choose one alternative while run MRP. But system by default picking first alternative BOM.
    regards
    Deviprasad

  • Production version selection

    Hi
    If we have two production version with same lot size quantity and same validity date
    On what basis system determines IN THE PRODUCTION OR PROCESS ORDERS.
    The selection key in Material master is Production version only
    Please explain the logic
    Regards
    Sasikanth

    What is the basis for the Selecting the production version .
    How the system identify this is the first production version ?
    system will check the validity date, from lot size and to lot size with requirement qty,  if both the PV has valid on date having same lot size, System will take first created PV, if the first created PV is locked, then system will take second PV
    If i created Version with Number 1000, 1001
    and if we kept 1001 as the first , Which version system will create ?
    System will take first created PV, if 1001 is created as first then system will take 1001

  • Automatic selection production version in MFBF

    Hello !
    I have a material setted with Selection method = 2(Selection by production version) in Material Master, so, I have two production version: V001 & V002, the last one is locked for any usage. 
    I need automatic selection of production version in MFBF , but when I'm doing the confirmation the system show the screen of  production version selection  with two versions .
    Do you know what is missing for automatic selection works ?
    Thanks a lot.
    Vero

    Hi Vernoica ,
    Good Day , PV will be selected based on the lot size and the creation dates.
    It will copy the PV (BOM & Routing ) based on Lot size or Explosion date you defind in MRP-4 view i.e. BOM selection ,BY -explosion date,1-lot size,2- by PV and 3 by PV only.
    If you would like to get rid the selection of PV,
    why dont you try created a production version than only go to material master change screen MM02 in MRP4 view and Select 2 at selection method field.
    In the IMG (OPLD) for Order Type Dependent Parameters, the production version selection is already set to manual selection.  But the production version is always defaulted as version 1 which is the first one in the material master and is not asking to select the version at the time of converting the planned order to a production order!
    You can also check settings in configue trans OPL8 to have routing selection set to automatic selection if you want to avoid placing routing versions in each individual material master. Just another way to look at it
    Hope it will resolve your problem.

  • Automactic Selection of production Version

    Hi.
    I have created a material "A"
    I maintained in material master's MRP4 view selection method "2"
    I have created two production version with same validity period & same lot size "0001" & "0002"
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    Now when i am going to create a process order system is selection production version "0001".
    But I want automatic selection of production version "0002".
    What setting shall I do?
    Regards
    Vivek

    Dear Vivek,
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    In order type dependent parameters maintain as manual selection
    Then system will raise an pop-up to select production version while creating prodiuction order
    The above setting is only useful while creating manual production order
    If you are converting plan order to production order then above setting will not play any role
    System will default take 1st PV
    All you can do is you can change manually in plan order
    Or if you want system to take automatically in MRP then you need to lock 1st PV
    Also refer my reply from this thread
    [Alternative BOM selection|Using customer to determine what BOM to use in Production order (tx:CO41);
    Regards
    Madhu

  • How to select the production versions for MTO?

    Hi PP Experts,
    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    Example:
    Material u2013 A  -
    sale order u2013 666001 u2013Prod version - 0001
    Material u2013 A --- sale order u2013 666002 u2013 prod version - 0002
    How to map the above scenario?
    Thanks in advance.
    Regards,
    Vimal

    In our scenario we have two production versions and also we are in MTO strategy. While creating the sales order is there any option to select the production version (i.e.) before planning for that corresponding sales order I have to choose the production versions.
    If the Production version selection is based on Lot size means No problem.
    If both the Production version is same lot size, system will select the first PV only in MRP
    In STD SAP, we can't Give Production Version  in sale order level,
    If you want after MRP run , U can assign Production version in plan order or in production order Manually

  • Produciton version selection in MRP

    Dear all,
    we have prepared alt bom scenario for MTS with two prod versions.
    I am facing one problem of production version selection while MRP.
    In MTS scenario, system is picking the prod version no. 1 by default while creating order.
    1. How we can configure/change the selection of Prod version while MRP?
    2. I need to select the prod version on my choice in MTS / MRP(depends on materail availability)?
    Thanks,
    Jeevan

    Hi,
    Production Version  in Material Master in tab page "MRP 04". If BOM or Routing changes then PV also change. In Selection method two options are available related to PV- Selection by order quant. 1 Selection by explosion date 2 Selection by production version 3 Selection only by production version 1)With Selection by order quantity, the system chooses the alternative BOM into whose lot size range the order quantity falls. The lot size range and area of validity of the BOM apply. 2)With Selection by explosion date, the system chooses the alternative BOM into whose area of validity the date falls according to the setting BOM via dates. 3)With Selection by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply. 4) With Selection only by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    1. How we can configure/change the selection of Prod version while MRP?
    =>OPL8 ->Production Version->1     Manual selection of production version
    In MD61 - You can set  in User Parameter-Requirements type  - LSF  Make-to-stock production
    2. I need to select the prod version on my choice in MTS / MRP(depends on material availability)?
    =>In MD61 - You can set  in User Parameter-Requirements type  - LSF  Make-to-stock production
    After this u can change PV while converting Plan order to production order.
    With Regards,
    Ashish

  • Production version selction

    Hi all,
    I have created 2 production versions for a material X,but when i create a process order manualy it automatcally picks up the first PV.Ican change it but is there any option where the system pops up a window indicating that the material has multiple PVs??
    Looking forward to your reply
    Thanks and Regards,
    Karthik Rai

    Hi,
    This can be achived by 2 ways,
    - As suggested by our other 2 experts do changes in your order type dependent parameters.Select your plant and order type and change selection of Production version Manually.
       This is Configuration Part.
    - And if you don't want to do changes in Configuration then.Follow below stpes.
    1) Go to COR1.Select Material,Plant, and order type.
    2) Now in Header screen you will find one tab Production Version.Just press it.This will give you a pop up screen which gives you a list of available production version for manual selection.
    3) This tab disable once the production version is selected whether it is manual or automatically.
    Regards,
    Dhaval

  • Is it Necessary to create production version if  using master recipe

    our industry Process industry
    we are using Master recipe for Production
    is it necessary to create production version

    Hi Krishna,
    Production version is essential to mantain if you have a PP-PI industry scenario.
    However, if you have not mantained it, you can still create a process order. Process order first searches for the production version (automatically/ manually) depending on the configuration settings.
    If you have not mantained it, system would throw a SAP standard information message, "Material XXXXX: Production Version not mantained".
    If system is not able to select valid master recipe / version.  it would look for default values for operation in the master recipe settings and would try to create a operation.
    Please see the following link:
    http://help.sap.com/saphelp_470/helpdata/en/ee/641c181bed11d29bfe080009b31c68/content.htm
    Method for Selecting Alternative Bills of Material
    Indicator determining the selection of the alternative BOM when requirements are exploded in material requirements planning.
    Use
    With Selection by order quantity, the system chooses the alternative BOM into whose lot size range the order quantity falls. The lot size range and area of validity of the BOM apply.
    With Selection by explosion date, the system chooses the alternative BOM into whose area of validity the date falls according to the setting BOM via dates.
    With Selection by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    With Selection only by production version, the system chooses the alternative BOM defined in the valid production version. The lot size range and area of validity of the production version apply.
    If no production version is found, no production orders or process orders can be created.
    BR
    Rahul

  • Production versions

    Hi,
    I have a BOM with 3 alternatives all with the same validity period.
    The material master contains a production version which has been created for alternate 3.
    When I create a production order shouldn't I get alternate 3 defaulting in????
    I am currently getting alternate 1!!!!
    My order type is set to 'Automatic Production Version'  selection!!
    Help!!!!
    Thanks
    Stuart

    Dear Stuart,
    Please check what value you have given in the Selection method under BOM
    Explosion/Dependent Requirements in MRP4 view of the material master.
    Please check whether value 3(Selection only Production version) is maintained.
    You can also use option 2 - Selection by Production version.
    Check with this & revert to forums.
    Regards
    Mangal

  • Manual selection production version during order creation

    hello!
    i have setup production orders that during order creation the production version has to be selected manually. this works fine in CO01 and CO40. but in CO41 the production version is determined automatically - where would i change that setting?
    best regards,
    matthias

    Dear Matthias,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • Manual selection of production version in REM scenario.

    Hai gurus,
    I discrete manufacturing we  can several production versions and we can select the same manually
    when we convert planned order to production order. Like this whether it is possible in REM scenario
    to select the production version manually, if so what is the settings and procedure.
    waiting for the positive reply.
    regards,
    sekar chand.

    Dear Sekar Chand,
    Are you not able to select the production version in MFBF manually ,assuming if you have more than
    one production version for the same material?
    What Tejas has suggested you is to start the planning process itself based on Prod.versions ---> MRP
    run-> planned orders--> Production confirmation.
    In case if you do not take MRP run and go for a direct confirmation also you will be able to select the
    production version in MFBF.
    IF not means revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Output of Intrastat and extrastat

    Hello Experts, For intrastat and extrastat reporting , for italy, when i run MEIS for intrastat i get the following fields in the output. Our Italian client requires the intrastat to be sorted as per vendor VAT number and commercial code is this the

  • How to connect nokia 6610 to pc using data cable

    i hav dku-5 connectivity adapter cable and i have installed both driver and pc suite but still i cant connect my nokia 6610 phone to my pc how can i connect it?..

  • Would RollBacks For Stateless Session Beans work In case of Stored Procedures or Triggers Written in Oracle PL/SQl

              We are writing a J2EE application and using Weblogic 5.1 on Unix machine. We are           considering writing some Stored Procedures or Triggers on Oracle DBMS. Hence our           Stateless Session Beans / Data Access Objects (DAOs) would

  • VL10A Issue

    Hi The user is unable to create delivery from a sales order that is appearing in the Delivery Due List (VL10A). When I checked the error log in delivery creation, its says for item xxx After product selection, there is a remaining quantity of  12 NOS

  • Problems Opening PS7 files in PS CS3

    When I try to open certain Photoshop files that I had created in PS7 they won't open and I get a message "Could not complete your request because of a program error. What is that about? If I flatten the file, I can open it, but that defeats the purpo